Upload
tahir
View
530
Download
85
Tags:
Embed Size (px)
DESCRIPTION
Principle/Testing of IEC 60598-1/IEC 60598-2-1. Vicky Zhang Product Expert DEKRA Shanghai. IECEE Workshop August 26 & 27 Nairobi - Kenya. Content. Why? What? How?. Why to use IEC standards?. Recalls by product categories. - 2012, EU. Recalls by type of risk. - 2012, EU. - PowerPoint PPT Presentation
Citation preview
IEC SYSTEM OF CONFORMITY ASSESSMENT
SCHEMES FOR ELECTROTECHNICAL
EQUIPMENT AND COMPONENTS
Principle/Testing of IEC Principle/Testing of IEC 60598-1/IEC 60598-2-160598-1/IEC 60598-2-1
Vicky ZhangProduct ExpertDEKRA Shanghai
IECEE Workshop August 26 & 27Nairobi - Kenya
IECEE Workshop August 26 & 27, Nairobi - Kenya2
Content
• Why?
• What?
• How?
IECEE Workshop August 26 & 27, Nairobi - Kenya3
• Why to use IEC standards?
IECEE Workshop August 26 & 27, Nairobi - Kenya4
IECEE Workshop August 26 & 27, Nairobi - Kenya5
Recalls by product categories
- 2012, EU
IECEE Workshop August 26 & 27, Nairobi - Kenya6
Recalls by type of risk
- 2012, EU
IECEE Workshop August 26 & 27, Nairobi - Kenya7
Product Risks
IECEE Workshop August 26 & 27, Nairobi - Kenya8
What is product safety?
Product Product SafetySafety
No hazards to People
No hazardsto environment
No hazards to other equipments
IECEE Workshop August 26 & 27, Nairobi - Kenya9
Provisions against Hazards
ProvisionsProvisions
BB
EE
CC
DD
AAMechanical
hazards
Electrical Hazards
Heat related hazards
Radiation hazards
Fire hazards
IECEE Workshop August 26 & 27, Nairobi - Kenya10
Advantage of IEC standards
IEC Standards
Reducing risk, increasing quality, confidence
Bases of national standard or regulations
Wide adoption
Transparent process
Representing market needs
IECEE Workshop August 26 & 27, Nairobi - Kenya11
Technical committees
TC 34Lamps and
related equipments
SC 34DLuminaires
SC 34CAuxiliaries for lamps
SC 34ALamps
SC 34BLampcaps/
holders
IECEE Workshop August 26 & 27, Nairobi - Kenya12
• What criterias are required in IEC 60598-1/60598-2-1?
IECEE Workshop August 26 & 27, Nairobi - Kenya13
Standards
• IEC 60598-1
Luminaires –
Part 1: General requirements and tests
IECEE Workshop August 26 & 27, Nairobi - Kenya14
Standards
• IEC 60598-2-1
Luminaires –
Part 2- Particular requirements for Fixed general purpose luminaires
IECEE Workshop August 26 & 27, Nairobi - Kenya15
Scope
• Fixed general purpose luminaire
• Working voltage <= 1000 V
• Tungsten filament, tubular fluorescent and other discharge lamps
IECEE Workshop August 26 & 27, Nairobi - Kenya16
Definition – Fixed luminaire
• Not easily be moved from one place to another
• A: only be removed with the aid of a tool
or
• B: for use out of arms reach
IECEE Workshop August 26 & 27, Nairobi - Kenya17
Classification• Protection against electrical shock
• Class I luminaire:
basic insulation + protective earthing
• Class II luminaire:
basic + supplementary insulation or
reinforced insulation
• Class III luminaire:
SELV (safety extra-low voltage)
IECEE Workshop August 26 & 27, Nairobi - Kenya18
Conformity Assessment
Type Type TestTestType Type TestTest
Carried out by laboratoryTo use standardized test methodTo check compliance of the design of a product
Routine Routine TestTestRoutine Routine TestTest
Carried out by manufacturers after productionTo ensure every luminaire conforms with the sample approved under type test
IECEE Workshop August 26 & 27, Nairobi - Kenya19
Conformity Assessment
Type Type TestTestType Type TestTest
Carried out by laboratoryTo use standardized test methodTo check compliance of the design of a product
Routine Routine TestTestRoutine Routine TestTest
Carried out by manufacturers after productionTo ensure every luminaire conforms with the sample approved under type test
IECEE Workshop August 26 & 27, Nairobi - Kenya20
Component
• Suitable for use in the Luminaire
• Correct Classification and Ratings• In compliance with relevant IEC
requirements To ensure
safety of usage
IECEE Workshop August 26 & 27, Nairobi - Kenya21
Provision of Marking
• Marking on products
• Mounting Instructions
The height of letters and numerals ≥ 2 mm .
The height of symbol ≥ 5 mm • Durability and legiability
IECEE Workshop August 26 & 27, Nairobi - Kenya22
Construction - Lampholder
• Positioning test
IECEE Workshop August 26 & 27, Nairobi - Kenya23
Construction - Lampholder
• Bending test
IECEE Workshop August 26 & 27, Nairobi - Kenya24
Construction - Lampholder
• Torque test
IECEE Workshop August 26 & 27, Nairobi - Kenya25
Construction – Terminal block
• Space- Luminaire with connecting
leads requires a terminal block to connect to fixed wiring
- Adequate space for terminal block
IECEE Workshop August 26 & 27, Nairobi - Kenya26
Construction – Reliable terminals
• 8 mm conductor• live conductor
• earth conductor
IECEE Workshop August 26 & 27, Nairobi - Kenya27
Construction – Reliable terminals
• External cable & Internal wiring• Retained by cord anchorage
• Clamped by spring terminal
IECEE Workshop August 26 & 27, Nairobi - Kenya28
Construction – Reliable terminals
• Internal wiring- Anchored to a tag
before soldering
- Twisted in a reliable manner
- Fasten by sleeve, tape
- Inserted into a hole of PCB, bend and soldered
IECEE Workshop August 26 & 27, Nairobi - Kenya29
Construction – Reliable terminals
• Internal wiring- Securely crimped- Securely wrapped
IECEE Workshop August 26 & 27, Nairobi - Kenya30
Construction – Double/Reinforced Insulation
• Metal encased class II luminaire- No contact between mounting surface
and part with basic insulation only
Double insulated wire
Terminal block with a cover
IECEE Workshop August 26 & 27, Nairobi - Kenya31
Construction – Double/Reinforced Insulation
• Metal encased class II luminaire- No contact between accessible part and
basic insulation→ Double insulated wire→ Insulating lining, sleeve
Mechanical strength
Electrical strength
Thermal strength
1.Retained by positive means2.Not be removed without being seriously damaged
1. Humidity 48 hrs
2. Insulation resistance & electric strength
1. Thermal test
2. T(wire)+20°C
3. Aging T(wire)+20°C, 240 hrs, checked by electrical strength
IECEE Workshop August 26 & 27, Nairobi - Kenya32
Construction – Screws
• Torque test
No damage
No creep
IECEE Workshop August 26 & 27, Nairobi - Kenya33
Construction – Screws
• Torque test• 0,5 Nm for screws on cord anchorage
bearing directly on cable or cord
IECEE Workshop August 26 & 27, Nairobi - Kenya34
Construction – Glands
• Torque test
IECEE Workshop August 26 & 27, Nairobi - Kenya35
Construction – Mechanical Strength
• Impact test
IECEE Workshop August 26 & 27, Nairobi - Kenya36
Construction – Mechanical Strength
• Impact test- Live part shall not be accessible
- Insulation shall not be impaired
- No reduction on IP protection and classification
- Removable/replaceable part can be removed/replaced without breakage
IECEE Workshop August 26 & 27, Nairobi - Kenya37
Construction – Mechanical Strength
• Metal part enclosing live part- Pressure test by test finger- 30 N- Metal part shall not touch live part- No reduction on creepage distance and
clearance
IECEE Workshop August 26 & 27, Nairobi - Kenya38
Construction – Mechanical Strength
• All Suspended luminaires- Loading test- 4 x weight of luminaire- 1 hrs- No deformation on suspension system
IECEE Workshop August 26 & 27, Nairobi - Kenya39
Construction – Mechanical Strength
• Rigid Suspended luminaires- Torque test- 2,5 Nm, 1 min- Clockwise and anti-clockwise- No rotation more than one revolution in both
directions
IECEE Workshop August 26 & 27, Nairobi - Kenya40
Construction – Mechanical Strength
• Rigid Suspension bracket (heavy duty)- Loading 40 N, >=2,5 Nm, at free end- 1 min- No permanent displacement, deformation
IECEE Workshop August 26 & 27, Nairobi - Kenya41
Construction – Mechanical Strength
• Rigid Suspension bracket (light duty)- Loading 10 N, >=1,0 Nm, at free end- 1 min- No permanent displacement, deformation
IECEE Workshop August 26 & 27, Nairobi - Kenya42
Construction – Mechanical Strength
• Track mounted luminaire- Luminaire mass < max. load for track
IECEE Workshop August 26 & 27, Nairobi - Kenya43
Construction – Mechanical Strength
• Adjusting device- No twisting over 360
IECEE Workshop August 26 & 27, Nairobi - Kenya44
Construction – Mechanical Strength
• Flexing test- Strands broken < 50%- Insulation resistance & electric strength
IECEE Workshop August 26 & 27, Nairobi - Kenya45
Construction – Flammable Material
• Glow‑wire test 650 C
• Spacing 30 mm
• No fiercely burning material
IECEE Workshop August 26 & 27, Nairobi - Kenya46
External Wiring
• Supply connection
Terminals
Adaptor for track
Supply cable & Plug
IECEE Workshop August 26 & 27, Nairobi - Kenya47
External Wiring
• Supply connection
Appliance inlet
Connecting leads
IECEE Workshop August 26 & 27, Nairobi - Kenya48
External Wiring
• Type of cable
• 0,75 mm2 for ordinary luminaires;
• 1,0 mm2 for other luminaires
IECEE Workshop August 26 & 27, Nairobi - Kenya49
External Wiring
• Type of connection
- Type X attachment
- Type Y attachment
- Type Z attachment
IECEE Workshop August 26 & 27, Nairobi - Kenya50
External Wiring
• Cord anchorage
IECEE Workshop August 26 & 27, Nairobi - Kenya51
External Wiring
• Cord anchorage - Pull test (25 time, displacement <= 2mm)
- Torque test
IECEE Workshop August 26 & 27, Nairobi - Kenya52
Internal Wiring
• Internal wiring directly connected to fixed wiring
Operating current >= 2 A Operating current < 2 A
min. 0,5 mm2 min. 0,4 mm2
Insulation thickness: min. 0,6 mm
(PVC or Rubber)
Insulation thickness: min. 0,5 mm
(PVC or Rubber)
1,5 mm2 for through wiring
--
IECEE Workshop August 26 & 27, Nairobi - Kenya53
Internal Wiring
• Internal wiring connected to fixed wiring via current limiting device <= 2 A
If current-carrying capacity and the mechanical properties are adequate
- Cross-sectional area min. may be less than 0,4 mm2
- Insulation thickness may be less than 0,5 mm
IECEE Workshop August 26 & 27, Nairobi - Kenya54
External & Internal Wiring
• Soldering
Clamping terminal
Spring terminal
IECEE Workshop August 26 & 27, Nairobi - Kenya55
External & Internal Wiring
• Soldering
Spring terminal
Clamping terminal
Cold flowBad electrical
connection
IECEE Workshop August 26 & 27, Nairobi - Kenya56
Earthing
• Accessible metal part, basic insulated• Non-accessible metal part, basic
insulated, but in contact with supporting surface
- Reliably connected to earthing terminal or earthing contact
IECEE Workshop August 26 & 27, Nairobi - Kenya57
Earthing
IECEE Workshop August 26 & 27, Nairobi - Kenya58
Earthing
• Location of earthing terminal• Adjacent to mains terminal (type X, Y)
• Material of earthing terminal• Brass or non-rusting material
• Bare contact surface
IECEE Workshop August 26 & 27, Nairobi - Kenya59
Earthing
• Cord for earthing• Green-yellow cord shall only be used
for earthing connection
• Earthing make contact first
• Earthing detached later
IECEE Workshop August 26 & 27, Nairobi - Kenya60
Earthing
• Terminal blocks with integrated screwless earthing contacts
IECEE Workshop August 26 & 27, Nairobi - Kenya61
Earthing
• Terminal blocks with integrated screwless earthing contacts• Pull test 20 N – terminal block shall be in
place• Pull test 50 N – applies only to earthing
contact – no damage, no loosen on earthing contact
• Earthing contact – supporting plate < 0,05 ohm
IECEE Workshop August 26 & 27, Nairobi - Kenya62
Earthing
• Terminal blocks with integrated screwless earthing contacts• Voltage drop test• Resistance < 0,05 ohm
IECEE Workshop August 26 & 27, Nairobi - Kenya63
Protection against electrical shock
• Live parts not accessible when luminaire installed and wired as in normal use or during lamp/starter replacement
- Wall-mounted luminaires: within arm reach, no access to basic insulated parts by means of a Ø 50 mm probe
IECEE Workshop August 26 & 27, Nairobi - Kenya64
Protection against electrical shock
• Basis insulated parts of Class II luminaires to be regarded as live parts
IECEE Workshop August 26 & 27, Nairobi - Kenya65
Protection against electrical shock
• No basic insulated components on outside of luminaire
• Luminaires incorporating a capacitor >0,5μF must be provided with a discharge device
IECEE Workshop August 26 & 27, Nairobi - Kenya66
Resistance to dust and moisture
• Dust Test (IP#X)
IECEE Workshop August 26 & 27, Nairobi - Kenya67
Resistance to dust and moisture
• Dust Test (IP#X)• Solid-object-
proof (IP2X)• Solid-object-
proof (IP3X or IP4X)
• Dust-proof (IP5X)
• Dust-tight proof (IP6X)
IECEE Workshop August 26 & 27, Nairobi - Kenya68
Resistance to dust and moisture
• IP Test (IPX#)• Drip-proof (IPX1) • Drip-proof (IPX2)
IECEE Workshop August 26 & 27, Nairobi - Kenya69
Resistance to dust and moisture• IP Test (IPX#)
• Rain-proof (IPX3) and splash-proof (IPX4)
IECEE Workshop August 26 & 27, Nairobi - Kenya70
Resistance to dust and moisture
• IP Test (IPX#)• Jet-proof (IPX5) and powerful water jet-proof
(IPX6)IP X5
15 min / distance = 3 m / 12,5 l/min ± 5 % (30 kN/m2)
IP X6
3 min / distance = 3 m / 100 l/min ± 5 % (100 kN/m2)
IECEE Workshop August 26 & 27, Nairobi - Kenya71
Resistance to dust and moisture
• IP Test (IPX#)• Watertight (IPX7)• 30 min in water / 150 mm of water above the top of
the speciment and the lowest portion is subjected to at least 1 m head of water
• Pressure watertight (IPX8)• 30 min in water / water pressure 1,3 x pressure
which corresponds to the rated maximum immersion depth
IECEE Workshop August 26 & 27, Nairobi - Kenya72
Resistance to dust and moisture
• Humidity test• R.H. 91% to 95 %• 10 ºC – 30 ºC
• 48 hrs
IECEE Workshop August 26 & 27, Nairobi - Kenya73
Insulation Resistance
• Class I luminaire: 2 Mohm
• Class II luminaire: • Basic/Supplementary insulation: 2 Mohm• Double/Reinforced insulation: 4 Mohm
• Class III luminaire: 1 Mohm
IECEE Workshop August 26 & 27, Nairobi - Kenya74
Electric Strength
• Class I luminaire: 2U + 1000 V
• Class II luminaire:• Basic/Supplementary insulation: 2U + 1000 V• Double/Reinforced insulation: 4U + 2000 V
• Class III luminaire: 500 V
IECEE Workshop August 26 & 27, Nairobi - Kenya75
Creepage distance & Clearances
• Live Parts of different polarity
• Live Parts Adjacent Metal Parts
• Live Parts Body or Housing
• Live Parts Mounting Surface
IECEE Workshop August 26 & 27, Nairobi - Kenya76
Creepage distance & Clearances
IECEE Workshop August 26 & 27, Nairobi - Kenya77
Endurance and Thermal test
• Endurance 7 or 10 Days• Thermal Test Normal operation• Thermal Test Abnormal operation• Thermal Test on luminaires classified
for mounting on normally flammable surfaces
• Thermal Test on thermalplastic luminaires
IECEE Workshop August 26 & 27, Nairobi - Kenya78
Resistance to heat, fire and tracking
• Needle Flame Test
• Ball Pressure Test
IECEE Workshop August 26 & 27, Nairobi - Kenya79
Resistance to heat, fire and tracking
• Glow-wire Test 650 ºC
• Tracking Test on IP>20 Luminaire
IECEE Workshop August 26 & 27, Nairobi - Kenya80
Conformity Assessment
Type Type TestTestType Type TestTest
Carried out by laboratoryUse standardized test methodTo check compliance of the design of a product
Routine Routine TestTestRoutine Routine TestTest
Carried out by manufacturers after productionTo ensure every luminaire conforms with the sample approved under type test
IECEE Workshop August 26 & 27, Nairobi - Kenya81
Routine test by Manufacturer
• Visual check• Function test• Earth continuity (earthing resistance:
0,05ohm)• Electric strength or insulation
resistance (for metal encased)• Polarity (for Class I luminaire)
IECEE Workshop August 26 & 27, Nairobi - Kenya82
• How to build up a laboratory carrying out testing of IEC 60598-2-1?
IECEE Workshop August 26 & 27, Nairobi - Kenya83
What is a laboratory?
• Area where tests are conducted(electrical, chemical, physical, mechanical etc.)
Why are tests conducted in a laboratory?
• External influences on the test results are ruled out!
• Conditions for testing are controlled!
IECEE Workshop August 26 & 27, Nairobi - Kenya84
Consumable goods/ items
Test methods/validationMeasurement traceabilitySamplingHandling of test items
Environmental conditionsEquipment
Conditions which can influence test results in your laboratory?
Manpower
Machines
Methods
Means
Human factors
IECEE Workshop August 26 & 27, Nairobi - Kenya85
Process model
Input Process Output
Manpower Machines
Means Methods
IECEE Workshop August 26 & 27, Nairobi - Kenya86
Manpower
• Competent staff• Staff in training (adequate supervision needed)• Personnel competent and qualified• Goals and policy / procedures for training and
qualification requirements• Job descriptions (management, technical and
supporting)• Records of all personnel maintained, readily
available (authorizations, competences, qualifications, training, skills, experience…)
Input Process Output
Manpower Machines
Means Methods
IECEE Workshop August 26 & 27, Nairobi - Kenya87
Machines (1)
• Facilitate correct performance of tests• Technical requirements that can effect the
results documented• Monitor, control, record environmental
conditions and stop testing when environmental conditions jeopardize results
• Effective separation of incompatible areas• Access and use shall be defined and
controlled
Machines
Input Process Output
Manpower
Means Methods
IECEE Workshop August 26 & 27, Nairobi - Kenya88
Machines (2)
• Lab with all equipments required for the correct
performance of tests• Equipment capable of achieving accuracy
needed• Authorized personnel; up to date instructions• Unique identification• List of records for each piece of equipment
Machines
Input Process Output
Manpower
Means Methods
IECEE Workshop August 26 & 27, Nairobi - Kenya89
Machines (3)
• IECEE – CTL testing equipments under CB schemehttp://www.iecee.org/ctl/equipment/html/ctl_testing_lite.htm
• IECEE-CTL Operational Procedures
• http://www.iecee.org/ctl/operational/Operational_procedures.htm
Machines
Input Process Output
Manpower
Means Methods
CTL-OP 108 Use of thermocouples
CTL-OP 109 Acceptance of thermocouples
CTL-OP 110 Procedure for measuring power source characteristic
CTL-OP 111 Traceability of calibrations and calibration intervals
IECEE Workshop August 26 & 27, Nairobi - Kenya90
Machines (4)
• Refer to CTL-OP 110 “Procedure for Measuring Laboratory Power Source Characteristics”
8.1 When not otherwise specified in the testing standard, the power source used for testing shall meet the following requirements:
A. Voltage stability: ± 3 % maximum
B. Frequency stability: ± 2 % maximum
C. Total harmonic distortion (THD): maximum 5 %
Machines
Input Process Output
Manpower
Means Methods
IECEE Workshop August 26 & 27, Nairobi - Kenya91
Machines (5)
• Note:
IEC 60598-1, cl. 12.4.1 e) ±1% (preferred ± 0.5%)
voltage stability instead of ± 3%!
Machines
Input Process Output
Manpower
Means Methods
IECEE Workshop August 26 & 27, Nairobi - Kenya92
Machines (6)Machines
Input Process Output
Manpower
Means Methods
IECEE Workshop August 26 & 27, Nairobi - Kenya93
Machines (7)Machines
Input Process Output
Manpower
Means Methods
IECEE Workshop August 26 & 27, Nairobi - Kenya94
Machines (8)Machines
Input Process Output
Manpower
Means Methods
IECEE Workshop August 26 & 27, Nairobi - Kenya95
Machines (9)Machines
Input Process Output
Manpower
Means Methods
IECEE Workshop August 26 & 27, Nairobi - Kenya96
MethodsMachines
Input Process Output
Manpower
Means Methods
• Appropriate methods for all tests within scope• Instructions for all equipment• Up to date and readily available to personnel• Methods must meet the requirements of
standards• Latest valid editions of standards to be used
IECEE Workshop August 26 & 27, Nairobi - Kenya97
MeansMachines
Input Process Output
Manpower
Means Methods
• Policy and procedures for selection & purchase of services and supplies, when relevant for tests
• Procedures for inspecting supplies prior to use• Purchasing documents reviewed and approved
for technical content prior to release
IECEE Workshop August 26 & 27, Nairobi - Kenya98
InputMachines
Input Process Output
Manpower
Means Methods
• Review of requests, tenders and contracts• Methods adequately defined
• Posses capability and resources
• Differences resolved before work begins
• Record of reviews maintained, including discussion with clients
• Any subcontracted work
IECEE Workshop August 26 & 27, Nairobi - Kenya99
OutputMachines
Input Process Output
Manpower
Means Methods
• Reporting results• Shall include all information requested by the client
and all information required by the method used
• Subcontracted results clearly identified
IECEE Workshop August 26 & 27, Nairobi - Kenya100
OutputMachines
Input Process Output
Manpower
Means Methods
• IECEE – TRF (test report form)
http://members.iecee.org/
• IECEE – TRF guide
• OD-2020
• http://www.iecee.org/Operational_documents/od-cb_index.html
IEC SYSTEM OF CONFORMITY ASSESSMENT
SCHEMES FOR ELECTROTECHNICAL
EQUIPMENT AND COMPONENTS
Vicky ZhangProduct ExpertDEKRA Shanghai
IECEE Workshop August 26 & 27Nairobi - Kenya