Project overhauling installations at Hydrogen plant 18500 NmcH, Preemraff Location: Gothenborg, Sweden
Client: Hydrochem, Linde Engineering Division of North America Completion date: Apr. 2018 – Jan.2019 Scope: Mechanical, electrical, instrumentation &insulation works.
Portfolio
Pro
cess
Pla
nts
New Gas plant, Gassco Germany Location: Emdem Germany Client: Linde Engineering AG Completion date: Oct. 2015 – Feb.2016 Scope: Mechanical repairs gas pipelines. Equipment erection
Portfolio
Pro
cess
Pla
nts
Air separation unit Linde Galati GOX 60.000 Nmc/h Location: ArcelorMittal Galati, Romania Client: Linde Gas Romania Completion date: 2011 - 2012 Scope: civil detail design; piping and equipment erection; pressure testing, electric and instrumentation installation, commissioning.
Hydrogen Plant Linde Petrobrazi Location: OMV Petrom Ploiesti Romania Client: Hydrochem USA Linde Division Completion date: 2013 - 2014 Scope: turnkey project- civil, piping, electric&instrumentation works.
Portfolio
Pro
cess
Pla
nts
Air separation unit Linde Otelu Rosu GOX 6.000 Nmc Location: Mechel Otelu Rosu Romania Completion date: 2008 Scope:mechanical and piping works
Air separation unit Resita GOX 5.500 Nm3/h Location: TMK Artrom Resita , Rumänien Completion date: 2009 Scope:mechanical and piping works
Portfolio
Pro
cess
Pla
nts
Pro
cess
Pla
nts
Air separation unit Air Liquide Calarasi Location: Saint Gobain Calarasi Romania Completion date: 2006 Scope : Mechanical and piping works
Air separation unit SIAD Calarasi AFPLN 7.000
Location: Tenaris Calarasi, Romania
Completion date: 2007
Scope: engineering ,mechanical and piping works
Portfolio
Po
wer
pla
nt
pro
ject
Power plant EDF 240MW Corsica France Client: Boccard France Completion period: 2012 – 2014 Scope: erection, alignment, commissioning (under MAN supervision) of 7 groups (diesel motors and electrical generators); erection of cooling towers and steel structures, pipe racks; execution and montage of 8 metal tanks for technological fluids; erection of 7 overhead cranes.
Portfolio
Overhauling for 9 piston compressors Location: ROMINSERV Navodari , Romania Contract completion : Oct – Nov.2015 Scope of work: engineering, mechanics, electrical and instrumentation.
Portfolio
Dyn
am
ic e
qu
ipm
ents
Upgrading Turbogenerators TG1 / TG2 – 7MW Location: ArcelorMittal Galati , Romania Completion date: Dec.2014 – Apr.2015 Scope of work: engineering, piping, mechanics, electric al and instrumentation, commissioning..
Portfolio
Dyn
am
ic e
qu
ipm
ents
Upgrading Turbo blowers TB4/TB8 Location: ArcelorMittal Galati , Romania Completion date: Feb.2014 – Feb.2015 Scope of work: engineering, piping, mechanics, hydraulics, electric and instrumentation. Turbo-compressor 270.000m3/h. Supplier for compressors, steam turbines – REP Holding Gazprom.
Dyn
am
ic e
qu
ipm
ents
Portfolio
Air separation unit Linde Galati GOX 60.000 Nmc/h Location: ArcelorMittal Galati, Romania Completion date: 2011 - 2012 Scope: civil detail design; piping and equipment erection; pressure testing, electric and instrumentation installation, commissioning. General overhauling completion of 5 turbo compressors: 2 x K1700 - 100.000 Nmc/h (6stages),;1x VK100 Demag - 100.000 Nmc/h(4stages); 2 x VK85 Demag – 85.000 Nmc/h
Dyn
am
ic e
qu
ipm
ents
Portfolio
Dyn
am
ic e
qu
ipm
ents
Air Separation Plant SIAD Calarasi Romania Completion date: 2007 Scope: erection air turbo compressor COOPER type TAE 20.000 and nitrogen recycle compressor COOPER type 6R3MSGE
Air Separation Plant Linde Otelul Rosu, Romania Completion date: 2008 Scope: erection ATLASCOPCO turbo compressor, type GT063L3K1MAC/BAC
Portfolio
Revamping of BF ArcelorMittal Zenica, Bosnia&Hertegovina Client: Danieli Corus BV The Netherlands Period: July.2017 - July.2018 Scope: Mechanical and piping works
Portfolio
Met
allu
rgic
al
Eng
inee
rin
g
Mechanical Repairs Blast Furnace no.5 Client: ArcelorMittal Galati Romania Period: July – Dec.2017 Scope: Erection copper staves for BF no.5
Portfolio
Met
allu
rgic
al
Eng
inee
rin
g
Project overhauling Convertor Client: ArcelorMittal Galati Romania Period: Mar – Nov.2017 Scope: Repair works Convertor no.1
Portfolio
Met
allu
rgic
al
Eng
inee
rin
g
Revamp of ESP S730 SIFA 2 ArcelorMittal Gent Belgium Client: Hamon Research Cottrel Belgium Period: Aug. – Oct.2017 Scope:The ESP has a front inlet and 4 electric fields, consecutively. Each field consists of 29 plate rows (each plate row contains electrodes with 27 rows). Renew all plates and electrodes of field 1 and 2 Renew knocking system of field 1 and 2 Reparation of the steel construction Renew of inlet screen Repair of profiles in inlet cones Replacement of all bearings from knocking system field 3 / 4
Portfolio
Met
allu
rgic
al
Eng
inee
rin
g
Project revamping installation BF2 Client: ArcelorMittal Ostrava Czech Republic Period: Jan – June.2017 Scope: Works for repairs and replacement cooling installations at BF2
Portfolio
Met
allu
rgic
al
Eng
inee
rin
g
Project overhauling installation BF HKM Duisburg Germany Client: Danieli Corus BV Period: Sept.16 – Jan.17 Scope: Mechanical installation overall
Portfolio
Met
allu
rgic
al
Eng
inee
rin
g
Project overhauling tap hole BFno.4 SSAB Oxelosund Client: HEAT TeQ Sweden Period: Oct –Nov.2016 Scope: Tap hole repair works of Blast Furnace no.4
Project revamping installation BF ArcelorMittal Eisenhüttenstadt Germany Client: Pirson Montage AG Period: July.2016 – Nov.2016 Scope: Works for replacement cooling installations at BF.
Portfolio
Met
allu
rgic
al
Eng
inee
rin
g
Blast Furnace repair works at DK Recycling und Roheisen site, Duisburg Germany Client: Danieli Corus BV Period: May.2016 – Aug.2016 Scope: Mechanical works - new cooling system
Portfolio
Met
allu
rgic
al
Eng
inee
rin
g
Project reconstruction metallic structures BF, Dunaferr Hungary Client: TERMOSTAV-MRAZ- Slovakia Period: April – June 2016 Scope: Mechanical works of Reconstruction BF no.2
Portfolio
Met
allu
rgic
al
Eng
inee
rin
g
Mechanical Repairs at BF no.4 ArcelorMittal Zenica Bosnia & Hertegovina Period: Aug – Oct 2016 Scope: Dismantling & Assembly of top charging system BF 4.
Erection of new Hot Leveler Machine, at LTG2 ArcelorMittal Galati Romania Period: July.2014 – July.2015 Equipment supplier Danielli Company Scope of works: Foundations, hydraulic room, electrical room, pump station.
Portfolio
Met
allu
rgic
al
Eng
inee
rin
g
Blast Furnace no 5 upgrading works Location: ArcelorMittal Galati Romania Completion date: 2013 - 2014 Scope: replacing existing charging system with new BLT(bell less top) and implementing of a new profilmeter.
Portfolio
Met
allu
rgic
al
Eng
inee
rin
g
Blast Furnace B Location: ArcelorMittal Gent Belgium Completion date: 2012 Scope:replacing cooling elements and shielding
Overhauling Converter no.3 Location: ArcelorMittal Galati Romania Completion date: 2013 - 2014 Scope: civil, mechanical, works; steel structures, refractory masonry
Portfolio
Met
allu
rgic
al
Eng
inee
rin
g
Met
allu
rgic
al
Eng
inee
rin
g
Blast Furnace no 5 Cooling Water Location: ArcelorMittal Galati, Romania Boccard France as Main Contractor for civil, piping, commissioning. Completion date: 2011 Scope:civil detail design; new pump group station;pipe rack; revamping of the underground hot water tank.Supply and erection of several pressure vessels; electrical and instrumentation works.
Blast Furnace no 3 Cooling elements Location: ArcelorMittal Galati Romania Completion date: 2012 Scope: providing a variable circular platform for works inside of blast furnace; montage of new cooling elements supplied by ArcelorMittal; various modifications and repair on the furnace;repairs on the de-dusting filter