13
Previously, at Bolides 2009 Prague...

Previously,

  • Upload
    nevin

  • View
    17

  • Download
    0

Embed Size (px)

DESCRIPTION

Previously,. a t Bolides 2009 Prague. Sky-plane probability distribution for impactors 30 days before impact. with V < 22.7 and apparent motion < 12 deg/day. Veres et al. ( 2009). Sky-plane probability distribution for 3 meter diameter impactors (bolides) 1 day before impact. 2008 TC 3. - PowerPoint PPT Presentation

Citation preview

Page 1: Previously,

Previously,

at Bolides 2009 Prague...

Page 2: Previously,

Veres et al. (2009)

Sky-plane probability distribution for impactors 30 days before impactwith V < 22.7 and apparent motion < 12 deg/day

Page 3: Previously,

2008 TC3

Sky-plane probability distribution for 3 meterdiameter impactors (bolides) 1 day before impact

with V < 22.7 and apparent motion < 12 deg/day

Veres et al. (2009)

Page 4: Previously,

impactor discoveries in a4 year PS1 survey mission

3 night orbit1 night tracklet

Veres et al. (2009)

Page 5: Previously,

Veres et al. (2009)

impactor discoveries in a4 year PS1 survey mission

3 night orbit1 night tracklet

So how did CSS find 2008 TC3?

• they got ‘lucky’ or

• there are more small impactors than expected or

• something is wrong with our simulation

Page 6: Previously,

ATLAS

STEROID

ERRESTRIALIMPACT

AST

LERT

YSTEM

• John Tonry, PI• 8 telescopes and cameras

– 25cm aperture, f/2.8, 5° FOV, 20 deg2

– 4x4k pixels at 4.4”/pix– 30s exp, 4s readout, 10e- read-noise

• Sensitivity at SNR=5– V=19.3 1 telescope, 1 exp, red & blue– V=20.0 4 telescope, 4 exp, red & blue

• Deployment– 2 pairs x 2 pointings x 2 sites – “blue” (g+r) and “red” (r+i) filters– 2 observations of 20,000 deg2/night

Page 7: Previously,

STEROID

ERRESTRIALIMPACT

AST

LERT

YSTEM

ATLAS

Page 8: Previously,

A STEROID

ERRESTRIALIMPACT

AST

LERT

YSTEM

TLAS

Page 9: Previously,

STEROID

ERRESTRIALIMPACT

AST

LERT

YSTEM

ATLAS

• portable • robotic• autonomous

Ironwood Observatory

Page 10: Previously,

STEROID

ERRESTRIALIMPACT

AST

LERT

YSTEM

ATLAS

• Cost• ≈ $2M construction for 2 sites• ≈ $0.5M/year operations• ≈ $1M incremental/site

• Time• 2 years from start of funding

Page 11: Previously,

• Asteroid collisions• 10m MB asteroid disruption/day• 100m MB asteroid disruption/year• 1000m dust cloud visible in MB

• Light curves• ~400 photometric observations/year

for ~105 asteroids

• Bolides• One bolide like 2008 TC3 per year

STEROID

ERRESTRIALIMPACT

AST

LERT

YSTEM

ATLAS

Page 12: Previously,

ATLAS

ATLASwill identify>60% of allimpactors

Page 13: Previously,

STEROID

ERRESTRIALIMPACT

AST

LERT

YSTEM

ATLAS