Preventive Maintenance Report-Plasma

Embed Size (px)

Citation preview

  • 7/30/2019 Preventive Maintenance Report-Plasma

    1/2

    ERPCODE SCCContactNameSCHOOLNAME SCCContactNo.LOCATION

    RE/FEContactNameRE/FEContactNo.

    PMDate

    Sl.No. ACTIVITY TO BE DONEETEC-1

    (YES / NO)

    ETEC-2

    (YES / NO)

    ETEC-3

    (YES / NO)

    ETEC-4

    (YES / NO)

    ETEC-5

    (YES / NO)

    PleaseincreaseasavailableinETEC'sin

    School.

    1Cleaning of the smart class materials

    with the help of sweeper from School.

    2 Scanning & Defragmenting the CPU

    3 Anti-virus install / update

    4Unnecessary software needs to be

    uninstalled.

    5Ensure that all Smartclass related

    software working fine.

    6 UPS battery backup check up

    7 Wireless Keyboard & Mouse checkup.

    8Tagging the hanging cable (power

    cable, audio cable etc.)

    9 Channels and Pipes reliability

    10 IP address checking.

    11 Plasma TV alignment checking.

    12 Plasma TV audio checking

    13 Plasma TV resolution checking

    14 Digiboard alignment checking

    15 Digiboard lock checking

    16 Digiboard writing board checking.

    17 Over all checkup.

    Sl.No. ACTIVITY TO BE DONETeacher-1

    (Yes/No.)

    Teacher-2

    (Yes/No.)Teacher-3 (Yes/No.)

    Others

    (Yes/No.)

    1Cleaning of the smart class materials

    with the help of sweeper from School.

    2 Scanning & Defragmenting the CPU

    3 Anti-virus install / update

    4 Unnecessary software needs to beuninstalled.

    5Ensure that all Smartclass related

    software working fine.

    6 UPS battery backup check up

    7Tagging the hanging cable (power

    cable, audio cable etc.

    8 IP address checking.

    9 Speaker sound checking

    10 Speaker wire checking

    11 Woofer checking (volume)

    12 Monitor checking

    13 Printer Checking

    14 KC systems positioning

    15 Over all setup

    PREVENTIVE MAINTENANCE REPORT

  • 7/30/2019 Preventive Maintenance Report-Plasma

    2/2

    Sl.No. ACTIVITY TO BE DONE

    STATUS

    (working / not

    working)

    Operating System

    SOFTWARE

    available in

    Smartclass

    Machine

    Anti-Virus with

    upates

    1 Network Switch 8 port checking

    2 Network Switch 16 port checking

    3 Network Switch 24 port checking

    4 Campus wide networking reliability.

    5 Channels & PVC Pipes reliability.

    AvailableQty(Nos.) Checked( No s. ) W or king(Nos.) Notworking(Nos.)TotalETEC'sTeacherSystemsNetworkSwitchCPU

    UPS

    Speakers

    Projectors

    MimioKitWiredKeyboardWiredMouseW/LKeyboardW/LMouseMonitor

    WhiteBoardGreenBoardCabinet

    PlasmaTV

    Sl.No. ETECNo IPAddress CPUWorkingfineYes orNo

    IfCPUProblemActionTakenDetailsandsolution

    IfnotActiontakendetailsorSolution

    ProjectorandAlignmentfineYesor

    No

    Ifnotactiontakenorsolution

    UPSBackupgoodYesor

    No

    Ifnotactiontakenorsolution SpeakerworkingfineYesorNo Ifnotactiontakenorsolution SCC'sRemarks

    SCCSignature SchoolPrincipalSignature/Seal RE/FESignature

    FEEDBACK FROM SCC / SCHOOL

    Networkconnectivitystatus YesorNo