22
Project Concept Report Project: Plank Rd. Corridor Enhancement (N. 22 nd St. to Harding Blvd.) Date: November 21, 2019 This is a conceptual report. The project features and layouts will be further refined through planning and design phases.

Project Concept Report - MOVEBR · Project Concept Report Project: Plank Rd. Corridor Enhancement (N. 22nd St. to Harding Blvd.) Date: November 21, 2019 This is a conceptual report

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Project Concept Report - MOVEBR · Project Concept Report Project: Plank Rd. Corridor Enhancement (N. 22nd St. to Harding Blvd.) Date: November 21, 2019 This is a conceptual report

Project Concept Report

Project: Plank Rd. Corridor

Enhancement (N. 22nd St. to Harding Blvd.)

Date: November 21, 2019

This is a conceptual report. The project features

and layouts will be further refined through

planning and design phases.

Page 2: Project Concept Report - MOVEBR · Project Concept Report Project: Plank Rd. Corridor Enhancement (N. 22nd St. to Harding Blvd.) Date: November 21, 2019 This is a conceptual report

1 | Page

Image above represents broad outline of the project area as shown in 2018 MOVEBR tax plan proposition

Project: Plank Rd. Corridor Enhancement (N. 22nd St. to Harding Blvd.)

MOVEBR Program ID: CEP-52 Project Length (feet): 23,000 Estimated Cost: $15,000,000 Funded from Proposition: $15,000,000

PROJECT OVERVIEW

This project proposes to enhance pedestrian and cyclist mobility. Right-of-way space will

be considered to identify opportunities to improve sidewalks and provide bicycle

accommodates where feasible as well as improve sidewalk access to current transit

stops, thereby enhancing multi-modal access throughout the corridor. Plank Rd. has one

of the highest bus ridership totals in the parish and is also part of the potential Bus Rapid

Transit route. High visibility crosswalks at all intersections and pedestrian countdown

signals at major intersections will be considered. Access management principles will also

be considered to better control access to current public facilities and commercial

businesses. Signalized intersection improvements may also be required at major

intersections. Findings from both the Plank-Nicholson Bus Rapid Transit study and the Plank

Road Master Plan must be taken into consideration for this project.

Page 3: Project Concept Report - MOVEBR · Project Concept Report Project: Plank Rd. Corridor Enhancement (N. 22nd St. to Harding Blvd.) Date: November 21, 2019 This is a conceptual report

2 | Page

Current Condition: Four-lane undivided w/sidewalks (I-110 to Evangeline St.)

Four-lane w/two-way left turn lane and sidewalks (Evangeline St. to Sumrall Dr.) Four-lane divided w/sidewalks (Sumrall Dr. to Harding Blvd.)

Proposed Condition: See Typical Sections for Preliminary Concept Alternates.

During later phases, other alternate improvements will be developed and finalized with input from the public.

PROJECT STATUS

This project is currently in the planning phase.

COMPLETE STREETS

The MOVEBR Program has developed design guidelines that aim to institutionalize the

Complete Streets policy by accommodating pedestrians, bicyclists, and transit users,

regardless of age and ability.

DRAINAGE AND GREEN INFRASTRUCTURE CONSIDERATIONS

Among the drainage considerations for this specific project are the following:

A portion or all of this project is located within Flood Zone AE, which is considered

a Special Flood Hazard Area (SFHA).

This project location was in an area identified as an “estimated inundation area”

from the 2016 floods. This map can be viewed at

https://www.arcgis.com/home/webmap/viewer.html?webmap=cb332217bdab4572b4930e02d

6655f84

Existing drainage for this project area utilizes a closed (sub-surfaced) system.

The project budget will consider funding for green infrastructure to improve water quality

and mitigate impacts of stormwater runoff. Examples of green infrastructure include but

are not limited to porous pavement, creation or maintenance of a tree canopy,

bioswales, planter boxes, rain gardens, and land conservation efforts.

ENVIRONMENTAL CONSIDERATIONS

Initial reviews support the following;

Page 4: Project Concept Report - MOVEBR · Project Concept Report Project: Plank Rd. Corridor Enhancement (N. 22nd St. to Harding Blvd.) Date: November 21, 2019 This is a conceptual report

3 | Page

Environmental considerations have been identified including potential Cultural

Resources, Underground Storage Tanks needing remediation, and Railroad impacts

and must be reviewed and potentially addressed.

*Note that this is not exhaustive of possible future environmental considerations.

TRAFFIC & SIGNALIZATION INTERSECTIONS

The Projected Average Daily Traffic (ADT) for year 2042 is 52,000 (north of Airline).

The current concept supports turn lanes at major intersections for budget purposes.

Future traffic studies will identify locations for turn lanes, median openings and

connections (driveways, side streets etc.).

Signal systems will be upgraded as a part of future projects if required due to future

configurations.

UTILITIES CONSIDERATIONS

A preliminary assessment of the project area provides for the utilities listed below.

Potential utility relocation costs will be included in the project budget if the infrastructure

is located within the utility’s own servitude.

Possible Utilities Existing Adjust/Relocate

Overhead Electric TBD

Underground Electric TBD

Water TBD

Sanitary Sewer TBD

Telephone TBD

CATV/Fiber TBD

Gas Distribution TBD

Gas HP Pipeline TBD

RIGHT OF WAY CONSIDERATIONS

Minimal residential or commercial right of way acquisitions are anticipated at this time.

Page 5: Project Concept Report - MOVEBR · Project Concept Report Project: Plank Rd. Corridor Enhancement (N. 22nd St. to Harding Blvd.) Date: November 21, 2019 This is a conceptual report

4 | Page

PROJECT CONCEPT MAP

The following pages provide a potential solution(s) for the proposed project. The project

features and layouts, shown within the typical section(s) and concept plans, will be

further refined through planning and design phases of the project.

Page 6: Project Concept Report - MOVEBR · Project Concept Report Project: Plank Rd. Corridor Enhancement (N. 22nd St. to Harding Blvd.) Date: November 21, 2019 This is a conceptual report

11/21/19

Page 7: Project Concept Report - MOVEBR · Project Concept Report Project: Plank Rd. Corridor Enhancement (N. 22nd St. to Harding Blvd.) Date: November 21, 2019 This is a conceptual report

11/21/19

Page 8: Project Concept Report - MOVEBR · Project Concept Report Project: Plank Rd. Corridor Enhancement (N. 22nd St. to Harding Blvd.) Date: November 21, 2019 This is a conceptual report

SHELL

11/12/19

Sheet No.PLANK RD. CORRIDOR ENHANCEMENT

(N. 22ND ST. TO HARDING BLVD.)

LOT LINES

LEGEND:

EDGE OF PAVEMENT

CURRENT BUS STOP

EXISTING SIDEWALK

SCALE: 1" = 50'

0 50 100'

PLANK RD.

N. 22N

D ST.

PLANK RD.

BIR

CH S

T.

JEFFE

RS

ON A

VE.

NB I-1

10

SB I-1

10

PLANK RD.

SB I-1

10

NB I-1

10

1of15

SE

MIN

OLE S

T.

SHELL

SB I-1

10 E

XIT

RAMP

11/21/19

Page 9: Project Concept Report - MOVEBR · Project Concept Report Project: Plank Rd. Corridor Enhancement (N. 22nd St. to Harding Blvd.) Date: November 21, 2019 This is a conceptual report

11/12/19

Sheet No.PLANK RD. CORRIDOR ENHANCEMENT

(N. 22ND ST. TO HARDING BLVD.)

LOT LINES

LEGEND:

EDGE OF PAVEMENT

CURRENT BUS STOP

EXISTING SIDEWALK

SCALE: 1" = 50'

0 50 100'

PLANK RD.

PLANK RD.

SH

AW

NE

E S

T.

JA

CK

SO

N A

VE.

MA

DIS

ON A

VE.

AD

AM

S A

VE.

AD

AM

S A

VE.

MA

DIS

ON A

VE.

FAIR

FIE

LD

S A

VE.

PA

WN

EE S

T.

2of15

WA

SHIN

GT

ON A

VE.

11/21/19

Page 10: Project Concept Report - MOVEBR · Project Concept Report Project: Plank Rd. Corridor Enhancement (N. 22nd St. to Harding Blvd.) Date: November 21, 2019 This is a conceptual report

11/12/19

Sheet No.PLANK RD. CORRIDOR ENHANCEMENT

(N. 22ND ST. TO HARDING BLVD.)

LOT LINES

LEGEND:

EDGE OF PAVEMENT

CURRENT BUS STOP

EXISTING SIDEWALK

SCALE: 1" = 50'

0 50 100'

PLANK RD.

PLANK RD.

CH

OC

TA

W D

R.

DU

KE S

T.

SE

NE

CA S

T.

IRO

QU

OIS S

T.

CHIP

PE

WA S

T.

RAIL

RO

AD

CA

NA

DIA

N N

ATIO

NA

L

SE

NE

CA S

T.

CHIP

PE

WA S

T.

IRO

QU

OIS S

T.

SOCIETYDE PAUL

ST. VINCENT

3of15

MO

NR

OE A

VE.

MOSQUE #65MUHAMMAD

AV

E.

MO

NR

OE

11/21/19

Page 11: Project Concept Report - MOVEBR · Project Concept Report Project: Plank Rd. Corridor Enhancement (N. 22nd St. to Harding Blvd.) Date: November 21, 2019 This is a conceptual report

11/12/19

Sheet No.PLANK RD. CORRIDOR ENHANCEMENT

(N. 22ND ST. TO HARDING BLVD.)

LOT LINES

LEGEND:

EDGE OF PAVEMENT

CURRENT BUS STOP

EXISTING SIDEWALK

SCALE: 1" = 50'

0 50 100'

PLANK RD.

PLANK RD.

OS

AG

E S

T.

ON

TA

RIO S

T.

BR

AD

Y S

T.

ON

TA

RIO S

T.

ERIE S

T.

ERIE S

T.

HU

RO

N S

T.

HU

RO

N S

T.

4of15

MID

WA

Y A

VE.

DA

LT

ON S

T.

11/21/19

Page 12: Project Concept Report - MOVEBR · Project Concept Report Project: Plank Rd. Corridor Enhancement (N. 22nd St. to Harding Blvd.) Date: November 21, 2019 This is a conceptual report

11/12/19

Sheet No.PLANK RD. CORRIDOR ENHANCEMENT

(N. 22ND ST. TO HARDING BLVD.)

LOT LINES

LEGEND:

EDGE OF PAVEMENT

CURRENT BUS STOP

EXISTING SIDEWALK

SCALE: 1" = 50'

0 50 100'

PLANK RD.

PLANK RD.

OZ

AR

K S

T.

WIN

BO

UR

NE A

VE.

CA

LU

ME

T S

T.

CA

LU

ME

T S

T.

SPIRIT MINISTRIESFRUIT OF THE

NA

VAJ

O S

T.

OS

WE

GO S

T.

CH

AR

LES S

T.

WY

AN

DO

TTE S

T.

WY

AN

DO

TT

E S

T.

5of15

TEMPLEMIRACLE

HOLINESSWAY OF

GODCHURCH OFSCHOLARS

UNITED BIBLE

MINISTRIESNATIONAL

INTER-FAITH CITY

11/21/19

Page 13: Project Concept Report - MOVEBR · Project Concept Report Project: Plank Rd. Corridor Enhancement (N. 22nd St. to Harding Blvd.) Date: November 21, 2019 This is a conceptual report

11/12/19

Sheet No.PLANK RD. CORRIDOR ENHANCEMENT

(N. 22ND ST. TO HARDING BLVD.)

LOT LINES

LEGEND:

EDGE OF PAVEMENT

CURRENT BUS STOP

EXISTING SIDEWALK

SCALE: 1" = 50'

0 50 100'

PLANK RD.

PLANK RD.

PA

MP

AS S

T.

WIN

NE

BA

GO S

T.

WIN

NE

BA

GO S

T.

MO

HIC

AN S

T.

MO

HIC

AN S

T.

AN

NA S

T.

WE

LL

ER A

VE.

WE

LL

ER A

VE.

LIN

DE

N A

VE.

6of15

11/21/19

Page 14: Project Concept Report - MOVEBR · Project Concept Report Project: Plank Rd. Corridor Enhancement (N. 22nd St. to Harding Blvd.) Date: November 21, 2019 This is a conceptual report

11/12/19

Sheet No.PLANK RD. CORRIDOR ENHANCEMENT

(N. 22ND ST. TO HARDING BLVD.)

LOT LINES

LEGEND:

EDGE OF PAVEMENT

CURRENT BUS STOP

EXISTING SIDEWALK

SCALE: 1" = 50'

0 50 100'

PLANK RD.

PLANK RD.

PL

US

KA

T A

VE.

PR

ES

CO

TT R

D.

RO

PO

LL

O S

T.

DA

YT

ON S

T.

DA

YT

ON S

T.

OF GODLIFE ASSEMBLYRESURRECTION

SH

ER

WO

OD S

T.

MY

RTLE

LA

WN S

T.

SH

ER

WO

OD S

T.

CL

AY

TO

N D

R.

MINISTRIESLOVE

REDEEMING

7of15

POLICE DEPT.BATON ROUGE

11/21/19

Page 15: Project Concept Report - MOVEBR · Project Concept Report Project: Plank Rd. Corridor Enhancement (N. 22nd St. to Harding Blvd.) Date: November 21, 2019 This is a conceptual report

11/12/19

Sheet No.PLANK RD. CORRIDOR ENHANCEMENT

(N. 22ND ST. TO HARDING BLVD.)

LOT LINES

LEGEND:

EDGE OF PAVEMENT

CURRENT BUS STOP

EXISTING SIDEWALK

SCALE: 1" = 50'

0 50 100'

PLANK RD.

SH

ELLE

Y S

T.

EV

AN

GE

LIN

E S

T.

EV

AN

GE

LIN

E S

T.

SH

ELLE

Y S

T.

CL

AY

TO

N D

R.

PLANK RD.

BY

RO

N A

VE.

BY

RO

N A

VE.

SY

CA

MO

RE S

T.

SY

CA

MO

RE S

T.

FELLOWSHIPHARVEST TIME

8of15

EXXON

EXXON

11/21/19

Page 16: Project Concept Report - MOVEBR · Project Concept Report Project: Plank Rd. Corridor Enhancement (N. 22nd St. to Harding Blvd.) Date: November 21, 2019 This is a conceptual report

11/12/19

Sheet No.PLANK RD. CORRIDOR ENHANCEMENT

(N. 22ND ST. TO HARDING BLVD.)

LOT LINES

LEGEND:

EDGE OF PAVEMENT

CURRENT BUS STOP

EXISTING SIDEWALK

SCALE: 1" = 50'

0 50 100'

PLANK RD.

PLANK RD.

BE

EC

H S

T.

LO

RR

AIN

E S

T.

LO

RR

AIN

E S

T.

KE

LVIN S

T.

HO

LL

YW

OO

D S

T.

HO

LL

YW

OO

D S

T.R

ILE

Y S

T.

CHURCHMAJELLA

ST. GERARD

9of15

AV

E.

ST. G

ER

AR

D

ST. K

AT

HE

RIN

E A

VE.

SHOPPING CENTERDELMONT VILLAGE

11/21/19

Page 17: Project Concept Report - MOVEBR · Project Concept Report Project: Plank Rd. Corridor Enhancement (N. 22nd St. to Harding Blvd.) Date: November 21, 2019 This is a conceptual report

11/12/19

Sheet No.PLANK RD. CORRIDOR ENHANCEMENT

(N. 22ND ST. TO HARDING BLVD.)

LOT LINES

LEGEND:

EDGE OF PAVEMENT

CURRENT BUS STOP

EXISTING SIDEWALK

SCALE: 1" = 50'

0 50 100'

PLANK RD.

PLANK RD.

AM

ARIL

LO S

T.

VA

UG

HN D

R.

GR

EE

NW

EL

L S

T.

J.H. C

OO

NE

Y S

T.

HU

RRIC

AN

E C

RE

EK

CEMETERYLIVE OAK

10of15

PARKSANO

MONTE

11/21/19

Page 18: Project Concept Report - MOVEBR · Project Concept Report Project: Plank Rd. Corridor Enhancement (N. 22nd St. to Harding Blvd.) Date: November 21, 2019 This is a conceptual report

11/12/19

Sheet No.PLANK RD. CORRIDOR ENHANCEMENT

(N. 22ND ST. TO HARDING BLVD.)

LOT LINES

LEGEND:

EDGE OF PAVEMENT

CURRENT BUS STOP

EXISTING SIDEWALK

SCALE: 1" = 50'

0 50 100'

PLANK RD.

PLANK RD.

CA

NN

ON S

T.

CA

NN

ON S

T.

DE

NH

AM S

T.

DA

WS

ON D

R.

ENTRANCE RAMP

SB AIRLINE HWY.

EXIT R

AMP

SB AIR

LIN

E H

WY.

ENTR

ANCE R

AMP

SB AIR

LINE H

WY.E. MASON ST.

11of15

RESTORATIONRESURRECTION

TEXACO

11/21/19

Page 19: Project Concept Report - MOVEBR · Project Concept Report Project: Plank Rd. Corridor Enhancement (N. 22nd St. to Harding Blvd.) Date: November 21, 2019 This is a conceptual report

11/12/19

Sheet No.PLANK RD. CORRIDOR ENHANCEMENT

(N. 22ND ST. TO HARDING BLVD.)

LOT LINES

LEGEND:

EDGE OF PAVEMENT

CURRENT BUS STOP

EXISTING SIDEWALK

SCALE: 1" = 50'

0 50 100'

PLANK RD.

PLANK RD.

NB AIR

LIN

E H

WY.

SB AIR

LIN

E H

WY.

EXIT

RA

MP

SB AIR

LINE

HW

Y.

BEECHWOOD DR.

MONTE SANO AVE.

12of15

MINISTRIESRESTORATIONLIVING WORD

ENTRANCE RAMP

AIRLINE HWY.

EXIT R

AMP

AIR

LINE H

WY.

ENTRANCE RAMP

AIRLINE HWY.

ENTRANCE RAMP

AIRLINE HWY.

EXIT RAMP

AIRLIN

E HWY.

EXIT R

AMP

AIR

LINE H

WY.

11/21/19

Page 20: Project Concept Report - MOVEBR · Project Concept Report Project: Plank Rd. Corridor Enhancement (N. 22nd St. to Harding Blvd.) Date: November 21, 2019 This is a conceptual report

11/12/19

Sheet No.PLANK RD. CORRIDOR ENHANCEMENT

(N. 22ND ST. TO HARDING BLVD.)

LOT LINES

LEGEND:

EDGE OF PAVEMENT

CURRENT BUS STOP

EXISTING SIDEWALK

SCALE: 1" = 50'

0 50 100'

PLANK RD.

PLANK RD.

72

ND A

VE.

MO

NA

RC

H A

VE.

PE

ER

LESS S

T.

SU

MR

ALL D

R.

CR

OW

N A

VE.

13of15

HOMEFUNERAL

WINNFIELDCHEVRON

BAPTIST CHURCHPROMISED LAND HOUSE

OMNI

11/21/19

Page 21: Project Concept Report - MOVEBR · Project Concept Report Project: Plank Rd. Corridor Enhancement (N. 22nd St. to Harding Blvd.) Date: November 21, 2019 This is a conceptual report

11/12/19

Sheet No.PLANK RD. CORRIDOR ENHANCEMENT

(N. 22ND ST. TO HARDING BLVD.)

LOT LINES

LEGEND:

EDGE OF PAVEMENT

CURRENT BUS STOP

EXISTING SIDEWALK

SCALE: 1" = 50'

0 50 100'

PLANK RD.

PLANK RD.

PAIG

E S

T.

CA

DIL

LA

C S

T.

STE

AR

NS S

T.

PA

CK

AR

D S

T.

GA

RD

EN A

VE.

HID

DE

N

FO

RD S

T. CENTER

CHRISTIANRHEMA

EXXON

14of15

POSTAL SERVICEUNITED STATESSCOTLANDVILLE

ANIMAL HOSPITALPLANK ROAD

INTERNATIONALBURNING SANDS

11/21/19

Page 22: Project Concept Report - MOVEBR · Project Concept Report Project: Plank Rd. Corridor Enhancement (N. 22nd St. to Harding Blvd.) Date: November 21, 2019 This is a conceptual report

11/12/19

Sheet No.PLANK RD. CORRIDOR ENHANCEMENT

(N. 22ND ST. TO HARDING BLVD.)

EXISTING SIDEWALK

LOT LINES

EDGE OF PAVEMENT

CURRENT BUS STOP

LEGEND:

SCALE: 1" = 50'

0 50 100'

SHELL

HA

RDIN

G B

LV

D.

HO

OP

ER R

D.

PLANK RD.

15of15

POSTAL SERVICESUNITED STATESSCOTLANDVILLE

11/21/19