Upload
suvodip-ds
View
984
Download
7
Embed Size (px)
DESCRIPTION
This document shows how to change the profit center in material master while the material has balance quantity.
Citation preview
7/16/2019 Profit Center Change in Material Master (A Guide)
http://slidepdf.com/reader/full/profit-center-change-in-material-master-a-guide 1/9
Profit Center Change for Material A General Guide
Created by Subhadeep Das
Note: The views/solutions expressed here are those of the author and do not necessarily reflect that of SAP
AG. The basic idea of these notes are to help user understand the approach in resolving issues.
7/16/2019 Profit Center Change in Material Master (A Guide)
http://slidepdf.com/reader/full/profit-center-change-in-material-master-a-guide 2/9
1. Purpose:
The purpose of this document is to demonstrate the process of changing profit center for aparticular material in material master.
In standard SAP it is possible to change the profit center at any time. However this should bedone with care as it may create inconsistencies in profit center accounting. Hence all existingstock should be issued first to a cost center with 201 movement type, then change the profitcenter followed by another reversal entry with movement type 202.
2. Process:
Following are all the relevant screen shots that will demonstrate the entire process of changing
the profit center.
Checking the desired
material in T Code MMBE
7/16/2019 Profit Center Change in Material Master (A Guide)
http://slidepdf.com/reader/full/profit-center-change-in-material-master-a-guide 3/9
Using T Code MB5B to
check the closing value of the stock and qty
Checking Profit center for thematerial in material master
7/16/2019 Profit Center Change in Material Master (A Guide)
http://slidepdf.com/reader/full/profit-center-change-in-material-master-a-guide 4/9
Stock transfer to cost center
with mvt type 201.
T.code:MB1A
7/16/2019 Profit Center Change in Material Master (A Guide)
http://slidepdf.com/reader/full/profit-center-change-in-material-master-a-guide 5/9
In T.Code MB5B, checking the Null status of the stock post
issuance.
7/16/2019 Profit Center Change in Material Master (A Guide)
http://slidepdf.com/reader/full/profit-center-change-in-material-master-a-guide 6/9
Checking on profit center
balance, the stock issuanceentry is appearing as marked in
red.
Executing profit center change,entering material master area.
7/16/2019 Profit Center Change in Material Master (A Guide)
http://slidepdf.com/reader/full/profit-center-change-in-material-master-a-guide 7/9
Changing profit center from
6000 to 5100.
7/16/2019 Profit Center Change in Material Master (A Guide)
http://slidepdf.com/reader/full/profit-center-change-in-material-master-a-guide 8/9
Reversing the stock issuancewith mvt type 202.
7/16/2019 Profit Center Change in Material Master (A Guide)
http://slidepdf.com/reader/full/profit-center-change-in-material-master-a-guide 9/9
*********
The reversing of stock entrynow appearing in the changed
profit center.