Upload
justin-bradford
View
217
Download
0
Tags:
Embed Size (px)
Citation preview
presented to
Performance Measures Session
FDOT ITS Working Group Meeting, Tampa, FL
presented by
Kenny Voorhies, Cambridge Systematics
March 20, 2008
Florida ITS Performance Measures Update
Agenda
Incident Duration
• Highlights from last ITS working group meeting
• Progress report
• Action items
Travel Time Reliability
• Highlights from last ITS working group meeting
• Progress report
• Action items
Next steps
Incident DurationConcerns from Last Working Group Meeting
Actions of partner agencies will not be included in timeline• Time emergency vehicles arrive on the scene
• Incident investigation time by FHP
• FHP CAD system could be helpful for operations purposes
Initially, reporting of incident duration will likely differ among Districts• Roll out of SunGuide software
• Operators in different districts interpret the incident duration timestamps differently
Incident Duration Action Items
Review incident duration definitions with each District and fine-tune to resolve misinterpretations
Conduct pilot test for incident duration
• District 6
Plan for consistent training of operators across Districts
Conduct QA/QC of incident duration results across Districts to identify anomalies
Incident DurationProgress Report
Met with D6 SunGuide Transportation Management Center - March 10/11
Recommendations
• Document current SunGuide reports
• Provide validation of SunGuide reports
• Conduct Statewide Workshop
• Provide standard operating guidelines
• Conduct operations staff training on definitions
Travel Time ReliabilityConcerns from Last Working Group Meeting
Connection between speed data and reliability unclear
Method of calculating reliability not clear
Concern that since districts don’t have data for roadways before the implementation of ITS, it won’t be possible to quantify the full benefits of ITS
Travel Time Reliability Action Items
Conduct a reliability workshop with FDOT Districts to review FDOT definitions of reliability using actual data
Pilot test for travel time reliability in one district
Travel Time ReliabilityProgress Report
Met with D5 on February 12
Recommendations
• Create template for developing detector configuration file
• Create guidelines for detector quality and maintenance (statewide level)
• Define reporting templates
• Conduct training
Next Steps
Conduct Incident Duration Teleconference with Districts within next 4 weeks
• Review timeline and definitions
• Clarify expectations for this reporting cycle
• Discuss concerns
Conduct Reliability Teleconference within the next 2 months
• Review data and reporting
• Clarify expectations for this and next reporting cycles
• Discuss concerns
Next Steps (continued)
Central Office
• Develop and implement Incident Duration Performance Measures Policy
• Develop detector data quality guidelines
• Develop training materials and plan
• Begin compiling data for 07/08 report to FTC
Questions and Contact
Anita Vandervalk or Kenny Voorhies
Cambridge Systematics2457 Care Drive, Suite 101Tallahassee, Florida 32308