PROJECT EXPERIENCE SUMMARY - INDONESIA No EJJV Project No Client Name Owner Project Name Specific Responsibilities/ Scope of Work Work Location Year Awarded Contract Duration Year Completed Contract Type 1 C0118 CS--17499876R Safety Equipment and Services Indonesia 2018 10January 2018 - 01 February 2021 On Going Lumpsum 2 C0117 C1279730Retender Welding and Static Equipment Repair Services Indonesia 2018 22 January 2018 - 24 January 2023 On Going Lumpsum 3 C0116 A2597459 Provision of Support Services for CPF and FSO Indonesia 2017 10January 2018 - 01 February 2021 On Going Lumpsum 4 C0115 C1548979 Operations Maintenance and Support Services for SLO North Indonesia 2017 02 January 2018 - 01 February 2019 On Going Lumpsum 5 C0114 CS-17270137 Onshore Buidling Maintenance Facilities and Vegetation Control Services Indonesia 2017 01 January 2018 - 31 December 2021 On Going Lumpsum 6 C0113 4200002254 KG Repair Leakage Flowline Services Indonesia 2017 12 September 2017 - 11 December 2017 2017 Lumpsum 7 C0112 CS17416414R Lifting Superintendent Services for Sumatera Onshore Marine Operations Indonesia 2017 09 february 2018 - 09 October 2020 On Going Lumpsum 8 C0111 CS-17508844 Onshore Slope Repair Services Indonesia 2017 04 September 2017 - 03 September 2018 On Going Lumpsum 9 C0110 A2588363R FSO Maintenance Services Indonesia 2017 19 June2017 - 16 June 2020 On Going Lumpsum 10 C0109 A2603776 Provision of Tank Demucking Services for FSO Indonesia 2017 16 June2017 - 16 June 2020 On Going Lumpsum 11 C0108 FAB-582/EJJV/VI/2017 Provision of KRN Pipeline Repair Survey Services Indonesia 2017 06 June 2017 - 05 July 2017 2017 Lumpsum 12 C0107 FAB-581/EJJV/III/2017 Provision of Pipe Fitter and Welder Services Indonesia 2017 24 March 2017 - 29 December 2017 2017 Lumpsum PROJECT MANAGEMENT, ROV & DIVING, IT CONSULTANTS & CONSTRUCTION PT EJJV Engineering Indonesia - Project Experience Summary Page 1 of 12

PROJECT EXPERIENCE SUMMARY - INDONESIA - …ejjv.co.id/templates/akd_e/files/camellia-akd/uploads/downloads/... · PROJECT EXPERIENCE SUMMARY - INDONESIA No ... Development Project

Embed Size (px)

Citation preview

Page 1: PROJECT EXPERIENCE SUMMARY - INDONESIA - …ejjv.co.id/templates/akd_e/files/camellia-akd/uploads/downloads/... · PROJECT EXPERIENCE SUMMARY - INDONESIA No ... Development Project

PROJECT EXPERIENCE SUMMARY - INDONESIA

NoEJJV Project

NoClient Name Owner Project Name Specific Responsibilities/ Scope of Work Work Location Year Awarded Contract Duration

Year

CompletedContract Type

1 C0118 CS--17499876R Safety Equipment and Services Indonesia 201810January 2018 -

01 February 2021On Going Lumpsum

2 C0117 C1279730Retender Welding and Static Equipment Repair Services Indonesia 201822 January 2018 -

24 January 2023On Going Lumpsum

3 C0116 A2597459 Provision of Support Services for CPF and FSO Indonesia 201710January 2018 -

01 February 2021On Going Lumpsum

4 C0115 C1548979Operations Maintenance and Support Services for SLO

NorthIndonesia 2017

02 January 2018 -

01 February 2019On Going Lumpsum

5 C0114 CS-17270137Onshore Buidling Maintenance Facilities and Vegetation

Control ServicesIndonesia 2017

01 January 2018 -

31 December 2021On Going Lumpsum

6 C0113 4200002254 KG Repair Leakage Flowline Services Indonesia 201712 September 2017 -

11 December 20172017 Lumpsum

7 C0112 CS17416414RLifting Superintendent Services for Sumatera Onshore

Marine OperationsIndonesia 2017

09 february 2018 -

09 October 2020On Going Lumpsum

8 C0111 CS-17508844 Onshore Slope Repair Services Indonesia 201704 September 2017 -

03 September 2018On Going Lumpsum

9 C0110 A2588363R FSO Maintenance Services Indonesia 201719 June2017 -

16 June 2020On Going Lumpsum

10 C0109 A2603776 Provision of Tank Demucking Services for FSO Indonesia 201716 June2017 -

16 June 2020On Going Lumpsum

11 C0108 FAB-582/EJJV/VI/2017 Provision of KRN Pipeline Repair Survey Services Indonesia 201706 June 2017 -

05 July 20172017 Lumpsum

12 C0107 FAB-581/EJJV/III/2017 Provision of Pipe Fitter and Welder Services Indonesia 201724 March 2017 -

29 December 20172017 Lumpsum

PROJECT MANAGEMENT, ROV & DIVING, IT CONSULTANTS & CONSTRUCTION

PT EJJV Engineering Indonesia - Project Experience Summary Page 1 of 12

Page 2: PROJECT EXPERIENCE SUMMARY - INDONESIA - …ejjv.co.id/templates/akd_e/files/camellia-akd/uploads/downloads/... · PROJECT EXPERIENCE SUMMARY - INDONESIA No ... Development Project

PROJECT EXPERIENCE SUMMARY - INDONESIA

NoEJJV Project

NoClient Name Owner Project Name Specific Responsibilities/ Scope of Work Work Location Year Awarded Contract Duration

Year

CompletedContract Type

13 C0106 4300006476 Production Facilities Maintenance Services Indonesia 201724 March 2017 -

29 December 20172017 Lumpsum

14 C0105 12000012379 Provision of KF WHRU Recondition Services Indonesia 201701 February 2017 -

01 Juni 20172017 Lumpsum

15 C0104 4420001734 - BP Berau Ltd Integrated C&CM-ER Services Indonesia 201605 September 2016 -

05 September 2021On Going Lumpsum

16 C0102 CS-17291944 R Aircraft Rescue and Firefighting (ARFF) Personnel Services Indonesia 201619 October 2016 -

19 Mei 2018On Going Lumpsum

17 C0101 FAB-042/EJJV/VIII/2016

Provision of Construction Drawing Service Including Field

Survey for KF Deluge Line Replacement and KRA

Instrumentation Air Line

Indonesia 201601 September 2016 -

01 Oktober 20162016 Lumpsum

18 C0100 C1405560 General Construction Services for Darajat Area Indonesia 201601 August 2016 -

01 August 2018On Going Lumpsum

19 C0103 SS1/PRJ-146/15/NOV Provision of Call Out Diving Supervision Services Indonesia 201601 July 2016 -

01 July 2018On Going Lumpsum

20 C0099 CS-16859277R Radiator and Heat Exchanger Repair & Services Indonesia 201601 February 2016 -

16 February 2019On Going Lumpsum

21 C0098 45033942 - BP Berau Ltd Supporting BP Voyager Deployment Phase 2 Indonesia 201512 September 2015 -

31 December 20152015 Lumpsum

22 C0097TNS-7000012202 - Eni Muara

Bakau B.VCommissioning Services for Project Indonesia 2015

1 June 2015 -

31 December 20172017 Lumpsum

23 C0096 4420001306A - BP Berau Ltd IT&S GOI Services Delivery and Technical Services Indonesia 201515 April 2015 -

15 April 2018On Going Lumpsum

24 C0094 4420001345A - BP Berau LtdTechnical Services for Safety & Emergency Response

Equipment Maintenance and Inspection ServiceIndonesia 2015

16 April 2015 -

15 Juni 20172017 Lumpsum

25 C0095 45033942 - BP Berau Ltd Supporting BP Voyager Deployment Indonesia 201520 January 2015 -

10 Maret 20152015 Lumpsum

PT EJJV Engineering Indonesia - Project Experience Summary Page 2 of 12

Page 3: PROJECT EXPERIENCE SUMMARY - INDONESIA - …ejjv.co.id/templates/akd_e/files/camellia-akd/uploads/downloads/... · PROJECT EXPERIENCE SUMMARY - INDONESIA No ... Development Project

PROJECT EXPERIENCE SUMMARY - INDONESIA

NoEJJV Project

NoClient Name Owner Project Name Specific Responsibilities/ Scope of Work Work Location Year Awarded Contract Duration

Year

CompletedContract Type

26 C0093 4420001349 - BP Berau LtdTechnical Services Contract for Client Support Back Office

Operation and Project Management (Bridging)Indonesia 2015

02 March 2015 -

11 September 2015 2015 Lumpsum

27 C0092 EPPA-S14LL0096B-P23Jasa Pembuatan As Built 3D Model Fasilitas Produksi

Dengan Laser Scanning di Asset 5Indonesia 2014

13 Aug 2014 -

30 Aug 20172017 Lumpsum

28 C0090 4420000869 - BP Berau LtdProvision of Oversight Skill Competencies of Discipline

Capability ServicesIndonesia 2013

16 Dec 2013 -

15 Dec 20142014 Unit Rate

29 C0086 4420000784 - BP Berau Ltd Oversight Supervision of Boeing PK-TVZ C-Check Indonesia 20138 Oct 2013 -

20 Dec 20132013 Lumpsum

30 C0084M500-027-001 - BP UK / Rider Hunt

International UKThe Provision of Specilist Services Indonesia 2013

01 Oct 2013 -

30 Jan 20152015 Unit Rate

31 C0082212/DA/OPS/AUG-13 - West

Madura OffshoreProvision of Diving Supervisor for Under Water Services Indonesia 2013

26 Apr 2013 -

31 Jul 20152014 Unit Rate

32 C0081 4420000566 - BP Berau Ltd Upstream IT&S Project Services 2013-2016 Indonesia 201318 September 2013 -

17 September 2018On Going Unit Rate

33 C0079 4420000431 - BP Berau Ltd Supply Chain Business Support Service Indonesia 2013

8July 2013 -

7 June 2015

(2 Years)

2015 Unit Rate

34 C0076 4420000483 - BP Berau Ltd

Project Management Support Services for New

Condensate & Diesel Tanks, MATOA Mancamp & Aviation

Risk Study

Indonesia 2013

1 August 2013 -

1 January 2016

(2 Years)

2016 Unit Rate

35 C0075 4800022692 - BP Berau Ltd Fluid Database Project Consultation & Compliance Indonesia 20131 July 2013 -

1 March 20142014 Lumpsum

36 C0072 4420000550 - BP Berau LtdProject Management Support for Tangguh Expansion

Early WorksIndonesia 2013

15 March 2013 -

15 March 20142014 Lumpsum

PT EJJV Engineering Indonesia - Project Experience Summary Page 3 of 12

Page 4: PROJECT EXPERIENCE SUMMARY - INDONESIA - …ejjv.co.id/templates/akd_e/files/camellia-akd/uploads/downloads/... · PROJECT EXPERIENCE SUMMARY - INDONESIA No ... Development Project

PROJECT EXPERIENCE SUMMARY - INDONESIA

NoEJJV Project

NoClient Name Owner Project Name Specific Responsibilities/ Scope of Work Work Location Year Awarded Contract Duration

Year

CompletedContract Type

37 C0071CS-16318106 ConocoPhillips

IndonesiaIT Support Services Indonesia 2013

01 February 2013 -

31 October 2016

(33 Months)

2016 Lumpsum

38 C0068 4420000256-BP Berau LtdTechnical Services for Client Support Back Office

Operation and Project ManagementIndonesia 2012

22 October 2012 -

11 March 20152015 Lumpsum

39 C0067STC-0768A Offshore North West

Java

Provision of Client Site Representative to Support Diving

and ROV CompaignIndonesia 2012

17 September 2012 -

16 Dec 20142014 Lumpsum

40 C0064 4420000112 - BP Berau LtdProject Management Support for Tangguh Expansion

Early WorksIndonesia 2012

10 July 2012 -

09 November 2014

(24 Months)

2014 Lumpsum

41 C0061STC-0765 Offshore North West

Java

Consulting Contract for Project Engineering &

Construction Management Services (Package 2)Indonesia 2012

07 May 2012 -

06 May 2014

(24 Months)

2014 Unit Rate

42 C0060CS-15924767 ConocoPhillips

IndonesiaApplication Development and Maintenance Services Indonesia 2012

20 July 2012 -

19 July 2015

(36 Months)

2015 Lumpsum

43 C0058 4420000201 BP Tangguh Oversight Supervision of Boeing PK-TVZ C-Check Indonesia 20125 Apr 2012 -

15 Jul 20122012 Lumpsum

44 C0063SO 9420003527 - West Madura

OffshoreProvision of ROV and Diving Specialist Indonesia 2012

1 Mar 2012 -

31 Mar 20122012 Unit Rate

45 C0057 4420000206 BP TangguhProject management Support and Sevices for Onshore

ProjectIndonesia 2012

14 March 2012 -

3 Sept 2013

(12 Months)

2013 Unit Rate

46 C0056STC-0720 Offshore North West

Java

Consulting Contract for Project Engineering &

Construction Management Services (Package 1)Indonesia 2012

22 February 2012 -

21 February 2014

(24 Months)

2014 Unit Rate

47 C0042STC-0609 Offshore North West

Java

Provision of Project Management & Construction

Engineering

- Project Management Team

- Project Delivery Procedure

Indonesia 2010

30 November 2010 -

29 November 2012

(24 Months)

2012 Lumpsum

PT EJJV Engineering Indonesia - Project Experience Summary Page 4 of 12

Page 5: PROJECT EXPERIENCE SUMMARY - INDONESIA - …ejjv.co.id/templates/akd_e/files/camellia-akd/uploads/downloads/... · PROJECT EXPERIENCE SUMMARY - INDONESIA No ... Development Project

PROJECT EXPERIENCE SUMMARY - INDONESIA

NoEJJV Project

NoClient Name Owner Project Name Specific Responsibilities/ Scope of Work Work Location Year Awarded Contract Duration

Year

CompletedContract Type

48 C0039STC-0768 Offshore North West

Java

Technical Services for Provision of Client Site

Representative to Support Diving and ROV CampaignsIndonesia 2010

17 September 2010 -

16 September 2012

(24 Months)

2012 Lumpsum

49 C00384400000157 - BP Tangguh Gas

Processing Facilities

Provision of Technical Support Services for Tangguh Gas

Processing Facilities. General Scope of work are:

- Quality Management Services

- HSE Management Services

- Logistic Requirement Services

- Constructability Study

- Contracting & Project Control Services

- Specialized Study

Indonesia 2010

26 March 2010 -

25 Dec 2012 2012 Lumpsum

50 P0030STC-0429 - Offshore West Java

Rehabilitation Project

Project Management Services

The services are:

- Project Management Services

- Provide personnel for Construction

- Review Piping Validation

- Engineering Works for TAR 2009

- Project HSE Reviews

- Engineering Quality Plan

- Capital Value Process (CVP) Review

- Construction Engineering

Indonesia 20095 Jan 2009 -

30 Jul 20102011 Lumpsum

51 P0013 West Java Rehabilitation ProjectProvision of Piping Design Engineer / Construction

EngineerJakarta 2007

16 Apr 2007 -

15 Oct 20072007 Lumpsum

52 P0011 West Java Rehabilitation Project Provision of Workpack Development Specialist Services Onshore Jakarta 20076 Dec 2007 -

14 Jan 20092008 Lumpsum

53 P0003 West Java Rehabilitation Project Provision of As-Built Specialist Consultancy Onshore Jakarta 200720 Nov 2007 -

31 Jan 20082008 Lumpsum

54 P0003 West Java Rehabilitation ProjectProvision of Workpack Development Specialist

ConsultancyOnshore Jakarta 2007

15 Oct 2007 -

30 Nov 20072007 Lumpsum

55 P0003 West Java Rehabilitation ProjectProvision of Workpack Development Specialist

ConsultancyOnshore Jakarta 2007

11 Jul 2007 -

28 Sep 20072007 Lumpsum

56 P0023Shell Sarawak Berhad (B11LQ)

ProjectProvision of Manpower Services - Indirect Personnel

Miri, Sarak,

Malaysia2008 25-Jan-08 2008 Unit Rate

PT EJJV Engineering Indonesia - Project Experience Summary Page 5 of 12

Page 6: PROJECT EXPERIENCE SUMMARY - INDONESIA - …ejjv.co.id/templates/akd_e/files/camellia-akd/uploads/downloads/... · PROJECT EXPERIENCE SUMMARY - INDONESIA No ... Development Project

PROJECT EXPERIENCE SUMMARY - INDONESIA

NoEJJV Project

NoClient Name Owner Project Name Specific Responsibilities/ Scope of Work Work Location Year Awarded Contract Duration

Year

CompletedContract Type

57 P0031Mafumeira KWIP Offshore

Development ProjectProvision of Manpower Services - Direct Personnel US - Offshore 2008 05-Feb-09 2009 Unit Rate

58 P0028Takula Gas Processing Platform

ProjectProvision of Manpower Services - Direct Personnel Angola - Offshore 2008 2009 Unit Rate

59 P0016Takula Gas Processing Platform

ProjectProvision of Manpower Services - Direct Personnel Angola - Offshore 2008 2009 Unit Rate

60 P0016Takula Gas Processing Platform

ProjectProvision of Manpower Services - Direct Personnel Angola - Offshore 2008 2009 Unit Rate

61 TOTAL TUNU 11 Direct Hire of Lead Electrical Engineer PMT Jakarta 2006 2007 Lump Sum

62 P0001 TOTAL TUNU 11 Seconded Lead Piping Engineer PMT Jakarta 20061 Jun 2006 -

30 Nov 20062007 Lump Sum

63 C0077

3900214656

Cleaning Tanki and Processing

SOR

Cleaning Tanki T-2 / T-9 & Processing Sludge Oil Recovery

(SOR) - Pertamina EP Jatibarang FieldIndonesia 2013

15 June 2013 -

14 Oct 2013 2013 Lumpsum

64 C0066 SO2435 - EPC-1 Banyu Urip Project Completion System for Banyu Urip EPC-1 Indonesia 2012

13 July 2012 -

12 January 2014

(18 Month)

2014 Lumpsum

65 C0091 P14-049Provision to Supply for Tehcnical Safety Engineer for CP2

ProjectIndonesia 2014

12 Sept 2014 -

12 Oct 20142014 Lumpsum

66 C0089 MSOCL/CON-HSE/DEC/13/218 Provision of HAZID Workshop & Report Service Indonesia 201310 Dec 2013 -

30 Jun 20142014 Lumpsum

ENGINEERING & PROCESS SAFETY STUDIES

MAINTENANCE

PROJECT COMPLETION SYSTEM & COMMISSIONING

PT EJJV Engineering Indonesia - Project Experience Summary Page 6 of 12

Page 7: PROJECT EXPERIENCE SUMMARY - INDONESIA - …ejjv.co.id/templates/akd_e/files/camellia-akd/uploads/downloads/... · PROJECT EXPERIENCE SUMMARY - INDONESIA No ... Development Project

PROJECT EXPERIENCE SUMMARY - INDONESIA

NoEJJV Project

NoClient Name Owner Project Name Specific Responsibilities/ Scope of Work Work Location Year Awarded Contract Duration

Year

CompletedContract Type

67 C0088 SCA No : 2778-EN-SC-014 HAZOP & QRA Studies of Chevron AIP Project Indonesia 201317 Nov 2013 -

30 March 20142014 Lumpsum

68 C0087Safetec Malaysia Provision of Process Safety Engineer in Foorozan FZ-A

project at NGL Tech office in Kuala LumpurMalaysia 2013

17 May 2013 -

30 Oct 20132013 Unit Rate

69 C0085P00036 - Safetec Malaysia

Murphy Permas Topsides EPCC - RAM & AIV Studies Jakarta 201301 Oct 2013 -

30 Dec 20132013 Unit Rate

70 C0083380/CA/2013 Pertamina (persero)

RU III Plaju

Update P&ID Menggunakan 3D Scanning Kilang Utilities

PlajuIndonesia 2013

23 Sept 2013 -

15 Dec 20132013 Lumpsum

71 C0080

PS-102/EJJV/VI/2013

GSWP Project of Petronas Carigali

SDN Bhd

Hazid & Hazop Studies for Development of Generic

Satelite Wellhead Platform (GSWP) Project Jakarta 2013

4July 2013 -

4 August 20132013 Lumpsum

72 C0078SO No. PA03780613

PT Atamora Tehnik MakmurUmbilical Project for Hazid Study Indonesia 2013

17 June 2013 -

5-July-2013 2013 Lumpsum

73 C0074 PS-095A/EJJV/II/2013 Pertamina RFCC Cilacap QRA & BRA Studies Indonesia 2013

1 March 2013 -

1 June 2013

(3 month)

2013 Lumpsum

74 C0073 PS-095/EJJV/II/2013 Pertamina RFCC Cilacap QRA & BRA Studies Indonesia 2013

25 March 2013 -

25 June 2013

(3 month)

2013 Lumpsum

75 C0070RFCC-A-PR-AG-008A Cilacap Resid

Fluid Catalityc Cracking (RFCC)Provision Hazop and SIL Study Indonesia 2013

26 October 2012 -

26 January 2013

(3 month)

2013 Lumpsum

76 C0069 PPGJ-PS-TSA-079 Gundih Project Dispersion Study for Thermal Oxidaton Package (PE-0401) Indonesia 2012

23 October 2012 -

23 November 2012

(1 month)

2012 Lumpsum

PT EJJV Engineering Indonesia - Project Experience Summary Page 7 of 12

Page 8: PROJECT EXPERIENCE SUMMARY - INDONESIA - …ejjv.co.id/templates/akd_e/files/camellia-akd/uploads/downloads/... · PROJECT EXPERIENCE SUMMARY - INDONESIA No ... Development Project

PROJECT EXPERIENCE SUMMARY - INDONESIA

NoEJJV Project

NoClient Name Owner Project Name Specific Responsibilities/ Scope of Work Work Location Year Awarded Contract Duration

Year

CompletedContract Type

77 C0065 Naga Pelikan ProjectProvision of Hazid, Hazop & SIL Chairman & Scriber

ServicesIndonesia 2012

10 July 2012 -

9 July 2013

(1 years)

2013 Lumpsum

78 C0062 KF Booster Gas Compressor Project Hazid and Hazop Engineering Study Indonesia 20122 May 2012 -

29 June 20122012 Lumpsum

79 C0059 FEED GG Field Development ProjectPerform Safety Case Study i.e Fire and Explosion Analysis,

Pipeline Risk Assessment, QRA Study and FERA Study.Indonesia 2012

4 Apr 2012 -

31 May 20122012 Lumpsum

80 C0055Proyek Pengembangan Gas Jawa

Area GundihPerform QRA Study Indonesia 2012 05-Jan-12 2012 Lumpsum

81C0053 &

C0054EPC for LTRO Project Perform HAZOP and HAZID Study for LTRO Project Indonesia 2012 05-Jan-12 2012 Lumpsum

82 C0051EPCI OF AGX COMPRESSOR

RECONFIGURATION

Provision of Safety Studies i.e HAZID, HAZOP, QRA,

NHHA, ESSA, EERA, SIL, ALARP, Safety Case, What if

analysis, Safety critical elements and performance

standard, Noise Study, Chemical handling and Hazard

Register.

Indonesia 2011

10 October 2011 -

10 July 2012

(9 Months)

2012 Lumpsum

83 C0052 Subsea Project SSIV QRA Study Indonesia 2011 02-Nov-11 2012 Lumpsum

84 C0050Ujung pangkah Development WHP

B

Perform HAZID for Ujung pangkah Development WHP B

Upgrade and InspectionIndonesia 2011 12-Oct-11 2011 Lumpsum

85 C0049 CO-11-138 PremierOil Natuna Written Scheme of Examination Development & Safety

Safety Critical Element VerificationIndonesia 2011

12 Sep 2011 -

11 Sep 20122012 Lumpsum

86 C0048Bakrie Sumatera Plantations (BSP)

ProjectATEX 137 Hazardous Area Classification (HAC) Study Sumatera 2011

10 May 2011 -

24 Jun 20112011 Lumpsum

PT EJJV Engineering Indonesia - Project Experience Summary Page 8 of 12

Page 9: PROJECT EXPERIENCE SUMMARY - INDONESIA - …ejjv.co.id/templates/akd_e/files/camellia-akd/uploads/downloads/... · PROJECT EXPERIENCE SUMMARY - INDONESIA No ... Development Project

PROJECT EXPERIENCE SUMMARY - INDONESIA

NoEJJV Project

NoClient Name Owner Project Name Specific Responsibilities/ Scope of Work Work Location Year Awarded Contract Duration

Year

CompletedContract Type

87 C0046Salamander Existing Gas Plant

Pangkalan Brandan North Sumatra

Performed Hazard Identification (HAZID) study for

Installation VRU Compressor Package Jakarta 20114 Jun 2011 -

18 Jun 20112011 Lumpsum

88 C0047 Block A Gas Development ProjectPerformed Quantitative Risk Assessment (QRA) study for

Medco Block A Gas Development ProjectJakarta 2011

13 Apr 2011 -

22 Jun 20112011 Lumpsum

89 C0045LIMA Subsidence Remediation

Project

Performed Hazard Identification (HAZID) study for PHE

LIMA Subsidence Remediation ProjectJakarta 2011

11 Mar 2011 -

1 Apr 20112011 Lumpsum

90 C0044EHMR Water (reinjection) FEL-3

Project

Facilitating HAZID, SIL and HAZID/ENVID Session of CESC

Eastern Hub Mercury Removal - Water (Reinjection) FEL-3

project

Indonesia 201111 Feb 2011 -

23 Feb 20112011 Lumpsum

91 C0043 Ammonia Plant Project Performed QRA Study for Ammonia Gas Plant project Indonesia 201114 Dec 2010 -

25 Mar 20112011 Lumpsum

92 C0041CESC Bungin Develeopment FEL-2

Project

Facilitating HAZID, HAZOP and SIL of CESC Bungin

Development FEL-2 ProjectIndonesia 2010

15 Nov 2010 -

31 Dec 20102011 Lumpsum

93 C0040 CESC LTRO FEL3 projectFacilitating HAZID, HAZOP and SIL of CESC LTRO FEL3

ProjectIndonesia 2010

22 Oct 2010 -

31 Dec 20102010 Lumpsum

94 P0034 CO-09-098 PremierOil Natuna

Independent Verification Services In Accordance With the

Offshore Safety case Requirements

- Development of Written Scheme Examination (WSE)

Indonesia 20096 Jul 2009 -

5 Jul 20102010 Lumpsum

95 P0032 CO-09-101 PremierOil Natuna

Provision of Enhancement of Scheme of Verification for

Static Equipment Elements.

- Identification of Static SCEs

- SCE/MAE Matrix

- Development Operational Performance Standards for

approved Static SCEs

- Electrical Ex-Register Review

- Inputs for Update of Scheme of Verification Document

- SCE ID and First Pass Performance Standards

- Provide advice on in corporatation of Static SCE's in TSS

matrix

Indonesia 20096 Jul 2009 -

9 Oct 20102010 Lumpsum

PT EJJV Engineering Indonesia - Project Experience Summary Page 9 of 12

Page 10: PROJECT EXPERIENCE SUMMARY - INDONESIA - …ejjv.co.id/templates/akd_e/files/camellia-akd/uploads/downloads/... · PROJECT EXPERIENCE SUMMARY - INDONESIA No ... Development Project

PROJECT EXPERIENCE SUMMARY - INDONESIA

NoEJJV Project

NoClient Name Owner Project Name Specific Responsibilities/ Scope of Work Work Location Year Awarded Contract Duration

Year

CompletedContract Type

96 P0017SC-0063 - HSE Management

System Services

HSE Audit Support, Contractor Safety, Health and

Environt management System Implementation Support

Services, SIMOP Procedure, HSE Acceptance List, HSE

Online

Jakarta, West

Java & WJ

Marunda

200821 Apr 2008 -

13 Apr 20112012 Lumpsum

97 P0012 Anoa Safety Case

Performed Offshore Quantitative Risk Assessment (QRA),

Base Case Definition, Supporting Studies, Safety Case,

Offshore Handbook and Rollout, Training, Management

Updates, Safety Critical Element (SCE) studies for Anoa

Safety Case

Indonesia 200817 Dec 2007 -

18 Sep 20082009 Lumpsum

98 P0018 Update QRA & HAZOP Study Update QRA & HAZOP Study Onshore Jakarta 200822 Apr 2008 -

29 Apr 20082009 Lumpsum

99 P0025 Specialist Safety Study ProjectSpecialist Study for Quantitive Risk Assessment (QRA) and

Safety Integrity Level (SIL) AssessmentJakarta 2008 17-Jul-08 2009 Lumpsum

100 P0035Pangkah Liquid Development Oil

Treating & LPG Facilities ProjectPerform Detailed Surge Analysis Study Indonesia 2009 2009 Lumpsum

101 P0026Singa Gas Development Project

Lematang - South SumatraQuantitative Risk Assessment Study Indonesia 2009

23 Jan 2009 -

20 Mar 20092010 Lumpsum

102 P0027Ujung Pangkah Liquid Development

ProjectFireproofing Requirement Review Indonesia 2009

7 Aug 2009 -

21 Aug 20092009 Lumpsum

103 P0037Cnooc Mila A Wellhead Platform

and Pipeline ProjectPerformed HAZOP, HAZID and ALARP Studies Indonesia 2009 21-Aug-09 2010 Lumpsum

104 P0036Ujung Pangkah CPP & AUP EPCC

ProjectLQ Sprinkler System Requirement Review Indonesia 2009

23 Aug 2009 -

22 Sept 20092009 Lumpsum

105Ujung Pangkah Liquid Development

ProjectOTF & LPG Detailed Surge Analysis Indonesia 2009 2009 Lumpsum

PT EJJV Engineering Indonesia - Project Experience Summary Page 10 of 12

Page 11: PROJECT EXPERIENCE SUMMARY - INDONESIA - …ejjv.co.id/templates/akd_e/files/camellia-akd/uploads/downloads/... · PROJECT EXPERIENCE SUMMARY - INDONESIA No ... Development Project

PROJECT EXPERIENCE SUMMARY - INDONESIA

NoEJJV Project

NoClient Name Owner Project Name Specific Responsibilities/ Scope of Work Work Location Year Awarded Contract Duration

Year

CompletedContract Type

106 P0033 OTF & LPG recovey Plant Additional HAZOP study for LPG product Segregation &

produced water system packageIndonesia 2009 2009 Lumpsum

107 P0029Ujung Pangkah Development

ProjectPipeline Transient Analysis Revisit Indonesia 2009 2009 Lumpsum

108EPC Gas Production Facilities Jambi

Merang Development ProjectSafety Engineering - Review of Critical Indonesia 2008 2009 Lumpsum

109 P0024 LPG-FSO Petrostar Failure Analysis Matering of LPG-FSO PetrostarOffshore Jabung,

Jambi2008 07-Jul-08 2008 Lumpsum

110 P0022Oyong Phase 2 Onshore Processing

Plant (OPF) Project

Performed Hazard Identification (HAZID) study for Santos

Oyong Phase 2 OPF ProjectJakarta 2008 26-Jun-08 2009 Lumpsum

111 P0021Ujung Pangkah Liquid Development

ProjectWater Hammer Analysis & Surge Analaysis Indonesia 2008 01-Jul-08 2009 Lumpsum

112 P0020Gelagah Kambuna Development

ProjectSPECIALIST HAZOP, HAZID & SIL STUDY Indonesia 2008 04-Jun-08 2009 Lumpsum

113 P0019Singa Gas Development Project

Lematang - South Sumatra

Performed HAZOP and HAZID studies for Singa Gas Plant

Development Project

Lematang, South

Sumatra2008

4 Jun 2008 -

18 Jun 20082009 Lumpsum

114 P0015Gas Production Facility Jambi

Merang Project

Performed HAZOP and HAZID Studies for Jambi Merang

ProjectJAMBI MERANG 2008 06-Mar-08 2008 Lumpsum

115 P0014 West Java Rehabilitation Project Preparation of Material Take Off Onshore Jakarta 2008 23-Jan-08 2008 Lump Sum

PT EJJV Engineering Indonesia - Project Experience Summary Page 11 of 12

Page 12: PROJECT EXPERIENCE SUMMARY - INDONESIA - …ejjv.co.id/templates/akd_e/files/camellia-akd/uploads/downloads/... · PROJECT EXPERIENCE SUMMARY - INDONESIA No ... Development Project

PROJECT EXPERIENCE SUMMARY - INDONESIA

NoEJJV Project

NoClient Name Owner Project Name Specific Responsibilities/ Scope of Work Work Location Year Awarded Contract Duration

Year

CompletedContract Type

116 P0010North Duri Development Project -

Area 13

Performed HAZOP study for North Duri Development

Project - Area 13

North Duri -

Indonesia2007

17 Sept 2007 -

12 Nov 20072008 Lumpsum

117 P0008LPG FSO (Petrostar), FPU and Oil

FSO (Federal-I) Jabung Offshore

Undertake Safety Review to identify all the potential

hazards associated with the LPG FSO (Petrostar), FPU and

Oil FSO (Federal-I).

Offshore Jabung,

Jambi2007

31 Aug 2007 -

4 Oct 20072008 Lumpsum

118 P0009 `Export hose rupture case, Effect of pump seal failure at

MD3

Offshore Jabung,

Jambi2007

31 Aug 2007 -

9 Oct 20072008 Lumpsum

119 P0007

Ujung Pangkah Liquids

Development Projects –Oil Treating

Facility and LPG Recovery Plant

Project

Performed SIL, HAZOP, HAZID and QRA Studies for Ujung

Pangkah Liquids Development Projects –Oil Treating

Facility and LPG Recovery Plant Project

HESS

(INDONESIA

PANGKAH)

LIMITED

2007 27-Jul-07 2007 Lumpsum

120 P0006 Wellhead PlatformPerformed SIL and Noise studies for ENI Blacktip Gas

ProjectAUSTRALIA 2007

10 May 2007 -

17 Jul 20072007 Lumpsum

121 P0005Cilamaya Onshore Receiving Facility

and Offshore Platform

Performed SIL Verification for Cilamaya ORF and NGLB

Dehydration as part of the project

ONSHORE

CILAMAYA2007

24 Apr 2007 -

23 May 20072007 Lumpsum

122 P0004 KG Platform Modification ProjectPerformed FERA and EERA Studies for the KG Platform

Modification Project

KG PLATFORM,

OFFSHORE

NATUNA

200716 Mar 2007 -

16 Jun 20072007 Lumpsum

123 P0002Offshore LPG/Oil Terminal, Offshore

JabungHAZOPS, HAZID, and Safety Review

Offshore Jabung,

Jambi2007 4 Weeks 2007 Lumpsum