19th January 2012
NATIONAL SEMINAR
TO
AT
1
19th January 2012
By
Vice President - HNPCL Mumbai
PRESENTATION ON
2
GOOD LEADERSHIP IS THE ART OF GETTING EXTRA ORDINARY WORK DONE THROUGH ORDINARY PEOPLE
3
PROJECT MANAGEMENT CONCEPT
1. PROJECT (CLAUSE NO. 1.3.6)
A UNIQUE SET OF COORDINATED ACTIVITIES,
WITH DEFINITE STARTING AND FINISHING POINTS
UNDERTAKEN BY AN INDIVIDUAL OR ORGANIZATION
TO MEET SPECIFIC OBJECTIVES WITHIN
DEFINED SCHEDULE,
COST AND
PERFORMANCE PARAMETERS.
AS PER BRITISH STANDARD BS 6079 : 1996, PROJECT MANAGEMENT IS DEFINED AS:
4
PROJECT MANAGEMENT CONCEPT
2. MANAGEMENT
PLANNING, MONITORING AND CONTROL
OF
THE FUNCTIONS SUPPORTING
THE COMPLETE CYCLE (FLOW) OF ACTIVITIES,
AND
THE ASSOCIATED FLOW OF INFORMATION..
5
3. PROJECT MANAGEMENT (CLAUSE 1.3.9)
PLANNING, MONITORING AND CONTROL OF ALL ASPECTS OF A PROJECT AND THE MOTIVATION OF ALL THOSE INVOLVED IN IT TO ACHIEVE THE PROJECT OBJECTIVES ON TIME AND TO THE SPECIFIED COST, QUALITY AND PERFORMANCE.
PROJECT MANAGEMENT CONCEPT
6
4. PROJECT MANAGEMENT ACTIVITY (PMA)
(CLAUSE 1.3.9)
AN OPERATION, WITHIN A WORK PACKAGE OF A WORK BREAKDOWN STRUCTURE, THAT IS A SPECIFIC ACTION TO BE COMPLETED TO AID THE FULFILLMENT OF THE PROJECT AS A WHOLE.
5. PROJECT MANAGER (CLAUSE 1.3.10)
THE INDIVIDUAL OR BODY WITH RESPONSIBILITY FOR MANAGING A PROJECT TO ACHIEVE SPECIFIC OBJECTIVES.
PROJECT MANAGEMENT CONCEPT
7
IT CAN BE ELABORATED AS THE INDIVIDUAL OR BODY WITH THE RESPONSIBILITY FOR MANAGING A CONTRACTED PROJECT BY CO ORDINATING PROJECT MANAGEMENT FUNCTIONS AMONG CUSTOMER, CONSULTANT, SUPPLIERS, AND PROJECT SITE IN THE FIELD OF ENGINEERING, MANUFACTURING, SUPPLIES, ETC FROM CONCEPT TO COMPLETION OF THE PROJECT IN LINE WITH THE CONTRACT AGREEMENT.
PROJECT MANAGEMENT CONCEPT
5. PROJECT MANAGER THE INDIVIDUAL OR BODY WITH RESPONSIBILITY
FOR MANAGING A PROJECT TO ACHIEVE SPECIFIC OBJECTIVES.
8
6. PROJECT LIFE CYCLE (CLAUSE 1.3.8)
THE SEQUENTIAL PHASES THROUGH WHICH A PROJECT PASSES TO REACH ITS OBJECTIVES.
PROJECT MANAGEMENT CONCEPT
9
a) Define phase
b) Plan phase
c) Implement phase
d) Close phase
1. DEFINE PHASE
1 DEFINE PHASE-
a) Project strategy – Project (Goal) is defined
If the Goal is -
S pecific
M easurable
A ttractive
R ealistic and it’s
T imeline is clear
then it is a SMART Goal
10
SUCCESS IS BEST ACHIEVED WHEN WE ARE CLEAR ABOUT THE GOAL AND FLEXIBLE ABOUT THE PROCESS OF GETTING THERE
PROJECT MANAGEMENT CONCEPT
11
Planning -
Setting a Direction for
a System and then
Guiding the systems to follow the Direction
12
2. PLAN PHASE
2 PLAN PHASE-
2.1 a) Product Break down Structure (PBD)
- Decide the Packages / Sub packages
- Group them according to strategy
- Define the scope clearly and award the job
b) Work Break down Structure (WBD)
- Estimate all the works to be done in order to create the packages / sub packages
- Estimate the duration for each work
- Make mile stone schedule
- Make L-1 schedule13
2. PLAN PHASE
2.2 PLAN INFRASTRUCTURAL PACKAGES
2.3 IDENTIFY UNREALISTIC DEAD LINE IF POSSIBLE REMOVE THEM OR HAVE ALTERNATE PLAN TO NULLIFY THEIR EFFECT.
2.4 PLAN TAKING INTO ACCOUNT FESTIVALS, HOLIDAYS, SEASONAL EFFECTS
2.5 IDENTIFY MAJOR MILESTONES TO BE ACHIEVED
2.6 IDENTIFY STATUTORY AND NON STATUTORY CLEARANCES
14
2. PLAN PHASE
POOR PLANNING DOCUMENTS ARE ONE IMPORTANT REASON FOR BAD PROJECT RESULTS IN TERMS OF ADDITIONAL, UNPLANNED WORK, TIME DELAY AND COST OVER RUN
15
2. PLAN PHASE
2.6 A) STATUTORY CLEARANCES
1. POLLUTION CLEARANCE WATER GOI / GOS
AND AIR
2. PROJECT IMPORT REGISTRATION MOP, GOI
3 ENVIRONMENTAL CLEARANCE MOEF, GOI
4 AVIATION CLEARANCE AAI, GOI
16
2. PLAN PHASE
2.6 B) NON-STATUTORY CLEARANCES
1 LAND AVAILABILITY AT PLANT AREA
2 FOR TRANSPORTATION OF COAL
3 TRANSPORTATION OF FUEL (SECONDARY FUEL)
4 REAL ESTATE RIGHTS & RIGHT TO ACCESS AND USE OF SITE, INCLUDING RIGHT OF WAY FOR ALL CORRIDORS TO THE FACILITY FROM NEAREST STATE HIGHWAY, R&R
5 MEGA POWER PROJECT STATUS
6 DEFENCE CLEARANCE17
2. PLAN PHASE
2.6 C) OTHER CLEARANCES
1 APPROVAL AS PER EXPLOSIVES ACT AND RULES
2 APPROVAL AND REGISTRATION OF STEAM GENERATOR AS PER INDIAN BOILER REGULATION
3 APPROVAL AS PER INDIAN ELECTRICITY ACT AND RULES FOR ELECTRICAL INSTALLATION
4 APPROVAL AS PER INDIAN PETROLEUM ACT AND PETROLEUM RULES FOR STORAGE AND
TRANSPORT OF PETROLEUM PRODUCTS
5 APPROVAL AS PER GAS CYLINDER RULES AND HANDLING AND TRANSPORT OF COMPRESSED GASES 18
2. PLAN PHASE
2.6 C) OTHER CLEARANCES
6 A) COLLECTION, STORAGE AND DISPOSAL OF WASTE
B) SITE CLEARANCES, SAFE REPORT AND SAFETY
AUDIT
7CONFIRMATION OF COLLECTOR / DIRECTORATE OF
TOWN AND PLANNING FOR THE USE OF THE SITE FOR
THE CONSTRUCTION AND OPERATION OF THE POWER
STATION AND FUEL FACILITY
8 CONSENT OF RELEVANT PANCHAYAT FOR THE
DEVELOPMENT OF PROJECT SITE AND THE
TOWNSHIP SITE
•APPROVAL OF CHIEF INSPECTOR OF FACTORIES OF
THE PROPOSED DESIGN AND CONSTRUCTION OF
POWER STATION AND FUEL FACILITY
19
2. PLAN PHASE
2.6 C) OTHER CLEARANCES
10 ALLOCATION / APPROVAL OF ELECTRIC SUPPLY FOR BULK CONSTRUCTION POWER
11 NO OBJECTION CERTIFICATE REGARDING AIR &
FUGITIVE EMISSIONS
12 NO OBJECTION CERTIFICATE FOR PLANT LAYOUT WITH REGARD TO ELECTRICAL EQUIPMENT, OPERATIONAL SAFETY
13 NO OBJECTION CERTIFICATE FOR STORAGE OF CONSTRUCTION MATERIALS, ETC. TILL COD OF THE PROJECT
14 NO OBJECTION CERTIFICATE FOR STORAGE OF CONSTRUCTION MATERIAL, FUEL OILS AND CHEMICALS, ETC. IN THE SCOPE OF THE CONTRACTOR, TILL COD OF THE PROJECT
20
2. PLAN PHASE
2.6 C) OTHER CLEARANCES
15 NOC FOR STORAGE OF DISTILLATE OIL
16 LOCAL APPROVAL FOR OPERATING THE PLANT
17 LOCAL APPROVAL OF ARCHITECTURAL PLANS FOR TOWNSHIP
18 CLEARANCE FOR LIFTS
19 APPROVALS / CLEARANCES FOR LABOUR / MAN POWER LIKE LICENSE FROM LABOUR
COMMISSIONER FOR CONSTRUCTION LABOUR, REGISTRATION OF WORKERS
20 EXPORT AUTHORISATION (EXPORT LICENSE)
21 CLEARANCE FOR EOT CRANE / OTHER BUILDING CRANES 21
2. PLAN PHASE
3.1. KICK-OFF MEETINGS-
KICK-OFF MEETING IS THE BEGINNING OF IMPLEMETATION PHASE.
3.2 A TYPICAL AGENDA FOR KICK-OFF MEETING –
1 Detail scope of works
2 Identification of packages and detail of respective LOIs
3 List of terminal points of contract
4 List of exclusions in the contract
5 Proposed date of signing of contract.
6 Allocation of works for various mfg units
3. IMPLEMENTATION PHASE
22
3.2 TYPICAL AGENDA FOR KICK-OFF MEETING CONTD….
7 Detail of co ordinators for all the agencies concerned with postal addresses, contact persons area wise, phone numbers, fax number, e-mail address, mobile number etc
8 Contract coordination procedure with Customer, Consultant, inter units
etc.
9 Document numbering and trasmittal
modalities.
10 Data for preparation of L1 / L2 networks
11 List of drawings to be approved by customer for all the packages. Schedule of submission and approvals with dates.
12 List of Quality plans to be approved by customer for all the packages.
Schedule of submission and approvals with dates.
3. IMPLEMENTATION PHASE
23
3.2 TYPICAL AGENDA FOR KICK-OFF MEETING CONTD….
13 List of Sub vendors to be approved by customer for all the packages.
Schedule of submission and approvals with dates.
14 Nomenculature of auxiliaries like fans, mills , pumps etc. ( Numbering from left to right or from right to left )
15 List of mandatory spares to be supplied under each package and unitwise allocation of the same.
16 List of special tools and tackles to be supplied for each package and
unitwise allocation of the same.
17 List of commissioning spares to be supplied for each package.
18 List of recommended spares if any
3. IMPLEMENTATION PHASE
24
3.2 TYPICAL AGENDA FOR KICK-OFF MEETING CONTD….
19 List of customer inputs with schedule dates
20 Clarity on Guarantee data schedule.
21 Detail regarding applicability of Liquidated damages clause.
22 Detail regarding Insurance coverage for transportation, storage, E&C
23 Clarity on Zero date of contract
24 Clarity on mode of material despatches
25 Address of the customer for despatching the materials, Name of the Rly siding, List of
transporters available and their addresses with contact person and phone numbers
26 Project schedule milestone wise.
3. IMPLEMENTATION PHASE
25
26
HINDUJ A NATIONAL POWER CORPORATION LIMITED VIZAG 2X520 MW
L-1 SCHEDULE VS ACTUAL (ANTICIPATED) UNIT-1
NOTE : UNIT-2 SHALL FOLLOW WITH A PHASE SHIFT OF 3 MONTHS
COMPLETED
IN PROGRESS
TO BE STARTED
SG
30.05.11
11.06.11
30.06.10
30.06.10
30.06.11
30.05.11
15.11.11
(08.01.12)
30.09.12
(30.09.12)
15.02.13
(15.02.13)
15.04.13
(15.04.13)
10.05.13
(10.05.13)
15.05.13
(15.05.13)
31.05.13
(31.05.13)
25.06.13
(25.06.13)
30.06.13
(30.06.13)
BLR
ZEROD
BES
DL SB BLU
HT
SVF
SYN
CF FL TO
TG
30.01.12
(30.01.12)
30.06.10
30.06.10
TG FD
15.02.12
(15.02.12)
15.03.12
(15.03.12)
15.11.12
(15.11.12)
30.01.13
(30.01.13)
31.03.13
(31.03.13)
30.04.13
(30.04.13)
ZEROD
CES
TES
OF
TBU
SL BG
SCHEDULE
ACTUAL (ANTICIPATED)
28.02.12
(28.02.12) TG FLR
CES – CONDENSER ERECTION START TES – TURBINE ERECTION START SL – STATOR LIFTING TBU – TURBINE BOX UP OF – OIL FLUSHING BG – BARRING GEAR SYN - SYNCHRONISATION TO – TRIAL OPERTION BES – BOILER ERECTION START DL – DRUM LIFTING HT – HYDRAULIC TEST BLU – BOILER LIGHT UP SB – STEAM BLOWING SVF – SAFETY VALVE FLOATING CF – COAL FIRING FL – FULL LOAD
3.2 TYPICAL AGENDA FOR KICK-OFF MEETING CONTD….
27 Clarity regarding commissioning, trial operation, final acceptance, defect
liability period etc.
28 Clarity on scope of consumables to be supplied during and after
commissioning.
29 Clarity on taxes and duties
30 Clarity on Terms of payment
31 Site office/ space requirement.
32 Requirement of construction power and construction water
3. IMPLEMENTATION PHASE
27
3.3 PREPARE L-1 NETWORK
3.4 GET L-2 NETWORK DULY MATCHED WITH L-1
3.5 FINALISE ENGINEERING INFORMATION FLOW SCHEDULE AND DISTRIBUTE TO CONCERNED
3.6 FINALISE QUALITY PLAN / FIELD QUALITY PLAN SCHEDULE AND DISTRIBUTE TO CONCERNED.
3.7 FINALISE BROAD BILLING BREAKUP IN LINE WITH LOA
3.8 FINALISE BILLING BREAK UP FOR INDIVIDUAL UNITS
3. IMPLEMENTATION PHASE
28
1. INDEX MAP SHOWING LOCATION OF THE PROJECT (ROAD MAP AS WELL AS RAIL MAP)
2. PROJECT INFORMATION – POSTAL ADDRESS, CONTACT POINTS OF CUSTOMER,
CONSULTANTS, SITE, FOR TECHNICAL AND FINANCIAL MATTERS
3. ALLOCATION OF SUPPLIES & SERVICES.
4. MILESTONES TO BE MONITORED
5. LIST OF MAJOR INPUTS FROM CUSTOMER
6. CONTRACT CO-ORDINATION PROCEDURE.
3.9 PREPARE CONTRACT HAND BOOK : IT SHALL CONTAIN THE FOLLOWING –
29
3. IMPLEMENTATION PHASE
30
31
7. CORRESPONDENCE/DOCUMENT TRANSMITTAL PROCEDURE.
8. EXTRACT OF SALIENT TERMS & CONDITIONS OF CONTRACT.
9. LIST OF SPARES TO BE SUPPLIED.
10. TRIAL OPERATION DETAILS AS PER CONTRACT.
11. GUARANTEED PARAMETERS FOR PG TEST.
12. TESTS TO BE CARRIED OUT
13. LD / PENALTY / BONUS DETAILS
32
3.9 CONTRACT HAND BOOK CONTD…..
3. IMPLEMENTATION PHASE
14. LIST OF EXCLUSIONS
15. STATUTORY APPROVAL DETAIL
16. L-1 NETWORK
17. FACILITIES TO BE PROVIDED BY CUSTOMER
18. CONSIGNEE ADDRESS
19. INDEX OF TENDER / OFFER DOCUMENTS
20. LIST OF TERMINAL POINTS
33
3.9 CONTRACT HAND BOOK CONTD…..
3. IMPLEMENTATION PHASE
3.10 REVIEW PROGRESS ON INFRASTURE, EXPEDITE AND FOLLOW UP ENABLING WORKS
3.11 EXPEDITE SUPPLY OF ERECTION DRAWINGS QUALITY PLANS TO SITE
3.12 EXPEDITE MATERIAL SUPPLY TO SITE
3.13 MAKE A ROLING PLAN OF 3 MONTHS MATERIAL REQUIREMENT.
3.14 ORGANISE MONTHLY REVIEW MEETING TO MONITOR AND CONTROL PROGRESS AS PER L-2 SCHEDULE
3. IMPLEMENTATION PHASE
34
Monitoring and Control A Management process in which -
(1) Actual performance is compared with planned
performance,
(2) Difference between the two is measured,
(3) Causes contributing to the difference are
identified, and
(4) Corrective Action is taken to eliminate or
minimize the difference
35
COMML
MAFGUNITS
& ENGGCENTRES
ISX
TSX
PUR
QLY
PREBID INVOLVEMENT
POST AWARDRECEIVE C I S &
CONT DOC
ORGANISEKICK OFF MTG
PREPARATION OF L-1SCH & CHB . RECEIVE L-
2s AND WITH L-1
PREPARATION OFENABLING WORK SCH &
EXPEDITE
COORDN FOR ENGG, QPAPPRL, VENDOR APPRL,
PROCUREMENT,TESTING, X-PORTN OF
CRITICAL PKGS
MONITOR PROGRESS,REVIEW PROJECT /
MILESTONE (PMX-F15)AND TAKE CORRECTIVE
ACTIONS FORDEVIATION
FREEZE SCOPE,INTERFACES, CUST
INPUTS & ESTABLISHCONT COORDN
PROCEDURE
RESOLVE CUSTCOMPLAINT
CONTRACT CLOSING(FORM PMX-F14)
C U
S T
O M
E R
R E
Q U
I R
E M
E N
T
CUSTOMER
CONSULTANT
C U
S T
O M
E R
S
A T
I S
F A
C T
I O
N
SOX
PROCESSMAP
MSX
CONTINUALIMPROVEMENT
IN PM PROCESS 36
3.15 PREPARE PHYSICAL AND FINANCIAL TURN OVER FOR THE ENTIRE CONTRACT PERIOD AND MONITOR THE SAME
3.11 PLAN, MONITOR AND CONTROL OF INFRASTRUCTURE AND ENABLING WORKS.
3. IMPLEMENTATION PHASE
37
4 CLOSURE PHASE-
a) Finalise documentation “As build” / “As done”
b) Collect and evaluate all lessons learnt.
Data Banking
It will be useful for next project
c) Close the project officially
4. PROJECT LIFE CYCLE
38
TRIAL OPERATION (ER/ UNITS)
PG TEST (ER/ UNITS)
TIME EXTENSION (WR/ UNITS) APPLIED GRANTED
RECONCILIATION OF MAIN SUPPLIES
UNITS PHY FIN
PEM (STN C&I) HWR TRY BAP BPL EDN HYD PC
UNIT - 1 UNIT - 2
UNIT - 1 UNIT - 2 BLR STG STN C&I ESP
RECONCILIATION OF SPARES INITIAL SPARES
UNITS PHY FIN PEM (C&I) HWR TRY BAP
BPL EDN HYD JHS PC
SUBMISSION OF DOCUMENTS AS BUILT/ DRGS / MANUALS/ PROTOCOLS
PEM HWR TRY BAP BPL EDN
HYD JHS PC ER
LIQUIDATION OF PENDING POINTS (UNITS / ER) NOS NIL
PEM HWR TRY BAP BPL
EDN HYD JHS PC ER
SITE CLOSED (ER : YES / NO
PAYMENTS OUTSTANDING TOTAL PEM HWR TRY BAP BPL EDN HYD JHS PC WR
CC MEETINGS INTERNAL WITH CUST
ZERO DATE : SCH. COMPLN. : ACT/ANT. COMPLN :
BANK GUARENTEES
INSURANCE :
LD AMOUNT WITH HELD ENGG SUPP E & C
RECONCILATION OF SPL T & P ( WR / UNITS ) PEM HWR TRY BAP BPL EDN HYD ER PC
BANK GUARANTEES STATUS OF PENDING ISSUES
BG NO DATE FOR AMOUNT Valid upto 1 2 TOTAL CONTRACT CLOSING NOTES 1 2 3
PROJECT MANAGEMENT : MUMBAI PMX-F20/00
CONTRACT CLOSING WINDOW STATUS AS ON : PROJECT : PROJECT : TOTAL CONTRACT VALUE :
39
40
FORMAT NO. PMX-F01/01SHEET NO. …. OF. ….
CONTRACT CO-ORDINATION PROCEDURE - DETAILS OF CO-ORDINATOR
PROJECT :
SL NO
AGENCY MAILING ADDRESS CO-ORDINATOR MOBILE NO. TELEPHONE NO (O)
TELEPHONE NO. (R)
FAX NO. e- MAIL AREA REMARKS
41
FORMAT NO. PMX-F02 / 01CORRESPONDENCE AND DOCUMENT TRANSMITTAL PROCEDURE
PROJECT :
INITIATING ADDRESSED HNPCL HNPCL CONSULTANT OTHERS BHEL BHELAGENCY TO ENGINEERING SITE PMG UNIT
01. CORRESPONDANCE ( TECHNICAL )
BHEL UNIT HNPCLCONSULTANTOTHERS
HNPCL CONSULTANTOTHERS / BHEL PMGBHEL UNIT
CONSULTANT HNPCLOTHERSBHEL UNITS
OTHERS HNPCLCONSULTANTBHEL UNIT
02. CORRESPONDANCE ( COMMERCIAL )
BHEL UNIT HNPCL( PS COMMERCIAL ) CONSULTANT
OTHERS
HNPCL CONSULTANTOTHERS / BHEL PMGBHEL UNIT / PSCM
CONSULTANT HNPCLOTHERSBHEL UNITS
OTHERS HNPCLCONSULTANTBHEL UNIT
03. DRAWINGS FOR INFORMATION/APPROVAL
BHEL UNIT HNPCL / CONSULTANTOTHERS
HNPCL/CONSL OTHERSBHEL UNIT
OTHERS HNPCL / CONSULTANTBHEL UNIT
04. FINAL DRAWING
BHEL UNIT HNPCL / CONSULTANTOTHERS
HNPCL/CONSUL OTHERSBHEL UNIT
OTHERS HNPCL / CONSULTANTBHEL UNIT
BHEL UNIT HNPCL / CONSULTANTOTHERS
OTHERS HNPCL / CONSULTANTBHEL UNIT
NUMBER OF COPIES
05. INSTRUCTION MANUALS
42
ENGINEERING INFORMATION FLOW SCHEDULE
FROM TO SCH. ACT. SCH. ACTUAL
REMARKSFOR MILE STONE
NOTE :-
FINAL APPL.
1. To be filled as per information received from Engg Centres and Manufacturing Units.2. Distribution direct from source to other Engg Centres and Manufacturing units with copy to Proj Manager.
FORMAT NO. PMX-F04 / 01
PROJECT :
SL. NO.
DESCRIPTION DRAWING / DOCUMENT
NUMBER
AGENCY FIRST SUBMISSION
43
FORMAT NO. PMX-F05 / 01
QUALITY PLAN SCHEDULE PROJECT :
SCH. ACT. SCH. ACTUAL
NOTE :- Compiled by : ( Project Manager )
REMARKSSL. NO.
1. To be filled up as per information received from Engg Centres, Manufacturing Units, Head (Quality).
AGENCYQUALITY PLAN
NUMBER DESCRIPTION
FIRST SUBMISSION APPROVAL
44
FORMAT NO. PMX-F10 / 02
PROJECT :
FROM TO
LIST OF MANPOWER IDENTIFIED FOR SITE ( TO BE FURNISHED BY SMX 7 TSX WITHIN 2 WEEKS OF RECEIPT OF CONTRACT HANDBOOK )
SL. NO.
CATEGORY SCHEDULED DEPLOYMENT ACTUAL DATE OF POSTING
REMARKS
45
FORMAT NO. PMX-F12/01
ZERO DATE (PROJ) :
CIS RECEIPT DATE :
ZERO DATE (ERN) :
ERECTION START :
PROJECT COMPLETION :
SL NO
DISCRIPTION PRIM. RESP.
SCH SCH. DATE ACT. DATE
REMARKS
1 CONTRACT HANDBOOK PMX 62 L1 NETWORK PMX 63 L2 NETWORK FOR INSTALLATION ISX 6
4 SITE OPENING ISX 85 IDENTIFY CONST. MANAGER ISX 46 IDENTIFICATION AND
DEPLOYMEN PLAN FOR SITE STAFF
ISX TSX
4
7 PACKAGING OF SUB-CONTRACTOR
PMX 6
8 COMPLETE INPUT DATA FOR TENDER PREPARATION
PMX 3
9 SITE MOBILISATION BY SUB CONTRACTOR FOR
PUR
a. TURBINE/GENERATOR & AUXb. BOILER
10 SITE OFFICE( BUILDING) ISX11 MATL, STORAGE WITH WATCH &
WARDISX
12 COMMUNICATION FACILITIES TO BE ARRANGED
MSX
a. V-STATb. P&T Phonesc. FAX/COMPUTERS
13 FIRE FIGHTING AND SAFTY ARRNAGEMENTS
SITE
14 T&P IDENTIFICATION & DEPLOYMENT PLAN
ISX
15 IMTE IDENTIFICATION & DEPLOYMENT PLAN
TSX
16 INSURANCE PUR17 BILLING SCHEDULDE
FINALISATION FOR SUPPLYUNITS
18 BILLINGSCHEDULDE FINALIATION FOR ERECTION
ISX
19 ERECTION GUIDE LINES TSX20 INSTALLATION DRAWINGS PMX21 CONTRACT DOCUMENT PMX22 STORAGE AND PRESERVATION
MANUALSTSX
23 QUALITY SYSTEM DOCUMENTS QLY24 FQA CHECK LIST QLY25 CONST WATER& POWER SITE
ENABLING WORKS
PROJECT MANAGEMENT
(STATUS AS ON 24TH OF --------. )PROJECT :
46
FORMAT NO. PMX-F15/00
PROJECT : AS ON :
:
CONTRACT VALUE : REVIEW DATE :
SCOPE
DESCRIPTION SCHEDULE ACT/(ANT) DESCRIPTION SCHEDULE ACT/(ANT)
UPTO LAST YEAR
BALANCE UPTO MONTH
FOR THE MONTH
PHYSICAL SCH
ACT
FINANCIAL SCH
ACTBRIEF STATUS
CRITICAL ISSUES
OVERVIEW ( BUDGET )
FOR THE YEAR
COMMG DATE :
PROJECT SCHEDULE ( MILESTONES )
CONTRACT PERIOD : CONTRACT TODAY IS IN MONTH
CONSULTANT : ERECTION START :
ZERO DATE :
HINDUJA NATIONAL POWER CORPORATION LIMITEDPROJECT MANAGEMENT : MUMBAI
CUSTOMER : PROJECT :
-50
0
50
100
150
200
250
300
350
349
43
350
34
351
25
352
17
353
09
354
00
354
90
355
82
356
74
357
65
ENGINEERING
Cum. Sch.
Cum. Act.
1
100
75.5
0
20
40
60
80
100
120
355
21
355
82
356
43
357
04
357
65
358
27
358
86
359
47
360
08
360
69
361
30
361
92
362
51
363
12
363
73
ERECTION SCHEDULE VS ACTUAL - UNIT - 1 SG
Sch. Erection cum.
Actual erection cum
1
10095.5
0
20
40
60
80
100
120
355
21
355
82
356
43
357
04
357
65
358
27
358
86
359
47
360
08
360
69
361
30
361
92
357
35
ENGINEERING
Sch. Erection cum.
Actual erection cum
1
10095.5
0
20
40
60
80
100
120
355
21
355
82
356
43
357
04
357
65
358
27
358
86
359
47
360
08
360
69
361
30
361
92
357
35
ERECTION SCHEDULE VS ACTUAL - UNIT - 1 T G
Sch. Erection cum.
Actual erection cum
51530
5075105
145
195225
245255260265270273275
2102237
5777
97127
157182
212237
252262269275
0
50
100
150
200
250
300
Jan-
01
Ma
r-01
Ma
y-0
1
Jul-0
1
Sep
-01
No
v-0
1
Jan-
02
Ma
r-02
Ma
y-0
2
Jul-0
2
(1) ENGINEERING - HYD
Sch Cum
Act Cum
5153050
75105
145
195225
245255260265270273275
210223757
7797127
157182
212237252262269275
0
50
100
150
200
250
300
De
c-0
0
Fe
b-01
Apr
-01
Jun-
01
Aug
-01
Oct
-01
De
c-0
1
Fe
b-02
Apr
-02
Jun-
02
(2) ENGINEERING - TRY
Sch Cum
Act Cum
515305075105
145195
225245255260265270273275
2102237577797127
157182
212237252262269275
0
50
100
150
200
250
300
Jan-
01
Ma
r-01
Ma
y-0
1
Jul-0
1
Sep
-01
No
v-0
1
Jan-
02
Ma
r-02
Ma
y-0
2
Jul-0
2
(3) ENGINEERING - PC
Sch Cum
Act Cum
47
FORMAT NO. PMX-F18 / 00
HINDUJA NATIONAL POWER CORPORATION LIMITEDPROJECT MANAGEMENT : MUMBAI
PROJECTS :
SL No
CURRENCY
HARDWARHYDERA
BADEDN
B' LOREIS BHOPAL PEM
PC CHENNAI
TRICHY PSWR TOTAL
SUPPLYFREIGHT INSURANCE
SUPPLYFREIGHT INSURANCE
SUPPLYFREIGHT INSURANCE
4 SUPERVISION
5 TRG CHARGE SUPPLY
SUPPLYFREIGHT INSURANCE
PRICE ALLOCATION FOR EPC CONTRACT
MAIN SUPPLY CONTRCT
MANDATORY SPARES
SPECIAL TOOLS & TACKLES
TOTAL
1
2
3
48
ACTION PLAN FOR COMPLETING THE WORK IN SPECIFIED TIME
USE OF INTEGRATED PROJECT MGMT. SYSTEM
1. PROJECT MANAGEMENT FROM CONCEPT TO COMMISSIONING.
2. USE OF LEVEL 1, LEVEL 2 AND LEVEL 3 NETWORKS FOR MANUFACTURING, ERECTION & COMMISSIONING.
3. EXPEDITING INTERFACE REQUIREMENTS FOR CUSTOMER’S SCOPE OF WORKS.
49
4. RESOURCE PLANNING ON
- SITE INFRASTRUCTURE
- MAJOR TOOLS AND PLANTS
- CONSUMABLES
5. EXPEDITING FEEZING OF DRWINGS, DOCUMENTS & MANUALS.
6. MONITORING & EXPEDITING BOUGHT OUT ITEMS.
7. MONITORING AND CONTROLLING PROGRAMMES.
ACTION PLAN FOR COMPLETING THE WORK IN SPECIFIED TIME
50
8. CONSTRUCTION PLANNING AT SITE.
9. WORKING OUT PROPER SEQUENCES OF ERECTION
10. MANAGEMENT INTERVENTION & FOLLOW UP
11. WORKING ON PARALLEL ACTIVITIES.
ACTION PLAN FOR COMPLETING THE WORK IN SPECIFIED TIME
51
EXTENSION OF CONTRACT PERIOD PREPARE GROUND FOR GETTING CONTRACT PERIOD EXTENDED WITHOUT LEVY OF LD
REASONS FOR DELAY BY CUSTOMER, CONSULTANTS AND MANUFACTURING UNITS TO BE RECORDED WITH DOC. EVIDENCE
REASONS FOR DELAY BEYOND CONTROL OF CONTRACTOR OR OWNER TO BE RECORDED WITH DOCUMENTARY EVIDENCE LIKE –
A. NATURAL CALAMITY – FLOOD, DROUGHT, EARTHQUAKES, EPIDAMICS, CYCLONE, HURRICANE, NUCLEAR DISASTER ETCB. ACTS OF ANY GOVT. DOMESTIC OR FOREIGN – DECLARED OR UNDECLARED WAR, EMBARGOES ETCC. REBELLION, REVOLUTION, USURPATION OF CIVIL OR MILITARY GOVT. CONSPIRACY AND TERRORIST ACTSD. FAILURE OF ANY LOCAL, STATE OR NATIONAL GOVT AUTHORITY IN PROTECTING THE PROJECT
ANY ACTION BY CUSTOMER OR CONSULTANTS WHICH RESULTED IN ANY INCREASE IN COST TO BE RECORDED WITH DOC. EVIDENCETO GET COMPENSATION
1
2
3
4
52
PROJECT MANAGEMENT : PSWR : NAGPUR
STATISTICAL ANALYSIS SHOWS DELAY IN CONTRACT CLOSING IS DUE TO THE FOLLOWING WHICH NEEDS TO BE ADDRESSED :
1. DELAY IN ENGINEERING.
2. DELAY IN ENGINEERING AND APPROVALS OF DRAWINGS FOR B.O.Is.
3. DELAY DUE TO LATE RESOLUTION OF ENGINEERING INTERFACES BETWEEN UNIT TO UNIT, UNIT TO VENDORS AND DIFFERENT PRODUCT GROUPS.
4. DELAY IN ORDERING.
5. DELAY IN PIPING ENGINEERING.
53
PROJECT MANAGEMENT : PSWR : NAGPUR
STATISTICAL ANALYSIS SHOWS DELAY IN CONTRACT CLOSING IS DUE TO THE FOLLOWING WHICH NEEDS TO BE ADDRESSED :
6. DELAY IN PREPARATION OF CABLE SCHEDULE AND TERMINATION DETAILS.
8. DELAY IN INSPECTION.
12. DELAY IN SUBMISSION OF TIME EXTENSION CASE.
7. DELAY IN APPROVAL OF VENDOR DRGS & DATA SHEETS.
9. EXTRAORDINARY DELAY IN RETIREMENT OF DOCUMENTS FOR BOIs
10. DELAY IN COMPLETION OF TRIAL OPERATION
11. DELAY IN CONDUCTING PG TEST.
54
PROJECT MANAGEMENT : PSWR : NAGPUR
STATISTICAL ANALYSIS SHOWS DELAY IN CONTRACT CLOSING IS DUE TO THE FOLLOWING WHICH NEEDS TO BE ADDRESSED :
13. DELAY IN RECONCILIATION OF MAIN SUPPLIES.
14. DELAY IN HANDING OVER OF INITIAL SPARES TO CUSTOMER AND RECONCILIATION THEREOF.
15. DELAY IN HANDING OVER OF SPECIAL TOOLS & TACKLES
16. DELAY IN SUBMISSION OF DRAWINGS , DOCUMENTS O&M MANUALS AND AS BUILT DRAWINGS.
17. DELAY IN LIQUIDATION OF PENDING POINTS.
18. DELAY IN COMPLETION OF STATUTORY REQUIREMENTS.
55
56