Program Needs & Major Spatial Relationships
Honing the Program Vision
Design Direction and Aesthetics
Evaluating the Draft Plan
DRAFT PLAN & CEQA Process
Programming Phase Design Phase
M1
Process timeline
M309.24.18 11.01.18 01.24.19
M405.09.19 Summer ‘19
M2
MASTER PLAN
Property Line
Organization by PropertyOption 1
Organization by User Group Option 1
Site CoverageSite Coverageexisting
Site Coverageproposed
Site Coverageproposed
Housing Option 1
Housing Option 2
Housing Option 3
Housing Option 4
Phasing
Phase 1A
Phase 1B
Phase 2A
Phase 2B
Cost Estimate
$‐
$100,000,000
$200,000,000
$300,000,000
$400,000,000
$500,000,000
$600,000,000
$700,000,000
$800,000,000
$900,000,000
$1,000,000,000
OPTION 1 OPTION 2 OPTION 3 OPTION 4
COST ESTIMATE BY OPTION AND EXPENSE
Buildings Demolition Structured Parking Site Work Escalation
Cost Estimate by phase
$‐
$50,000,000
$100,000,000
$150,000,000
$200,000,000
$250,000,000
$300,000,000
$350,000,000
$400,000,000
OPTION 1 OPTION 2 OPTION 3 OPTION 4
COST ESTIMATE BY OPTION AND PHASES
PHASE 1A PHASE 1B PHASE 2A PHASE 2B