Upload
darbonnejd
View
358
Download
1
Tags:
Embed Size (px)
DESCRIPTION
METRO\'s General Presentation to Clients
Citation preview
Presentation of Qualifications
Orlando, Florida
Agenda
Firm Background
Professional Staff
Pre Qualifications
Firm Background
• Essential Firm Ingredients– Founding Principal – Former Corporate VP\– Incorporated in 2010– Strong FDOT Pre-Qualifications–Core Professional Services Under One Roof– Experienced / Engaged Staff – “Cost Efficient” Business Model
Recognition / Accountability Model
Productivity
Engagement
Retention
Achieve Client and Firm Expectations
Accountability /Quality Process
PD&E Studies
Engineering
Environmental Science
Quality Manager
Constructability Engineer
LEVEL 1 REVIEW LEVEL 2 REVIEW
Planning
Agenda
Firm Background
Pre Qualifications
Professional Staff
Pre-Qualifications
•2.0 - PD&E Studies
•3.1 - Minor Roadway Design
•3.2 - Complex Roadway Design
•3.3 - Controlled Access Roadway Design
•7.1 - Signing and Pavement Marking Plans
(FUTURE)•6 – Traffic Engineering
•7 - Signalization
•13 – Planning
•15 – Landscape Architecture
Professional Services
Agenda
Firm Background
Professional Staff
Pre Qualifications
Organization
George Botner, AICP, RLAPlanning
Richard Bobletz, PE Engineering
Ray Emmett, PhDEnvironmental Science
Dwayne Darbonne, PEQuality Manager
Nader Moghadas, EIConcepts Engineer
Nathan Kreuser, EIProject Engineer
Kevin HamiltonGIS / Designer
Project Manager
Fraser Howe, Jr, PEPD&E Studies
Dwayne Darbonne, PEPrincipal – Sr. Transportation Engineer
• BS Civil Engineering, LA Tech University• FES Leadership Institute Graduate• Jacobs Sr. Project Manager Training• D1 Transp. Engineering Contracts– Districtwide Design – I-4 / US 27 Interchange Reconstruction– I-75 Peace River Crossing– SR 84 Widening
Dwayne Darbonne, PEPrincipal – Sr. Transportation Engineer
PD&E Projects• Alton Road Flyover• NW 12th Ave Bridge• NW 21st / NW 32 Ave Bridge
Controlled Access Projects• Eller Drive ICTF• I-75 Peace River Crossing• I-4 / US 27 Interchange• SR 826 (Palmetto Expwy.)• I-595 Construction Management• I-49 Urban Segment• Greater NO Bridge No. 2• Westbank Expressway• I-10 / LA 3188 Interchange
Alternative Transportation Facilities• I-4 Pedestrian Bridge Gateway at Lake Ivanhoe• South Lake Trail• Ormond Beach Sidewalks
Fraser Howe, Jr., PESr. Transportation / PD&E Engineer
• BS Civil Engineering, Michigan State University• FES Leadership Institute Graduate• Jacobs Sr. Project Manager Training• D1 Transp. Engineering Contracts– Districtwide Design – I-4 / US 27 Interchange Reconstruction– I-75 Peace River Crossing– SR 84 Widening
Fraser Howe, Jr., PESr. Transportation / PD&E Engineer
PD&E Projects• Alton Road Flyover• NW 12th Ave Bridge• NW 21st / NW 32 Ave Bridge
Controlled Access Projects• Eller Drive ICTF• I-75 Peace River Crossing• I-4 / US 27 Interchange• SR 826 (Palmetto Expwy.)• I-595 Construction Management• I-49 Urban Segment• Greater NO Bridge No. 2• Westbank Expressway• I-10 / LA 3188 Interchange
Alternative Transportation Facilities• I-4 Pedestrian Bridge Gateway at Lake Ivanhoe• South Lake Trail• Ormond Beach Sidewalks
George Botner, AICP, RLASr. Planner / Landscape Architect
• MA Landscape Architecture, Cornell University• BA Landscape Architecture, University of Florida• 20 National and State Awards– Downtown Redevelopment– Street Network Planning– Land Use Plans– Streetscapes / /Gateways– Park Planning– Walkability Master Plans
Planning Services
• PD&E Studies• Public Involvement• Toll Facility Planning • Land Planning• Park Planning• Streetscapes / Gateways• Downtown Redevelopment
Richard Bobletz, PESr. Roadway / Stormwater Engineer
• BS Civil Engineering, University of Florida• Jacobs Project Manager Training• Roadway Experience– Pavement Design– Roadway Design– Drainage Design– Traffic Control Design– Utility Design / Coordination– Stormwater Permitting– Roadway Plan Development
Richard Bobletz, PESr. Roadway / Stormwater Engineer
• Roadway – Minor Projects
• D5 Drainage Districtwide • Stimulus Brevard / Osceola
– Major Projects• I-4 Braided Ramps• SR 25 / US 27 Widening• North Hancock Road
– Stormwater Projects• I-75 PD&E Study• Little Lake Howell Basin Study• Bridge Hydraulics
Engineering Services
• Minor Roadway • Complex Roadway • Controlled Access • Trails / Sidewalks• Drainage Design• Stormwater Permitting• Utility Coordination• Signing and Pavement Markings
Raymond Emmett, Ph.D.Sr. Environmental Scientist
• BA, MA and PhD Botany, University of Texas• NEPA, Section 4 (f), Ecological Surveys, Permitting• Texas Experience– Categorical Exclusions to Environmental Impact Statements
• Florida Experience– New Regional Airport– Districtwide Environmental Services– SR 40 ( Ocala to Barberville )– I-95 ( SR 50 to I-4 )– I-4 ( Kennedy to Ivanhoe )
Environmental Services
• Social– Community– Historical Screening
• Physical– Noise Assessments– Phase I Contamination
• Natural – Wetland Surveys
• Environmental Permitting• Public Involvement• GIS Services
• Firm / Professional Staff–Strong Pre-Qualifications–Services Under One Roof–FDOT Experienced Staff–Cost Efficient Business Model