41
CONTROL NO. CONTROL NO. CONTROL NO. PROJECT NO. SHEET NO. Fil e: 429150_NDOT_Titl e_Sheet. dgn Date: 23- SEP- 2020 11 : 32 ROADWAY DESI GN DI VI SI ON. Com puter: NDOTDESI GN61 1 2 3 4 9 10 11 12 13 14 15 16 21 22 23 24 25 26 27 28 33 34 35 36 4 5 6 7 8 9 16 17 19 20 21 28 29 30 31 32 18 33 C E D A R T H R EE MI LE R D 502 A AV E M I LL R D 504 TH AV E 503R D AV E 502ND AV E 501 ST AV E 505TH AV E 506TH AV E 8 1 9 T H R D 8 2 0 T H R D 8 2 1 S T R D 8 1 8 T H R D 8 1 7 T H R D 502 ND AV E INN RD COLLEGE N EL M S T SPALDING POP. 487 R 10 W R 9 W T 20 N 91 91 R I V E R INDEX OF SHEETS STATE OF NEBRASKA N PLANS FOR CONSTRUCTION CONVENTIONAL SIGNS R.O.W. LEGEND NEW RAILROAD TEMPORARY EASEMENT NEW RAILROAD PERMANENT EASEMENT EXISTING RAILROAD EASEMENT EXCESS TAKING TEMPORARY EASEMENT EXISTING PERMANENT EASEMENT NEW R.O.W. PREVIOUS R.O.W. LIMITS OF CONSTRUCTION PREVIOUS CONTROLLED ACCESS NEW CONTROLLED ACCESS PERMANENT EASEMENT GUARDRAIL FENCE R.O.W. OR WIRE TRAVELED WAY DIKE CULVERT POWER POLE TELEPHONE POLE MAILBOX RAILROAD TRACKS TREE - CONIFEROUS TREE - DECIDUOUS MARSH DEPARTMENT OF TRANSPORTATION APPLY TO THIS PROJECT. SPECIFICATIONS AND THE SPECIAL PROVISIONS THE 2017 EDITION OF THE NEBRASKA STANDARD THE WORK ON THIS PROJECT CONSISTS OF GROUPS IN THE LETTING OF GROUPS ARE INCLUDED IN THE LETTING OF GROUPS ARE INCLUDED IN THE LETTING OF GROUPS ARE INCLUDED * 8-SPECIALTY, 9-BITUMINOUS & 10-GENERAL 5-SEEDING, 6-BRIDGE, 7-GUARDRAIL, 1-GRADING, 3-PAVEMENT, 4-CULVERTS, 1, 3, 4, 5, 6, 7, 8, 9 & 10 GREELEY COUNTY A1 DRAINAGE SPALDING WEST 42915 91-4(1012) TITLE PAGE A1 SUMMARY OF QUANTITIES C1 U5 SPECIAL PLAN 3C CONCRETE WASHOUT & CONSTRUCTION EXIT AERIAL PHOTO SHEETS E1 HORIZONTAL ALIGNMENT & ORIENTATION F1 PLAN SHEETS L1 TYPICAL CROSS SECTIONS B1 - B2 GENERAL INFORMATION G1 - G2 PHASING PLANS H1 - H6 T1 - T2 SPECIAL PLAN 1C STA. 331+65 SINGLE SPAN RC BOX CULVERT CROSS SECTIONS X1 - X14 U1 - U4 SPECIAL PLAN 2C SILT CHECKS ALL TYPES DRAINAGE STRUCTURE CROSS SECTIONS R1 - R3 STANDARD PLANS 870 (2 SHEETS) CONCRETE PROTECTION BARRIER TYPICAL TRAFFIC SIGNAL CONTROL PLAN--ONE LANE, TWO-LANE OPERATION WITH BARRIERS M1 501-R7 (3 SHEETS) EROSION CONTROL 502-R2 (2 SHEETS) SILT FENCE DETAILS DHV: ADT: YEAR: T= % D= % 12 TRAFFIC 3R RURAL DESIGN DESIGNATION - 2020 2040 1,125 1,460 125 155 PROJECT LOCATION R.P. 103+20 TYPICAL TRAFFIC SIGNAL CONTROL PLAN--TEMPORARY TRAFFIC SIGNAL DETAILS M2 PRELIMINARY

PROJECT NO. SHEET NO. INDEX OF SHEETS STATE OF ... Spalding...PROJECT NO. SHEET NO. G E N E R A L I N F O R M A T I O N C.N. G1 R OAD W AY D E S I GN D I V I S I ON C o m pu t e r:

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PROJECT NO. SHEET NO. INDEX OF SHEETS STATE OF ... Spalding...PROJECT NO. SHEET NO. G E N E R A L I N F O R M A T I O N C.N. G1 R OAD W AY D E S I GN D I V I S I ON C o m pu t e r:

CONTROL NO.

CONTROL NO.

CONTROL NO.

PROJECT NO. SHEET NO.

File: 429150_

ND

OT_

Title

_Sheet.dgn

Date: 23-

SE

P-

2020 11:32

RO

AD

WA

Y

DE

SI

GN

DI

VISI

ON.

Co

mputer:

ND

OT

DE

SI

GN61

1234

9

10 11

12

1314

1516

21

2223

24

25

26

2728

33 34 35 36

456

7 8 9

1617

19

2021

28

29

30

31 32

18

33

CEDAR

THREE MILE RD502

A

AV

E

MIL

L

RD

504

TH

AV

E

503

RD

AV

E

502

ND

AV

E

501S

T

AV

E

505

TH

AV

E

506

TH

AV

E

819TH RD

820TH RD

821ST RD

818TH RD

817TH RD

502

ND

AV

E

INN RD

COLLEGE

N ELM ST

SPALDINGPOP. 487

R 10 W R 9 W

T 20

N

9191

RIVER

INDEX OF SHEETS STATE OF NEBRASKA

N

PLANS FOR CONSTRUCTION

CONVENTIONAL SIGNS R.O.W. LEGEND

NEW RAILROAD TEMPORARY EASEMENT

NEW RAILROAD PERMANENT EASEMENT

EXISTING RAILROAD EASEMENT

EXCESS TAKING

TEMPORARY EASEMENT

EXISTING PERMANENT EASEMENT

NEW R.O.W.

PREVIOUS R.O.W.

LIMITS OF CONSTRUCTION

PREVIOUS CONTROLLED ACCESS

NEW CONTROLLED ACCESS

PERMANENT EASEMENT

GUARDRAIL

FENCE R.O.W. OR WIRE

TRAVELED WAY

DIKE

CULVERT

POWER POLE

TELEPHONE POLE

MAILBOX

RAILROAD TRACKS

TREE - CONIFEROUS

TREE - DECIDUOUS

MARSH

DEPARTMENT OF TRANSPORTATION

APPLY TO THIS PROJECT.

SPECIFICATIONS AND THE SPECIAL PROVISIONS

THE 2017 EDITION OF THE NEBRASKA STANDARD

THE WORK ON THIS PROJECT CONSISTS OF GROUPS

IN THE LETTING OF

GROUPS ARE INCLUDED

IN THE LETTING OF

GROUPS ARE INCLUDED

IN THE LETTING OF

GROUPS ARE INCLUDED

*

8-SPECIALTY, 9-BITUMINOUS & 10-GENERAL

5-SEEDING, 6-BRIDGE, 7-GUARDRAIL,

1-GRADING, 3-PAVEMENT, 4-CULVERTS,

1, 3, 4, 5, 6, 7, 8, 9 & 10

GREELEY COUNTY

A1

DRAINAGE

SPALDING WEST

42915

91-4(1012)

TITLE PAGEA1

SUMMARY OF QUANTITIESC1

U5 SPECIAL PLAN 3C CONCRETE WASHOUT & CONSTRUCTION EXIT

AERIAL PHOTO SHEETSE1

HORIZONTAL ALIGNMENT & ORIENTATIONF1

PLAN SHEETSL1

TYPICAL CROSS SECTIONSB1 - B2

GENERAL INFORMATIONG1 - G2

PHASING PLANSH1 - H6

T1 - T2 SPECIAL PLAN 1C

STA. 331+65

SINGLE SPAN

RC BOX CULVERT

CROSS SECTIONSX1 - X14

U1 - U4 SPECIAL PLAN 2C SILT CHECKS ALL TYPES

DRAINAGE STRUCTURE CROSS SECTIONSR1 - R3

STANDARD PLANS

870 (2 SHEETS) CONCRETE PROTECTION BARRIER

TYPICAL TRAFFIC SIGNAL CONTROL PLAN--ONE LANE, TWO-LANE OPERATION WITH BARRIERSM1

501-R7 (3 SHEETS) EROSION CONTROL

502-R2 (2 SHEETS) SILT FENCE DETAILS

DHV:

ADT:

YEAR:

T= % D= %12

TRAFFIC

3R RURAL

DESIGN DESIGNATION

-

2020 2040

1,125 1,460

125 155

PROJECT LOCATION

R.P. 103+20

TYPICAL TRAFFIC SIGNAL CONTROL PLAN--TEMPORARY TRAFFIC SIGNAL DETAILSM2

PRELIMIN

ARY

Page 2: PROJECT NO. SHEET NO. INDEX OF SHEETS STATE OF ... Spalding...PROJECT NO. SHEET NO. G E N E R A L I N F O R M A T I O N C.N. G1 R OAD W AY D E S I GN D I V I S I ON C o m pu t e r:

42915

91-4(1012)

T Y P I C A L C R O S S S E C T I O N S

PROJECT NO. SHEET NO.

C.N.

B1

RO

AD

WA

Y

DE

SI

GN

DI

VISI

ON

Co

mputer:

ND

OT

DE

SI

GN61

Date: 23-

SE

P-

2020 11:32

File: 429150dt01.dgn

3:1

2% 2%

3:1

6%6%

STA. 331+51 TO STA. 331+80

3:1

2

3

LEGEND

4

5

12" SURFACING

9" TEMPORARY SURFACING

SUBGRADE PREPARATION

EARTH SHOULDER CONSTRUCTION

ROADWAY GRADING

1114

3

4

3

5

4

2 2

5

3

6'-0" 12'-0" 12'-0" 6'-0"

CL

CL2'-0" 2'-0"

EXISTING PAVEMENT

12'-0"

EXISTING PAVEMENT

12'-0"8'-0" 8'-0"

STA. 329+80 TO STA. 333+40

3:1

3

329+80 - 333+40 RT./LT.

6%6%

VARIES VARIES

(REESTABLISHMENT OF EARTH SHOULDER AFTER TEMP SURFACING REMOVAL)

CL6'-0"6'-0"

EXISTING BITUMINIOUS

12'-0"

EXISTING BITUMINIOUS

12'-0"

4

44

STATION TO STATION SIDE PRELIMIN

ARY

Page 3: PROJECT NO. SHEET NO. INDEX OF SHEETS STATE OF ... Spalding...PROJECT NO. SHEET NO. G E N E R A L I N F O R M A T I O N C.N. G1 R OAD W AY D E S I GN D I V I S I ON C o m pu t e r:

PROJECT NO. SHEET NO.

C.N.

RO

AD

WA

Y

DE

SI

GN

DI

VISI

ON

Co

mputer:

ND

OT

DE

SI

GN61

Date: 23-

SE

P-

2020 11:36

File: 429150dt02.dgn

B2

SH

EE

T 1

OF 1 1100 2 e 04

91-4(1012)

42915

PRELIMIN

ARY

Page 4: PROJECT NO. SHEET NO. INDEX OF SHEETS STATE OF ... Spalding...PROJECT NO. SHEET NO. G E N E R A L I N F O R M A T I O N C.N. G1 R OAD W AY D E S I GN D I V I S I ON C o m pu t e r:

PROJECT NO. SHEET NO.

C.N.

File: 429150_

ND

OT_

Su

mm

ary_

Sheet.dgn

Date: 23-

SE

P-

2020 11:36

RO

AD

WA

Y

DE

SI

GN

DI

VISI

ON.

Co

mputer:

ND

OT

DE

SI

GN61

SUMMARY OF QUANTITIES42915

C191-4(1012)

PRELIMIN

ARY

Page 5: PROJECT NO. SHEET NO. INDEX OF SHEETS STATE OF ... Spalding...PROJECT NO. SHEET NO. G E N E R A L I N F O R M A T I O N C.N. G1 R OAD W AY D E S I GN D I V I S I ON C o m pu t e r:

SPALDING WEST DRAINAGEGREELEY COUNTY

DATE:

FLIGHT:

2016

NAIP

42915

91-4(1012) E1

PROJECT NO. SHEET NO.

C.N.

RO

AD

WA

Y

DE

SI

GN

DI

VISI

ON

Co

mputer:

ND

OT

DE

SI

GN61

Date: 23-

SE

P-

2020 11:37

File: 429150da01.dgn

Scale: 1:50

PSSC

PEMEPEMF

PEMA

330 335 340 345

SEC. 13-T20N-R9W

SEC. 24-T20N-R9W

HWY. N-91

0

FIE

LD

DRI

VE

STA. 0+00 FIELD DRIVE

STA. 338+64 HWY. N-91 =

LEGEND

LIMITS OF CONSTRUCTION

WETLANDS - DO NOT DISTURB

IMPACTED WETLANDS

TEMPORARY IMPACTED WETLANDS

HAZ

SEN

HAZARDOUS MATERIAL SITE

SENSITIVE AREA - DO NOT ENTER

PRELIMIN

ARY

Page 6: PROJECT NO. SHEET NO. INDEX OF SHEETS STATE OF ... Spalding...PROJECT NO. SHEET NO. G E N E R A L I N F O R M A T I O N C.N. G1 R OAD W AY D E S I GN D I V I S I ON C o m pu t e r:

42915

91-4(1012)

RO

AD

WA

Y

DE

SI

GN

DI

VISI

ON

F1

Co

mputer:

ND

OT

DE

SI

GN61

Date: 23-

SE

P-

2020 11:37

File: 429150dh01.dgn

Scale: 1:100

PROJECT NO. SHEET NO.

C.N.

HORIZONTAL ALIGNMENT & ORIENTATION

330 335 340 345 350 355 360 365

0

Ending chain 91C description =============================================================================== Point 33 X 2,075,849.5540 Y 683,263.8530 Sta 365+32.37 Course from 32 to 33 88º 36' 25.79" Dist 794.0327 Point 32 X 2,075,055.7559 Y 683,244.5523 Sta 357+38.34 Course from 31 to 32 88º 34' 11.47" Dist 454.6167 Point 31 X 2,074,601.2808 Y 683,233.2059 Sta 352+83.72 Course from 30 to 31 88º 33' 30.62" Dist 818.1619 Point 30 X 2,073,783.3779 Y 683,212.6241 Sta 344+65.56 Course from PT 91C_3 to 30 88º 35' 53.93" Dist 600.7457 Chord Bear = 88º 36' 17.38" Ahead = 88º 35' 53.93" Back = 88º 36' 40.83" C.C. X 2,073,060.5040 Y 688,196.4328 P.T. Station 338+64.81 X 2,073,182.8119 Y 683,197.9289 P.C. Station 338+63.67 X 2,073,181.6754 Y 683,197.9012 Mid. Ord. = 0.0000 Long Chord = 1.1368 External = 0.0000 Radius = 5,000.0000 Length = 1.1368 Tangent = 0.5684 Degree = 1º 08' 45.30" Delta = 0º 00' 46.90" (LT) P.I. Station 338+64.24 X 2,073,182.2437 Y 683,197.9150 Curve 91C_3 *----------* Curve Data Course from 29 to PC 91C_3 88º 36' 40.83" Dist 1,131.4647 Point 29 X 2,072,050.5430 Y 683,170.4810 Sta 327+32.21 =============================================================================== Feature: Survey Beginning chain 91C description 29 CUR 91C_3 30 31 32 33 Chain 91C contains: <* 1 DESCRIBE CHAIN 91C

Ending chain FD description =============================================================================== Point FD2 X 2,073,181.1930 Y 683,282.8075 Sta 0+84.90 Course from FD1 to FD2 359º 17' 27.34" Dist 84.8990 Point FD1 X 2,073,182.2437 Y 683,197.9150 Sta 0+00.00 =============================================================================== Feature: County Road Beginning chain FD description FD1 FD2 Chain FD contains: <* 1 DESCRIBE CHAIN FD

HWY. N-91

HWY. N-91 (CHAIN 91C)

(C

HAI

N

FD)

FIE

LD

DRI

VE

FIELD DRIVE

ALIGNMENT

GEOPAK ALIGNMENT INFORMATION

PROFILECHAIN

91C -HWY N-91

MODIFIED TO REPRESENT THE FIELD SURVEY DATA COLLECTED.

* ALIGNMENT HAS BEEN CREATED FROM ASBUILT INFORMATION, AND

FD -FIELD DRIVE

STA. 0+00 FIELD DRIVE

STA. 338+64 HWY. N-91 =

DATUM INFORMATION

NAD 83 (1995) NAVD 88

D.A.F. = 1.0004251

HORIZONTAL VERTICAL

PRELIMIN

ARY

Page 7: PROJECT NO. SHEET NO. INDEX OF SHEETS STATE OF ... Spalding...PROJECT NO. SHEET NO. G E N E R A L I N F O R M A T I O N C.N. G1 R OAD W AY D E S I GN D I V I S I ON C o m pu t e r:

PROJECT NO. SHEET NO.

C.N.G E N E R A L I N F O R M A T I O NG1

RO

AD

WA

Y

DE

SI

GN

DI

VISI

ON

Co

mputer:

ND

OT

DE

SI

GN61

Date: 23-

SE

P-

2020 11:37

File: 429150dn01.dgn

Scale: 1:100

LEGEND

TELEVISION BOXTV

GAS LINEG

E ELECTRICAL SERVICE

P POWER LINE

OVERHEAD POWER LINEOP

SANITARY SEWERSAN

STORM SEWERSS

TELEPHONE LINET

FIBER OPTIC TELE. LINEFO

OVERHEAD TELEPHONE LINEOT

CABLE TV LINETV

OVERHEAD CABLE TV LINEOTV

WATER LINEW

FENCE - CHAIN LINK

FENCE - R.O.W. OR WIRE

FENCE - WOOD

FLOWLINE

CENTER LINE DRIVE

BENCH MARKB

M

CONTROL POINT

GAS METERG

GAS VALVE

GRID TICK

GUARDRAIL

GUARD POST

GUY POLE

GUY WIRE

LIGHT POLEOR

MAILBOX

MANHOLE

MARSH

OIL WELL

PHOTO CODE POINT

POWER BOXP

POWER POLE

POWER PULL BOXP

PROPANE TANK

R.O.W. MARKERR

ADVANCED R.R. WARNING SIGN

RAILROAD WARNING

RAILROAD TRACKS

RETAINING WALL

SATELLITE DISH

SIGN

TRAFFIC SIGNAL

TRAFFIC SIGNAL/ST. LIGHT

TELEPHONE BOXT

TELE. FIBER OPTICS BOXFO

TELEPHONE PULL BOXT

TELEPHONE POLE

TREE - CONIFEROUS

TREE - DECIDUOUS

TREE STUMP

WATER (FIRE) HYDRANT

WATER VALVE

WATER METERW

WELL

WINDMILL

CENTER PIVOT

DIKE

TYPICAL SECTION OF EARTH DIKE

*

2'-0"

*-VARIES (ELEV. 1901.50)

1.5:

1 1.5:1

STA. 336+51 TO STA. 338+36

STA. 338+72 TO STA. 340+19

NOTES

furnish Borrow on this Project.

The Contractor will be required to

42915

91-4(1012)

of damage to the utility facility.

care in order to avoid any possibility

must be accomplished with extreme

faction of all parties. The excavation

located and identified to the satis-

until all such facilities have been

area of underground utility facilities

No excavation will be permitted in the

at the request of the Contractor.

be located and flagged by the Utilities

utilities, whether indicated or not will

indicated in these plans. Underground

ground utility facilities may not be

The locations of all aerial and under-

STATION R rSIDE

RETURN RADIUS

24 - 9040 40

FEET FEET FEET FEET > SQ. YDS.

PREPARATION

SQ. YDS. CU. YDS.

GRAVELL

LENGTH

ANGLE

INTERSECTION

5

SUMMARY OF QUANTITIES AND LOCATION OF SURFACED DRIVEWAYS

< Project

>

W

WIDTHPLACEMENT

r

R

W

L

Grav

el

ON PREPARED SUBGRADE

6" SURFACING

344+65 Lt. 183 183

TYPE DESCRIPTION

1

2

3

4

5

6

7

8

RCSP

RCP

GCCMP

ACCMP

PCCMP

HDPE-CI

HDPE-SI

PVC

Reinforced Concrete Sewer Pipe

Reinforced Concrete Pipe

High Density Polyethylene (corrugated Interior)

High Density Polyethylene (smooth Interior)

Polyvinyl Chloride Pipe

CULVERT PIPE LEGEND

Galvanized (zinc) Coated Corrugated Metal Pipe

Aluminum Coated Corrugated Metal Pipe

Polymer Coated Corrugated Metal Pipe

TYPICAL SECTION OF EARTH DIKE

1

1'-0"

1.5:

1 1.5:1

STATION TO STATION

EARTHWORK QUANTITIES

(CU. YDS.)

AVAILABLE

EXCAVATION

(CU. YDS.)

IN EMBANKMENT

EARTHWORK MEASURED

452

TOTAL

460

440 -

107

329+79 - 333+40

332+00 - 338+00

336+50 - 338+34

338+79 - 340+11

339+00 - 344+00

108

-

-

1000

461

-

1028

PRELIMIN

ARY

Page 8: PROJECT NO. SHEET NO. INDEX OF SHEETS STATE OF ... Spalding...PROJECT NO. SHEET NO. G E N E R A L I N F O R M A T I O N C.N. G1 R OAD W AY D E S I GN D I V I S I ON C o m pu t e r:

42915

91-4(1012)

G E N E R A L I N F O R M A T I O NG2

Date: 23-

SE

P-

2020 11:37

Co

mputer:

ND

OT

DE

SI

GN61

RO

AD

WA

Y

DE

SI

GN

DI

VISI

ON.

File: dit

ch profile sheet 20 scale.dgn

PROJECT NO. SHEET NO.

C.N.

0 10' 20'

SCALE

332331+65 333 334 335 336 337

PROPOSED EL. = 1895.55 PROPOSED EL. = 1894.83 PROPOSED EL. = 1894.11 PROPOSED EL. = 1893.39 PROPOSED EL. = 1892.68 PROPOSED EL. = 1891.98

EXISTING EL. = 1896.12 EXISTING EL. = 1895.47 EXISTING EL. = 1894.84 EXISTING EL. = 1894.02 EXISTING EL. = 1893.22

EXISTING EL. = 1893.58

FL. = 1891.69 PROPOSED BOX CULVERT

Sta. 345+28.48 R1

337 338 339 340 341 342

PROPOSED EL. = 1899.02 PROPOSED EL. = 1898.38 PROPOSED EL. = 1897.74 PROPOSED EL. = 1897.10 PROPOSED EL. = 1896.27 PROPOSED EL. = 1895.55

EXISTING EL. = 1900.35 EXISTING EL. = 1899.35 EXISTING EL. = 1898.41 EXISTING EL. = 1897.57

EXISTING EL. = 1897.18 EXISTING EL. = 1896.12

FL = 1896.65 FL = 1896.99

342 343 344 345

FL = 1900.55 FL = 1900.45

PROPOSED EL. = 1900.30 PROPOSED EL. = 1899.66 PROPOSED EL. = 1899.02

EXISTING EL. = 1901.16 EXISTING EL. = 1900.35 EXISTING EL. = 1902.36

EXISTING GRADE LINE:

PROPOSED GRADE LINE:PRELIMIN

ARY

Page 9: PROJECT NO. SHEET NO. INDEX OF SHEETS STATE OF ... Spalding...PROJECT NO. SHEET NO. G E N E R A L I N F O R M A T I O N C.N. G1 R OAD W AY D E S I GN D I V I S I ON C o m pu t e r:

H1

PROJECT NO. SHEET NO.

C.N.

File: 429150dz01.dgn

Date: 23-

SE

P-

2020 11:37

RO

AD

WA

Y

DE

SI

GN

DI

VISI

ON.

Co

mputer:

ND

OT

DE

SI

GN61

329 330 331 332 333 334 335

SEC. 13-T20N-R9W

SEC. 24-T20N-R9W

HWY. N-91

LEGEND

TRAFFIC FLOW

CONCRETE BARRIER

BUILD SURFACING/TEMPORARY SURFACING

COMPLETED SURFACING/TEMPORARY SURFACING

REMOVE ASPHALTIC SURFACE/TEMPORARY SURFACING

42915

91-4(1012)

PHASE 1

PRELIMIN

ARY

Page 10: PROJECT NO. SHEET NO. INDEX OF SHEETS STATE OF ... Spalding...PROJECT NO. SHEET NO. G E N E R A L I N F O R M A T I O N C.N. G1 R OAD W AY D E S I GN D I V I S I ON C o m pu t e r:

H2

PROJECT NO. SHEET NO.

C.N.

File: 429150dz02.dgn

Date: 23-

SE

P-

2020 11:37

RO

AD

WA

Y

DE

SI

GN

DI

VISI

ON.

Co

mputer:

ND

OT

DE

SI

GN61

329 330 331 332 333 334 335

SEC. 13-T20N-R9W

SEC. 24-T20N-R9W

HWY. N-91

LEGEND

TRAFFIC FLOW

CONCRETE BARRIER

BUILD SURFACING/TEMPORARY SURFACING

COMPLETED SURFACING/TEMPORARY SURFACING

REMOVE ASPHALTIC SURFACE/TEMPORARY SURFACING

42915

91-4(1012)

PHASE 2

PRELIMIN

ARY

Page 11: PROJECT NO. SHEET NO. INDEX OF SHEETS STATE OF ... Spalding...PROJECT NO. SHEET NO. G E N E R A L I N F O R M A T I O N C.N. G1 R OAD W AY D E S I GN D I V I S I ON C o m pu t e r:

H3

PROJECT NO. SHEET NO.

C.N.

File: 429150dz03.dgn

Date: 23-

SE

P-

2020 11:37

RO

AD

WA

Y

DE

SI

GN

DI

VISI

ON.

Co

mputer:

ND

OT

DE

SI

GN61

329 330 331 332 333 334 335

SEC. 13-T20N-R9W

SEC. 24-T20N-R9W

HWY. N-91

LEGEND

TRAFFIC FLOW

CONCRETE BARRIER

BUILD SURFACING/TEMPORARY SURFACING

COMPLETED SURFACING/TEMPORARY SURFACING

REMOVE ASPHALTIC SURFACE/TEMPORARY SURFACING

42915

91-4(1012)

PHASE 3

PRELIMIN

ARY

Page 12: PROJECT NO. SHEET NO. INDEX OF SHEETS STATE OF ... Spalding...PROJECT NO. SHEET NO. G E N E R A L I N F O R M A T I O N C.N. G1 R OAD W AY D E S I GN D I V I S I ON C o m pu t e r:

H4

PROJECT NO. SHEET NO.

C.N.

File: 429150dz04.dgn

Date: 23-

SE

P-

2020 11:37

RO

AD

WA

Y

DE

SI

GN

DI

VISI

ON.

Co

mputer:

ND

OT

DE

SI

GN61

329 330 331 332 333 334 335

SEC. 13-T20N-R9W

SEC. 24-T20N-R9W

HWY. N-91

LEGEND

TRAFFIC FLOW

CONCRETE BARRIER

BUILD SURFACING/TEMPORARY SURFACING

COMPLETED SURFACING/TEMPORARY SURFACING

REMOVE ASPHALTIC SURFACE/TEMPORARY SURFACING

42915

91-4(1012)

PHASE 4

PRELIMIN

ARY

Page 13: PROJECT NO. SHEET NO. INDEX OF SHEETS STATE OF ... Spalding...PROJECT NO. SHEET NO. G E N E R A L I N F O R M A T I O N C.N. G1 R OAD W AY D E S I GN D I V I S I ON C o m pu t e r:

H5

PROJECT NO. SHEET NO.

C.N.

File: 429150dz05.dgn

Date: 23-

SE

P-

2020 11:37

RO

AD

WA

Y

DE

SI

GN

DI

VISI

ON.

Co

mputer:

ND

OT

DE

SI

GN61

329 330 331 332 333 334 335

SEC. 13-T20N-R9W

SEC. 24-T20N-R9W

HWY. N-91

LEGEND

TRAFFIC FLOW

CONCRETE BARRIER

BUILD SURFACING/TEMPORARY SURFACING

COMPLETED SURFACING/TEMPORARY SURFACING

REMOVE ASPHALTIC SURFACE/TEMPORARY SURFACING

42915

91-4(1012)

PHASE 5

PRELIMIN

ARY

Page 14: PROJECT NO. SHEET NO. INDEX OF SHEETS STATE OF ... Spalding...PROJECT NO. SHEET NO. G E N E R A L I N F O R M A T I O N C.N. G1 R OAD W AY D E S I GN D I V I S I ON C o m pu t e r:

H6

PROJECT NO. SHEET NO.

C.N.

File: 429150dz06.dgn

Date: 23-

SE

P-

2020 11:37

RO

AD

WA

Y

DE

SI

GN

DI

VISI

ON.

Co

mputer:

ND

OT

DE

SI

GN61

329 330 331 332 333 334 335

SEC. 13-T20N-R9W

SEC. 24-T20N-R9W

HWY. N-91

LEGEND

TRAFFIC FLOW

CONCRETE BARRIER

BUILD SURFACING/TEMPORARY SURFACING

COMPLETED SURFACING/TEMPORARY SURFACING

REMOVE ASPHALTIC SURFACE/TEMPORARY SURFACING

42915

91-4(1012)

PHASE 6

PRELIMIN

ARY

Page 15: PROJECT NO. SHEET NO. INDEX OF SHEETS STATE OF ... Spalding...PROJECT NO. SHEET NO. G E N E R A L I N F O R M A T I O N C.N. G1 R OAD W AY D E S I GN D I V I S I ON C o m pu t e r:

42915

91-4(1012)

RO

AD

WA

Y

DE

SI

GN

DI

VISI

ON

L1

Co

mputer:

ND

OT

DE

SI

GN61

Date: 23-

SE

P-

2020 11:37

File: 429150dc01.dgn

Scale: 1:50

PROJECT NO. SHEET NO.

C.N.

RR T R

330 335 340 345

0

P.O.T. STA. 0+00.00

P.O.T.

ST

A. 0

+84.90

P.C.

ST

A. 338

+63.67

P.T. STA. 338+64.81

P.C. STA. 338+63.67

R = 5000.00

L = 1.14

T = 0.57

> = 0°00'46.90" Lt.

P.I. STA. 338+64.24

P.T.

ST

A. 338

+64.81

>

= 0°02'2

3.31"

Lt.

P.I.

ST

A. 344

+65.56

SEC. 24-T20N-R9W

SEC. 13-T20N-R9W

HWY. N-91

See

Cross

Sectio

n

Sheets.

Cle

ano

ut

&

Re-

Grade

Dit

ch.

Sta. 332

+00 to 338

+41

Lt.

See

Cross

Sectio

n

Sheets.

Cle

ano

ut

&

Re-

Grade

Dit

ch.

Sta. 338

+80 to 344

+35

Lt.

Pla

n 502.

Silt

Fence-

Lo

w

Porosit

y.

Build 84

Lin.

Ft. of

Fabric

Sta. 331+

94

Lt.

Sta. 331+

29 to

Pla

n 501.

Co

ntrol,

Cla

ss 2

A.

Build 79

Sq.

Yds. of

Erosio

n

Sta. 331+

81

Lt.

Sta. 331+

49 to

2A

2A

1D 1D

2A2A 2A2A

Pla

n 502.

Silt

Fence-

Lo

w

Porosit

y.

Build 98

Lin.

Ft. of

Fabric

Sta. 331+

94

Rt.

Sta. 331+

28 to

Pla

n 501.

Co

ntrol,

Cla

ss 2

A.

Build 79

Sq.

Yds. of

Erosio

n

Sta. 331+

81

Rt.

Sta. 331+

49 to

Pla

n 501.

Co

ntrol,

Cla

ss 1

D.

Build 82

Sq.

Yds. of

Erosio

n

Sta. 338

+36

Lt.

Sta. 336

+51 to

Pla

n 501.

Co

ntrol,

Cla

ss 1

D.

Build 164

Sq.

Yds. of

Erosio

n

Sta. 340

+19

Lt.

Sta. 338

+72 to

Pla

n 501.

Co

ntrol,

Cla

ss 2

A.

Build 49

Sq.

Yds. of

Erosio

n

Sta. 338

+47

Lt.

Sta. 338

+22 to

Pla

n 501.

Co

ntrol,

Cla

ss 2

A.

Build 49

Sq.

Yds. of

Erosio

n

Sta. 344

+40

Lt.

Sta. 344

+15 to

Pla

n 501.

Co

ntrol,

Cla

ss 2

A.

Build 49

Sq.

Yds. of

Erosio

n

Sta. 345

+09

Lt.

Sta. 344

+84 to

Pla

n 501.

Co

ntrol,

Cla

ss 2

A.

Build 49

Sq.

Yds. of

Erosio

n

Sta. 339

+02

Lt.

Sta. 338

+77 to

STA. 0+00 FIELD DRIVE

STA. 338+64 HWY. N-91 =

FIE

LD

DRI

VE

30" ` 34'

DR.

PIP

E

ST

A. 338

+64, 56'

LT.

Re

mo

ve.

Exc.=

104

Cu.

Yds.

Type 2, 3, 4, 5, 6, 7 or 8.

Equiv

ale

nt

Culv

ert

Pip

e

Build

Twin 42" x 40'

Ro

und

Sta. 338

+64

Lt.

6' ` 2' ` 110'

CO

NC.

BO

X

CU

LV.

ST

A. 331+

65

Fill=

7'.

Exc.=

680

Cu.

Yds.

Win

gwalls.

Special

Pla

n 1C.

Co

ncrete

Bo

x

Culv

ert

wit

h

Build 8' ` 4' ` 78'

H.

W.

= 5.99'

D.A.

= 240

Ac.,

Q25

=296 cfs,

Sta. 331+

65

Re

mo

ve

Structure.

30" ` 52'

DR.

PIP

E

ST

A. 344

+63

LT.

Re

mo

ve.

Exc.=

210

Cu.

Yds.

Type 2, 3, 4, 5, 6, 7 or 8.

Culv

ert

Pip

e

Build

Twin 42" x 54'

Sta. 344

+63

Lt.

on 2

%

Grade.

Build

Earth

Driv

e (24'

Wid

e)

Sta. 338

+65

Lt.

See

Sheet

G.

Build

Earth

Dik

e.

Sta. 340

+19

Lt.

Sta. 338

+72 to

See

Sheet

G.

Build

Earth

Dik

e,

Sta. 338

+36

Lt.

Sta. 336

+51 to

Asphalt

Surface.

Re

mo

ve 80

Sq.

Yds. of

Sta. 331+

80

Lt./

Rt.

Sta. 331+

51 to

See Sheet

B.

12" Surfacin

g.

Build 80 Sq.

Yds.

of

Sta.

331+80 Lt.

Sta.

331+51 to

ee

Sheet

G.

on 2

%

Grade

&

Surface.

Build

Earth

Driv

e (24'

Wid

e)

Sta. 344

+65

Lt.

2A

PRELIMIN

ARY

Page 16: PROJECT NO. SHEET NO. INDEX OF SHEETS STATE OF ... Spalding...PROJECT NO. SHEET NO. G E N E R A L I N F O R M A T I O N C.N. G1 R OAD W AY D E S I GN D I V I S I ON C o m pu t e r:

42915

91-4(1012) M1

PROJECT NO. SHEET NO.

C.N.

Co

mputer:

ND

OT

TR

AF

FIC8

Date: 17-

AU

G-

2020 10:57

File:

wz111e-

1 r8.dgn

TR

AF

FIC

EN

GI

NE

ERI

NG

DI

VISI

ON

WORK AREA3'

50' 50'

6

1

6

1

150'50'

A

A

A

A

TRAFFIC SIGNAL

DRIVERS VIEW OF

TO AVOID BLOCKING

OFFSET SIGN 6' MIN.

100' TAPER

A

500'200'

(AS REQUIRED)

REMOVE CONFLICTING EDGE LINE

TRAFFIC SIGNAL

DRIVERS VIEW OF

TO AVOID BLOCKING

OFFSET SIGN 6' MIN.

TEMPORARY TRAFFIC SIGNAL

24" TEMPORARY WHITE STOP BAR

REMOVE CENTER LINE TO STOP BAR

CONCRETE PROTECTION BARRIER

TEMPORARY WHITE PAVEMENT MARKING

MINIMUM LANE WIDTH

CONCRETE PROTECTION BARRIER

TEMPORARY WHITE PAVEMENT MARKING

25' SPACING

24" TEMPORARY WHITE STOP BAR

BACK TO BACKBACK TO BACK

100'100'

A

450' MIN

(IF APPLICABLE)

500' 500' 500'200' 250'250' 250'250'

WORK AREA3'

50' 50'

6

1

50'

WORK AREA

CONCRETE PROTECTION BARRIER

STOP BAR TO STOP BAR

REMOVE CENTER LINE

6

1

6

1

STOP BAR TO STOP BAR

REMOVE CENTER LINE

A A

A A

TRAFFIC SIGNAL

DRIVERS VIEW OF

TO AVOID BLOCKING

OFFSET SIGN 6' MIN.

MINIMUM LANE WIDTH

BACK TO BACK

TEMPORARY TRAFFIC SIGNAL

24" TEMPORARY WHITE STOP BAR

TEMPORARY TRAFFIC SIGNAL

25' SPACING

CONCRETE PROTECTION BARRIER

TEMPORARY WHITE PAVEMENT MARKING

CONCRETE PROTECTION BARRIER24" TEMPORARY WHITE STOP BAR

50'

25' SPACING

BACK TO BACK

700' MIN

700' MIN

700' MIN

3'

CONCRETE PROTECTION BARRIER

1

6

30' BUFFER

TYPICAL

30' BUFFER

TYPICAL

30' BUFFER

TYPICAL

30' BUFFER

TYPICAL

MAX.

XX'WIDTH

W40-73-48

SPEEDLIMIT

45

W3-5-36

W14-3-48

G20-2B-48

W20-8-36

W3-3-48

SPEEDING FINES

DOUBLED

WHEN WORKERS

PRESENT

R41-17B-48

W14-7R

W14-7L W14-7RW14-7L

W14-7R

W14-7L

W14-7L

W14-7R

TEMPORARY TRAFFIC SIGNAL

W14-7L W14-7RW14-7LW14-7L W14-7R

W14-7R

TEMPORARY

RUMBLE STRIPS

DRUMS AT

DRUMS AT

DRUMS AT

REMOVE CENTER LINE TO STOP BAR

STOP BAR TO STOP BAR

REMOVE CENTER LINE

DESIGNED

REVIEWED

APPROVED DATE DRAWN TRAFFIC ENGINEER DATE

11

TYPICAL TRAFFIC SIGNAL CONTROL PLAN

ONE LANE, TWO-WAY OPERATION

WITH BARRIERS

04/19

KSF

TRAFFIC ENGINEERING DIVISION

OF TRANSPORTATIONNEBRASKA DEPARTMENT

175' TEMPORARY WHITE PAVEMENT MARKING

175' TEMPORARY WHITE PAVEMENT MARKING

25' SPACING

DRUMS AT

R2-1WZ-24

R2-1-24

R4-1-24

R2-1WZ-24

R2-1-24

R2-1-24

W5-3-48

OR

W20-4A-48

R2-1WZ-24

R2-1-24

R2-1WZ-24

R2-1-24

R10-6L-24

TRAFFIC SIGNAL

DRIVERS VIEW OF

TO AVOID BLOCKING

OFFSET SIGN 6' MIN.

R10-6L-24

R2-1WZ-24

R2-1-24

R10-6L-24

R2-1WZ-24

R2-1-24R10-6L-24

OR

100' TAPER

OR 75' MINIMUM

TEMPORARY WHITE PAVEMENT MARKING

TAPER RATE 15:1

OR 75' MINIMUM

TEMPORARY WHITE PAVEMENT MARKING

TAPER RATE 15:1

OR 75' MINIMUM

TEMPORARY WHITE PAVEMENT MARKING

TAPER RATE 15:1

OR 75' MINIMUM

TEMPORARY WHITE PAVEMENT MARKING

TAPER RATE 15:1

W/TYPE "A" WARNING

TYPE III BARRICADE

LIGHT MOUNTED ABOVE

W40-9F-48

W20-1F-48

OR

(SEE NOTE 5)

W16-2AP-24

W5-2-48

1000 FT

NARROW

BRIDGE

(SEE NOTE 5)W16-3P-30

W5-2-48

½MILE

(SEE NOTE 5)

NARROW

BRIDGE

TYPICAL APPROACH TO WORK ZONE

LEGEND

TYPE III BARRICADE

REFLECTORIZED PLASTIC DRUM

SINGLE POST SIGN

DOUBLE POST SIGN

CONCRETE PROTECTION BARRIER DETAIL

NOT BE USED.

BARRIERS WITH BROKEN LOOPS SHALL

PIN SHALL PASS THROUGH ALL LOOPS.5"

4"

OR

VERTICAL PANEL

REFLECTOR WHEN BOTH FALL IN SAME LOCATION.

BARRIER TAPER. INSTALL VERTICAL PANEL IN PLACE OF

2S SPACING ON TOP OF BARRIER, EVERY S SPACING ALONG

SHALL BE W14-7L, RIGHT SIDE SHALL BE W14-7R, AT EVERY

VERTICAL PANELS MOUNTED ON LEFT SIDE OF TRAFFIC

SHEETING AT 25' SPACING

OR 3" X 9" RETROREFLECTIVE, TYPE IV

2-3" CENTER-MOUNTED REFLEX-REFLECTORS

ADJACENT EDGE LINE.

THE COLOR OF THE

REFLECTORS SHALL MATCH

THE COLOR OF THE

MINIMUM WIDTH OF TRAVELED LANE SHALL BE DETERMINED BY THE ENGINEER.

TO OTHER TRAFFIC CONTROL DEVICES.

SUBSIDIARYREFLECTORS USED FOR WORK ZONE TRAFFIC CONTROL SHALL BE

IF INSTALLED ON THE PROJECT IN ADVANCE OF THIS WORK SITE.

SIGNS R41-17B-48, W20-1F-48 AND W40-9F-48 ARE NOT REQUIRED

MAY BEND, BUT NOT COME LOOSE IF STRUCK BY A PASSING VEHICLE.

BARRIERS. THE BRACKET SHALL BE CONSTRUCTED OF MATERIAL THAT

BRACKET TO SUPPORT THEM IN A STABLE POSITION ON THE CONCRETE

THE CONTRACTOR SHALL FURNISH REFLECTORS, VERTICAL PANELS AND A

BE ALLOWED IN THE TRAVEL LANE OF APPROACHING TRAFFIC.

BACK EACH NIGHT. AT NO TIME WILL A BLUNT END OF THE BARRIER

REQUIRED TO BE MOVED FOR WORK ACCESS THEY SHALL BE REPOSITIONED

OF THE PROTECTION BARRIERS AT ANY TIME. IF BARRIERS ARE

NO EQUIPMENT OR CONSTRUCTION MATERIAL IS TO BE PLACED IN FRONT

CONCRETE PROTECTION BARRIERS SHOULD EXTEND TO EDGE OF PAVEMENT.

INSTALL WHEN LANE WIDTH ACROSS IS LESS THAN APPROACH LANE WIDTH.

NOTES

1.

2.

4.

5.

6.

3.

PRELIMIN

ARY

Page 17: PROJECT NO. SHEET NO. INDEX OF SHEETS STATE OF ... Spalding...PROJECT NO. SHEET NO. G E N E R A L I N F O R M A T I O N C.N. G1 R OAD W AY D E S I GN D I V I S I ON C o m pu t e r:

42915

91-4(1012) M2

PROJECT NO. SHEET NO.

C.N.

Co

mputer:

ND

OT

TR

AF

FIC8

Date: 17-

AU

G-

2020 10:57

File: sptts_r4.dgn

TR

AF

FIC

EN

GI

NE

ERI

NG

DI

VISI

ON

0'-6"

ED

GE

OF

RO

AD

WA

Y

-

ED

GE

OF

RO

AD

WA

Y

1

2

3

4

5

6

7

8

IN SAME MANNER AS PEDESTAL POLE INSTALLATION

INTERCONNECT SHALL BE ACCOMPLISHED

WHEN SIGNALS ARE NEEDED ON BOTH SIDES OF ROAD,

AND CONSTRUCTIONS.

RESPONSIBLE FOR PROTECTING ALL AERIAL AND UNDERGROUND UTILITIES

OF DAMAGE TO THE UTILITY FACILITY. THE CONTRACTOR SHALL BE

ACCOMPLISHED WITH EXTREME CARE IN ORDER TO AVOID ANY POSSIBILITY

TO THE SATISFACTION OF ALL PARTIES. THE EXCAVATION MUST BE

UNTIL ALL SUCH FACILITIES HAVE BEEN LOCATED AND IDENTIFIED

BE PERMITTED IN THE AREA OF UNDERGROUND UTILITY FACILITIES

UTILITIES AT THE REQUEST OF THE CONTRACTOR. NO EXCAVATION WILL

WHETHER INDICATED OR NOT WILL BE LOCATED AND FLAGGED BY THE

MAY NOT BE INDICATED IN THESE PLANS, UNDERGROUND UTILITIES,

THE LOCATIONS OF ALL AERIAL AND UNDERGROUND UTILITY FACILITIES

OF THE STATE OF NEBRASKA.

ANY STATE SUPPLIED EQUIPMENT OR MATERIAL SHALL REMAIN THE PROPERTY

THE SIGNAL HEAD LENSES SHALL BE A MINIMUM OF 12 INCHES IN DIAMETER.

NOTES

1.

2.

3.

4.

-

TO 5% OF SPAN

SAG SHALL BE 3

TRAFFIC SIGNAL HEAD

10'-0" MINBREAK-AWAY

30" MIN

POWER

6'-0" MIN

8'-0" MIN

4'-0"

18'-0" + 6"

8'-0" MIN

3'-0"

15'-0"

18'-0" + 6"

6'-0"

4'-0"

TO UTILITY SERVICE

8'-0" MIN

REMAIN HIS PROPERTY.

ALL EQUIPMENT AND MATERIAL FURNISHED BY THE CONTRACTOR SHALL

REQUIRED FOR THE TEMPORARY SIGNAL UNLESS OTHERWISE SPECIFIED.

THE CONTRACTOR SHALL FURNISH ALL EQUIPMENT AND MATERIAL

RESPONSIBILITY OF THE CONTRACTOR.

MAINTENANCE OF THE TEMPORARY SIGNAL SHALL BE THE FULL

CHECKED EVERY 24 HOURS TO INSURE PROPER OPERATION.

NOT LESS THAN 26 HOURS. PORTABLE TRAFFIC SIGNALS SHALL BE

HAVE STANDBY BATTERY POWER CAPABLE OF OPERATING THE SIGNAL

TRAFFIC SIGNALS POWERED BY MEANS OF A PORTABLE GENERATOR SHALL

ENGINEEER UNLESS THE EXACT PLACEMENT IS NOTED IN THE PLANS.

SIGNAL POLE LOCATIONS SHALL BE DETERMINED IN THE FIELD BY THE

TRAFFIC SIGNAL BE LEFT UNCOVERED ON AN OPEN ROAD TO THE PUBLIC.

WAY TRAFFIC. UNDER NO CIRCUMSTANCES SHALL AN INOPERATIVE

BOTH DIRECTIONS DURING PERIODS WHEN THE BRIDGE IS OPEN TO TWO-

THE SIGNAL SHALL BE PLACED INTO FLASHING AMBER OPERATON FOR

SEE SIGNING STANDARD FOR REQUIRED SIGNING TO ACCOMPANY SIGNAL.

6.

7.

8.

9.

10.

11.

12.

13.

REGULATIONS, THE SPECIFICATIONS AND THE PROJECT PLANS.

OF UNIFORM TRAFFIC CONTROL DEVICES, ALL LOCAL ORDINANCES AND

WITH THE NATIONAL ELECTRIC CODE (LATEST EDITION), THE MANUAL

INSTALLATION OF THE TEMPORARY SIGNAL SHALL BE IN COMPLIANCE

14. WHEN REQUIRED, THE CONTRACTOR SHALL FURNISH ALL EQUIPMENT AND

MATERIAL REQUIRED FOR VEHICLE DETECTION ON ALL APPROACHES.

TRAFFIC ENGINEERING DIVISION. FOR THE SPECIFIC INSTALLATION,

5. ALL SIGNAL LAMPS SHALL BE EXTENDED ANGLE LED.

1

3

4

5

SIGNAL

2

DESIGNED

REVIEWED

APPROVED DATE DRAWN TRAFFIC ENGINEER DATE

11

TYPICAL TRAFFIC SIGNAL CONTROL PLAN

TEMPORARY TRAFFIC SIGNAL

DETAILS

05/19

TJF

TRAFFIC ENGINEERING DIVISION

OF TRANSPORTATIONNEBRASKA DEPARTMENT

<

GUY WIRE ANCHOR DETAIL

-SPANNED ACROSS ROADWAY, MINIMUM CLEARANCE SHALL BE 18' + 6"

JACKED CONDUIT, ROUTED UNDER BRIDGE OR AERIAL IF INTERCONNECT IS

INTERCONNECT CABLE MAY BE INSTALLED UNDER THE ROADWAY IN 1"

BREAK-AWAY

4" MAX

7'-0" MIN

7'-0" MIN

SEE SPECIAL PROVISION

IF REQUIRED

WAIT TIME DISPLAY

SEE SPECIAL PROVISION

IF REQUIRED

WAIT TIME DISPLAY

SEE SPECIAL PROVISION

IF REQUIRED

WAIT TIME DISPLAY

THE COMPLETE TEMPORARY SIGNAL.

COMPENSATION FOR FURNISHING, INSTALLING, MAINTAINING AND REMOVING

SIGNAL WITH WAIT TIME DISPLAY". THIS PRICE SHALL BE FULL

FOR THE ITEM "TEMPORARY TRAFFIC SIGNAL" OR "TEMPORARY TRAFFIC

THE TRAFFIC SIGNAL SHALL BE PAID FOR AT THE CONTRACT UNIT PRICE

ITEM NO. DESCRIPTION

1

2

3

4

5

6

7

8

METER SOCKET (IF REQ'D BY UTILITY)

3/8" HIGH STRENGTH 7 STRAND WIRE ROPE

600 VOLT NO. 12 AWG 5/C TRAFFIC SIGNAL CABLE

1/4" SIEMANS MARTIN 7 STRAND WIRE ROPE

CONTROLLER CABINET *

PROGRAMMING MANUAL.

* CONTRACTOR SHALL FURNISH A SOLID STATE DIGITAL CONTROLLER WITH A

CLASS IV BUTT TREATED WOOD POLE W/DOWN GUYS

TRAFFIC SIGNAL W/BACKPLATE

5/8" X 10' COPPERWELD GROUND ROD

NOTURN

ON RED

STOP

THEN YIELD

IN DIRECTION

OF FLASHING

ARROW

R10-11-24

R10-11E-30

TO 12'-0" MAX

6'-0" MIN

FOR DETAIL

SEE SPECIAL PROVISION

6'-0" MIN

<STOP

THEN YIELD

IN DIRECTION

OF FLASHING

ARROW

R10-11E-30

TO 12'-0" MAX

6'-0" MIN

FOR DETAIL

SEE SPECIAL PROVISION

R10-11B-24

R

FYFY

R

6'-0" MIN

<

6'-0" MIN

<

PEDESTAL POLE INSTALLATION

PORTABLE SIGNAL

DRIVEWAY ASSISTANCE DEVICE

SPAN WIRE INSTALLATION

CALL TRAFFIC ENGINEERING DIVISION AT 402-479-4594.

THE TIMING OF THE SIGNAL CYCLE SHALL BE DETERMINED BY THE NDOT

PRIOR TO INSTALLATION TO AVOID UNEXPECTED PROJECT DELAYS.

SIGNALS AND ADT FOR HIGHWAYS. TIMING SHOULD BE REQUESTED ONE WEEK

CONTROL NUMBER, DISTANCE BETWEEN STOP BARS, NUMBER OF SIDE STREET

HAVE THE FOLLOWING INFORMATION READY WHEN YOU CALL. PROJECT NAME,

PHASED PAVEMENT & STRUCTURE REPAIRS AT STA 331+65

APPROXIMATE LOCATION OF TEMP TRAFFIC SIGNAL

PRELIMIN

ARY

Page 18: PROJECT NO. SHEET NO. INDEX OF SHEETS STATE OF ... Spalding...PROJECT NO. SHEET NO. G E N E R A L I N F O R M A T I O N C.N. G1 R OAD W AY D E S I GN D I V I S I ON C o m pu t e r:

42915

91-4(1012) R1R1

Date: 23-

SE

P-

2020 11:37

Co

mputer:

ND

OT

DE

SI

GN61

RO

AD

WA

Y

DE

SI

GN

DI

VISI

ON.

File:

Ne

w

Culv

ert

Locatio

n

Sheet.dgn

PROJECT NO. SHEET NO.

C.N.

0 10' 20'

SCALE

FL = 1891.69 FL = 1891.48

3:13:1

6' x 2' x 110' CONC. BOX CULV.

STA. 331+65

Remove Structure.

Fill=7'. Exc.=680 Cu. Yds.

Wingwalls. Special Plan 1C.

Concrete Box Culvert with

Build 8' ̀ 4' ̀ 78'

D.A.=240Ac.,Q=296cfs,H.W.=5.99'

00 55 1010 1515 2020 2525 3030 3535 4040 4545 5050 5555 6060 6565 7070 7575 8080

1880 1880

1885 1885

1890 1890

1895 1895

1900 1900

1905 1905

1910 1910

331+65

1910

1905

1900

1895

1890

1885

18801880

1885

1890

1895

1900

1905

1910

PHASE 2 PHASE 4

PHASE LINE

STA. 331+65

PRELIMIN

ARY

Page 19: PROJECT NO. SHEET NO. INDEX OF SHEETS STATE OF ... Spalding...PROJECT NO. SHEET NO. G E N E R A L I N F O R M A T I O N C.N. G1 R OAD W AY D E S I GN D I V I S I ON C o m pu t e r:

42915

91-4(1012) R2R2

Date: 23-

SE

P-

2020 11:37

Co

mputer:

ND

OT

DE

SI

GN61

RO

AD

WA

Y

DE

SI

GN

DI

VISI

ON.

File:

Driv

ePip

e

Sheet 5

Scale.dgn

PROJECT NO. SHEET NO.

C.N.

0 10' 20'

SCALE

Sta. 0+45.72

FL = 1896.98 FL = 1896.56

Remove.

40'

Exc.=104 Cu. Yds.

Type 2,3,4,6,7, or 8.

Equivalent Culvert Pipe

Build Twin 42" x 40' Round

30" ` 34' DR. PIPE

STA. 338+64 LT.

00 55 1010 1515 2020 2525 3030 3535 4040 4545 5050 5555 6060 6565 7070 7575 8080 00 55 1010 1515 2020 2525 3030 3535 4040 4545 5050 5555 6060 6565 7070 7575 8080

1885 1885

1890 1890

1895 1895

1900 1900

1905 1905

1910 1910

FIELD DRIVE

1885

1890

1895

1910

1905

1900

1885

1890

1895

1900

1905

1910

STA. 338+64 LT.

PRELIMIN

ARY

Page 20: PROJECT NO. SHEET NO. INDEX OF SHEETS STATE OF ... Spalding...PROJECT NO. SHEET NO. G E N E R A L I N F O R M A T I O N C.N. G1 R OAD W AY D E S I GN D I V I S I ON C o m pu t e r:

42915

91-4(1012) R3R3

Date: 23-

SE

P-

2020 11:37

Co

mputer:

ND

OT

DE

SI

GN61

RO

AD

WA

Y

DE

SI

GN

DI

VISI

ON.

File:

Co

unty

Road

Culv

ert

Sheet 5 scale.dgn

PROJECT NO. SHEET NO.

C.N.

Sta. 0+47.26

30" ` 52' DR. PIPE

STA. 344+63 LT.

Sta. 0+44.42

Remove.

FL = 1900.45 FL = 1900.55

54'

Exc.=210 Cu. Yds.

Culvert Pipe Type 3.

Build Twin 42" x 54'

00 55 1010 1515 2020 2525 3030 3535 4040 4545 5050 5555 6060 6565 70 75 8000 55 1010 1515 2020 2525 3030 3535 4040 4545 5050 5555 6060 6565 7070 7575 8080

1895 1895

1900 1900

1905 1905

1910 1910

1915 1915

1920 1920

COUNTY RD 503A

1895

1900

1905

1910

1915

1920

1895

1900

1905

1910

1920

1915STA. 344+63 LT.

PRELIMIN

ARY

Page 21: PROJECT NO. SHEET NO. INDEX OF SHEETS STATE OF ... Spalding...PROJECT NO. SHEET NO. G E N E R A L I N F O R M A T I O N C.N. G1 R OAD W AY D E S I GN D I V I S I ON C o m pu t e r:

NOTES

PARTIAL PLAN AT END

R

Q

P

R

Q

FL

3"

WL

No. 4 bars

2-No. 4 bars

FS

WS

AL

(parapet)

S-8 bars

AS

90$

{

L

(turndown)

F-8 bars

B

B

Optional

No. 4 bent

bars at

18" ctrs. in turndown

$

culvert skew angle

Concrete box

SHORT WINGLONG WING

of wing wallFront face

4 bars

3-No.

? No. 4bent bars

1'-2"

8"

9"

2'-

0"

9"

1'-10"

2'-

0"

1'-2"

8"

9"

of wing wall

Front face

C Culvert

Half Span

CROSS SECTION OF SINGLE BOX

3"

S

3"

12"

18" ctrs.

bars at

No. 4 bent

bars (typ.)

No. 4

FRONT BACK

N

No. 4 bars (diagonal)

No. 4 bars at 18" ctrs.

No. 4 bars at 18" ctrs. (typ.)

Varies

Varies

}

SECTION A-A

9"

6"

8"

4"

3'-

0"

Varies

P

DESIGN DATA

Left-hand-back identical, but opposite-hand)

(Right-hand-back box culvert skew shown

TW

TW

TW

M

}

diameter of bar

Length = 36 x

W-10 bars

W-8 bars

match W-10 bars

W-9 bars to

W-7 bars

W-7 bars

CO

NC

RE

TE

BO

X

CU

LV

ER

T

SI

NG

LE S

PA

NH

L-93

1

2

C ProjectL

Long

Wing

Long

Wing

Skew Angle

LEFT-HAND-BACK SKEW

C ProjectL

LongWing

LongWing

RIGHT-HAND-BACK SKEW(with respect to C project)L (with respect to C project)L

` Culvert ` Culvert

90°

Skew Angle

90°

N/

A

TT

Ris

eT

B

2"

joint

construction

Optional

joint

Construction8"

4"

6"

8"

3•"

F-1

S-1

S-3

S-5 (typ.)S-6

F-3F-5 (typ.)F-6

W-6 at 12" ctrs. (typ.)

or greater

rise is 6'-0"

placed when the

W-5 bars to be\

Symm. about this centerline

` Box Culvert

Half SpanTO

J

C-4

C-2

W-1

W-2

C-3

C-1

Ga

Fa

Ea D

a

1'-6"

Eb

Db

A

Fb

Gb

No. 4 bars @ 18" ctrs.

STANDARD ORIENTATION SKETCH

1C

\

W-5

@

Eq.

Spa.

(Typ.)

Construct fence connections in accordance with the Standard Specifications.

Bar Detail. No allowances will be made for additional steel required for bar laps.

The contractor shall have the option of using dowel bars to match vertical wall bars as shown in the Optional

space from inside face of wall.

Spacing of S-5 bars equals (span length) divided by (number of S-5 bars), with first bar being placed one-half

Spacing of F-5 bars equals (span length plus 3•") divided by (number of F-5 bars minus 1).

bars, and S-3 bars midway between S-1 bars.

Place F-3 bars midway between F-1 bars, C-3 bars midway between C-1 bars, C-4 bars midway between C-2

Transverse barrel bars, except skew bars, shall be placed normal to the centerline of culvert.

but only for the portions below flow line.

Excavation for ends consists of neat excavation for barrel turndowns, wing footings and footing turndowns,

through ends of barrel, plus all concrete and steel not included in the barrel cross section.

Concrete and steel quantities for two ends include all concrete and steel beyond vertical planes passing

The minimum lap for spliced bars shall be 48 bar diameters.

length of barrel as shown in cross section.

Concrete and steel quantities per foot of barrel include concrete and steel in floor, walls and slab for one-foot

additional steel used in making splices.

Payment for reinforcing steel shall be based on quantities as shown, and no allowances will be made for

sizes are in customary U.S. units.

All reinforcing steel shall conform to the requirements of ASTM designation A-615/A-615M, grade 60. All bar

other bars, unless noted otherwise. Field bend and/or clip reinforcing bars to maintain minimum covering.

for bars near the underside of culvert floor and wing footings, 1•" for skew bars at parapets, and 2" for all

The minimum covering, measured from the face of the concrete to the surface of a reinforcing bar shall be 3"

All concrete shall be class 47B-3000.

Spacing of the No. 4 bent bars shall be 18" in the wing footing turndowns with or without construction joints.

will be made for additional No. 4 bent bars required because of reduced bar spacing.

bar size is a No. 8, spacing is 14" and if skew bar size is a No. 9, spacing is 10". No additional allowances

the skew bar size is a No. 7 or smaller, the spacing of the No. 4 bent bars in barrel turndown is 18", if skew

If a construction joint is used in the barrel turndown, then the spacing of bent bars shall be as follows: when

? Spacing of the No. 4 bent bars shall be 18" when the barrel turndown is cast as a unit with the barrel floor.

If culvert is skewed, see design data for number of F-8 and S-8 bars.

{ See design data for parapet width.

including subsequent revisions.

This structure is designed in accordance with the AASHTO LRFD Bridge Design Specifications, Eighth Edition,

91-4(1012)

42915

N/A

SP

AL

DI

NG

WE

ST

GR

EE

LE

Y

N-91

N/

A

331+

65

JG

HJ

GH

JW

BJ

UL

Y 2020

W-10 4 12.0" BARS AND OTHER WING BARS.

W-9 4 12.0" FOR PARAPET BARS, TURNDOWN

W-8 0 0.0" SEE PLAN VIEWS AND SECTIONS

W-7 4 12.0" NOTE:

BAR SIZE SPAC

STEEL FOR WINGS

XL = 0'- 0.0" XS = 0'- 0.0" T = 2'- 5.0" U = 3'- 0.0" BASE COURSE 4.83 CY

FL = 0'- 0.0" FS = 0'- 0.0" R = 1'- 2.0" S = 1'- 0.0" EXCAVATION 6 CY

WL = 8'- 3.0" WS = 8'- 3.0" P = 1'-11.0" Q = 1'-11.0" REINFORCING 901 LB

AL = 30.0 DEG AS = 30.0 DEG M = 0'- 0.0" N = 0'- 0.0" CONCRETE 10.74 CY

WALL THICKNESS (TW) = 8.0" QUANTITIES FOR WINGS ON TWO ENDS

WING ANGLES AND DIMENSIONS

PARAPET WIDTH = 8.0"

BASE COURSE 0.253 CY

REINFORCING 98.5 LB

CONCRETE 0.728 CY

QUANTITIES (PER FOOT OF BARREL)

F-6 4 4 W-6 4 8 S-6 4 4

F-5 4 6 W-5 4 4 S-5 4 6

F-3 5 18.0" 5'- 2.0" S-3 4 12.0" 4'-10.0"

W-2 4 6.0" 4'-11.0"

F-1 6 18.0" 9'- 4.0" W-1 4 12.0" 4'-11.0" S-1 5 12.0" 9'- 0.0"

C-3 5 18.0" 4'- 5.0" C-4 5 18.0" 4'- 6.0"

C-1 6 18.0" 5'- 2.0" C-2 5 18.0" 4'-10.0"

BAR SIZE SPAC NO LENGTH BAR SIZE SPAC NO LENGTH BAR SIZE SPAC NO LENGTH

BARREL REINFORCING STEEL

J = 1'- 7.0"

Db = 2'- 8.0" Eb = 2'- 3.0" Fb = 2'- 7.0" Gb = 2'- 3.0"

Da = 2'- 6.0" Ea = 2'- 2.0" Fa = 2'- 3.0" Ga = 2'- 3.0"

A = 1'- 5.0"

BARREL BAR DIMENSIONS

TOP (TT) = 8.0"

SIDE (TO) = 8.0"

BARREL SLAB THICKNESSES: BOTTOM (TB) = 8.0"

8 FT. 4 FT. 6 FT. 0 DEG. HL-93 FLARED TWO ENDS 3 : 1

SPAN RISE FILL SKEW DES LOAD WINGS WINGS ON WING SLOPE

REINFORCED CONCRETE BOX CULVERT DESIGN SINGLE SPAN AT STATION 331+65

File: cn42915jgh01.dgn

T1

Co

mputer:

ND

OT

BRI

DG

E23

Date: 20-J

UL-

2020 10:05

DESI

GN

ED BY

DET

AIL

ED BY

DA

TE

BRIDGE ENGINEER

CHEC

KED BY

CO

UN

TY

HW

Y. N

O.

REF. POST.

STA.

SPECIALPLAN NO.

LOC

ATIO

NSK

EW

RO

AD

WA

YDESI

GN

LIV

E LO

AD

PROJECT NUMBER SHEETNO.

C. N.

STRUCTURE NUMBER

BRI

DG

E

DI

VISI

ON.

NEBR

ASK

A

DEPA

RT

MEN

T

OF TR

ANSP

ORT

ATIO

N -

BRID

GE DIVISIO

N

Good Life. Great Journey.

DEPARTMENT OF TRANSPORTATIONPRELIMIN

ARY

Page 22: PROJECT NO. SHEET NO. INDEX OF SHEETS STATE OF ... Spalding...PROJECT NO. SHEET NO. G E N E R A L I N F O R M A T I O N C.N. G1 R OAD W AY D E S I GN D I V I S I ON C o m pu t e r:

ELEVATION OF WING

SECTION B-B(Transverse floor bars are not shown)

UT

3"

No. 4 bars at 18" ctrs. (front face)

2-No. 4 bars

and extend into wing as shown.

No. 4 bars in parapet. Field bend

S-6 Bar

TT

TB

Ris

e

A

A

S

*

*

XL or XS

N

3'-

0"

4"

TT

At inlet At outlet

(Transverse slab bars are not shown)

bars (typ.)

S-8 skew

at 18" ctrs. (typ.)

No. 4 bent bars No. 4 bars (typ.)

1•

" (typ.)

SECTION THROUGH PARAPETS

{ {

3"

TB

OPTIONAL BAR DETAIL

||

4"

9"

R=6"

18" (typ.)

TB

No. 4 bars

F-8 skew bar

? No. 4 bent bars

here when required.

Place third F-8 skew bar

1'-0"

9"

3'-

0"

2'-

6"

4"

Not to Scale

PLAN VIEWPLAN VIEW

(with paved apron(s))(without paved apron(s))

18"

(Typ.)

18"

(Typ.)

\

\

$ $

\

\

18" 18"

6"

SECTIONAL VIEW See Sheet 1 for quantities.

$ = Per linear foot of barrel quantity.

\ = Actual quantity for ends.

NOTE:

{ See design data for parapet width.

W-10 bars (back face)

W-8 (back face)

W-9 bars to match W-10 bars

CRUSHED ROCK BASE COURSE

2

2

end of CBC

Flowline at

F-8 skew bar

bar here when required

Place third F-8 skew

No. 4 bars

TB

8" 8"

4"

5'-

0" (min.) for ris

es greater than 5'-

0"

NOTES

9"

Sheet Piling

passage of reinforcing bars.

sheet piling to allow for

Burn or drill holes through

(Longitudinal section taken at midspan)

3'-

0" (min.) for ris

es of 5'-

0" or less

AT END OF BARREL FLOOR

OPTIONAL STEEL SHEET PILING TURNDOWN

9"

4"

Varies 8" 6"

8" 8"

4"

Bottom of wing footing

Top of wing footing

wing wallFront face of

5'-

0" (min.) for ris

es greater than 5'-

0" S

Sheet Piling

3'-

0" (min.) for ris

es of 5'-

0" or less

(For concrete box culvert wings)

OPTIONAL SHEET PILING TURNDOWN AT WING FOOTING

passage of reinforcing bars.

sheet piling to allow for

Burn or drill holes through

DIAGONAL REINFORCING AROUND CULVERT PIPENot to Scale

Culvert pipe

culvert pipe is required through CBC wall or wing wall.

Place No. 4 diagonal bars around pipe openings when a

bars (Typ.)

2-No. 4 diagonal

W-7 bars

ctrs. (each face)

No.

4 bars at 18"

and extend 2'-0" into wing.

Longitudinal bars in wall. Field bend

slightly below the level shown.

turndowns is permitted at or

the barrel and wing footing

? A construction joint through

or W-2 bar

48 times W-1

W-1 or W-2 bars

W-1 or W-2 bars.

size and spacing of

Dowel bars to match

All sheet piling shall be interlocking. Steel sheet piling shall have a 7 gauge thickness (minimum).

the Department.

labor and incidentals necessary to complete the work shall be supplied at no additional cost to

footing. All sheet piling, additional concrete, reinforcing steel, preparation, equipment, tools,

5'-0". The wing footing extension shall be poured monolithically with the rest of the wing

piling turndown shall be 3'-0" for rises of 5'-0" or less, and, 5'-0" for rises greater than

Additionally, the distance from the top of the wingwall footing to the bottom of the sheet

The wing footing thickness, shall be increased by an additional 4" around the sheet piling.

1C

CO

NC

RE

TE

BO

X

CU

LV

ER

T

SI

NG

LE S

PA

NH

L-93

N/

A

91-4(1012)

42915

N/A

SP

AL

DI

NG

WE

ST

GR

EE

LE

Y

N-91

N/

A

331+

65

JG

HJ

GH

JW

BJ

UL

Y 2020

File: cn42915jgh01.dgn

T2

Co

mputer:

ND

OT

BRI

DG

E23

Date: 20-J

UL-

2020 10:05

DESI

GN

ED BY

DET

AIL

ED BY

DA

TE

BRIDGE ENGINEER

CHEC

KED BY

CO

UN

TY

HW

Y. N

O.

REF. POST.

STA.

SPECIALPLAN NO.

LOC

ATIO

NSK

EW

RO

AD

WA

YDESI

GN

LIV

E LO

AD

PROJECT NUMBER SHEETNO.

C. N.

STRUCTURE NUMBER

BRI

DG

E

DI

VISI

ON.

NEBR

ASK

A

DEPA

RT

MEN

T

OF TR

ANSP

ORT

ATIO

N -

BRID

GE DIVISIO

N

Good Life. Great Journey.

DEPARTMENT OF TRANSPORTATIONPRELIMIN

ARY

Page 23: PROJECT NO. SHEET NO. INDEX OF SHEETS STATE OF ... Spalding...PROJECT NO. SHEET NO. G E N E R A L I N F O R M A T I O N C.N. G1 R OAD W AY D E S I GN D I V I S I ON C o m pu t e r:

PROJECT NO. SHEET NO.

C.N.

RO

AD

WA

Y

DE

SI

GN

DI

VISI

ON

Co

mputer:

ND

OT

DE

SI

GN61

Date: 23-

SE

P-

2020 11:37

File: 429150ds01.dgn

U1

SH

EE

T 1

OF 4 5104 1 e 00

SHEET 1 OF 4

SPECIAL PLAN 2C

42915

91-4(1012)

PRELIMIN

ARY

Page 24: PROJECT NO. SHEET NO. INDEX OF SHEETS STATE OF ... Spalding...PROJECT NO. SHEET NO. G E N E R A L I N F O R M A T I O N C.N. G1 R OAD W AY D E S I GN D I V I S I ON C o m pu t e r:

PROJECT NO. SHEET NO.

C.N.

RO

AD

WA

Y

DE

SI

GN

DI

VISI

ON

Co

mputer:

ND

OT

DE

SI

GN61

Date: 23-

SE

P-

2020 11:38

File: 429150ds01.dgn

U2

SH

EE

T 2

OF 4 5104 1 e 00

SHEET 2 OF 4

SPECIAL PLAN 2C

91-4(1012)

42915

PRELIMIN

ARY

Page 25: PROJECT NO. SHEET NO. INDEX OF SHEETS STATE OF ... Spalding...PROJECT NO. SHEET NO. G E N E R A L I N F O R M A T I O N C.N. G1 R OAD W AY D E S I GN D I V I S I ON C o m pu t e r:

PROJECT NO. SHEET NO.

C.N.

RO

AD

WA

Y

DE

SI

GN

DI

VISI

ON

Co

mputer:

ND

OT

DE

SI

GN61

Date: 23-

SE

P-

2020 11:38

File: 429150ds01.dgn

U3

SH

EE

T 3

OF 4 5104 1 e 00

SHEET 3 OF 4

SPECIAL PLAN 2C

91-4(1012)

42915

PRELIMIN

ARY

Page 26: PROJECT NO. SHEET NO. INDEX OF SHEETS STATE OF ... Spalding...PROJECT NO. SHEET NO. G E N E R A L I N F O R M A T I O N C.N. G1 R OAD W AY D E S I GN D I V I S I ON C o m pu t e r:

PROJECT NO. SHEET NO.

C.N.

RO

AD

WA

Y

DE

SI

GN

DI

VISI

ON

Co

mputer:

ND

OT

DE

SI

GN61

Date: 23-

SE

P-

2020 11:39

File: 429150ds01.dgn

U4

SH

EE

T 4

OF 4 5104 1 e 00

SHEET 4 OF 4

SPECIAL PLAN 2C

91-4(1012)

42915

PRELIMIN

ARY

Page 27: PROJECT NO. SHEET NO. INDEX OF SHEETS STATE OF ... Spalding...PROJECT NO. SHEET NO. G E N E R A L I N F O R M A T I O N C.N. G1 R OAD W AY D E S I GN D I V I S I ON C o m pu t e r:

PROJECT NO. SHEET NO.

C.N.

RO

AD

WA

Y

DE

SI

GN

DI

VISI

ON

Co

mputer:

ND

OT

DE

SI

GN61

Date: 23-

SE

P-

2020 11:39

File: 429150ds02.dgn

U5

SH

EE

T 1

OF 1 5101 1 e 00

SHEET 1 OF 1

SPECIAL PLAN 3C

42915

91-4(1012)

PRELIMIN

ARY

Page 28: PROJECT NO. SHEET NO. INDEX OF SHEETS STATE OF ... Spalding...PROJECT NO. SHEET NO. G E N E R A L I N F O R M A T I O N C.N. G1 R OAD W AY D E S I GN D I V I S I ON C o m pu t e r:

42915

91-4(1012) X1X1

Date: 23-

SE

P-

2020 11:40

Co

mputer:

ND

OT

DE

SI

GN61

RO

AD

WA

Y

DE

SI

GN

DI

VISI

ON.

File:

Dit

ch

Cle

ano

ut

XS

Sheets 10

Scale.dgn

PROJECT NO. SHEET NO.

C.N.

0 10' 20'

SCALE

Sta. 332+00.00 R1

3:1

1891.98

51.86

LT.,

El. 1891.98

70.01

LT.,

El. 1891.98

CL

Sta. 332+50.00 R1

3:1

1892.33

67.37

LT.,

El. 1892.89

65.70

LT.,

El. 1892.33

50.70

LT.,

El. 1892.33

CL

Sta. 333+00.00 R1

3:1

1892.68

64.60

LT.,

El. 1892.96

63.76

LT.,

El. 1892.68

48.76

LT.,

El. 1892.68

CL

Sta. 333+50.00 R1

3:1

63.78

LT.,

El. 1893.25

63.12

LT.,

El. 1893.03

48.12

LT.,

El. 1893.03

1893.03

CL

00 1010 2020 3030 4040 5050 6060 7070 8080 9090 100100 110110 120120 130130 140140 150150 160160

1880 1880

1885 1885

1890 1890

1895 1895

1900 1900

1905 1905

1910 1910

332+00.00

1880 1880

1885 1885

1890 1890

1895 1895

1900 1900

1905 1905

1910 1910

332+50.00

1880 1880

1885 1885

1890 1890

1895 1895

1900 1900

1905 1905

1910 1910

333+00.00

1880 1880

1885 1885

1890 1890

1895 1895

1900 1900

1905 1905

1910 1910

333+50.00

00 1010 2020 3030 4040 5050 6060 7070 8080 9090 100100 110110 120120 130130 140140 150150 160160

1880 1880

1885 1885

1890 1890

1895 1895

1900 1900

1905 1905

1910 1910

332+00.00

1880 1880

1885 1885

1890 1890

1895 1895

1900 1900

1905 1905

1910 1910

332+50.00

1880 1880

1885 1885

1890 1890

1895 1895

1900 1900

1905 1905

1910 1910

333+00.00

1880 1880

1885 1885

1890 1890

1895 1895

1900 1900

1905 1905

1910 1910

333+50.00

DITCH CLEANOUT

PRELIMIN

ARY

Page 29: PROJECT NO. SHEET NO. INDEX OF SHEETS STATE OF ... Spalding...PROJECT NO. SHEET NO. G E N E R A L I N F O R M A T I O N C.N. G1 R OAD W AY D E S I GN D I V I S I ON C o m pu t e r:

X291-4(1012)

42915

X2

Date: 23-

SE

P-

2020 11:40

Co

mputer:

ND

OT

DE

SI

GN61

RO

AD

WA

Y

DE

SI

GN

DI

VISI

ON.

File:

Dit

ch

Cle

ano

ut

XS

Sheets 10

Scale.dgn

PROJECT NO. SHEET NO.

C.N.

0 10' 20'

SCALE

Sta. 334+00.00 R1

3:1

1893.39

47.63

LT.,

El. 1893.39

62.63

LT.,

El. 1893.39

64.36

LT.,

El. 1893.97 CL

Sta. 334+50.00 R1

3:1

1893.75

46.70

LT.,

El. 1893.75

61.70

LT.,

El. 1893.75

64.21

LT.,

El. 1894.59

CL

Sta. 335+00.00 R1

3:1

46.04

LT.,

El. 1894.11

1894.11

61.04

LT.,

El. 1894.11

64.05

LT.,

El. 1895.12

CL

Sta. 335+50.00 R1

3:1

45.59

LT.,

El. 1894.47

1894.47

60.59

LT.,

El. 1894.47

63.25

LT.,

El. 1895.36

CL

00 1010 2020 3030 4040 5050 6060 7070 8080 9090 100100 110110 120120 130130 140140 150150 160160

1880 1880

1885 1885

1890 1890

1895 1895

1900 1900

1905 1905

1910 1910

334+00.00

1880 1880

1885 1885

1890 1890

1895 1895

1900 1900

1905 1905

1910 1910

334+50.00

1880 1880

1885 1885

1890 1890

1895 1895

1900 1900

1905 1905

1910 1910

1915 1915

335+00.00

1880 1880

1885 1885

1890 1890

1895 1895

1900 1900

1905 1905

1910 1910

335+50.00

00 1010 2020 3030 4040 5050 6060 7070 8080 9090 100100 110110 120120 130130 140140 150150 160160

1880 1880

1885 1885

1890 1890

1895 1895

1900 1900

1905 1905

1910 1910

334+00.00

1880 1880

1885 1885

1890 1890

1895 1895

1900 1900

1905 1905

1910 1910

334+50.00

1880 1880

1885 1885

1890 1890

1895 1895

1900 1900

1905 1905

1910 1910

1915 1915

335+00.00

1880 1880

1885 1885

1890 1890

1895 1895

1900 1900

1905 1905

1910 1910

335+50.00

DITCH CLEANOUT

PRELIMIN

ARY

Page 30: PROJECT NO. SHEET NO. INDEX OF SHEETS STATE OF ... Spalding...PROJECT NO. SHEET NO. G E N E R A L I N F O R M A T I O N C.N. G1 R OAD W AY D E S I GN D I V I S I ON C o m pu t e r:

X391-4(1012)

42915

X3

Date: 23-

SE

P-

2020 11:40

Co

mputer:

ND

OT

DE

SI

GN61

RO

AD

WA

Y

DE

SI

GN

DI

VISI

ON.

File:

Dit

ch

Cle

ano

ut

XS

Sheets 10

Scale.dgn

PROJECT NO. SHEET NO.

C.N.

0 10' 20'

SCALE

Sta. 336+00.00 R1

3:1

44.14

LT.,

El. 1894.83

59.14

LT.,

El. 1894.83

61.77

LT.,

El. 1895.79

CL

1894.83

Sta. 336+50.00 R1

3:1

1895.19

43.56

LT.,

El. 1895.19

58.56

LT.,

El. 1895.19

60.64

LT.,

El. 1895.88

CL

Sta. 337+00.00 R1

3:1

1895.55

43.14

LT.,

El. 1895.55

58.14

LT.,

El. 1895.55

59.39

LT.,

El. 1895.97

CL

Sta. 337+50.00 R1

3:1

42.16

LT.,

El. 1895.91

57.16

LT.,

El. 1895.91

59.16

LT.,

El. 1896.58

1895.91

CL

00 1010 2020 3030 4040 5050 6060 7070 8080 9090 100100 110110 120120 130130 140140 150150 160160

1885 1885

1890 1890

1895 1895

1900 1900

1905 1905

1910 1910

1915 1915

336+00.00

1885 1885

1890 1890

1895 1895

1900 1900

1905 1905

1910 1910

1915 1915

336+50.00

1885 1885

1890 1890

1895 1895

1900 1900

1905 1905

1910 1910

1915 1915

337+00.00

1885 1885

1890 1890

1895 1895

1900 1900

1905 1905

1910 1910

1915 1915

337+50.00

00 1010 2020 3030 4040 5050 6060 7070 8080 9090 100100 110110 120120 130130 140140 150150 160160

1885 1885

1890 1890

1895 1895

1900 1900

1905 1905

1910 1910

1915 1915

336+00.00

1885 1885

1890 1890

1895 1895

1900 1900

1905 1905

1910 1910

1915 1915

336+50.00

1885 1885

1890 1890

1895 1895

1900 1900

1905 1905

1910 1910

1915 1915

337+00.00

1885 1885

1890 1890

1895 1895

1900 1900

1905 1905

1910 1910

1915 1915

337+50.00

DITCH CLEANOUT

PRELIMIN

ARY

Page 31: PROJECT NO. SHEET NO. INDEX OF SHEETS STATE OF ... Spalding...PROJECT NO. SHEET NO. G E N E R A L I N F O R M A T I O N C.N. G1 R OAD W AY D E S I GN D I V I S I ON C o m pu t e r:

X491-4(1012)

42915

X4

Date: 23-

SE

P-

2020 11:40

Co

mputer:

ND

OT

DE

SI

GN61

RO

AD

WA

Y

DE

SI

GN

DI

VISI

ON.

File:

Dit

ch

Cle

ano

ut

XS

Sheets 10

Scale.dgn

PROJECT NO. SHEET NO.

C.N.

0 10' 20'

SCALE

Sta. 338+00.00 R1

3:1

41.25

LT.,

El. 1896.27

56.25

LT.,

El. 1896.27

58.58

LT.,

El. 1897.05

1896.27

CL

00 1010 2020 3030 4040 5050 6060 7070 8080 9090 100100 110110 120120 130130 140140 150150 160160

1885 1885

1890 1890

1895 1895

1900 1900

1905 1905

1910 1910

1915 1915

338+00.00

00 1010 2020 3030 4040 5050 6060 7070 8080 9090 100100 110110 120120 130130 140140 150150 160160

1885 1885

1890 1890

1895 1895

1900 1900

1905 1905

1910 1910

1915 1915

338+00.00

DITCH CLEANOUT

PRELIMIN

ARY

Page 32: PROJECT NO. SHEET NO. INDEX OF SHEETS STATE OF ... Spalding...PROJECT NO. SHEET NO. G E N E R A L I N F O R M A T I O N C.N. G1 R OAD W AY D E S I GN D I V I S I ON C o m pu t e r:

42915

91-4(1012) X5X5

Date: 23-

SE

P-

2020 11:40

Co

mputer:

ND

OT

DE

SI

GN61

RO

AD

WA

Y

DE

SI

GN

DI

VISI

ON.

File:

Field

Driv

e

Sheets 10

Scale.dgn

PROJECT NO. SHEET NO.

C.N.

0 10' 20'

SCALE

Sta. 0+15.00

1903.43

27.71

RT.,

El. 1903.59

26.65

LT.,

El. 1903.27

Sta. 0+20.00

1903.29

22.71

RT.,

El. 1903.48

22.25

LT.,

El. 1903.21

Sta. 0+25.00

18.89

RT.,

El. 1903.20

1903.27

18.01

LT.,

El. 1902.94

Sta. 0+30.00

1902.74

15.17

LT.,

El. 1902.46

16.22

RT.,

El. 1902.59

00 1010 2020 3030 4040 5050 6060 7070 8080 9090 100100 110110 120120 130130 140140 150150 160160

1890 1890

1895 1895

1900 1900

1905 1905

1910 1910

1915 1915

1920 1920

0+15.00

1890 1890

1895 1895

1900 1900

1905 1905

1910 1910

1915 1915

1920 1920

0+20.00

1890 1890

1895 1895

1900 1900

1905 1905

1910 1910

1915 1915

1920 1920

0+25.00

1885 1885

1890 1890

1895 1895

1900 1900

1905 1905

1910 1910

1915 1915

1920 1920

0+30.00

FIELD DRIVE

PRELIMIN

ARY

Page 33: PROJECT NO. SHEET NO. INDEX OF SHEETS STATE OF ... Spalding...PROJECT NO. SHEET NO. G E N E R A L I N F O R M A T I O N C.N. G1 R OAD W AY D E S I GN D I V I S I ON C o m pu t e r:

X691-4(1012)

42915

X6

Date: 23-

SE

P-

2020 11:40

Co

mputer:

ND

OT

DE

SI

GN61

RO

AD

WA

Y

DE

SI

GN

DI

VISI

ON.

File:

Field

Driv

e

Sheets 10

Scale.dgn

PROJECT NO. SHEET NO.

C.N.

0 10' 20'

SCALE

1902.17

14.42

LT.,

El. 1902.04

14.63

RT.,

El. 1902.08

Sta. 0+40.00

1901.80

13.53

RT.,

El. 1901.57

14.06

LT.,

El. 1901.61

Sta. 0+45.00

1901.4214.06

LT.,

El. 1901.14

11.92

RT.,

El. 1901.51

00 1010 2020 3030 4040 5050 6060 7070 8080 9090 100100 110110 120120 130130 140140 150150 160160

1885 1885

1890 1890

1895 1895

1900 1900

1905 1905

1910 1910

1915 1915

1920 1920

0+35.00

1885 1885

1890 1890

1895 1895

1900 1900

1905 1905

1910 1910

1915 1915

1920 1920

0+40.00

1885 1885

1890 1890

1895 1895

1900 1900

1905 1905

1910 1910

1915 1915

1920 1920

0+45.00

FIELD DRIVE

PRELIMIN

ARY

Page 34: PROJECT NO. SHEET NO. INDEX OF SHEETS STATE OF ... Spalding...PROJECT NO. SHEET NO. G E N E R A L I N F O R M A T I O N C.N. G1 R OAD W AY D E S I GN D I V I S I ON C o m pu t e r:

X791-4(1012)

42915

X7

Date: 23-

SE

P-

2020 11:40

Co

mputer:

ND

OT

DE

SI

GN61

RO

AD

WA

Y

DE

SI

GN

DI

VISI

ON.

File:

Field

Driv

e

Sheets 10

Scale.dgn

PROJECT NO. SHEET NO.

C.N.

0 10' 20'

SCALE

15.21

LT.,

El. 1900.61

1901.06

8.18

RT.,

El. 1901.51

10.29

RT.,

El. 1901.51

13.73

RT.,

El. 1900.31

Sta. 0+55.00

3:1

16.35

LT.,

El. 1900.15

1900.59

6.72

RT.,

El. 1901.50

8.73

RT.,

El. 1901.51

12.98

RT.,

El. 1899.93

Sta. 0+60.00

5:12:1

18.88

LT.,

El. 1899.61

7.27

RT.,

El. 1901.50

9.29

RT.,

El. 1901.51

15.47

RT.,

El. 1899.00

1900.11

00 1010 2020 3030 4040 5050 6060 7070 8080 9090 100100 110110 120120 130130 140140 150150 160160

1885 1885

1890 1890

1895 1895

1900 1900

1905 1905

1910 1910

1915 1915

1920 1920

0+50.00

1885 1885

1890 1890

1895 1895

1900 1900

1905 1905

1910 1910

1915 1915

1920 1920

0+55.00

1885 1885

1890 1890

1895 1895

1900 1900

1905 1905

1910 1910

1915 1915

1920 1920

0+60.00

FIELD DRIVE

PRELIMIN

ARY

Page 35: PROJECT NO. SHEET NO. INDEX OF SHEETS STATE OF ... Spalding...PROJECT NO. SHEET NO. G E N E R A L I N F O R M A T I O N C.N. G1 R OAD W AY D E S I GN D I V I S I ON C o m pu t e r:

X891-4(1012)

42915

X8

Date: 23-

SE

P-

2020 11:40

Co

mputer:

ND

OT

DE

SI

GN61

RO

AD

WA

Y

DE

SI

GN

DI

VISI

ON.

File:

Field

Driv

e

Sheets 10

Scale.dgn

PROJECT NO. SHEET NO.

C.N.

0 10' 20'

SCALE

Sta. 0+65.00

4:1 3:120.86

LT.,

El. 1899.09

8.75

RT.,

El. 1901.51

10.87

RT.,

El. 1901.51

17.54

RT.,

El. 1898.75

1899.50

Sta. 0+70.00

4:1 2:11898.88

22.73

LT.,

El. 1898.57

10.26

RT.,

El. 1901.50

12.26

RT.,

El. 1901.50

18.64

RT.,

El. 1898.75

Sta. 0+75.00

X

4:1

1898.33

11.76

RT.,

El. 1901.50

24.82

LT.,

El. 1898.04

00 1010 2020 3030 4040 5050 6060 7070 8080 9090 100100 110110 120120 130130 140140 150150 160160

1885 1885

1890 1890

1895 1895

1900 1900

1905 1905

1910 1910

1915 1915

1920 1920

0+65.00

1885 1885

1890 1890

1895 1895

1900 1900

1905 1905

1910 1910

1915 1915

1920 1920

0+70.00

1885 1885

1890 1890

1895 1895

1900 1900

1905 1905

1910 1910

1915 1915

1920 1920

0+75.00

FIELD DRIVE

PRELIMIN

ARY

Page 36: PROJECT NO. SHEET NO. INDEX OF SHEETS STATE OF ... Spalding...PROJECT NO. SHEET NO. G E N E R A L I N F O R M A T I O N C.N. G1 R OAD W AY D E S I GN D I V I S I ON C o m pu t e r:

X991-4(1012)

42915

X9

Date: 23-

SE

P-

2020 11:40

Co

mputer:

ND

OT

DE

SI

GN61

RO

AD

WA

Y

DE

SI

GN

DI

VISI

ON.

File:

Field

Driv

e

Sheets 10

Scale.dgn

PROJECT NO. SHEET NO.

C.N.

0 10' 20'

SCALE

Sta. 0+77.55

X

X

4:1

12.75

RT.,

El. 1901.50

14.90

RT.,

El. 1901.50

1898.0726.10

LT.,

El. 1897.76

Sta. 0+80.00

X

4:11897.89

11.30

RT.,

El. 1900.59

13.59

RT.,

El. 1900.47

27.34

LT.,

El. 1897.50

Sta. 0+84.90

1897.58

00 1010 2020 3030 4040 5050 6060 7070 8080 9090 100100 110110 120120 130130 140140 150150 160160

1885 1885

1890 1890

1895 1895

1900 1900

1905 1905

1910 1910

1915 1915

1920 1920

0+77.55

1885 1885

1890 1890

1895 1895

1900 1900

1905 1905

1910 1910

1915 1915

1920 1920

0+80.00

1885 1885

1890 1890

1895 1895

1900 1900

0+84.90

FIELD DRIVE

PRELIMIN

ARY

Page 37: PROJECT NO. SHEET NO. INDEX OF SHEETS STATE OF ... Spalding...PROJECT NO. SHEET NO. G E N E R A L I N F O R M A T I O N C.N. G1 R OAD W AY D E S I GN D I V I S I ON C o m pu t e r:

42915

91-4(1012) X10X10

Date: 23-

SE

P-

2020 11:40

Co

mputer:

ND

OT

DE

SI

GN61

RO

AD

WA

Y

DE

SI

GN

DI

VISI

ON.

File:

Additio

nal

Dit

ch

XS

Sheets 10

Scale.dgn

PROJECT NO. SHEET NO.

C.N.

0 10' 20'

SCALE

X

X

X

3:1

1897.10

49.86

LT.,

El. 1897.10

39.98

LT.,

El. 1897.10

CL

See "Berm Grading" Sheets for Details

XX

X 3:1

CL

1897.42

39.04

LT.,

El. 1897.42

49.12

LT.,

El. 1897.42

See "Berm Grading" Sheets for Details

X

X

X 3:1

CL

1897.74

38.65

LT.,

El. 1897.74

50.27

LT.,

El. 1897.74

See "Berm Grading" Sheets for Details

3:1

CL

1898.06

38.09

LT.,

El. 1898.06

53.09

LT.,

El. 1898.06

56.73

LT.,

El. 1899.27

00 1010 2020 3030 4040 5050 6060 7070 8080 9090 100100 110110 120120 130130 140140 150150 160160

1885 1885

1890 1890

1895 1895

1900 1900

1905 1905

1910 1910

1915 1915

339+00.00

1885 1885

1890 1890

1895 1895

1900 1900

1905 1905

1910 1910

1915 1915

339+50.00

1885 1885

1890 1890

1895 1895

1900 1900

1905 1905

1910 1910

1915 1915

1920 1920

340+00.00

1885 1885

1890 1890

1895 1895

1900 1900

1905 1905

1910 1910

1915 1915

1920 1920

340+50.00

DITCH CLEANOUT

PRELIMIN

ARY

Page 38: PROJECT NO. SHEET NO. INDEX OF SHEETS STATE OF ... Spalding...PROJECT NO. SHEET NO. G E N E R A L I N F O R M A T I O N C.N. G1 R OAD W AY D E S I GN D I V I S I ON C o m pu t e r:

X1191-4(1012)

42915

X11

Date: 23-

SE

P-

2020 11:40

Co

mputer:

ND

OT

DE

SI

GN61

RO

AD

WA

Y

DE

SI

GN

DI

VISI

ON.

File:

Additio

nal

Dit

ch

XS

Sheets 10

Scale.dgn

PROJECT NO. SHEET NO.

C.N.

0 10' 20'

SCALE

3:1

CL

1898.38

37.98

LT.,

El. 1898.38

52.98

LT.,

El. 1898.38

56.71

LT.,

El. 1899.62

3:1

CL

1898.70

37.80

LT.,

El. 1898.70

52.80

LT.,

El. 1898.70

57.68

LT.,

El. 1900.33

3:1

CL

1899.02

37.53

LT.,

El. 1899.02

52.53

LT.,

El. 1899.02

57.94

LT.,

El. 1900.82

00 1010 2020 3030 4040 5050 6060 7070 8080 9090 100100 110110 120120 130130 140140 150150 160160

1885 1885

1890 1890

1895 1895

1900 1900

1905 1905

1910 1910

1915 1915

1920 1920

341+00.00

1885 1885

1890 1890

1895 1895

1900 1900

1905 1905

1910 1910

1915 1915

1920 1920

341+50.00

1890 1890

1895 1895

1900 1900

1905 1905

1910 1910

1915 1915

1920 1920

342+00.00

DITCH CLEANOUT

PRELIMIN

ARY

Page 39: PROJECT NO. SHEET NO. INDEX OF SHEETS STATE OF ... Spalding...PROJECT NO. SHEET NO. G E N E R A L I N F O R M A T I O N C.N. G1 R OAD W AY D E S I GN D I V I S I ON C o m pu t e r:

X1291-4(1012)

42915

X12

Date: 23-

SE

P-

2020 11:40

Co

mputer:

ND

OT

DE

SI

GN61

RO

AD

WA

Y

DE

SI

GN

DI

VISI

ON.

File:

Additio

nal

Dit

ch

XS

Sheets 10

Scale.dgn

PROJECT NO. SHEET NO.

C.N.

0 10' 20'

SCALE

3:1

CL

1899.34

37.37

LT.,

El. 1899.34

52.37

LT.,

El. 1899.34

58.17

LT.,

El. 1901.46

3:1

CL

1899.66

37.82

LT.,

El. 1899.66

52.82

LT.,

El. 1899.66

57.71

LT.,

El. 1901.63

3:1

38.07

LT.,

El. 6394.94

52.94

LT.,

El. 6394.98

57.20

LT.,

El. 6396.55

CL

1899.94

3:1

CL

1900.30

52.67

LT.,

El. 1900.30

37.67

LT.,

El. 1900.30

58.04

LT.,

El. 1902.39

00 1010 2020 3030 4040 5050 6060 7070 8080 9090 100100 110110 120120 130130 140140 150150 160160

1890 1890

1895 1895

1900 1900

1905 1905

1910 1910

1915 1915

1920 1920

342+50.00

1890 1890

1895 1895

1900 1900

1905 1905

1910 1910

1915 1915

1920 1920

343+00.00

1890 1890

1895 1895

1900 1900

1905 1905

1910 1910

1915 1915

1920 1920

343+50.00

1890 1890

1895 1895

1900 1900

1905 1905

1910 1910

1915 1915

1920 1920

1925 1925

344+00.00

DITCH CLEANOUT

PRELIMIN

ARY

Page 40: PROJECT NO. SHEET NO. INDEX OF SHEETS STATE OF ... Spalding...PROJECT NO. SHEET NO. G E N E R A L I N F O R M A T I O N C.N. G1 R OAD W AY D E S I GN D I V I S I ON C o m pu t e r:

42915

91-4(1012) X13X13

Date: 23-

SE

P-

2020 11:40

Co

mputer:

ND

OT

DE

SI

GN61

RO

AD

WA

Y

DE

SI

GN

DI

VISI

ON.

File:

Spaldin

gWest

Ber

m

Sheets 10

Scale.dgn

PROJECT NO. SHEET NO.

C.N.

0 10' 20'

SCALE

Sta. 338+81.58 R1

X

X

-76.41,

El. 1901.50

1.5:

11.5:1

-83.23,

El. 1897.63

2'

CL

Sta. 339+00.00 R1

X

X

X

-76.86,

El. 1901.50

1.5:11.5:

1

-83.12,

El. 1897.99

-71.28,

El. 1898.45

2'

CL

Sta. 339+25.00 R1

XX

X

-77.35,

El. 1901.50

1.5:11.5:

1

-83.02,

El. 1898.39

-71.86,

El. 1898.50

2'

CL

00 1010 2020 3030 4040 5050 6060 7070 8080 9090 100100 110110 120120 130130 140140 150150 160160

1885 1885

1890 1890

1895 1895

1900 1900

1905 1905

1910 1910

1915 1915

1920 1920

338+81.58

1885 1885

1890 1890

1895 1895

1900 1900

1905 1905

1910 1910

1915 1915

1920 1920

1925 1925

339+00.00

1885 1885

1890 1890

1895 1895

1900 1900

1905 1905

1910 1910

1915 1915

1920 1920

1925 1925

339+25.00

BERM GRADING

PRELIMIN

ARY

Page 41: PROJECT NO. SHEET NO. INDEX OF SHEETS STATE OF ... Spalding...PROJECT NO. SHEET NO. G E N E R A L I N F O R M A T I O N C.N. G1 R OAD W AY D E S I GN D I V I S I ON C o m pu t e r:

X1491-4(1012)

42915

X14

Date: 23-

SE

P-

2020 11:40

Co

mputer:

ND

OT

DE

SI

GN61

RO

AD

WA

Y

DE

SI

GN

DI

VISI

ON.

File:

Spaldin

gWest

Ber

m

Sheets 10

Scale.dgn

PROJECT NO. SHEET NO.

C.N.

0 10' 20'

SCALE

Sta. 339+50.00 R1

XX

X

-77.85,

El. 1901.50

1.5:11.5:

1

-83.20,

El. 1898.60

-72.74,

El. 1898.76

2'

CL

Sta. 339+75.00 R1

X

X

X

-78.41,

El. 1901.50

1.5:11.5:

1

-82.83,

El. 1899.22

-73.46,

El. 1898.87

2'

CL

Sta. 340+00.00 R1

X

X

X

-78.97,

El. 1901.50

1.5:11.5:

1

-81.98,

El. 1900.16

-75.21,

El. 1899.67

2'

CL

00 1010 2020 3030 4040 5050 6060 7070 8080 9090 100100 110110 120120 130130 140140 150150 160160

1885 1885

1890 1890

1895 1895

1900 1900

1905 1905

1910 1910

1915 1915

1920 1920

1925 1925

339+50.00

1885 1885

1890 1890

1895 1895

1900 1900

1905 1905

1910 1910

1915 1915

1920 1920

1925 1925

339+75.00

1885 1885

1890 1890

1895 1895

1900 1900

1905 1905

1910 1910

1915 1915

1920 1920

1925 1925

340+00.00

BERM GRADING

PRELIMIN

ARY