SOLAR WATER PUMP
INSTALLATION OF SOLAR WATER PUMP IN SINDH
A PROJECT OF EBR ENERGY(PVT)PAKISTAN
GROUP MEMBER
∆ HAMZA SHAUKAT
I.A.S DEPARTMENT
PUNJAB UNIVERSITY LAHORE
∆ WWW.HAMZA20.MAGIX.NET
TABLE OF CONTENT
∆ COMPANY PROFILE
∆ SERVICES
∆ INTRODUCTION OF PROJECT
∆ TYPES OF PUMP
∆ FUNCTIONING OF SOLAR WATER PUMP
∆ COMPARISION BETWEEN DIESEL AND SOLAR PUMP
∆ PROJECT OVER VIEW
∆ PROJECT LIFE CYCLE
∆ CONCLUSION & RECOMMENDATION
∆ EBR energy Pakistan (Pvt) limited is a leading renewable energy (RE)
company focusing on solar PV, solar thermal and wind energy solutions. EBR
energy has already established itself as one of the leading firms in the renewable
energy field .
∆ EBR energy we're working hard to provide alternative
energy solutions to Pakistan's homes and businesses
every day. Our quality products and unmatched service
have made us the alternative energy leader for homes,
businesses and government agencies.
∆ No matter what the size of your project, we deliver
equipment tailored to your power and cost requirements.
∆ EBR energy has a dedicated team of professional licensed engineers and
NABCEP (north American board of certified engineer practitioners) certified
system installers to design and deliver systems that not only meet regulatory
requirements but also meet customers' expectations.
COMPANY PROFILE
COMPANY VISIONProvide Pakistani consumer with alternate source of electricity generation solution at a cost-effective price.
COMPANY MISSION Is to "provide alternative sources of electricity at cost effective prices" to all consumer sectors with a special focus on commercial, residential and rural communities.
COMPANY COMMITMENT:We provide services from the equity all the way to commissioning of the system. All services performed by EBR energy Pakistan are 100% guaranteed .
EBR Energy has expertise in the following areas: Grid-Tied PV Systems Off-Grid (remote) Energy System Solar Thermal Systems Micro Wind Turbine Systems System Design System Installation
SERVICES
Solar Photovoltaic (PV)Solar water pumpsFeasibility studyDetailed engineering designingProcurementLogisticsInstallationsCommissioningMonitoring
INTRODUCTION OF PROJECT
SOLAR WATER PUMP• If you need to supply water beyond the reach of power lines, then
solar power can solve the problem.• Photovoltaic powered pumps provide a welcome alternative to fuel-
burning engines, windmills, and hand pumps. Thousands of solar pumps are working throughout the world.
• They produce best during sunny weather, when the need for water is greatest. Photovoltaic (PV) modules (i.e. Solar electric panels) produce electricity from sunlight using silicon cells, with no moving parts.
• They have been mass-produced since 1979. They are so reliable that most manufacturers give a 20-year warranty, and a life expectancy beyond 30 years. They work well in cold or hot weather.
Domestic Water:
Solar pumps are used for private
homes, villages, medical clinics, etc. A water pump can
be powered by its own PV array, or by a main system
that powers lights and appliances
Livestock Watering:
It can also be use for watering of livestock in those areas
where there is no supply of power and maintenance cost
is higher.
Irrigation:
Solar pumps are used on small farms, orchards and gardens.
It is most economical to power the pump directly from the
PV array (without battery), store water in a tank, and then
distribute it by gravity flow.
USES OF SWP
SIGNIFICANCE
Save electricity. Environment friendly water pumping. Reliable and less maintenance cost. Efficient and cheaper than other way of
pumping water. Helps to pump water in those areas where maintenance cost is
higher and no supply of electricity.
PUMP TYPES
There is a large variety of solar water pump types in the market. The most common types of mechanisms are
Helical rotor (mono) Centrifugal Piston or diaphragm
Our project includes only the installation of helical rotor pump so we discuss only this.
FUNCTIONING OF HELICAL ROTOR SOLAR PUMPS:
The pump is mounted on a submersible motor and is submerged below the water level in the borehole. Electricity is provided by a solar panel array installed within a close distance from the borehole.
The Unit Water Cost (UWC): the cost of a specific volume
of water that one has to sell to recover the capital cost.Maintenance cost and
operating cost of a pump over the full life cycle.
Very often investment decisions are based only on
the cost for purchasing .
The cost of the diesel pump Maintenance costs. For diesel pumps, as every farmer
knows, these costs are significant. Already at this point the diesel pump is
twice as expensive as the solar pump.
COMPARISON BETWEEN SOLAR WATER PUMP AND DIESEL PUMP
PROJECT OVERVIEW
The project comprises of installation of solar water pump in the Mitthi area of Sindh. This is done by one of the renowned company of Pakistan solar sector EBR energy. The whole project includes the installation of three solar water pumps and it is divided into three
phase. In every phase there is an installation of solar water pump.
SCOPE OF THE PROJECT
clean
continuous
maintenance free supply of water.
Educate the people about the use of solar technology
PROJECT OBJECTIVES
Installation of three solar water pumps phase by
phase.
All installation must be carried
out on scheduled time.
Safe installation of solar pumps and solar panels as
they are expensive and have risk of
damage
INFORMATION GATHERING• Information is gather from the EBR energy secondary source of
information gathering is Lorentz Company of Germany who provide solar product to EBR.
NEED OF THE HOUR
Today Pakistan is facing the worst energy crisis. Due to the inefficiency of energy reserves i.e. Electricity and gas it has become inevitable to find the new, cheap and environment friendly energy
resources and for this purpose solar energy is the best way to fulfill the ever
increasing energy demand.
So, we select this project on one of the lesser known solar energy product i.e. “SOLAR
WATER PUMP”.
PROJECT LIFE CYCLE
PROJECT LIFE CYCLE
Planning
Deliver
y
DEFINING
Goals
Specification
Responsibilities
Teams
Tasks
After the preparation of feasibility report project management team decides how to accomplish the project efficiently and effectively
GoalsFinish the project within schedule time table
Within schedule budget
With planned level of quality
Customer satisfaction
SPECIFICATIONS
TECHNICAL SPECIFICATION•Total Dynamic Head is 160 feet.•Average Flow Rate is 27,000 Liters per day (27.0 m³ per day).•Based on the water requirements of the community, EBR Energy recommends the most viable solar pump for drinking purpose
EQUIPMENT SPECIFICATIONS•The table # 02 lists the specifications of solar pump and its accessories. All recommended equipments are of a reputed German brand (Original Lorentz Brand).
TasksMaking a contract between EBR and Lorentz (supplier)
Develop a design for installing solar water pump (SWP)
Installation of solar panel and SWP
Legal requirements about installation
Quality and inspection check
Arrangement for accommodation of employee at field place
Safety of the worker
TEAM AND RESPONSIBILITIES
Technician team• Technician team is responsible for the
installation and wiring of solar panel and pump under the guidance of project manager
Finance related team
• Finance related team responsible for allocating finances in all activities efficiently
Labor team• These teams are consisted on skilled and non
skilled persons. They are responsible for the work such as building base for solar panel installation and base for the placement of water storage tank
HR team • This team is responsible for the accommodation and safety arrangement of employee at work
Planning
Schedules
Budget
Risks
Staffing
Resources
Total budget is of 10 lac rupees
BUDGETS
RESOURCES
Financial resources
Non-financial resources
Technical resources
RISKS
Arrival of equipment on time from Germany
Financial risk (unavailability of finance on time)
Clearance from the customs department on time
Safety risk
STAFFINGHired staff
o 2 laborso 2 Technicians
Permanent Staffo Inspection engineero Technician heado 3 Labors
Execution
Status reportsChangesQualityForecasting
Delivery
Quality
Specification
Use
Train customer
Release resources
Transfer documents
Lesson learned
The first stage is completed according to plan and first solar water
pump is installed on scheduled.
There is good communication between different level of employee
and department which is necessary for the on time project completion.
The quality promises are made according to commitment.
The company provides maximum facility to the employees at work
site.
CONCLUSION
SUGGESTIONS
The company must ensure the safety of employees in the work field.
Company must give relaxation time after the completion of each project.
Company must make special arrangement for the safe transportation of
sensitive equipment to work place.