Indonesia Sumatatera Sng Project

Embed Size (px)

Citation preview

  • 8/17/2019 Indonesia Sumatatera Sng Project

    1/12

    Feasibility Studies with the Aim of Developing a Bilateral Offset CreditMechanism  FY2011

    Studies for Project Development and Organization

    Indonesia Sumatera SNG Project

    Feasibility Study of Low rank coal to SNG

    New Energy and Industrial Technology Development Organization (NEDO)Mitsubishi Heavy Industries, Ltd.

  • 8/17/2019 Indonesia Sumatatera Sng Project

    2/12

    Indonesia Sumatera SNG Project

    Feasibility Study of Low rank coal to SNG

    2012/5

  • 8/17/2019 Indonesia Sumatatera Sng Project

    3/12

    Low rankcoal

    SNG

    CO

     

    SNG Plant

    EOR/CCS

    To existingpipeline

    4.55 Mton/yr

    11.4M ton/yr

    150MMSCFD

    コンバスタ

    リダクタ

    SGCSGC 化炉 化炉

    Coal Gasifier(Oxygen blown) 

    Gas purification

    Pre-Drying

    SNGCompression

    CO2

    Synthesisgas 

    CO2 Compression

    Project Outline (1/1)

    SNGSynthesis

    Coal Supplier

    1. Outline of Sumatera SNG Project

  • 8/17/2019 Indonesia Sumatatera Sng Project

    4/12

    SNG Plant

    JAKARTA

    CO2OilCO2

    EOR

    Concept

    SNG Plant

    Low Rank Coal Mine

    Oil Plant

    CO2 Injection

    Singapore

    JAKARTA

    NG

    Pipeline

    South Sumatera is promising plant location.

    ● SNG plant is constructed beside Low Rank Coal mine. SNG product is transported to West Java withexiting pipeline.

    ● Byproduct CO2 is injected existing oil fields for EOR and CCS.

    Project Outline 2/2)

    1. Outline of Sumatera SNG Project

  • 8/17/2019 Indonesia Sumatatera Sng Project

    5/12

    ● Design of coal gasification and SNG synthesis processwith Low Rank Coal

    ● Estimation of Plant Capital and Operating Cost

    ● Oxygen-blown gasification test with “Indonesian LowRank Coal” at Gasification Pilot Plant in Nagasaki Japan

    ● Study of EOR and CCS opportunity of CO2, byproduct

    SNG Plant● Study of application for “Bilateral Offset Credit

    Mechanism (BOCM)” 

    2. Outline of Feasibility Study

  • 8/17/2019 Indonesia Sumatatera Sng Project

    6/12

    Gasifier 

    Control Room

    Coal Feeder 

    ● Oxygen-blown Gasification test using “Indonesian Low Rank Coal” wasconducted at 50ton per day class Pilot Plant in MHI’s Nagasaki R&D center.

    ● Test results such as main syngas components and gasification efficiency, will bereflected to the design of Commercial class gasifier.

    Appearance of 50 t/d class Coal Gasification Pilot Plant

    Coal Gasification Pilot Plant Test(1/2)

    3. Feasibility Study Result

  • 8/17/2019 Indonesia Sumatatera Sng Project

    7/12

    Slag

    SlagWaterBathe

    Slag hole

    camera

    GasifierVessel

    Combustor

    Waterbathe

    camera

     Slag is discharged very stably. No unburned carbon falls down from slag hole. Discharged Slag is grassy. (Good appearance)

    Discharged slag

    slag hole camera

    water bathe camera

    Coal gasification test was completed successfully.

    Coal Gasification Pilot Plant Test(2/2)

    3. Feasibility Study Result

  • 8/17/2019 Indonesia Sumatatera Sng Project

    8/12

    Initial Screening Study of CO2/EOR

    - Initial CO2 EOR/CCS Screening Study was completed. The study was

    screening of oil fields in South Sumatera Basin of 100km radius of SNG

    plant.

    - The study collected data of half of oil fields in the radius. 2/3 of

    reservoirs show CO2/EOR miscible flooding.

    - Detail study for CO2/EOR for one representative reservoir was

    conducted. The study of core sampling, slim tube test and geologicalsimulation was carried out. Increment oil recovery is estimated to be

    28.8%.

    3. Feasibility Study Result

  • 8/17/2019 Indonesia Sumatatera Sng Project

    9/12

    BOCM / CO2 Emission Reduction Calculation 1/1)<Coal Gasification> 

    <CCS-EOR> 

    ER y : 3,316,404 tCO2/yr GHG emissions reductions in year y by CCS-EOR

    BE y : 4,560,270 tCO2/yr Baseline emissions reductions in year y

    PE y : 1,243,866 tCO2/yr Project emissions reductions in year y

    LE y : 0 tCO2/yr Leakage in year y

    ER y : 2,975,874 tCO2/yr GHG emissions reductions at the Coal Gasification Plant in year y

    BE y : 10,582,242 tCO2/yr Baseline emissions reductions in year y

    PE y : 7,606,368 tCO2/yr Project emissions reductions in year y

    LE y : 0 tCO2/yr Leakage in year y

    <Combined Result> 

    ER y : 6,292,278 tCO2/yr GHG emissions reductions by coal gasification and CCS-EOR in year y

    BE y : 10,582,242 tCO2/yr Baseline emissions reductions in year y

    PE y : 4,289,964 tCO2/yr Project emissions reductions in year y

    LE y : 0 tCO2/yr Leakage in year y

    3. Feasibility Study Result

  • 8/17/2019 Indonesia Sumatatera Sng Project

    10/12

    Base Condition for Sensitive Analysis of SNG Price

    Item Unit Price

    ①  EPC Plant Cost MM USD 2,920~ 3,650 (100%~125%)

    ②  Coal Price $/ton 13 ~ 16

    ③  Target SNG Price $/MMBtu < 10

    ④  CO2 Off Take Price $/ton30~  50

    (25 years)

    ⑤  BOCM Credit Price $/ton0  – 10

    (10 years)

    ⑥  Finance Repayment %p.a./ Year 5% / 18

    ⑦  Return on Equity (ROE) % 12.5

    ⑧  Project Period Year 30

    ⑨  Availability % 90

    Sensitive Analysis (1/2)

    3. Feasibility Study Result

  • 8/17/2019 Indonesia Sumatatera Sng Project

    11/12

    Coal Price CAPEX CO2 Price ( US$/ ton) SNG Price

    (US$ / MMBtu)Off-Take BOCM Credit

    Project Target @ 13 US$ / ton 3,302 MM US$

    (EPC 2,920 + O/C 208 +IDC 174)

    30 10 10.0

    EPC Cost High @ 13 US$ / ton 4,073 MM US$

    (EPC 3,650 + O/C 208 +IDC 215)

    30 10 12.1

    Coal Price High @ 16 US$ / ton 3,302 MM US$

    (EPC 2,920 + O/C 208 +IDC 174)

    30 10 10.8

    CO2 Credit Price

    Zero

    @ 13 US$ / ton 3,302 MM US$

    (EPC 2,920 + O/C 208 +IDC 174)

    30 0 10.8

    CO2 Off TakePrice High

     

    @ 13 US$ / ton 3,302 MM US$

    (EPC 2,920 + O/C 208 +IDC 174)

    50 10 7.9

    CO2 Off TakePrice High

     

    @ 13 US$ / ton 4,073 MM US$

    (EPC 3,650 + O/C 208 +

    IDC 215)

    50 10 10.0

    Sensitive Analysis (2/2)

    O/C : Owner’s Cost, IDC : Interest during Construction

    3. Feasibility Study Result

  • 8/17/2019 Indonesia Sumatatera Sng Project

    12/12

    4. Feasibility Study Summary

    The product price of SNG is 10 $/MMBtu calculated by sensitiveanalysis. This price is equivalent to import LNG CIF price.

    Coal gasification test was completed successfully. Slag was discharged

    very stable. No unburned carbon fell down from slag hole. Initial CO2 EOR/CCS Screening Study around the potential low rank coal

    mine was completed. The study was screening of oil fields in SouthSumatra Basin of 100km radius of SNG Plant. The study collected dataof half of oil fields in the radius. 2/3 of reservoirs show CO2 /EOR

    miscible flooding. The reduction potential volume of CO2 was calculated and the

    methodology of CO2 reduction for Indonesia SNG/EOR plant wassummarized. Possible CO2 Reduction volume in this plant will be about6.29 M t/y.