Progress on Phase 1 of the Bing Kong Tong Building Renovation

April-May 2014

Page 2: Progress on Phase 1 of the Bing Kong Tong Building Renovation April-May 2014

Forms and rebar at the front of the building ready to pour for shear walls.

Page 3: Progress on Phase 1 of the Bing Kong Tong Building Renovation April-May 2014

Rafters getting reinforcedDry rot and broken rafters were reinforced to carry new roofing material.

Page 4: Progress on Phase 1 of the Bing Kong Tong Building Renovation April-May 2014

LVLs (manufactured beams) were added at the rear and front of the building.

Page 5: Progress on Phase 1 of the Bing Kong Tong Building Renovation April-May 2014

Concrete was poured into forms at the front and rear for shear wall support.

Page 6: Progress on Phase 1 of the Bing Kong Tong Building Renovation April-May 2014

Old front parapet wall going down Main Street for storage at River Storage.It was removed due to dry rot damage.

Page 7: Progress on Phase 1 of the Bing Kong Tong Building Renovation April-May 2014

Rebuilding of the new parapet wall to exact dimensions of the original.

Page 8: Progress on Phase 1 of the Bing Kong Tong Building Renovation April-May 2014

The new parapet wall being placed

Page 9: Progress on Phase 1 of the Bing Kong Tong Building Renovation April-May 2014

Installing insulation

Page 10: Progress on Phase 1 of the Bing Kong Tong Building Renovation April-May 2014

Installing insulation prior to roofing