Date: Issue: Ref: 2014 Thermographic Inspection (Project Name & Location) Accredited Thermographers

(Project Name & Location) - Amazon S3s3-ap-southeast-2.amazonaws.com/resources.farm1.mycms.me... · 2015-04-16 · Internal switchgear components and associated wiring were inspected

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: (Project Name & Location) - Amazon S3s3-ap-southeast-2.amazonaws.com/resources.farm1.mycms.me... · 2015-04-16 · Internal switchgear components and associated wiring were inspected

Date: Issue: Ref:

2014 Thermographic Inspection

(Project Name & Location)

Accredited Thermographers

Page 2: (Project Name & Location) - Amazon S3s3-ap-southeast-2.amazonaws.com/resources.farm1.mycms.me... · 2015-04-16 · Internal switchgear components and associated wiring were inspected

- 2 -

Issued By:

Thermal Imaging Services 8/139 Woolooware Rd Burraneer NSW 2230 T. (02) 9544 3588 F. (02) 9544 3688 E. [email protected]

Thermographer:

XXXXXXXXXXXXXX

Thermographer Accreditation No:

AINDT – XXXXX

IR Camera:

Manufacturer :- Serial No.:- Calibration Date :-

Client: XXXXXXXXXXXXXX

Client Representative:

XXXXXXXXXXXXXX

Location:

XXXXXXXXXXXXXX

REPORT DETAILS

Page 3: (Project Name & Location) - Amazon S3s3-ap-southeast-2.amazonaws.com/resources.farm1.mycms.me... · 2015-04-16 · Internal switchgear components and associated wiring were inspected

- 3 -

An Infrared Thermal Scan of Listed Electrical Switchboards was conducted XXXXXX. The complex was drawing load from the Local Supply Authority at time of inspection. Internal switchgear components and associated wiring were inspected for abnormal operating temperatures affected by load or equipment condition. Wiring and terminations were inspected for high resistance connections and insulation condition. Load conditions were as experienced during periods of normal demand. All inspected online switchboard components and associated wiring were thermally operating XXXXXXXXXXXXXXXXXX. Internal wiring insulation and terminations appear to be XXXXXXXXXXXXXXX.

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX Malcolm Rhind Level 2 AINDT Certification No. 2067

Date: / /

REPORT SUMMARY

Page 4: (Project Name & Location) - Amazon S3s3-ap-southeast-2.amazonaws.com/resources.farm1.mycms.me... · 2015-04-16 · Internal switchgear components and associated wiring were inspected

- 4 -

The information listed below is to assist in the interpretation and discharge of appropriate remedial action of reported faults or potential areas of concern. Recommendations listed within this report are within the area of our expertise and recommend you discuss the implementation of service/repair with your maintenance service provider. Scope Infrared Thermal scan of electrical switchgear and associated conductors to detect the evidence of equipment operating near or above rated thermal temperatures. Where possible load readings are taken to ensure proper diagnosis of prospective faults. Australian and IEC Standards along with Copper & Brass Association publication No.22 are used as benchmarks for assessing permissible temperature limits. Australian Standards state that in all switchboards the temperature rises (on the outer panels) shall be referred to ambient. Referring to accessible boards – i.e. touchable, the rise is not to exceed 30° C, non-accessible boards 40° C. (extract from AS3439.1 ‘Low voltage switchgear and controlgear assemblies’ Table 3 Temperature limits). Where higher temperatures are applied to components, the insulation maximum should not be exceeded Maximum temperatures (These are not recommended operating temperatures)

Bare Copper & Aluminium - 75° C MIMS cables – up to - 90° C PVC insulation V-75 cables - 75° C Silver/Nickel Coated cables - 105° C Actual Tin Coated cables - 90° C High temperature cables - 105° C Electrical Equipment - 50° C (to maintain maximum current and fault ratings) Connections – as above + 15° C

Method All accessible covers are removed from the switchboards with internal PVC shrouds removed when installed in a manner that facilitates safe removal. Switchboards assigned a segregation rating greater than two (2), in accordance with AS3439, or where fitted with internal busbar shrouds can be arranged to be scanned with the arrangement of at least two shutdowns to remove and reinstall covers. Internal metal covers will not be removed whilst the switchboard is on line.

An infrared radiometer with its range initially set at 20C to 40C is passed over all switchgear, bus system and cable connections. Areas displaying abnormal temperature variations are further investigated by means of equipment application analysis, load measurement and pinpoint temperature readings. Faults and areas of concern have infrared thermal and digital images saved for report and condition monitoring tasks. Thermal detection and analysis via infrared radiation is limited by the amount of current passing through the system. Equipment should be loaded to enable it to generate an appropriate amount of heat to detect an abnormality. The amount of current required to detect or analyse an abnormal thermal condition varies from system to system and is dependent on its current carrying capacity, ambient temperature and inherent design.

INSPECTION DETAILS

INSPECTION DETAILS

Page 5: (Project Name & Location) - Amazon S3s3-ap-southeast-2.amazonaws.com/resources.farm1.mycms.me... · 2015-04-16 · Internal switchgear components and associated wiring were inspected

- 5 -

Results A priority rating schedule along with suggested remedial action plans are included for prioritising rectification works. Where faults of a life or property threatening situation are detected, notification will be immediately made to the client’s representative. Ultimately it is the owner or plant operator’s responsibility to implement or gain further advice of the recommended repairs contained within this report. Each thermal image is uniquely identified to correspond with a label placed upon the affected equipment for ready identification by maintenance personnel.

Priority Rating Temp Rise ΔT⁰C Recommended Action

1 >40⁰C Corrective Action required immediately

2 >20⁰C - 40⁰C Corrective Action required as soon as possible

3 >10⁰C - 20⁰C Corrective Action required at scheduled maintenance

4 1⁰C - 10⁰C Condition monitor. Possible fault developing.

- - No Fault. Re-scan within 12 months

Licensed electricians must perform all repairs and service.

Page 6: (Project Name & Location) - Amazon S3s3-ap-southeast-2.amazonaws.com/resources.farm1.mycms.me... · 2015-04-16 · Internal switchgear components and associated wiring were inspected

- 6 -

Section Equipment Priority Page Mechanical Services Switchboard Located Level 4 Plant Room

Compressor 3 Motor Starter

2

7

House Services Panel Located Level 3 Riser

Fan Isolating Switch & DB-2 Isolating Switch

2

8

DB-8A Located Level 4 Riser

Main Switch

2

9

DB-3 Located Warehouse Ramp

Circuit Breaker 89-90

1

10

DB-4.4 Located Level 1 Riser

A phase circuit breaker chassis

1

11

Summary of Inspection List of Reported Items 12

List of Inspected Assets 13

Certification Details 14

TABLE OF CONTENTS

TABLE OF CONTENTS

Page 7: (Project Name & Location) - Amazon S3s3-ap-southeast-2.amazonaws.com/resources.farm1.mycms.me... · 2015-04-16 · Internal switchgear components and associated wiring were inspected

- 7 -

Inspected Equipment Operator:

Mechanical Services Switchboard Located Level 4 Plant Room

Malcolm Rhind

Equipment Compressor 3 Motor Starter

Equipment Type ABB A-63

Additional Information

Date 14/03/2011

Time 11:38 AM

Working conditions:

Located within a non ventilated environment

Thermoteknix TVS-600 11:38:04 AM 24/03/2011 e : 0.95 Bg : 35.9°C

-20.0

300.0

17.0

60.1

Celsius

20.0

25.0

30.0

35.0

40.0

45.0

50.0

55.0

51.4

Max.

75.8

75.8

IR Image Details

Image No.

Emissivity 0.95

Spot 1 51.4°C

Spot 2 75.8°C

Area 1 Max. 75.8°C

Area 2 Max. <unknown>

Background 36.0°C

Description of Fault High resistance A phase load side termination.

Priority Rating 2

Recommendation Re-scan within 12 months.

Previous Fault Description

Date Image

Vol. Code

Page Time

Remedial Action Taken

Authorised

Reference Image

Thermal Image

Page 8: (Project Name & Location) - Amazon S3s3-ap-southeast-2.amazonaws.com/resources.farm1.mycms.me... · 2015-04-16 · Internal switchgear components and associated wiring were inspected

- 8 -

Inspected Equipment Operator:

House Services Panel Located Level 3 Riser

Malcolm Rhind

Equipment Fan Isolating Switch & DB-2 Isolating Switch

Equipment Type Quicklag Q355C & Q3100CN

Additional Information

Date 20/04/2011

Time 07:18 AM

Working conditions:

Located within a non ventilated environment

Thermoteknix TVS-600 7:18:41 AM 20/04/2011 e : 0.95 Bg : 22.0°C

-20.0

300.0

17.8

67.0

Celsius

20.0

25.0

30.0

35.0

40.0

45.0

50.0

55.0

60.0

65.0

49.4

Max.

89.4

89.4 76.5

44.2

60.7

44.8

IR Image Details

Image No.

Emissivity 0.95

Spot 1 49.4°C

Spot 2 89.4°C

Area 1 Max. 89.4°C

Area 2 Max. <unknown>

Background 22.0°C

Description of Fault High resistance terminations. Variation in line and load side temperatures

Priority Rating 2

Recommendation Inspect contact surfaces and re-terminate. Ensure tunnel terminals are securely fitted to circuit breaker housings

Previous Fault Description

Date Image

Vol. Code

Page Time

Remedial Action Taken

Reference Image

Thermal Image

Page 9: (Project Name & Location) - Amazon S3s3-ap-southeast-2.amazonaws.com/resources.farm1.mycms.me... · 2015-04-16 · Internal switchgear components and associated wiring were inspected

- 9 -

Inspected Equipment Operator:

DB-8A Located Level 4 Riser

Malcolm Rhind

Equipment Main Switch

Equipment Type Quicklag Q3100C

Additional Information Loading A Phase – 89 Amperes B Phase – 32 Amperes C Phase – 38 Amperes

Date 2/05/2011

Time 08:41 AM

Working conditions:

Located within a ventilated environment

Thermoteknix TVS-600 8:41:04 AM 2/05/2011 e : 0.95 Bg : 25.1°C

-20.0

300.0

2.5

50.3

Celsius

5.0

10.0

15.0

20.0

25.0

30.0

35.0

40.0

45.0

31.3

Max.68.0

68.0

28.4

58.2

IR Image Details

Image No.

Emissivity 0.95

Spot 1 31.3°C

Spot 2 68.0°C

Area 1 Max. 68.0°C

Area 2 Max. <unknown>

Background 25.0°C

Description of Fault High resistance A phase connection. Unbalanced load

Priority Rating 2

Recommendation Ensure runnel terminal is securely fitted to circuit breaker housing. Re-tension termination. Re-distribute load over adjacent phases.

Previous Fault Description

Date Image

Vol. Code

Page Time

Remedial Action Taken

Authorised

Reference Image

Thermal Image

Page 10: (Project Name & Location) - Amazon S3s3-ap-southeast-2.amazonaws.com/resources.farm1.mycms.me... · 2015-04-16 · Internal switchgear components and associated wiring were inspected

- 10 -

Inspected Equipment Operator:

DB-3 Located Warehouse Ramp

Malcolm Rhind

Equipment Circuit Breaker 89-90

Equipment Type Hager

Additional Information Neutral Conductor

Date 23/04/2010

Time 09:30 AM

Working conditions:

Located within a ventilated environment

Thermoteknix TVS-600 9:30:38 AM 23/04/2010 e : 0.95 Bg : 24.9°C

-20.0

300.0

26.1

86.2

Celsius

30.0

35.0

40.0

45.0

50.0

55.0

60.0

65.0

70.0

75.0

80.0121.0

Max.121.0

60.0

IR Image Details

Image No.

Emissivity 0.95

Spot 1 121.0°C

Spot 2 60.0°C

Area 1 Max. 121.0°C

Area 2 Max. <unknown>

Background 25.0°C

Description of Fault High resistance termination.

Priority Rating 1

Recommendation Make good cable end and re-terminate

Previous Fault Description

Date Image

Vol. Code

Page Time

Remedial Action Taken

Authorised

Reference Image

Thermal Image

Page 11: (Project Name & Location) - Amazon S3s3-ap-southeast-2.amazonaws.com/resources.farm1.mycms.me... · 2015-04-16 · Internal switchgear components and associated wiring were inspected

- 11 -

Inspected Equipment Operator:

DB-4.4 Located Level 1 Riser

Malcolm Rhind

Equipment A phase circuit breaker chassis

Equipment Type Merlin Gerin

Additional Information

Date 24/03/2010

Time 08:26 AM

Working conditions:

Located within a non ventilated environment.

Thermoteknix TVS-600 8:26:28 AM 24/03/2010 e : 0.95 Bg : 24.9°C

-20.0

300.0

35.0

183.5

Celsius

40.0

60.0

80.0

100.0

120.0

140.0

160.0

>300.033.7

IR Image Details

Image No.

Emissivity 0.95

Spot 1 300.0°C

Spot 2 33.7°C

Area 1 Max. 300.0°C

Area 2 Max. <unknown>

Background 25.0°C

Description of Fault High resistance A phase connection to circuit breaker chassis

Priority Rating 1

Recommendation Replace circuit breaker chassis and make good connection hardware and conductor.

Previous Fault Description

Date Image

Vol. Code

Page Time

Remedial Action Taken

Reference Image

Thermal Image

Page 12: (Project Name & Location) - Amazon S3s3-ap-southeast-2.amazonaws.com/resources.farm1.mycms.me... · 2015-04-16 · Internal switchgear components and associated wiring were inspected

- 12 -

Authorised

Page 13: (Project Name & Location) - Amazon S3s3-ap-southeast-2.amazonaws.com/resources.farm1.mycms.me... · 2015-04-16 · Internal switchgear components and associated wiring were inspected

- 13 -

List of Reported Items

Switchboard Equipment Fault Priority/Recommendation Mechanical Services Switchboard Located Level 4 Plant Room

Compressor 3 Motor Starter

High resistance A phase load side termination was detected

2

Termination re-tensioned during inspection

House Services Panel Located Level 3 Riser

Fan Isolating Switch & DB-2 Isolating Switch

High resistance terminations. Variation in line and load side temperatures

2

Inspect contact surfaces and re-terminate. Ensure tunnel terminals are securely fitted to circuit breaker housings

DB-8A Located Level 4 Riser

Main Switch

High resistance A phase connection. Unbalanced load

2

Ensure runnel terminal is securely fitted to circuit breaker housing. Re-tension termination. Re-distribute load over adjacent phases.

DB-3 Located Warehouse Ramp

Circuit Breaker 89-90

High resistance termination.

1

Make good cable end and re-terminate

DB-4.4 Located Level 1 Riser

A phase circuit breaker chassis

High resistance A phase connection to circuit breaker chassis

1

Replace circuit breaker chassis and make good connection hardware and conductor.

Page 14: (Project Name & Location) - Amazon S3s3-ap-southeast-2.amazonaws.com/resources.farm1.mycms.me... · 2015-04-16 · Internal switchgear components and associated wiring were inspected

- 14 -

List of Inspected Assets

Location Switchboard Fault Comment Main Switch Room Main Switchboard Nil

PFC Unit 1 Nil

PFC Unit 2 Nil

Unmarked DB Nil

Admin. Block Data Recovery Room

UPS DB Nil

By Pass Switch Nil

Located Level 1 Riser DB-4.4 √ See Report Page 11

Under Art Department (Building Void)

DB-7 Nil

DB-8 Nil

Compressor Load Centre Nil

Under Administration Block DB-5 Nil

Air Conditioning Sub Board Nil

Warehouse Ramp DB-3 √ See Report Page 10

DB-3A Nil

Warehouse Mezzanine MCC Nil

Warehouse (Adj. Loading Dock)

DB-3C Nil

Warehouse Customer Service

DB-3D Nil

Warehouse (Rear Wall)

DB-6

Nil

DB-3CB Nil

Workshop Sub Board - No load

Located Level 4 Riser DB-8A

√ See Report Page 9

Level 4 Plant Room Mechanical Services Switchboard

√ See Report Page 7

House Services Panel Located Level 3 Riser

Fan Isolating Switch & DB-2 Isolating Switch

√ See Report Page 8

Data Room DB Nil

UPS By Pass Switch Nil

Book Fare Warehouse DB-1 Nil

Level 1 Admin. New Media

DB-2 Nil

DB-3 Nil

DB-3 (Special Purpose) Nil

Level 1 Comms. Room New Media

UPS -1 Sub Board Nil

UPS -2 Sub Board Nil

Page 15: (Project Name & Location) - Amazon S3s3-ap-southeast-2.amazonaws.com/resources.farm1.mycms.me... · 2015-04-16 · Internal switchgear components and associated wiring were inspected

- 15 -

ACCREDITATION DETAILS

ACCREDITATION DETAILS