    Process Efficiency ProjectPlan for All CC Departments

    Prepared by: QAU Team BnCC Karachi

  • 8/14/2019 Process(T&D Response)

    2/17

    Page 2

    OBJECTIVE

    Initiating business process efficiency.

    To optimize the purpose of available processes.

    To assign accountability to different designations.

    To minimize correctable errors in deliverance of information.

    To increase satisfaction level of CSR and enhance

    dependability on the information available.

    To grade the non-calling staff and motivate them to improve

    productivity individually and as a team as well.

    Increase credibility of customer services.

  • 8/14/2019 Process(T&D Response)

    3/17

    Page 3

    TARGET

    Training and Development

    Call Center Support

    Outbound Team

    Team Leaders

  • 8/14/2019 Process(T&D Response)

    4/17

    Page 4

    STEP A

    Synchronization of agents and team leaders with the information hub (T&D)

    on the same understanding level.

    PROPOSAL Development of Query Box in ECS and integration of the same in Agent ECS accounts.

    (Agreed already in process)

    IDs in ECS to be defined with editable rights for T&D where submitted queries will belogged with different categorization of Shifts and Departments. IDs of TLs will be defined

    with viewable rights and limited ticketing rights according to shifts. (Agreed already in

    process, upon discretion of IT)

    Providing agents runtime reporting process for different new and unknown queries.

    (Agreed)

    Providing agents standard statements to be delivered to the callers in case whereinformation is not available. (Sometimes we are unable to answer the queries from our

    side & we have to wait for response in that case we are unable to give any standard reply

    from our side; rest is & always will be assured)

  • 8/14/2019 Process(T&D Response)

    5/17

    Page 5

    PROPOSAL

    Submitted queries will be replied by T&D within a turnaround time of 24 to 48 hours. (only

    those complaints answers of which are available can be answered within TAT, Secondly

    queries can only be answered after consulting with Back end support if query is concerned

    with them or after consulting with concerns)

    The replied queries will display in TL ECS IDs with categorized view of departments and

    agents. The same reply would display in Agents IDs. (To be developed by IT)

    The responses and answers will be counseled by TL to the CSR and Ticket will be closed

    with satisfactory or contradictory tabs. (TLs Responsibility after integration of suchmechanism in ECS)

    Counseling and tagging the replied query will have a turnaround time of 24 hours. (TLs

    Responsibility after integration of such mechanism in ECS)

    Repeated similar queries will be identified and notification will be made on One Click

    bulletin board by T&D. (Agreed)

    TLs will circulate the information in pre-shift meeting and addition of the same will be sent

    in shift meeting points. (TLs Responsibility after integration of such mechanism)

  • 8/14/2019 Process(T&D Response)

    6/17

    Page 6

    PROPOSAL

    After notification of the Information by T&D similar submission of newqueries will marked invalid. This will help T&D and operations to identify

    weak CSRs so as to take necessary actions in terms of training,

    refreshers or shuffling of skills. (Agreed, after integration of such

    mechanism)

    Turnaround Time and validation of the reply will be monitored by QAUon monthly basis.

  • 8/14/2019 Process(T&D Response)

    7/17

    Page 7

    FLOW CHART

    Agent

    T&D

    TL

    Reply

    Counseling

    TAT 24 Hours

    TAT 24-48 Hours

    QAU Observance

  • 8/14/2019 Process(T&D Response)

    8/17

    Page 8

    CONCLUSION

    Errors occurrence in Problem resolution, incorrect information and

    incomplete information will reduce.

    Minimizing dissatisfactory counseling remarks from CSRs.

    Reducing hold time of CSRs as answers to their queries will be

    available in their specific ECS logs.

    Complains from CSR on deduction of marks about verbal flotation of

    information will decrease.

    Floatation of information by T&D on repeated queries will be helpful for

    the synchronization of information in all shifts as answers to repeated

    queries will be discussed in pre-shift meetings and emailed in shift

    meeting points. Contradictions and confusions will be identified present in One Click by

    contradictory tagged entries.

    T&D and TLs will be held accountable for calls graded poor by QAU.

    (Not Agreed)

  • 8/14/2019 Process(T&D Response)

    9/17

    Page 9

    STEP B

    Non voice processes performed by CC support to be scrutinized by QAU.

    Observation

    Order taken in ECS but not processed in BnCC.

    Orders available in BnCC not passed. Unattended complains according to Turn Around time.

    Comments on complains with no explanatory reasons.

    Invalid complains marked In process.

    Valid complain marked with Invalid remarks.

    Complains whose status has been resolved and replied from the

    concerns have been received by status of the complaints have not been

    update.

  • 8/14/2019 Process(T&D Response)

    10/17

    Page 10

    PROPOSAL

    In all entries made in ECS (complain/order) will have option of Alert check box

    with comments field. (Excellent suggestion should only be with AssistantManagers)

    Alert checked complains/orders will be displayed only to QAU and team lead CC

    support.

    TL CC support will immediately attend to the complains marked Alert and after

    responding to the required action will mark the Alert complain Attended

    QAU will close the Alert after validating the proper action which was required.

    (Assistant Manager will close the Alert after validating the proper action which

    was required).

    CC Support Agents who dealt with complain initially in which QAU will find the

    Alert valid will be marked fatal. Each fatal will constitute of 20 marks. CC

    Support Agents will be grade from a total of 100 marks per CC support member.

    (CC Support Agents who dealt with complain initially in which Assistant Manager

    will find the Alert valid will be marked fatal. Each fatal will constitute of 20

    marks. CC Support Agents will be grade from a total of 100 marks per CC

    support member).

  • 8/14/2019 Process(T&D Response)

    11/17

    Page 11

    Complains falling in the tab order entry and orders which have not beenattended will be marked Alert by CSR. These complains or orders will be

    dealt by TL CC support within a TAT (turn around time) of 24 hours.

    TL CC Support will be held accountable directly for failing to attend to

    Complain or Order marked Alert.

    Invalid Alert marking will be notified to Team Lead under which the CSR

    is functioning. (Agreed)

    PROPOSAL

  • 8/14/2019 Process(T&D Response)

    12/17

    Page 12

    CONCLUSION

    Credibility of complain will be insured.

    Repetition of complain will reduce.

    Irate customer complains will reduce.

    Customer satisfaction will improve.

    Order cancellation will minimize.

    TAT as quoted by CSR at the time of order or complain will be meet. Accuracy of reporting will be ensured.

    Quality of processes within the call center will improve.

    Panicking of TLs will minimize as urgent issue are forwarded by TLs on apiece of paper which does not have any record.

    Confidence of CSRs will develop on entries made in ECS.

    Non calling members of CC Support will be monitored for efficiency.

  • 8/14/2019 Process(T&D Response)

    13/17

    Page 13

    STEP C

    Monitoring authenticity of tasks

    performed by outbound department.

    OBERVATION

    It has been observed that logs of calls

    connected are not even 10% of leads

    consumed in tasks assigned and

    completed for outbound team.

    Total number of calls connected in

    between 7th of Sep. till 17th of Sep. are

    as follows, where as an average of

    200-250 numbers were given per CSRevery day.

    NAME 7-15 # of Calls

    Hinadi Dawood 8 256

    Sohail Ahmed 5 34

    Stallone Peter 7 216

    Muhammad Hanif 7 311

    Shariq Zia 7 219

    Saim uz Zaman 6 140

    Ahsan Raza 7 98

    Muhammad Arshad 7 282

    Umair Alam 6 138

  • 8/14/2019 Process(T&D Response)

    14/17

    Page 14

    PROPOSAL

    On weekly basis TL outbound will gather all data provided to a particularoutbound agent. Calls showing comments i.e connected calls will be

    counted. Same will be repeated for all outbound agents.

    BnCC call log will be tallied to confirm the authenticity of work done by

    outbound team.

    Outbound agent will be counseled by TL outbound.

    Compiled report of connected call count will be sent to the QAU for

    validation at the end of the month.

    (Out Bound is no more at CC Karachi, if continued in future this will be very

    helpful)

  • 8/14/2019 Process(T&D Response)

    15/17

    Page 15

    CONCLUSION

    False reporting of completed tasks will be eliminated.

    Productivity of outbound team will improve in term of new orders on

    existing dead leads, customer retention and bill recovery from unwilling to

    pay customer.

    Proper Utilization of leads and preventing wastage of potential customers. Monitoring and validating the outbound team performance.

    (Backend is to be revamped; process of which is yet to be proposed)

  • 8/14/2019 Process(T&D Response)

    16/17

    Page 16

    Step D

    To measure TL performance with input from the different scales.

    PROPOSAL

    Conduction of popularity survey among the CSRs once a month.

    Survey form will include grading sections ranging from 1 to 5.

    Grading section will contain parameters;

    Availability when needed.

    Co-operation

    Behavior.

    Attitude.

    Break management.

    Counseling approach.

    Deliverance of updates.

    (To be answered by Operations)

  • 8/14/2019 Process(T&D Response)

    17/17

    Page 17

    STEP D

    Reporting of TL performance will constitute of following;

    Quality efficiency of Team working under the TL. TL test report conducted by T&D.

    Popularity Scoring.

    Measuring the TLs performance

    Operation department can identify the Least and Highest performing TL.

    Gauging CSRs opinion and satisfaction level.

    Motivating TLs for excelled performance.

    TL performance can be associated with his team performance.

    (To be answered by Operations)

    CONCLUSION