Procedures and information needed to process application of modification/repair for unfired pressure vessel
Attachment A5
PROCEDURES AND INFORMATION NEEDED TO PROCESS APPLICATION OF MODIFICATION/REPAIR FOR UNFIRED PRESSURE VESSEL.
A. Documents needed:
1. Application letter.
2. Reasons for modification/repair of unfired pressure vessel
3. 3 sets of technical drawings (as built drawing)
4. 2 sets of procedures of repair/modification
5. 1 set of design calculation of modification/repair area
6. 2 set of approved welding procedure specification (wps)
7. Material certificate.
8. PMT certificate and a copy of and/or approval letter
9. Latest inspection report on the vessel
B. Contents of application letter:
1. Name and address of company
2. Name and telephone no. of contact person
3. Reference letter and date of application
4. Subject of application (modification/repair)
5. Signature
C. Contents of repair/modification procedure.
1. Detail procedure of repair/modification
2. Attach together with sketch of modification/repair.
3. Non destructive test involved.
4. Any hydrostatic test must be witness by DOSH Inspector.
5. List of approved welders.
6. Name of approved repairer by DOSH
Attachment A5-upv