35
Project Launch: Bangladesh Adam Brennan Sustainability Project Manager – PUMA.Safe Ecology 17 Sep 2013

Project Launch: Bangladesh

  • Upload
    elsa

  • View
    54

  • Download
    0

Embed Size (px)

DESCRIPTION

Project Launch: Bangladesh. Adam Brennan Sustainability Project Manager – PUMA.Safe Ecology 17 Sep 2013. Objectives of this Afternoon. Provide an introduction into what SAVE is and its aims Provide you a timeline of activities Provide you an indication of the required resources - PowerPoint PPT Presentation

Citation preview

Page 1: Project Launch: Bangladesh

Project Launch:Bangladesh

Adam BrennanSustainability Project Manager – PUMA.Safe Ecology

17 Sep 2013

Page 2: Project Launch: Bangladesh

2

Page 3: Project Launch: Bangladesh

3

Objectives of this Afternoon• Provide an introduction into what SAVE is and its

aims• Provide you a timeline of activities• Provide you an indication of the required resources • Introduce you to the Project Partners: H&M and

ASSIST• Discuss any questions you may have

Page 4: Project Launch: Bangladesh

4

Agenda13.30hrs – 14.00hrs

(30 mins)

Welcome Guests

PUMA, H&M and ASSIST

14.00hrs – 14:15hrs

(15 mins)

Opening and PUMA introduction

(Adam Brennan, Sustainability Project Manager – PUMA.Safe Ecology)

14:15hrs – 14:30hrs

(15 mins)

H&M Introduction

(Shariful Hoque, H&M)

14:30hrs – 15:00hrs Lunch

15:00hrs – 15:30hrs

(30 mins)

SAVE Project Introduction

(Adam Brennan)15:30hrs – 15:50hrs

(20 mins)

Consulting Partner Introduction

(Aru David, Regional Director - ASSIST)15.50hrs – 16:25hrs

(35 mins)

Stakeholders Discussion and Q&A

(Puma, H&M, ASSIST, and suppliers)16:25hrs – 16.30hrs

(05 mins)

Closing

(Adam Brennan)

Page 5: Project Launch: Bangladesh

5

„To be the most desirable and sustainable

Sportlifestyle Company in the

world.“

Jochen Zeitz

Our Mission Statement

Page 6: Project Launch: Bangladesh

6

PUMA Sustainability Scorecard 2015

Page 7: Project Launch: Bangladesh

7

Project Stakeholders

PUMA is one of the world’s leading sportlifestyle companies that designs and develops footwear, apparel and accessories. It is committed to working in ways that contribute to the world by supporting Creativity, Sustainability and Peace.

DEG, a member of the KfW Bankengruppe (KfW Banking Group), promotes private enterprise in developing and transition countries as a contribution to sustainable growth and a lasting improvement in the living conditions of the local population.

ASSIST is a leading international capacity building organization, promoting sustainable practices to address social problems in the developing world, with focus on Asia and Africa.

Project Co-Financing / Management

Project Delivery & Advisory

Project Co-Financing

Project Partner H&M is a global fashion brand and pioneer of design collaborations with many style icons and has a vision of all business operations being run in a way that is economically, socially and environmentally sustainable.

Page 8: Project Launch: Bangladesh

Shariful HoqueProject Responsible, H&M Bangladesh

17 Sep 2013

Page 9: Project Launch: Bangladesh

SUSTAINABILITY – a shared responsibility

H&M’s business operation shall be run in away which

is economically , socially and environmentally

sustainable.

With sustainable we mean that the needs of the both

present & future generations must be fullfilled.

Profit

Planet PeopleWe focus on sustainability because it is GOOD BUSINESS

Page 10: Project Launch: Bangladesh

1. Provide fashion for conscious customersMake products with an added sustainability value.

2. Choose and reward responsible partnersWork with partners who share our values.

3. Be EthicalAlways act with integrity and respect.

4. Be Climate SmartBe energy-efficient and inspire others to reduce total CO2 emissions.

5. Reduce, Reuse, RecycleAim for zero waste to landfill.

6. Use natural resources responsiblyConserve water, soil, air and species.

7. Strengthen CommunitiesContribute to the development of the communities where we operate.

7 COMMITMENTS

H&M Conscious is the name for all H&M’s work for a more sustainable fashion future.

Hundreds of what we call Conscious Actions - big and small, short and long-term - work to put these commitments into practice.

Page 11: Project Launch: Bangladesh

Production Office concentration

Focus on the entire supply chain

Integrate and deliver sustainability in all our operations

Page 12: Project Launch: Bangladesh

Chemical Restrictions 1995

Better Cotton Initiative 2004

Code of Conduct 1997

Environmental inspections 2003

Cleaner Production 2005

Full Audit Program 2005

SRM strategy 2011

Water Aid 2002

Water based adhesives 2009

ZDHC 2011

Ø

Water risk map 2008

Organic T-shirt by Stella McCartney 2005

Forefront Triangle 2012

GHG inventory 1999

Denim water savings 2009

CSR strategy 2009

Conscious Collection 2011

Re-cycle clothes 2011

Water Stewardship 2013H&M ENVIRONMENTALSUSTAINABILITY PROGRAM

Risk: consumption of non-renewable resources

SOI strategy 2013

Page 13: Project Launch: Bangladesh

Ø ZDHC

GLOBAL COLLABORATION

Page 14: Project Launch: Bangladesh
Page 15: Project Launch: Bangladesh

PARTNERSHIP FOR CLEANER TEXTILE (PaCT)

Page 16: Project Launch: Bangladesh

ZERO DISCHARGE OF HAZARDOUS CHEMICALS(ZDHC)

H&M is committed to continuously eliminate the use of all hazardous chemicals and hence achieve zero discharge in all production procedures associated with the making and using of H&M products, at the latest by 2020. To achieve this ambitious goal, we work together with our industry and a broad array of other stakeholders.

Page 17: Project Launch: Bangladesh

Thanks

Page 18: Project Launch: Bangladesh

18

Project Objectives• Increase the environmental capacity at a site

level• Identify potential resource saving

improvements• Create an action plan to meet 25% targets• Provide the factories technical assistance

through implementation phaseBy 2015, reduce your energy, water, waste

and CO2 by 25% compared to 2011 baseline

Page 19: Project Launch: Bangladesh

19

Project Participants

50FACTORIES

Page 20: Project Launch: Bangladesh

20

Project Benefits

Page 21: Project Launch: Bangladesh

21

Project Activities

Page 22: Project Launch: Bangladesh

22

2013

20142015

Project Timelines

Page 23: Project Launch: Bangladesh

23

SAVE Project Teams

Page 24: Project Launch: Bangladesh

24

What is expected from you?

A dedicated, stable and competent sustainability team

Top management support Co-operation throughout the project Investment for the improvement measures Implement within a reasonable timeframeReach the 25% sustainability scorecard targets

Page 25: Project Launch: Bangladesh

25

Critical Success Factors

• Management understanding and commitment

• Project team to be identified before training

• Appointed PM for each supplier• Whole team attending trainings

Page 26: Project Launch: Bangladesh

26

Project Team members from suppliers

SAVE project needs strong support from the participating suppliers. A committed project team can ensure a successful implementation of the project in their factory. The supplier should nominate below mentioned core project team members. As the project focuses on different areas, namely Energy / GHG, Water and Waste management, the core project team should include an expert from each domain, supervising on their part a domain specific technical team.

The core project team will also need support from different departments, such as finances, admin and HR/Training.

Page 27: Project Launch: Bangladesh

27

No Project Team Member Role (Who they are) Responsibilities (What they do)

1 Project Leader CEO / COO / Operations Head Manage overall the commitment of supplier / project team

Supervise the project team Final decision maker

2 Project Manager Operation ManagerHave extensive experience on the factory management

Support the Project Leader Supervise the implementation of the project Instruct team members

3 Energy Manager Manager of the energy specialists team Carry out the energy and GHG specific implementations Support the Project Leader and Project Manager Supervise the energy team Work in close cooperation with the local energy

consultant appointed for the project

4 Water Manager Manager of the water specialists team

Carry out the water specific implementations Support the Project Leader and Project Manager Supervise the water team Work in close cooperation with the local energy

consultant appointed for the project

5 Waste Manager Manager of the waste specialists team

Carry out the waste specific implementations Support the Project Leader and Project Manager Supervise the waste team Work in close cooperation with the local energy

consultant appointed for the project

Page 28: Project Launch: Bangladesh

28

Energy Management Team

General Manager

Project Sponsor

Energy Manager

Management Representative

Technical Head

Process Engineer

(IE / Production Engineering)

Maintenance Engineer

(Machine Maintenance)

Facilities Engineer

(Building Engineer)

Quality Engineer

(Management Systems related)

Page 29: Project Launch: Bangladesh

29

Page 30: Project Launch: Bangladesh

30

Waste Management Team

General Manager

Project Sponsor

Waste (Solid and Non Solid) Manager

Management Representative

Admin / Facilities Head

Process Engineer

(IE / Production Engineering)

Production Engineer

(Production Planning)

Facilities Engineer

(Building Engineer)

Quality Engineer

(Management Systems related)

Page 31: Project Launch: Bangladesh

Consulting Partner Introduction

Aru DavidRegional Director, Mekong and Africa

Project Leader, SAVE17 Sep 2013

Page 32: Project Launch: Bangladesh

32

Who We AreAbout ASSIST

• An international, non-stock, non-profit

social organization.

• Operates in South Asia, South East Asia,

China and Africa.

• Focal areas are

– Social Improvement & Sustainable

Transformation.

Our Approach• We are driven by the triple C approach:

Communicate – Collaborate – Capacitate

Page 34: Project Launch: Bangladesh

Our Methodology

34

5D H O W W E D E L I V E R T H E P R O J E C T

DISCOVER

Client Understanding

Project Kick-off

Client Meeting

Group Discussion

Awareness Trainings

Gap Analysis

DEFINE

Process Definition

Brainstorming

Existing Process Identification

Process Mapping

Process Drafting

Metrics Development

Technical Trainings

DOCUMENT

Formal Documentation

Client Review

Revision & Improvement

Approval for Implementation

DEPLOY

Implementation

Implementation Trainings

Set-up for Roll-out

Implementation

Incubation

Monitoring

Effectiveness Check

DETERMINE

Corrective Action

Preventive Action

Improvements

Determine Lessons Learned

Effectiveness Check

Page 35: Project Launch: Bangladesh

35

THANK YOU

DISCUSSION SESSION