13
PROJECT LOCATION SHOWN BY MONROE COUNTY INDIANA AVE & 3RD STREET SCALE: 1" = 300’ Perry Township, Monroe Co., Indiana Located 2.0 Miles West of SR46, In Sections 33 & 4 T-9-N, R-1-W, Bloomington, IN Intersection Improvements at Indiana Ave and 3rd. St. City of Bloomington URBAN DESIGN DATA DESIGN SPEED PROJECT DESIGN CRITERIA FUNCTIONAL CLASSIFICATION RURAL/URBAN TERRAIN ACCESS CONTROL 3R MAJOR COLLECTOR LEVEL NONE STA. 11+53.31 "S-3RD" BEGIN PROJECT STA. 12+64.00 "S-3RD" END PROJECT STA. 5+79.37 "S-IN" BEGIN CONSTRUCTION STA. 6+83.66 "S-IN" END CONSTRUCTION URBAN DESIGN DATA DESIGN SPEED PROJECT DESIGN CRITERIA FUNCTIONAL CLASSIFICATION RURAL/URBAN TERRAIN ACCESS CONTROL 3R MAJOR COLLECTOR LEVEL NONE INDIANA AVE 3rd ST. 25 MPH 30 MPH P:\B0270060_ Bl oo m i ng t on I N - 3r d St a t I nd i a n a A v e \De s i gn \Pl a n s \Mi s c \T itl e . dgn 11/11/2020 2: 25: 06 PM XXXXXXX XXXXX XXXXXXX PREPARED BY: CERTIFIED BY: APPROVED FOR LETTING: INDIANA DEPARTMENT OF TRANSPORTATION DATE DATE PHONE NUMBER (317) 844-8900 PLANS SURVEY BOOK CONTRACT PROJECT of SHEETS DESIGNATION TO BE USED WITH THESE PLANS STANDARD SPECIFICATIONS DATED 2020 INDIANA DEPARTMENT OF TRANSPORTATION 1 8900 Keystone Crossing, Suite 475, Indianapolis, IN 46240 Clark Dietz, Inc. T:317.844.8900...www.clarkdietz.com INDIANAPOLIS, INDIANA 46240 8900 KEYSTONE CROSSING, SUITE 475 13 ROAD & SIGNAL PLANS CITY OF BLOOMINGTON, IN P R O F E S S I O N A L E N G I N E E R R E G I S T E R E D NO. PE10707495 STATE OF I N D I A N A K E V I N M . H E T R I C K 9/30/2020

PROJECT DESIGN CRITERIA FUNCTIONAL CLASSIFICATION …

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PROJECT DESIGN CRITERIA FUNCTIONAL CLASSIFICATION …

PROJECT LOCATION SHOWN BY

MONROE COUNTY

INDIANA AVE & 3RD STREET

SCALE: 1" = 300’

Perry Township, Monroe Co., IndianaLocated 2.0 Miles West of SR46, In Sections 33 & 4 T-9-N, R-1-W,

Bloomington, INIntersection Improvements at Indiana Ave and 3rd. St.

City of Bloomington

URBAN

DESIGN DATADESIGN SPEED

PROJECT DESIGN CRITERIA

FUNCTIONAL CLASSIFICATION

RURAL/URBAN

TERRAIN

ACCESS CONTROL

3R

MAJOR COLLECTOR

LEVEL

NONE

STA. 11+53.31 "S-3RD"

BEGIN PROJECT

STA. 12+64.00 "S-3RD"

END PROJECT

STA. 5+79.37 "S-IN"

BEGIN CONSTRUCTION

STA. 6+83.66 "S-IN"

END CONSTRUCTION

URBAN

DESIGN DATADESIGN SPEED

PROJECT DESIGN CRITERIA

FUNCTIONAL CLASSIFICATION

RURAL/URBAN

TERRAIN

ACCESS CONTROL

3R

MAJOR COLLECTOR

LEVEL

NONE

INDIANA AVE

3rd ST.25 MPH

30 MPH

P:\

B0270060_

Blo

omin

gton IN - 3rd

St at In

dia

na

Ave\

Desig

n\

Pla

ns\

Mis

c\

Title.d

gn

11/

11/

2020

2:2

5:0

6

PM

XXXXXXX

XXXXX XXXXXXX

PREPARED BY:

CERTIFIED BY:

APPROVED

FOR LETTING:

INDIANA DEPARTMENT OF TRANSPORTATION DATE

DATE

PHONE NUMBER

(317) 844-8900

PLANS

SURVEY BOOK

CONTRACT PROJECT

of

SHEETS

DESIGNATION

TO BE USED WITH THESE PLANS

STANDARD SPECIFICATIONS DATED 2020

INDIANA DEPARTMENT OF TRANSPORTATION

1

8900 Keystone Crossing, Suite 475, Indianapolis, IN 46240

Clark Dietz, Inc.

T:317.844.8900...www.clarkdietz.com

INDIANAPOLIS, INDIANA 46240

8900 KEYSTONE CROSSING, SUITE 475

13

ROAD & SIGNAL PLANS

CITY OF BLOOMINGTON, IN

PRO

FESSIONAL ENGI

N

EER

REGISTERED

NO.

PE10707495

STATE OF

INDIANA

KE

VIN M. HETRICK

9/30/2020

Page 2: PROJECT DESIGN CRITERIA FUNCTIONAL CLASSIFICATION …

ATTN:

TEL. :

Email:

ELECTRIC

ATTN:

TEL. :

Email:

ATTN:

TEL. :

Email:

Communication

Bloomington, IN 47408

4517 E. Indiana Bell Court

AT & T

Russel Owen

812-334-4629 (office)

[email protected]

Lafayette, IN 47905

3395 Greenbush St.

Duke Energy

Chuck Walls

765-446-4015 (office)

[email protected]

GAS

Columbus, IN 47203

4324 Middle Road

Vectren Energy

Chris Baldwin

812-348-6710 (office)

[email protected]

ATTN:

TEL. :

Email:

812-349-3631 (office)

ATTN:

TEL. :

Email:

Communication

812-935-2413 (office)

ATTN:

TEL. :

Email:

City of Bloomington Utilities

Bloomington, IN 47402

600 East Miller Drive

(Water, Sanitary, Storm Sewer)

Jane Fleig

[email protected]

Ellettsville, IN 47429

1600 W. Temperance St.

Smithville Fiber

Ben Kirk

[email protected]

Telecommunication

Indianapolis, IN 46256

9209 Castlegate Drive

Zayo Bandwidth

Waylon W. Higgins

765-341-1199 (cell)

[email protected]

ATTN:

TEL. :

Email:

812-822-3267 (office)

ATTN:

TEL. :

Email:

Communication

616-988-5319 (office)

Comcast Cable Communication

Bloomington, IN 47404

1600 West Fountain Drive

CABLE TV

Steve Mcartor

[email protected]

Grand Rapids, MI 49503

201 Ionia Ave SW

US Signal

Rob Fisher

[email protected]

2

ATTN:

TEL. :

Email:

Mike Stinson

812-349-3450 (office)

Street Department

Bloomington, IN 47401

1981 S Henderson St.

City of Bloomington

[email protected]

REVISIONS

1

SHEET NO. DATE REV. NO. REVISED

2,9,10 & 13 11/10/2020curb ramp to northern project limits.

Curb and gutter to vertical curb. Added driveway

P:\

B0270060_

Blo

omin

gton IN - 3rd

St at In

dia

na

Ave\

Desig

n\

Pla

ns\

Mis

c\In

dex01.d

gn

11/

11/

2020

3:0

9:5

8

PM

UTILITIES GENERAL NOTES

All earth shoulders, median areas, cut and fill slopes shall be plain or mulch seeded except where sodding

is specified.

The final cross sections of the grading contract will be the original cross sections of the paving contract. However,

partial or complete cross sections shall be taken if necessary to determine the actual excavation quantities.

The paper relocation will be cross sectioned by the Engineer before construction.

Existing asphalt pavement located outside the construction limits, between Sta. _________ and Sta. _________,

shall be removed as directed.

The quantity of peat excavation shown on the plans has been estimated on the basis of theoretical cross sections

by using treatment of existing fills, treatment by removal, or treatment by displacement where each treatment applies.

DESIGNED:

CHECKED:

DRAWN:

CHECKED:

FOR APPROVALRECOMMENDED

DESIGN ENGINEER DATE

HORIZONTAL SCALE

VERTICAL SCALE

SURVEY BOOK

CONTRACT PROJECT

SHEETS

DESIGNATION

BRIDGE FILE

XXXXXXX

of

XXXXX XXXXXXX

JAJ

KMH KMH

JAJ

NONE

NONE

Know what’sbelow.before you dig.Call

R

CITY OF BLOOMINGTON, INDIANA

13

PRO

FESSIONAL ENGI

N

EER

REGISTERED

NO.

PE10707495

STATE OF

INDIANA

KE

VIN M. HETRICK

9/30/2020

INDEX SHEETSTANDARD DRAWINGS &GENERAL INFORMATION,

Page 3: PROJECT DESIGN CRITERIA FUNCTIONAL CLASSIFICATION …

CONTROL POINTS

POINT #

100

101

102

NORTHING

1426746.59093

1426928.90624

1426795.13855

EASTING

3110471.38964

3110488.00628

3110738.75495

ELEVATION

788.66

780.97

793.25

DESCRIPTION

5/8" DIA. REBAR WITH RED "CONTROL WITNESS" CAP FLUSH

MAG NAIL FLUSH

MAG NAIL FLUSH

S89° 21’ 37"E 300.00’ LINE "S-3RD"

N00° 3

6’ 56"W 3

00.0

0’ LIN

E "

S-I

N"

#100

#102

#101

EAST 3RD STREET

SO

UT

H I

NDIA

NA A

VE

NU

E

10+00 11+00 12+00 13+00

5+

00

6+

00

7+

00

8+

00

VERTICAL DATUM: NAVD88 (Geoid 12B), U.S. Survey Feet

HORIZONTAL DATUM: NAD83 (2011), Indiana State Plane West Zone, U.S. Survey Feet

E: 3110627.93816

N: 1426780.32795

P.O.T. 13+00.00 "S-3RD"

E: 3110327.95687

N: 1426783.67768

P.O.T. 10+00.00 "S-3RD"

E: 3110523.31682

N: 1426668.97043

P.O.T. 5+00.00 "S-IN"

E: 3110520.09438

N: 1426968.95312

P.O.T. 8+00.00 "S-IN"

3

P:\

B0270060_

Blo

omin

gton IN - 3rd

St at In

dia

na

Ave\

Desig

n\

Pla

ns\

Mis

c\

Layout01.d

gn

11/

11/

2020

2:2

5:2

2

PM

DESIGNED:

CHECKED:

DRAWN:

CHECKED:

FOR APPROVALRECOMMENDED

DESIGN ENGINEER DATE

HORIZONTAL SCALE

VERTICAL SCALE

SURVEY BOOK

CONTRACT PROJECT

SHEETS

DESIGNATION

BRIDGE FILE

XXXXXXX

of

XXXXX XXXXXXX

MMK JAJ

MMK KMH

1" = 20’

LAYOUT

CITY OF BLOOMINGTON, INDIANA

NONE

13

PRO

FESSIONAL ENGI

N

EER

REGISTERED

NO.

PE10707495

STATE OF

INDIANA

KE

VIN M. HETRICK

9/30/2020

Page 4: PROJECT DESIGN CRITERIA FUNCTIONAL CLASSIFICATION …

P:\

B0270060_

Blo

omin

gton IN - 3rd

St at In

dia

na

Ave\

Desig

n\

Pla

ns\

MntTraff\

MO

T01.d

gn

11/

11/

2020

2:2

5:2

7

PM

DESIGNED:

CHECKED:

DRAWN:

CHECKED:

FOR APPROVALRECOMMENDED

DESIGN ENGINEER DATE

HORIZONTAL SCALE

VERTICAL SCALE

SURVEY BOOK

CONTRACT PROJECT

SHEETS

DESIGNATION

BRIDGE FILE

XXXXXXX

of

XXXXX XXXXXXX

JAJ

KMH KMH

JAJ

1" = 50’

NONE

CITY OF BLOOMINGTON, INDIANA

13

PRO

FESSIONAL ENGI

N

EER

REGISTERED

NO.

PE10707495

STATE OF

INDIANA

KE

VIN M. HETRICK

9/30/2020

PHASE IMAINTENANCE OF TRAFFIC

**DRUM WITH TYPE "C" STEADY BURNING LIGHT

TEMPORARY PAVEMENT MARKING, REMOVABLE, 4 IN (SOLID WHITE)

71

70

LANE INDICATION ARROW

TEMP. PVMT. MESSAGE, MARKING, REMOVABLE,

EX. PVMT. MESSAGE, MARKING, LANE INDICATION ARROW

DIRECTION OF TRAFFIC (FLOW ARROW)

EXISTING PAVEMENT MARKING

CONSTRUCTION SIGN TYPE "A" OR "B" AS INDICATED

STD. BARRICADE, TYPE III-B (REFLECTORIZED BOTH SIDES)

CONSTRUCTION AREA

LOW INTENSITY CONSTRUCTION WARNING LIGHT, TYPE "A"

LEGEND

ATWATER AVE

72

S HENDERSON ST

** 85 83

92

** 92

93

*

FLASHING ARROW SIGN

72

71 (Typ.)

72

72

S F

ESS A

VE

82

**

85 83

S I

NDIA

NA A

VE

END

CONSTRUCTION

XG20-2

Speeding

Max $1000

Reckless Driving

Max 6 Yrs

(60" x 36")

XW2-6M PH

ROAD

CONSTRUCTION

AHEAD

XW20-1

XW13-1

25CLOSED

AHEAD

RIGHT LANE

XW20-5(R) XW4-2(R)

MUST

LEFT LANE

TURN LEFT

R3-7(L)

80 82 83 85 90

9392

R1-1

STOP

LIN

E "

S-I

N"

LINE "S-3RD"

ADJUSTED AS DIRECTED BY THE ENGINEER.

SHOWN ON THE PLANS ARE APPROXIMATE AND SHALL BE

THE LOCATIONS OF SIGNS AND TRAFFIC CONTROL DEVICES5.

OTHERWISE DIRECTED BY THE ENGINEER.

THE TYPICAL SPACING FOR DRUMS SHALL BE 25’ OR AS4.

REQUIREMENTS.

ON UNIFORM TRAFFIC CONTROL DEVICES (IMUTCD)

ALL SIGNS SHALL MEET THE LATEST INDIANA MANUAL3.

UNLESS OTHERWISE NOTED.

ALL STATION CALLOUTS FROM LINE "S-IN" OR LINE "S-3RD"2.

MAINTAINED AT ALL TIMES.

ACCESS TO ALL DRIVES AND APPROACHES SHALL BE1.

NOTES:

70

5+00

10+

00

175’

4

"A"

"A"

X X X REMOVE EXISTING PAVEMENT MARKINGS

X X X

X X X

72

+55

+30

X X X

+98

+90

*

*

SIDEWALK

CLOSED

R9-9

79

79

79

+28

= 25 mph

Construction Design Speed

NOTE:

89*

80

*

80

100’

*

82

*

82

200’100’100’

82

*

80

*

82

*

*

80

*

82

100’

100’

90

**

90

71(Typ.)

82

89

*

*

100’

100’

89*

90’ Taper

92

*

92

**

93

*

E 3RD ST

175’’

79*

Merger115’ Lane

STAY

IN

LANE

(24"x30")

R4-9

72

SECTION "A-A"

Scale: None

5’1’WORK ZONE 10’ TRAVEL LANE

LANE

BIKE

2’

7272

Page 5: PROJECT DESIGN CRITERIA FUNCTIONAL CLASSIFICATION …

P:\

B0270060_

Blo

omin

gton IN - 3rd

St at In

dia

na

Ave\

Desig

n\

Pla

ns\

MntTraff\

MO

T02.d

gn

11/

11/

2020

2:2

5:3

1

PM

DESIGNED:

CHECKED:

DRAWN:

CHECKED:

FOR APPROVALRECOMMENDED

DESIGN ENGINEER DATE

HORIZONTAL SCALE

VERTICAL SCALE

SURVEY BOOK

CONTRACT PROJECT

SHEETS

DESIGNATION

BRIDGE FILE

XXXXXXX

of

XXXXX XXXXXXX

JAJ

KMH KMH

JAJ

1" = 50’

NONE

CITY OF BLOOMINGTON, INDIANA

13

PRO

FESSIONAL ENGI

N

EER

REGISTERED

NO.

PE10707495

STATE OF

INDIANA

KE

VIN M. HETRICK

9/30/2020

PHASE IIMAINTENANCE OF TRAFFIC

ATWATER AVE

S HENDERSON ST

93

*

82

71 (Typ.)

71(Typ.)

72

S F

ESS A

VE

S I

NDIA

NA A

VE

END

CONSTRUCTION

XG20-2

Speeding

Max $1000

Reckless Driving

Max 6 Yrs

(60" x 36")

XW2-6M PH

ROAD

CONSTRUCTION

AHEAD

XW20-1

XW13-1

25CLOSED

AHEAD

RIGHT LANE

XW20-5(R) XW4-2(R)

MUST

LEFT LANE

TURN LEFT

R3-7(L)

80 82 83 8581

90 9392

R1-1

STOP

SIGN LEGEND

LIN

E "

S-I

N"

LINE "S-3RD"

ADJUSTED AS DIRECTED BY THE ENGINEER.

SHOWN ON THE PLANS ARE APPROXIMATE AND SHALL BE

THE LOCATIONS OF SIGNS AND TRAFFIC CONTROL DEVICES5.

OTHERWISE DIRECTED BY THE ENGINEER.

THE TYPICAL SPACING FOR DRUMS SHALL BE 25’ OR AS4.

REQUIREMENTS.

ON UNIFORM TRAFFIC CONTROL DEVICES (IMUTCD)

ALL SIGNS SHALL MEET THE LATEST INDIANA MANUAL3.

UNLESS OTHERWISE NOTED.

ALL STATION CALLOUTS FROM LINE "S-IN" OR LINE "S-3RD"2.

MAINTAINED AT ALL TIMES.

ACCESS TO ALL DRIVES AND APPROACHES SHALL BE1.

NOTES:

**DRUM WITH TYPE "C" STEADY BURNING LIGHT

TEMPORARY PAVEMENT MARKING, REMOVABLE, 4 IN (SOLID WHITE)

71

70

LANE INDICATION ARROW

TEMP. PVMT. MESSAGE, MARKING, REMOVABLE,

EX. PVMT. MESSAGE, MARKING, LANE INDICATION ARROW

DIRECTION OF TRAFFIC (FLOW ARROW)

EXISTING PAVEMENT MARKING

CONSTRUCTION SIGN TYPE "A" OR "B" AS INDICATED

STD. BARRICADE, TYPE III-B (REFLECTORIZED BOTH SIDES)

CONSTRUCTION AREA

LOW INTENSITY CONSTRUCTION WARNING LIGHT, TYPE "A"

LEGEND

72

70

10+

00

5+00

5

*

72

SECTION "A-A"

Scale: None

5’1’WORK ZONE 10’ TRAVEL LANE

LANE

BIKE

*

* 79*79

72

+55

+10

+30

+81

+74

= 25 mph

Construction Design Speed

NOTE:

81*

90

81

*

SIDEWALK

CLOSED

R9-9

79

79

*

80

*

8282

*

80

*

82

*

71(Typ.)

REMOVE EXISTING PAVEMENT MARKINGSX X X

X

X

X

72

Shift

Taper

90’ Lane

100’

100’

*

90

100’

100’

100’

** 85 83

*

82

**

85 83

175’

* 92

92

*

"A"

"A"

*

82

*

80

*

80

100’

*

82

200’100’100’

92

*

92

**

93

*

79

*

E 3RD ST

X

X

X

72

X X X

Merger115’ Lane

X X X

(36" x 36")

W1-4b

2’

7272

FLASHING ARROW SIGN

Page 6: PROJECT DESIGN CRITERIA FUNCTIONAL CLASSIFICATION …

P:\

B0270060_

Blo

omin

gton IN - 3rd

St at In

dia

na

Ave\

Desig

n\

Pla

ns\

MntTraff\

MO

T03.d

gn

11/

11/

2020

2:2

5:3

6

PM

DESIGNED:

CHECKED:

DRAWN:

CHECKED:

FOR APPROVALRECOMMENDED

DESIGN ENGINEER DATE

HORIZONTAL SCALE

VERTICAL SCALE

SURVEY BOOK

CONTRACT PROJECT

SHEETS

DESIGNATION

BRIDGE FILE

XXXXXXX

of

XXXXX XXXXXXX

JAJ

KMH KMH

JAJ

1" = 50’

NONE

CITY OF BLOOMINGTON, INDIANA

13

PRO

FESSIONAL ENGI

N

EER

REGISTERED

NO.

PE10707495

STATE OF

INDIANA

KE

VIN M. HETRICK

9/30/2020

ATWATER AVE

S HENDERSON ST

93

7271 (Typ.)

S F

ESS A

VE

S I

NDIA

NA A

VE

PHASE IIIMAINTENANCE OF TRAFFIC

END

CONSTRUCTION

XG20-2

Speeding

Max $1000

Reckless Driving

Max 6 Yrs

(60" x 36")

XW2-6

XW20-5(L) XW9-2(R)

M PH

ROAD

CONSTRUCTION

AHEAD

XW20-1

XW13-1

25MERGE

RIGHT

LEFT LANE

CLOSED

AHEAD

XW4-2(L)

MUST

LEFT LANE

TURN LEFT

R3-7(L)

80 82 84 81 86 87

90 9392

R1-1

STOP

LANE ENDS

SIGN LEGEND

LIN

E "

S-I

N"

LINE "S-3RD"

ADJUSTED AS DIRECTED BY THE ENGINEER.

SHOWN ON THE PLANS ARE APPROXIMATE AND SHALL BE

THE LOCATIONS OF SIGNS AND TRAFFIC CONTROL DEVICES5.

OTHERWISE DIRECTED BY THE ENGINEER.

THE TYPICAL SPACING FOR DRUMS SHALL BE 25’ OR AS4.

REQUIREMENTS.

ON UNIFORM TRAFFIC CONTROL DEVICES (IMUTCD)

ALL SIGNS SHALL MEET THE LATEST INDIANA MANUAL3.

UNLESS OTHERWISE NOTED.

ALL STATION CALLOUTS FROM LINE "S-IN" OR LINE "S-3RD"2.

MAINTAINED AT ALL TIMES.

ACCESS TO ALL DRIVES AND APPROACHES SHALL BE1.

NOTES:

**DRUM WITH TYPE "C" STEADY BURNING LIGHT

TEMPORARY PAVEMENT MARKING, REMOVABLE, 4 IN (SOLID WHITE)

71

70

LANE INDICATION ARROW

TEMP. PVMT. MESSAGE, MARKING, REMOVABLE,

EX. PVMT. MESSAGE, MARKING, LANE INDICATION ARROW

DIRECTION OF TRAFFIC (FLOW ARROW)

EXISTING PAVEMENT MARKING

CONSTRUCTION SIGN TYPE "A" OR "B" AS INDICATED

STD. BARRICADE, TYPE III-B (REFLECTORIZED BOTH SIDES)

CONSTRUCTION AREA

LOW INTENSITY CONSTRUCTION WARNING LIGHT, TYPE "A"

LEGEND

72

5+00

10+

00

175’

6

71

SECTION "A-A"

Scale: None

WORK ZONE

LANE

BIKE

72

X X X REMOVE EXISTING PAVEMENT MARKINGS

X X X

*

79

SIDEWALK

CLOSED

R9-9

79

71

+90

+65 +

96

+28

5’ 10’ 1’

= 25 mph

Construction Design Speed

NOTE:

2’

Bike Buffer Zone

71

71

*

82

71(Typ.)

70

*

81*

90

81

*

*

80

*

8282

*

80

*

82

*

71(Typ.)

X

X

X

72

Shift

Taper

90’ Lane

100’

100’

*

90

100’

100’

100’

*

79

*

82

87

* *

84

*

82

*

80

*

84

*

82

*

8087

"A"

"A"

*

86

*

86*

100’ 100’ 100’ 100’ 100’

92

*

92

*

E 3RD ST

*

93

* 92

92

*

*

79*

*79

Merger115’ Lane

(36" x 36")

W1-4b

X

X

X

FLASHING ARROW SIGN

Page 7: PROJECT DESIGN CRITERIA FUNCTIONAL CLASSIFICATION …

P:\

B0270060_

Blo

omin

gton IN - 3rd

St at In

dia

na

Ave\

Desig

n\

Pla

ns\

MntTraff\

MO

T04.d

gn

11/

11/

2020

2:2

5:4

0

PM

DESIGNED:

CHECKED:

DRAWN:

CHECKED:

FOR APPROVALRECOMMENDED

DESIGN ENGINEER DATE

HORIZONTAL SCALE

VERTICAL SCALE

SURVEY BOOK

CONTRACT PROJECT

SHEETS

DESIGNATION

BRIDGE FILE

XXXXXXX

of

XXXXX XXXXXXX

JAJ

KMH KMH

JAJ

1" = 50’

NONE

CITY OF BLOOMINGTON, INDIANA

13

PRO

FESSIONAL ENGI

N

EER

REGISTERED

NO.

PE10707495

STATE OF

INDIANA

KE

VIN M. HETRICK

9/30/2020

END

CONSTRUCTION

XG20-2

Speeding

Max $1000

Reckless Driving

Max 6 Yrs

(60" x 36")

XW2-6

XW20-5(L) XW9-2(R)

M PH

ROAD

CONSTRUCTION

AHEAD

XW20-1

XW13-1

25MERGE

RIGHT

LEFT LANE

CLOSED

AHEAD

XW4-2(L)

80 82 84 86 87

9392

R1-1

STOP

LANE ENDS

SIGN LEGEND

ATWATER AVE

S HENDERSON ST

*

93

*93

71 (Typ.)

S F

ESS A

VE

S I

NDIA

NA A

VE

PHASE IVMAINTENANCE OF TRAFFIC

72

ONLY

94 95

R3-5a R3-6

LIN

E "

S-I

N"

LINE "S-3RD"

ADJUSTED AS DIRECTED BY THE ENGINEER.

SHOWN ON THE PLANS ARE APPROXIMATE AND SHALL BE

THE LOCATIONS OF SIGNS AND TRAFFIC CONTROL DEVICES5.

OTHERWISE DIRECTED BY THE ENGINEER.

THE TYPICAL SPACING FOR DRUMS SHALL BE 25’ OR AS4.

REQUIREMENTS.

ON UNIFORM TRAFFIC CONTROL DEVICES (IMUTCD)

ALL SIGNS SHALL MEET THE LATEST INDIANA MANUAL3.

UNLESS OTHERWISE NOTED.

ALL STATION CALLOUTS FROM LINE "S-IN" OR LINE "S-3RD"2.

MAINTAINED AT ALL TIMES.

ACCESS TO ALL DRIVES AND APPROACHES SHALL BE1.

NOTES:

**DRUM WITH TYPE "C" STEADY BURNING LIGHT

TEMPORARY PAVEMENT MARKING, REMOVABLE, 4 IN (SOLID WHITE)

71

70

LANE INDICATION ARROW

TEMP. PVMT. MESSAGE, MARKING, REMOVABLE,

EX. PVMT. MESSAGE, MARKING, LANE INDICATION ARROW

DIRECTION OF TRAFFIC (FLOW ARROW)

EXISTING PAVEMENT MARKING

CONSTRUCTION SIGN TYPE "A" OR "B" AS INDICATED

STD. BARRICADE, TYPE III-B (REFLECTORIZED BOTH SIDES)

CONSTRUCTION AREA

LOW INTENSITY CONSTRUCTION WARNING LIGHT, TYPE "A"

LEGEND

72

FLASHING ARROW SIGN

5+00

10+

00

70

175’

7

71

SECTION "A-A"

Scale: None

WORK ZONE

72

71

10’ 1’

+46

= 25 mph

Construction Design Speed

NOTE:

Bike Buffer Zone

2’

LANE

BIKE

5’

71

SIDEWALK

CLOSED

R9-9

79

79

79*

79

*

79

*

*

84

*

82

*

8087

*

100’ 100’ 100’ 100’

87

* *

84

*

82

*

80

*

86

86*

100’

*

82

"A"

"A"

71

82

*

80

*

82

*

*

80

*

82

100’

100’

94

**

95

71(Typ.)

82

95

*

*

100’

94*

92

*

200’

92

*

E 3RD ST

* 92

92

*

Merger115’ Lane

72

X X X

Page 8: PROJECT DESIGN CRITERIA FUNCTIONAL CLASSIFICATION …

CROSS HERE

AHEAD

SIDEWALK CLOSED

USE OTHER SIDE

SIDEWALK CLOSED

USE OTHER SIDE

SIDEWALK CLOSED

CROSS HERE

AHEAD

SIDEWALK CLOSED

USE OTHER SIDE

SIDEWALK CLOSED

Type III-A Barricade

Type III-A Barricade

Type III-A Barricade

Type III-A Barricade

(24" x 18")

R9-11

(24" x 18")

R9-11

Type III-A Barricade

(24" x 12")

R9-10

(24" x 12")

R9-10(24" x 12")

R9-10

PEDESTRIAN MOT TYPICAL DETAIL*

CONSTRUCTION AREA

CONSTRUCTION WARNING LIGHT, TYPE "A"

*

*

*

***

CONSTRUCTION SIGN AND SUPPORTS

shall be covered or deactivated.

Pedestrian traffic signal displays controlling closed crosswalks 4)

shall be used on barricades that support signs and close sidewalks.

For overnight sidewalk closures, Type A Flashing warning lights3)

traffic.

are required in addition to the MOT requirements for vehicular

required for pedestrian MOT. The displayed signing and barricades

The details on this sheet show the minimum required signage2)

alteration, maintenance, or other condition.

pedestrian circulation path is temporarily closed by construction,

An alternate pedestrian access route is required when an existing1)

Notes

AHEAD

CLOSED

SIDEWALK

DETOUR

72

71

71

71 71

71 71

7171

71

71

72

79

70

70

XM4-8

XW11-2

M6-3

END

DETOURXM4-8a

XW11-2

DETOUR

71 72

CLOSED

SIDEWALK

R9-9

70

79

79

73

7373

73

73

73

73

73

79

79

TYPICAL PEDESTRIAN DETOUR

Construction Area

Construction Area

73

XW20-3 ("SIDEWALK")

XM4-96 (L or R)

PEDESTRIAN ACCESSMAINTENANCE OF TRAFFIC

P:\

B0270060_

Blo

omin

gton IN - 3rd

St at In

dia

na

Ave\

Desig

n\

Pla

ns\

MntTraff\

MO

T_

Pedestrain

Detail.d

gn

11/

11/

2020

2:2

5:4

5

PM

DESIGNED:

CHECKED:

DRAWN:

CHECKED:

FOR APPROVALRECOMMENDED

DESIGN ENGINEER DATE

HORIZONTAL SCALE

VERTICAL SCALE

SURVEY BOOK

CONTRACT PROJECT

SHEETS

DESIGNATION

BRIDGE FILE

XXXXXXX

of

XXXXX XXXXXXX

JAJ

KMH KMH

JAJ

1" = 50’

NONE

8

CITY OF BLOOMINGTON, INDIANA

13

PRO

FESSIONAL ENGI

N

EER

REGISTERED

NO.

PE10707495

STATE OF

INDIANA

KE

VIN M. HETRICK

9/30/2020

Page 9: PROJECT DESIGN CRITERIA FUNCTIONAL CLASSIFICATION …

TR

SS

STST

SS

ST

W

TR

SS

STST

SS

ST

W

(12" RCP)(12" RCP)

(18" RCP)

(8" CLAY)(8" CLAY)

(8" CLAY)

(12" PVC)

P:\

B0270060_

Blo

omin

gton IN - 3rd

St at In

dia

na

Ave\

Desig

n\

Pla

ns\

Pla

nProf\

PP01.d

gn

11/

11/

2020

2:2

5:5

0

PM

DESIGNED:

CHECKED:

DRAWN:

CHECKED:

FOR APPROVALRECOMMENDED

DESIGN ENGINEER DATE

HORIZONTAL SCALE

VERTICAL SCALE

SURVEY BOOK

CONTRACT PROJECT

SHEETS

DESIGNATION

BRIDGE FILE

XXXXXXX

of

XXXXX XXXXXXX

JAJ JAJ

KMHKMH

1" = 20’

1" = 5’

CITY OF BLOOMINGTON, INDIANA

13

PRO

FESSIONAL ENGI

N

EER

REGISTERED

NO.

PE10707495

STATE OF

INDIANA

KE

VIN M. HETRICK

9/30/2020

ASPHALT

ASPHALT

CONC.

CONC.

ASPHALT

LANDSCAPE

LANDSCAPE

GRASS

LANDSCAPE

CANOPY

CONC.

CIRCLE K SIGN

GAS PUMP

ISLAND

GAS PUMP

ISLAND

WALL

INDIANA UNIVERSITY

SIGN

WALLSIGNAL BOX

BRIC

K

N100

INDIA

NA A

VE

"CONTROL WITNESS" FLUSH

5/8" DIA. REBAR WITH RED

3rd ST

20.1’ 17.9’

10.5’4" Dec. Tree

No Parking

Sign

Conc.

Sdwk.

LIN

E "

S-I

N"

LINE "S-3RD"EL. 788.66

E: 3110471.38964

N: 1426746.59093N

101

INDIA

NA A

VE

LIN

E "

S-I

N"

MAG NAIL FLUSH

16.8’

5.4’

Gas Fill Cap

Light P.

5.9’

Conc. Slab

Edge of

EL. 780.97

E: 3110488.00628

N: 1426928.90624

10+

73.7

9, 6.0

4’, Dr. M

h.

11+

03.0

2, 2.1

9’, W

at. G

ate

+38.0

3, 16.2

1’, Sin

g. Post Sig

n (

NO P

AR

KIN

G)

+44.3

7, 17.2

4’, Sin

g. Post Sig

n (

SIG

NA

L A

HE

AD)

+49.6

4, 44.2

7’, D

ecid.

Tr. (4 I

N)

+55.7

7, 26.7

8’, C

ontr.

Cab.

+60.1

3, 26.3

7’, Traf. Sig. Strain P

ole

+61.5

1, 29.6

1’, Sin

g. Post Sig

n (

ON

E W

AY)

+63.9

1, 27.5

4’, Traf. Sig.

Mh.

12+

18.2

5, 31.2

3’, Lt. P

ole

+18.3

2, 18.2

9’, Traf. Sig. Strain P

ole

+18.4

8, 33.7

6’, Elec.

H.H. (V

AU

LT)

+30.0

9, 19.7

9’, M.

Nail S

et

+30.1

2, 25.2

1’, R

et. W

all

+30.1

3, 26.9

1’, R

et. W

all

+30.8

1, 36.6

8’, R

et. W

all

+30.8

5, 26.9

7’, R

et. W

all

+31.6

6, 25.1

8’, R

et. W

all

+31.6

7, 25.3

4’, R

et. W

all

+31.8

4, 26.2

5’, Brick W

all

+31.9

6, 36.3

2’, Brick W

all

+34.2

2, 41.7

3’, R

et. W

all

+34.7

1, 41.0

4’, Brick W

all

+40.0

2, 25.0

5’, R

et. W

all

+40.0

9, 26.1

2’, Brick W

all

10+

36.9

9, 95.5

2’, Brick W

all

+37.4

2, 82.4

0’, Brick W

all

+37.7

7, 18.7

8’, Lt. P

ole

+37.7

9, 65.9

6’, Brick W

all

+37.9

2, 95.5

3’, R

et. W

all

+38.2

7, 48.0

8’, Brick W

all

+38.3

1, 82.4

0’, R

et. W

all

+38.5

4, 80.5

0’, C.L.T.F.

+38.7

5, 29.6

4’, Brick W

all

+38.7

7, 95.4

3’, C.L.T.F.

+38.8

0, 65.9

6’, R

et. W

all

+39.1

4, 48.0

6’, R

et. W

all

+39.4

2, 61.6

0’, Lt. P

ole

+39.5

8, 29.7

4’, R

et. W

all

+40.6

2, 77.1

3’, C

onc.

Car

Sto

ps

+40.8

6, 68.9

6’, C

onc.

Car

Sto

ps

+41.0

9, 44.2

4’, C

onc.

Car

Sto

ps

+41.1

2, 60.7

4’, C

onc.

Car

Sto

ps

+41.2

0, 52.7

3’, C

onc.

Car

Sto

ps

+41.8

2, 36.1

1’, C

onc.

Car

Sto

ps

+48.7

5, 19.5

5’, Sin

g. Post Sig

n (

PA

RKIN

G A

HE

AD)

+74.9

8, 8.5

3’, Dr. M

h.

+84.2

4, 1.1

3’, S

an.

Mh.

+90.6

5, 32.7

4’, C

npy.

Cor.

+91.7

9, 91.0

7’, C

npy.

Cor.

+93.9

9, 25.3

9’, D

ecid.

Tr. (12 I

N)

+98.8

1, 25.3

8’, B

ush

11+

01.6

2, 43.7

4’, G

as P

mp.

+01.6

7, 39.8

1’, G

as P

mp.

+01.9

6, 63.7

7’, G

as P

mp.

+01.9

6, 67.8

2’, G

as P

mp.

+02.1

8, 41.8

1’, Misc. Fixed Str. (D

OW

N S

PO

UT)

+02.5

4, 65.7

9’, Misc. Fixed Str. (D

OW

N S

PO

UT)

+02.6

5, 42.2

1’, C

olu

mn C

or. (

CA

NO

PY P

OST)

+02.6

7, 41.3

8’, C

olu

mn C

or. (

CA

NO

PY P

OST)

+02.9

8, 65.3

8’, C

olu

mn C

or. (

CA

NO

PY P

OST)

+03.1

0, 66.2

2’, C

olu

mn C

or. (

CA

NO

PY P

OST)

+03.2

6, 89.7

1’, C

olu

mn C

or. (

CA

NO

PY P

OST)

+03.2

6, 25.8

9’, B

ush

+03.3

0, 39.6

9’, G

as P

mp.

+03.3

4, 90.4

5’, C

olu

mn C

or. (

CA

NO

PY P

OST)

+03.4

0, 43.8

6’, G

as P

mp.

+03.4

8, 42.2

0’, C

olu

mn C

or. (

CA

NO

PY P

OST)

+03.4

8, 41.4

0’, C

olu

mn C

or. (

CA

NO

PY P

OST)

+03.6

2, 63.6

7’, G

as P

mp.

+03.7

6, 67.8

4’, G

as P

mp.

+03.7

7, 65.3

4’, C

olu

mn C

or. (

CA

NO

PY P

OST)

+04.1

3, 89.6

5’, C

olu

mn C

or. (

CA

NO

PY P

OST)

+04.2

5, 40.3

9’, G

as P

mp.

+04.2

9, 43.1

3’, G

as P

mp.

+04.6

1, 64.3

7’, G

as P

mp.

+08.8

6, 25.4

2’, D

ecid.

Tr. (15 I

N)

+09.1

3, 43.1

2’, G

as P

mp.

+09.1

5, 40.2

9’, G

as P

mp.

+09.4

8, 64.2

6’, G

as P

mp.

+09.5

5, 67.0

8’, G

as P

mp.

+09.9

3, 39.6

3’, G

as P

mp.

+09.9

8, 43.7

9’, G

as P

mp.

+10.4

4, 67.7

4’, G

as P

mp.

+10.4

5, 63.4

8’, G

as P

mp.

+11.6

6, 43.7

1’, G

as P

mp.

+11.7

7, 39.6

7’, G

as P

mp.

+12.0

5, 63.5

2’, G

as P

mp.

+12.1

2, 67.5

1’, G

as P

mp.

+14.9

6, 25.4

1’, B

ush

+15.1

7, 32.3

1’, C

npy.

Cor.

+15.8

7, 91.0

2’, C

npy.

Cor.

+20.1

7, 25.2

5’, B

ush

+24.0

2, 20.4

9’, W

at. M

eter

+55.0

0, 35.3

2’, C

om

m. Sig

n (

CIR

CLE K)

+55.7

6, 34.2

9’, C

om

m. Sig

n (

CIR

CLE K)

+62.2

2, 41.5

2’, C

om

m. Sig

n (

CIR

CLE K)

+62.9

3, 40.5

7’, C

om

m. Sig

n (

CIR

CLE K)

+66.9

3, 99.5

9’, B

ush

+67.0

2, 87.1

8’, B

ush

+67.0

5, 75.9

8’, D

ecid.

Tr. (20 I

N)

+67.1

8, 92.4

6’, D

ecid.

Tr. (14 I

N)

+67.6

2, 81.8

2’, B

ush

+68.2

9, 21.8

3’, M

st. Arm P

ole

+87.1

5, 26.6

7’, W

at. G

ate

12+

11.0

1, 93.2

9’, P

ole

+17.1

8, 7.1

5’, Dr. M

h.

+17.3

1, 0.3

7’, S

an.

Mh.

+23.5

9, 55.8

9’, Stn.

Wall

+23.6

6, 54.0

7’, Stn.

Wall

+24.1

4, 51.0

5’, Stn.

Wall

+24.7

6, 47.5

2’, Stn.

Wall

+25.7

9, 44.1

5’, Stn.

Wall

+27.0

8, 51.7

8’, Grn

d.

Lig

ht

+27.6

5, 40.8

0’, Stn.

Wall

+28.8

3, 48.4

9’, Grn

d.

Lig

ht

+28.9

2, 53.8

4’, C

om

m. Sig

n (

CO

NC

RETE SIG

N)

+29.1

8, 18.3

7’, C

b. Inlet

+29.8

3, 37.8

4’, Stn.

Wall

+30.6

0, 54.6

1’, C

om

m. Sig

n (

CO

NC

RETE SIG

N)

+30.6

1, 45.0

4’, Grn

d.

Lig

ht

+30.7

6, 54.6

0’, C

om

m. Sig

n (

CO

NC

RETE SIG

N)

+32.1

4, 35.3

0’, Stn.

Wall

+32.8

4, 42.2

2’, Grn

d.

Lig

ht

+34.7

8, 18.5

4’, Traf. Sig. Strain P

ole

+34.8

0, 33.0

9’, Stn.

Wall

+35.4

6, 39.5

3’, Grn

d.

Lig

ht

+37.2

5, 41.3

4’, C

om

m. Sig

n (

CO

NC

RETE SIG

N)

+37.7

8, 31.2

9’, Stn.

Wall

+38.2

2, 36.9

6’, Grn

d.

Lig

ht

+38.7

6, 42.9

4’, C

om

m. Sig

n (

CO

NC

RETE SIG

N)

+41.0

6, 29.7

4’, Stn.

Wall

+41.1

9, 34.8

8’, Grn

d.

Lig

ht

+44.2

6, 28.6

4’, Stn.

Wall

+44.5

4, 32.8

7’, Grn

d.

Lig

ht

+47.6

8, 28.0

3’, Stn.

Wall

+47.8

4, 31.3

0’, Grn

d.

Lig

ht

+49.9

0, 33.1

3’, C

om

m. Sig

n (

CO

NC

RETE SIG

N)

+50.5

7, 34.9

1’, C

om

m. Sig

n (

CO

NC

RETE SIG

N)

+51.6

8, 27.6

8’, Stn.

Wall

765

770

775

780

785

790

795

765

770

775

780

785

790

795

10+00 11+00 12+00 13+00

P.O.T. 10+00.00 "S-3RD"

10+

00

LINE "S-3RD"

LIN

E "

S-I

N"

App. Ex. R/W

App. Ex. R/WApp. Ex. R/W

App.

Ex.

R/W

App.

Ex.

R/W

App.

Ex.

R/W

App.

Ex.

R/W

App. Ex. R/W

S I

NDIA

NA A

VE

E 3RD ST

KOOSHTARD PROPERTY V, LLC

OF MONROE COUNTY

INDIANA UNIVERSITY

THE TRUSTEES OF

INDIANA UNIVERSITY

THE TRUSTEES OF

INDIANA UNIVERSITY

THE TRUSTEES OF

Ex. Grade Line "S-3RD"

Inv. 785.05

Inv. 783.50

Inv. 783.82

Inv. 778.89

(Ex. 18" RCP)

(Ex. 8" CLAY San.)

(Ex. 8" CLAY San.

)

(Ex. 8" CLAY San.)

LEGEND

32

F

26

F F15

15

DisturbDo Not

- Do Not Disturb

- Do Not Disturb

- Do Not Disturb

- Do Not Disturb

See Intersection Details for additional information.

All R/W described from Line "S-3RD" or Line "S-IN".

Remove Traffic Signal Equipment

15

9

Signal Equipment

Remove Traffic

Remove Inlet & Remove Pipe

(Ex. 12" RCP)

(Ex. 12" RCP)

Inv. 784.10 (Field Verify)

Plug Existing Opening

P.O.T. 8+00.00 "S-IN"

P.O.T. 5+

00.0

0 "

S-I

N"

P.O.T. 6+12.55 "S-IN"

P.O.T. 11+94.16 "S-3RD" =

STA. 11+53.31 "S-3RD"

BEGIN PROJECT

Signal Equipment

Remove Traffic

P.O.T. 13+00.00 "S-3RD"

STA. 12+64.00 "S-3RD"

END PROJECT

STA. 6+83.66 "S-IN"

END CONSTRUCTION

STA. 5+79.37 "S-IN"

BEGIN CONSTRUCTION

Do Not Disturb

TOPOGRAPHY NOTES&

STORM SEWER PROFILE

MONROE COUNTY

PERRY TWP.

SEC 4, T8N, R1W

MONROE COUNTY

PERRY TWP.

SEC 33, T9N, R1W

Field Verify Location & Elevations

Construct Manhole Around Existing Pipe

Inv. E/W 784.10

Inv. N 785.30

Rim 788.41

M.H. C-4 & 6’ of 12" Pipe

12+30.92, 6.94’ LT, STR. NO.12

15

15

15

P

P

R

R

R

R

F

P

R

Asphalt Material for Tack Coat

165 #/Syd. HMA Surface, Type B, on

Milling, Asphalt, (1.5" Depth) and

15

26 Sodding, Nursery

31 Brick Pavers

32 Hardwood Mulch

31Inv. 785.50

Rim 788.26 (@ E/P)

Inlet J-10, 3’ of 12" Pipe

12+30.96 LT, STR. NO.11

FF F

1

2

Paired Perpendicular Conc. Curb Ramp

Blended Transition Conc. Curb Ramp

2 1

1

1

LEGEND

TYPICAL EROSION CONTROL

Scale: NONE P

Signal EquipmentRemove Traffic

Pavement*

Remove Driveway

+Concrete Vertical Curb

4" Compacted Aggregate, 53.

Sidewalk, Concrete, 4" PCCP on

0.0

000

11+55.0

0

TEMPORARY CURB INLET PROTECTIONCIP

SF PERIMETER PROTECTION

CIP

Rev. 11/10/2020

Rev. 11/10/2020

P

P

P

P

P

P

PSubgrade Treatment Type II

PCCP Patching, Full Depth^^, on

165#/Syd. HMA Surface, Type B on

+

*

^^

E 605-CCSJ-01

ON INDOT STANDARD DRAWING

SEE CONCRETE CURB (VERTICAL)

PAVEMENT REMOVAL PAY ITEM.

SHALL BE INLUDED IN THE

DRIVEWAY PAVEMENT REMOVAL

DRAWING SC-2

SEE BLOOMINGTON STANDARD

NOTE:

Revisions:

11/10/2020

Page 10: PROJECT DESIGN CRITERIA FUNCTIONAL CLASSIFICATION …

SS

ST

SS

SS

ST

SS

P:\

B0270060_

Blo

omin

gton IN - 3rd

St at In

dia

na

Ave\

Desig

n\

Pla

ns\

Mis

c\IntDet01.d

gn

11/

11/

2020

4:2

2:0

5

PM

DESIGNED:

CHECKED:

DRAWN:

CHECKED:

FOR APPROVALRECOMMENDED

DESIGN ENGINEER DATE

HORIZONTAL SCALE

VERTICAL SCALE

SURVEY BOOK

CONTRACT PROJECT

SHEETS

DESIGNATION

BRIDGE FILE

XXXXXXX

of

XXXXX XXXXXXX

JAJ JAJ

KMHKMH

1" = 10’

NONE

CITY OF BLOOMINGTON, INDIANA

SPOT ELEVATIONS&

INTERSECTION DETAILS13

PRO

FESSIONAL ENGI

N

EER

REGISTERED

NO.

PE10707495

STATE OF

INDIANA

KE

VIN M. HETRICK

9/30/2020

#100

17.9’

787.36

+42.82, 16.26

8.4

0%

1.5

0%

6.21%

7.76%

787.47

+47.82, 16.15

787.45

+36.83, 17.81

9.70%

787.67

+32.24, 19.84

787.92

+32.65, 20.261.44%

1.47%

787.85

+29.18, 23.64

787.95

+25.91, 29.55

788.12

+24.25, 34.66

8.40%788.37

+24.86, 34.43

788.01

+36.69, 29.861.50%

1.44%

787.92

+36.86, 23.87

787.92

+42.90, 30.05787.83

+42.86, 23.83

787.63(Ex.)

+46.34, 30.00

788.05(Ex.)

+40.46, 35.32

786.66(Ex.)

+55.52, 17.22

788.39(Ex.)

+31.42, 34.26

0.5

6%

0.9

1%

1.4

4%

1.5

0%

2.2

0%

3.71%

788.07(Ex.)

+23.24, 29.37

5.7

5%

787.24(Ex.)

+42.81, 13.676.00%

787.49(Ex.)

+36.90, 15.00 2.00%

787.10(Ex.)

+55.35, 26.84

8.0

4%

5.5

5%

4

788.04(Ex.)

+81.82, 13.13

787.76(Ex.)

+86.85, 8.58

787.96

+86.81, 13.16

787.88(Ex.)

+92.85, 8.62

788.04

+92.81, 13.20

4.00%

5.00%

1.3

3%

8.00%

8.00%

5.99

%

1.49%

0.25% 1.60%

4.9

5%

3.8

0%

788.05(Ex.)

+81.79, 17.00788.13(Ex.)

+81.68, 22.00788.49(Ex.)

+80.84, 24.67

788.73(Ex.)

+83.97, 29.84

789.05(Ex.)

+86.55, 35.397.94%

788.49

+86.62, 28.33

1.75

%

788.38

+86.72, 22.74

7.88

%

1.0

3%

1.88%

0.1

7%

1.00%

788.38

+96.56, 22.69

0.83%

3.80%

788.57

+96.70, 17.69

788.38

+96.68, 15.57

1.3

3%

1.88%

788.44

+92.56, 22.58

788.50

+92.38, 28.57

0.5

2%

1.5

0%

1.7

5%

10.00%

5.0

0%

788.53(Ex.)

+98.96, 28.76

788.43

+96.38, 28.69

3.00%

788.93

+96.24, 33.69

789.00(Ex.)

+96.18, 35.69

788.36

+92.78,17.20

788.28

+86.78,17.16

786.56

+87.93, 25.65

786.89(Ex.)

+84.37, 24.38

1.77%

1.46%1.50%

786.44

+88.07, 33.40

786.41

+88.10, 35.40

786.21(Ex.)

+94.21, 41.29

2.5

3%

3.2

2%

786.72(Ex.)

+79.37, 33.17

786.74(Ex.)

+79.28, 28.07

0.39%

786.50(Ex.)

+98.28, 38.93

3.77% 786.29

+997.21, 35.23

2.33%

2.00%

1.3

3%

1.2

9%

786.33

+94.10, 35.32

786.27(Ex.)

+88.21, 41.39786.52

+87.97, 27.91

1.98%

786.75

+28.35, 24.43

786.86

+27.96, 18.43

786.96(Ex.)

+24.85, 18.41

3.2

1%

3.40

%

1.67%

8.20

%

6.2

0%8.

20%

4.53

% 1.5

0%

786.46(Ex.)

+30.28, 26.70

10.32%

1.21

%

785.98(Ex.)

+26.55, 37.70

1.40

%

786.30

+37.55, 31.48

786.13(Ex.)

+39.99, 34.07

786.69

+42.59, 24.51

1.6

7%

2.00%

2.25%

1.5

0%

0.2

3%

0.3

6%

786.78

+36.59, 24.48

786.88

+36.62, 18.48

786.78

+42.62, 18.51

1.50%

786.87

+42.64, 14.51

1.8

0%

786.96

+36.64, 14.48

787.27

+31.50, 14.84

4.3

3%

6.4

2%

786.71

+30.94, 26.46

786.37

+33.56, 28.46

1.83%

786.72(Ex.)

+25.10, 24.56

0.9

2%

785.85(Ex.)

+33.02, 37.446.00

%

2.93

%

786.87(Ex.)

+42.66, 11.93

1.0

4%

787.02 B.C.

+30.93, 14.44

786.96 T.C.

+47.64, 14.54

786.50 B.C.

+47.64, 13.96

784.84(Ex.)

+83.71, 15.45

784.36(Ex.)

+83.65, 14.16

785.83(Ex.)

+67.00, 15.45

786.59(Ex.)

+81.37, 23.08

787.67(Ex.)

+81.85, 8.54

786.13(Ex.)

+54.41, 29.39

784.53(Ex.)

+83.57, 28.08

787.73(Ex.)

+30.89, 20.98

787.01(Ex.)

+28.92, 15.81

786.54(Ex.)

+93.22, 28.47

788.10(Ex.)

+97.76, 12.34

784.88(Ex.)

+83.59, 22.73

786.00(Ex.)

+56.14"S-3RD", 12.26’

786.15(Ex.)

+55.64"S-RD", 14.54

Match Ex.+63.65"S-3RD", 15.58

789.50(Ex.)+64.00"S-3RD", 12.77

788.39(Ex.)

+38.63"S-3RD", 12.37

788.90(Ex.)

+38.54"S-3RD", 0.78

788.73(Ex.)

+30.22"S-3RD", 13.00

788.49(Ex.)+23.00"S-3RD", 0.67

788.37(Ex.)+17.31"S-3RD", 0.37

788.15(Ex.)+17.18"S-3RD", 7.15

784.94(Ex.)

+83.68, 0.00

786.09(Ex.)

+63.68, 0.00

787.11(Ex.)

+43.68, 0.00

787.54(Ex.)

+25.93, 0.00

787.79(Ex.)

+99.19, 0.00

787.51(Ex.)

+81.66, 0.00

Inv. 785.50

Rim 788.26 (@ E/P)Inlet J-10, 3’ of 12" Pipe12+30.96 LT, STR. NO.1

781.85(Ex.)

+34.66, 22.73

781.45(Ex.)

+34.55, 12.86

1.43%

782.48(Ex. T.C.)+30.16, 22.75

781.97 (B.C.)

+30.66, 22.75

7.8

5%

5.0

0%

783.06

+16.82, 23.09

781.89(B.C.)

+30.37, 17.75

781.57(Ex.)

+34.61, 17.79

782.85(Ex.)

+16.89, 17.61

Existing

E 3RD ST

S I

NDIA

NA A

VE

App. Ex. R/W

App. Ex. R/W

App.

Ex.

R/W

App. Ex. R/WApp. Ex. R/W

App.

Ex.

R/W

App.

Ex.

R/W

App.

Ex.

R/W

Radius

R3

R4

R5

R6

R5

R6

R1

Center of Radius

R2

R4

Station

6+45.14

6+27.91

6+29.39

6+31.29

5+95.91

5+92.82

Offset

22.87 LT

23.77 LT

16.19 LT

21.40 RT

14.13 RT

28.90 RT

7.5’

5’

4’

LINE "S-3RD"

LIN

E "

S-I

N"

Value

8’

3’

6’

20’

3’

18’

Line

10

6+

00

7+

00

12+00

CURB RAMP DETAIL - NORTHWEST QUADRANT

CURB RAMP DETAIL - SOUTHWEST QUADRANT

CURB RAMP DETAIL - NORTHEAST QUADRANT

CURB RAMP DETAIL - SOUTHEAST QUADRANT

SCALE: 1" = 5’

SCALE: 1" = 5’

SCALE: 1" = 5’

SCALE: 1" = 5’

4’

4’

R2

R1

S-IN

S-IN

S-IN

S-IN

S-IN

S-IN

R3

All callouts described from Line "S-IN" unless otherwise shown.

LEGEND

Perpendicular Conc. Curb Ramp1

1

1

1

2

2 Blended Transition Conc. Curb Ramp

P

Detectable Warning Surface, 2’ Width (Typ.)

P

15

15

F Concrete, Sidewalk

31 Brick Pavers

Rev. 11/10/2020

Rev. 11/10/2020

F

F

F

FF

F

F

31

15

Revisions:

11/10/2020

Subgrade Treatment Type II

PCCP Patching, Full Depth^^, on

165#/Syd. HMA Surface, Type B on

E 605-CCSJ-01

ON INDOT STANDARD DRAWING

SEE CONCRETE CURB (VERTICAL)

DRAWING SC-2

SEE BLOOMINGTON STANDARD

NOTE:

+Concrete Vertical Curb

+

^^

2’2’

2’

2’

4’

2’

2’

2’

4’

Page 11: PROJECT DESIGN CRITERIA FUNCTIONAL CLASSIFICATION …

P:\

B0270060_

Blo

omin

gton IN - 3rd

St at In

dia

na

Ave\

Desig

n\

Pla

ns\

Pv

mt

Mrk\

Sig

nMark01.d

gn

11/

11/

2020

2:2

5:5

7

PM

DESIGNED:

CHECKED:

DRAWN:

CHECKED:

FOR APPROVALRECOMMENDED

DESIGN ENGINEER DATE

HORIZONTAL SCALE

VERTICAL SCALE

SURVEY BOOK

CONTRACT PROJECT

SHEETS

DESIGNATION

BRIDGE FILE

XXXXXXX

of

XXXXX XXXXXXX

JAJ

KMH KMH

JAJ

1" = 20’CITY OF BLOOMINGTON, INDIANA

LINE "S-3RD"SIGNING & STRIPING PLAN

NONE

13

PRO

FESSIONAL ENGI

N

EER

REGISTERED

NO.

PE10707495

STATE OF

INDIANA

KE

VIN M. HETRICK

9/30/2020

LEGEND

LINE, THERMOPLASTIC, SOLID, WHITE, 4 IN.

41

43

44

45

50

LINE "S-3RD"E 3RD ST

LIN

E "

S-I

N"

10+

00

5+00

S I

NDIA

NA A

VE

51

EXISTING SIGN AND SUPPORT TO REMAIN

EXISTING SIGN AND SUPPORT TO BE REMOVED

50

50

51

A

O

B

N

M K

L

H

FD

C E

J

G

I

41 (Typ.)

41(Typ.)

41 (Typ.)

(Typ.) 41

45

Station Offset

(Line "S-3RD")Crosswalk Layout Points

Point

A

B

C

D

E

F

G

H

I

J

K

L

M

N

O

11+66.92

11+77.04

12+05.33

12+05.29

11+72.62

11+67.34

11+58.16

14.13 LT

12.91 LT

27.42 RT

17.42 RT

27.20 RT

17.16 RT

13.03 RT

42

(NOT TO SCALE)

CROSSWALK DETAIL

45

2’ (Typ.)

4’

11

for Locations.

See Crosswalk Layout Points

Crosswalk Layout Line (Typ.)

OR41

11+81.52 31.84 LT

11+81.80 21.85 LT

12+07.04 32.55 LT

12+09.57 22.62 LT

12+25.39 10.83 LT

12+15.42 15.45 LT

12+25.22 12.96 RT

12+15.22 12.89 RT

45

46

See Note 2

CURB PAINTING, YELLOW

46

LINE, THERMOPLASTIC, DOTTED, WHITE, 4 IN. (2 FT. LINE, 4 FT. GAP)

TRANSVERSE MARKING, THERMOPLASTIC, STOP LINE, WHITE, 24 IN.

43

+80.2

+56.1

44(Typ.)

50

INFORMATION.

SEE THE TRAFFIC SIGNAL PLAN FOR ADDITIONAL SIGNING3.

NORTH PROJECT LIMIT AS DIRECTED BY THE ENGINEER.

SHALL BE PAINTED YELLOW FROM THE CURB RAMP TO THE

THE PROPOSED CURB ON THE WEST SIDE OF S INDIANA AVE2.

808 OF THE STANDARD SPECIFICATIONS.

APPROVED BY THE ENGINEER IN ACCORDANCE WITH SECTION

PAVEMENT MARKINGS SHALL BE REMOVED USING A METHOD

RESURFACING LIMITS THAT CONFLICT WITH THE PROPOSED

EXISTING PAVEMENT MARKINGS OUTSIDE OF THE PAVEMENT1.

NOTES:

TRANSVERSE MARKING, THERMOPLASTIC, CROSSWALK LINE, WHITE, 24 IN. (CROSSWALK, L = 10’)

4444

52

53

4343

LINE, PAINT, SOLID, WHITE, 4 IN.

LINE, PAINT, DOTTED, WHITE, 4 IN. (2 FT. LINE, 4 FT. GAP)

54 LINE, PAINT, BROKEN, WHITE, 4 IN.

55

55

+09

+30

+64

55 LINE, THERMOPLASTIC, BROKEN, WHITE, 4 IN.

55

67’ 63’48’72’

Page 12: PROJECT DESIGN CRITERIA FUNCTIONAL CLASSIFICATION …

TR

SS

STST

SS

ST

W

TR

SS

STST

SS

ST

W

CONTRACT NO.

DESIGN ENGINEER DATE

SCALE: 1" = 10’

TOTALPROJECT NO.DES. NO.

JAJJAJ

JAL JAL

DESIGNED:

CHECKED: CHECKED:

DRAWN:

COMM. NO. N/A

DESIGNED BY: DATE:

COMM. NO. N/A

S INDIANA AVENUE & E 3RD STREET

XXXXX XXXXXXX

MONROE COUNTY

BLOOMINGTON, INDIANA

TRAFFIC SIGNAL PLAN

CITY OF BLOOMINGTON, INDIANA

PROJECT NO. N/A

12 13

SHEET

P:\

B0270060_

Blo

omin

gton IN - 3rd

St at In

dia

na

Ave\

Desig

n\

Pla

ns\

Sig

nals\

Sig

nal0

1.d

gn

11/

11/

2020

2:2

6:0

1

PM

Ex. Electric Utilities

Ex. Water Utilities

Ex. Sanitary & Storm Sewer Utilities

SIGNAL LEGEND

NEW HANDHOLE, TYPE I

TR EXISTING HANDHOLE

EXISTING SIGNAL DUAL ARM CANTILEVER STRUCTURE & FOUNDATION

EXISTING SIGNAL PEDESTAL & FOUNDATION

SIGNAL INDICATION WITH BACKPLATE

NEW 1-WAY, 3-SECTION (12" RED, 12" AMBER, 12" GREEN)

EXISTING TRAFFIC SIGNAL CONTROLLER & CABINET

NEW TRAFFIC SIGN (AS INDICATED)

NEW STREET NAME SIGN (AS INDICATED)

EXISTING CONDUIT

NEW SIGNAL PEDESTAL ON NEW "A" FOUNDATION

WAY

ONE

WAY

ONE

ON REDTURN

NO

SIGN LEGEND

1 2 3 4

5 6 7 8

PHASE BLOCK DIAGRAM

ALL RED FLASH

NONE PREFERENTIAL

UTILITY LEGEND

12+

00

6+00

App. Ex. R/W

App.

Ex.

R/W

App.

Ex.

R/W

App. Ex. R/W

App. Ex. R/WApp. Ex. R/W

App.

Ex.

R/W

App.

Ex.

R/W

(30 m

ph)

S I

NDIA

NA A

VE

(25 mph)

E 3RD ST

35’

AR

M

D3-1

D3-1

R6-2(R)

LIN

E "

S-I

N"

LINE "S-3RD"

Station Offset

EXISTING UTILITY POLE

NEW APS PUSH-BUTTON (QUANTITY SHOWN)APS(#)

APS(2)

APS(1)

APS(2)

APS(1)

P1

P2

P3

P4

P5P6

No.

P1

P2

P3

P4

P5

P6

Pedestal and Mast Arm Data (Line "S-3RD")

11+65.65

11+60.32

30.41 LT

26.21 RT

Signal Dual Arm Cantilever Structure

Description

Signal Pedestal 15’

Signal Pedestal 11’

12+10.90

11+76.19 22.69 LT

12+16.46 23.78 LT

12+24.18 18.54 RT

26.39 RT

3rdE

500

S

300IndianaONE WAY ONE WAY

NEW PEDESTRIAN COUNTDOWN SIGNAL HEAD, INTERNATIONAL SYMBOLS, 18"

APS(2)(Luminaire Arm)

3-1c/10

1-7c/14

1-5c/14

1-7c/14

1-5c/14

1-5c/14

1-3c/14

Service to Remain

Existing Electrical

1-7c/14

3-5c/14

2-3c/14

1-7c/14

1-5c/14

Ave

200

St

600

Conduit to Remain)

(Existing Service

1-3c/8

NEW 2" GALVANIZED STEEL CONDUIT

R10-11 36"x48" R6-2(L) 30"x36" R6-2(R) 30"x36" D3-1 60"x18"

R6-1(L) 54"x18" R6-1(R) 54"x18"

Signal Pedestal 15’

Signal Pedestal 15’

Signal Pedestal 15’

D3-1 SIGN DETAILS

Additional Information

See D3-1 Sign Details for

(Signal Arm)

2-5c/14

ON NEW "SPECIAL" FOUNDATION

NEW SIGNAL DUAL ARM CANTILEVER STRUCTURE WITH POLE SECTION 2

ON NEW "P-1 MODIFIED" FOUNDATION

NEW TS2 CONTROLLER & "P-1" CABINET WITH UNINTERRUPTIBLE POWER SUPPLY

35’ LUMINAIRE MOUNTING HEIGHT

NEW 120V LUMINAIRE WITH PHOTOCELL ON 12’ TRUSS-TYPE ARM,

Modified Cabinet Foundation

Conduit to New Type P-1

Connect Existing Service

1 1 WIRE, NO. 4 COPPER IN PLASTIC DUCT, 4-1/C

1

1R6-1(R)

5c/14

2-5c/14

R6-2(L)

R10-11

35’ ARM

R6-1(L)

12’ ARM

R6-2(R)

17.98 RT

11+55.62

26.56 RT

11+55.03

R6-2(L)

5c/14

Type I (For Lighting)

Service Point

D3-1 102"x18"

2-5c/14

7c/14

2-5c/14

1

D3-1 SIGN DETAILS

R10-11

1-7c/14

1-5c/14

20.57 LT

12+15.91

24.48 LT

11+64.39

18.01 RT

12+13.04

unless otherwise shown.All callouts described from Line "S-3RD",

PRO

FESSIONAL ENGI

N

EER

REGISTERED

NO.

PE10707495

STATE OF

INDIANA

KE

VIN M. HETRICK

9/30/2020

3

WITH BACKPLATE

12" FLASHING AMBER ARROW) SIGNAL INDICATION

1-WAY, 3-SECTION (12" RED, 12" AMBER ARROW,

3

15.

14.

13.

12.

11.

10.

9.

8.

7.

6.

5.

4.

3.

2.

1.

BY APPLIED INFORMATION SHALL BE PROVIDED IN THE CONTROLLER CABINET.

AN AI-500-085-02 GLANCE PREEMPT AND PRIORITY VIDEO CAPABLE FMU MANUFACTURED

SIGNAL TIMINGS SHALL BE INCLUDED IN THE COST OF CONTROLLER AND CABINET, P1.

THE PRE-CONSTRUCTION MEETING. PRIOR TO SIGNAL EQUIPMENT INSTALLATION. IMPLEMENTATION OF

THE CONTRACTOR SHALL INPUT THE SIGNAL TIMINGS, PROVIDED BY THE ENGINEER AT

AT THIS LOCATION WHEN COMPARED TO OTHER SIGNAL LOCATIONS ALONG 3RD STREET.

CONTRACTOR SHALL BE AWARE WHEN PROGRAMMING THE CONTROLLER THAT THE PHASING IS DIFFERENT

TO BE OPENED WITHOUT REQUIRING THE PEDESTRIAN SIGNAL HEAD BE ROTATED OR MOVED.

THE PEDESTRIAN SIGNAL HEADS SHALL BE PLACED SO THAT THE HOUSINGS WILL BE ABLE

EQUIPMENT AND SIGNS SHALL BE AT NO ADDITIONAL COST TO THE CITY.

THE COST TO REPAIR OR REPLACE DAMAGED OR LOST SALVAGEABLE TRAFFIC SIGNAL

FOR AS SIGN, SHEET, RELOCATE.

REMOVAL AND REINSTALLATION OF THE HONORARY STREET NAME SIGN ILL BE PAID

COST OF SIGN, SHEET, REMOVE, AND NO ADDITIONAL COMPENSATIONWILL BE ALLOWED.

MATERIALS, AND EQUIPMENT REQUIRED FOR THIS WORK SHALLBE INCLUDED IN THE

CANTILEVER STRUCTURE AS DIRECTED BY THE ENGINEER.THE COST OF ALL LABOR,

ARM CANTILEVER STRUCTURE SHALL BE INSTALLED ON THE NEW SIGNAL DUAL ARM

EXCEPT THAT THE HONORARY STREET NAME SIGN ON THE EXISTING SIGNAL DUAL

ALL EXISTING SIGNS MOUNTED TO TRAFFIC SIGNAL EQUIPMENT SHALL BE REMOVED,

CABINET FOR THE NEW LUMINAIRE.

A SINGLE-POLE 15A CIRCUIT BREAKER SHALL BE PROVIDED IN THE NEW CONTROLLER

BLOOMINGTON.

REMOVED FROM THE EXISTING CONTROLLER CABINET AND RETURNED TO THE CITY OF

THE EXISTING RADIO EQUIPMENT FOR THE TRAFFIC SIGNAL INTERCONNECT SHALL BE

805-T-084.

TO BE SALVAGED AND RETURNED TO THE CITY OF BLOOMINGTON ARE SPECIFIED IN

ALLOWED. THE REMOVAL OF INDIVIDUAL ITEMS WILL NOT BE PAID FOR SEPARATELY. ITEMS

OF TRAFFIC SIGNAL EQUIPMENT, REMOVE, AND NO ADDITIONAL COMPENSATION WILL BE

MATERIALS, AND EQUIPMENT REQUIRED FOR THIS WORK SHALL BE INCLUDED IN THE COST

IN PLACE UNLESS OTHERWISE DIRECTED BY THE ENGINEER. THE COST OF ALL LABOR,

NOT INTERFERE WITH THE PROPOSED CONSTRUCTION SHALL BE CAPPED AND ABANDONED

WITH THE PROPOSED CONSTRUCTION SHALL BE REMOVED. EXISTING CONDUITS THAT DO

BY THE ENGINEER. PORTIONS OF THE EXISTING CONDUITS THAT INTERFERE IN ANY WAY

HANDHOLES, SHALL BE REMOVED UNLESS OTHERWISE NOTED ON THE PLANS OR DIRECTED

ALL EXISTING TRAFFIC SIGNAL EQUIPMENT, INCLUDING ALL SIGNAL CABLE AND SIGNAL

SEE THE SIGNING & STRIPING PLAN FOR EXACT PAVEMENT MARKINGS.

LIGHTING CABLE SHALL BE PLACED IN ITS OWN CONDUIT, SEPARATE FROM SIGNAL CABLE.

THE LUMINAIRE SHALL BE EQUIPPED WITH AN INDIVIDUAL PHOTOCELL.

HEIGHT OF THE LUMINAIRE SHALL BE 35’.

MAST ARMS AND A SINGLE 12’ TRUSS-TYPE ARM FOR THE LUMINAIRE. THE MOUNTING

THE COMBINATION MAST ARM ASSEMBLY SHALL CONSIST OF DUAL 35’ CANTILEVER SIGNAL

THE CONTRACTOR SHALL LEAVE A NYLON PULL CORD IN ALL CONDUITS.

TRAFFIC SIGNAL INSTALLATION.

THE EXISTING ELECTRICAL SERVICE SHALL REMAIN AND BE REUSED FOR THE NEW

NOTES:

5-7c/14

5-5c/14

2-3c/14

3-7c/14

1-5c/14

Page 13: PROJECT DESIGN CRITERIA FUNCTIONAL CLASSIFICATION …

Rev. 11/10/2020

Revisions:

11/10/2020

P:\

B0270060_

Blo

omin

gton IN - 3rd

St at In

dia

na

Ave\

Desig

n\

Pla

ns\

Tables\

Mis

c_

Tbl_

01.d

gn

11/

11/

2020

4:1

4:5

5

PM

DESIGNED:

CHECKED:

DRAWN:

CHECKED:

FOR APPROVALRECOMMENDED

DESIGN ENGINEER DATE

HORIZONTAL SCALE

VERTICAL SCALE

SURVEY BOOK

CONTRACT PROJECT

SHEETS

DESIGNATION

BRIDGE FILE

XXXXXXX

of

XXXXX XXXXXXX

13

CITY OF BLOOMINGTON, INDIANA

13ADV

KMH

ADV

KMH

NONE

NONE

MISCELLANEOUS TABLES PRO

FESSIONAL ENGI

N

EER

REGISTERED

NO.

PE10707495

STATE OF

INDIANA

KE

VIN M. HETRICK

9/30/2020