50
02/11/2015 1

Presentazione standard di PowerPointparsian-enterprise.ir/wp-content/uploads/2017/01/...02/11/2015 25 Improvements RTC vs 800 ① ② ① In this situation (RTC) the tube has not reached

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Presentazione standard di PowerPointparsian-enterprise.ir/wp-content/uploads/2017/01/...02/11/2015 25 Improvements RTC vs 800 ① ② ① In this situation (RTC) the tube has not reached

02/11/2015 1

Page 2: Presentazione standard di PowerPointparsian-enterprise.ir/wp-content/uploads/2017/01/...02/11/2015 25 Improvements RTC vs 800 ① ② ① In this situation (RTC) the tube has not reached

Company History

Production of metal turned parts

• Tosi was funded in 1964 as manufacturer of bar turned parts

• 1981 – Tosi bought MMV, production of metal turned parts

• 1990 – Transfer to the new Industrial Zone

02/11/2015 2

Page 3: Presentazione standard di PowerPointparsian-enterprise.ir/wp-content/uploads/2017/01/...02/11/2015 25 Improvements RTC vs 800 ① ② ① In this situation (RTC) the tube has not reached

• 2000 - Sirit (Air Brake Fittings) acquisition. Doubling of the premises

• 2002 - All the activities have moved to Varallo Sesia

• 2006 - Extension of the application field of the Quality Certification

• 2006 - Installation of photovoltaic panels

02/11/2015 3

Company History

Page 4: Presentazione standard di PowerPointparsian-enterprise.ir/wp-content/uploads/2017/01/...02/11/2015 25 Improvements RTC vs 800 ① ② ① In this situation (RTC) the tube has not reached

Production of metal turned parts

• 2006 – MMV additional new premises

02/11/2015 4

Company History

Page 5: Presentazione standard di PowerPointparsian-enterprise.ir/wp-content/uploads/2017/01/...02/11/2015 25 Improvements RTC vs 800 ① ② ① In this situation (RTC) the tube has not reached

Air Brake Fittings

• 2008 Strong penetretation in the Eastern European Markets with an increase of EasternEuropean customers thanks also to a warehouse and assembly line facility in Poland .

• 2010 - Development of a new range of product for railway division

• 2013 - ISO/TS 16949:2009

Russian and Eastern European market

Company History

02/11/2015 5

Page 6: Presentazione standard di PowerPointparsian-enterprise.ir/wp-content/uploads/2017/01/...02/11/2015 25 Improvements RTC vs 800 ① ② ① In this situation (RTC) the tube has not reached

International market presence

02/11/2015 6

Page 7: Presentazione standard di PowerPointparsian-enterprise.ir/wp-content/uploads/2017/01/...02/11/2015 25 Improvements RTC vs 800 ① ② ① In this situation (RTC) the tube has not reached

• The company works on 2 surfaces of 12.000 sqm

• N° 122 employees (+ 38 in MMV + 3 in Poland)

• Turnover 2014 - 25.642.038 € 45,8% Italy , 54,2% Export

• 41% Automotive 59% other sectors

Brass consumption 2015 per day

~ 20 tons

Production per day

~ 500.000 pieces

General information

02/11/2015 7

16.333.888 €

20.400.316 €

25.642.038 €

2002 2010 2014

Turnover

turnover

Page 8: Presentazione standard di PowerPointparsian-enterprise.ir/wp-content/uploads/2017/01/...02/11/2015 25 Improvements RTC vs 800 ① ② ① In this situation (RTC) the tube has not reached

• N° 61 machines for bar-turning from Ø 6 to Ø 65 among multi-spindle, bar-transfer and CNC lathes

• N° 3 transfer machines for the forged-part turning

Production facilities

02/11/2015 8

Page 9: Presentazione standard di PowerPointparsian-enterprise.ir/wp-content/uploads/2017/01/...02/11/2015 25 Improvements RTC vs 800 ① ② ① In this situation (RTC) the tube has not reached

CEORenzo TosiMario Tosi

R&D – Area testingBrea CristianR&[email protected]

Multispindle Production Sasselli Bruno

Transfer ProductionFerigo Paolo

Production Planner Voglino Claudio

[email protected]

Quality Control and QualityAssurance

Zarrillo Marco [email protected]

Order CustomerAdministration Riva [email protected]

Book keppingAlessandra Rossi

[email protected]

SIRITTechnical and commerdial

Andrea Tosi [email protected]

SIRIT

Andrea Tosi [email protected]

SIRIT POLAND

Cottura Fabrizio.

[email protected]

Organization Chart

02/11/2015 9

Page 10: Presentazione standard di PowerPointparsian-enterprise.ir/wp-content/uploads/2017/01/...02/11/2015 25 Improvements RTC vs 800 ① ② ① In this situation (RTC) the tube has not reached

• Our company has been working with a Certified Quality System since 1997

• In March 2013 our company achieved Automotive Certification ISO/TS

Certification

02/11/2015 10

Page 11: Presentazione standard di PowerPointparsian-enterprise.ir/wp-content/uploads/2017/01/...02/11/2015 25 Improvements RTC vs 800 ① ② ① In this situation (RTC) the tube has not reached

Product control: Optical machine

02/11/2015 11

Page 12: Presentazione standard di PowerPointparsian-enterprise.ir/wp-content/uploads/2017/01/...02/11/2015 25 Improvements RTC vs 800 ① ② ① In this situation (RTC) the tube has not reached

Some TOSI Customers

02/11/2015 12

Page 13: Presentazione standard di PowerPointparsian-enterprise.ir/wp-content/uploads/2017/01/...02/11/2015 25 Improvements RTC vs 800 ① ② ① In this situation (RTC) the tube has not reached

Some TOSI Customers

02/11/2015 13

Page 14: Presentazione standard di PowerPointparsian-enterprise.ir/wp-content/uploads/2017/01/...02/11/2015 25 Improvements RTC vs 800 ① ② ① In this situation (RTC) the tube has not reached

Società Italiana Raccordi Industriali TorinoItalian Company for Industrial Fittings in Turin

• 1968 - Sirit was funded in Grugliasco

• 1981 - Beginning of a sale program regarding DIN 2353 fittings

• 1985 - The design and production of the push-in fittings begins

SIRIT

02/11/2015 14

Page 15: Presentazione standard di PowerPointparsian-enterprise.ir/wp-content/uploads/2017/01/...02/11/2015 25 Improvements RTC vs 800 ① ② ① In this situation (RTC) the tube has not reached

Sirit product type

SIRIT

02/11/2015 15

Page 16: Presentazione standard di PowerPointparsian-enterprise.ir/wp-content/uploads/2017/01/...02/11/2015 25 Improvements RTC vs 800 ① ② ① In this situation (RTC) the tube has not reached

• Cutting-ring fittings

SIRIT product types

• Push-in fittings

02/11/2015 16

Page 17: Presentazione standard di PowerPointparsian-enterprise.ir/wp-content/uploads/2017/01/...02/11/2015 25 Improvements RTC vs 800 ① ② ① In this situation (RTC) the tube has not reached

Since 1997 Sirit fitting has had the TÜV Product Certification

Product certification

02/11/2015 17

Page 18: Presentazione standard di PowerPointparsian-enterprise.ir/wp-content/uploads/2017/01/...02/11/2015 25 Improvements RTC vs 800 ① ② ① In this situation (RTC) the tube has not reached

Straight terminal Pivoted adaptor Swivel adaptor

SIRIT Straight terminal

02/11/2015 18

Page 19: Presentazione standard di PowerPointparsian-enterprise.ir/wp-content/uploads/2017/01/...02/11/2015 25 Improvements RTC vs 800 ① ② ① In this situation (RTC) the tube has not reached

• Manufacturing of special articles in small quantitiesaccording to Customer’s request:

Assembly and testing processes

02/11/2015 19

Page 20: Presentazione standard di PowerPointparsian-enterprise.ir/wp-content/uploads/2017/01/...02/11/2015 25 Improvements RTC vs 800 ① ② ① In this situation (RTC) the tube has not reached

Product laboratory tests

02/11/2015 20

Page 21: Presentazione standard di PowerPointparsian-enterprise.ir/wp-content/uploads/2017/01/...02/11/2015 25 Improvements RTC vs 800 ① ② ① In this situation (RTC) the tube has not reached

SIRIT - RTC

02/11/2015 21

Page 22: Presentazione standard di PowerPointparsian-enterprise.ir/wp-content/uploads/2017/01/...02/11/2015 25 Improvements RTC vs 800 ① ② ① In this situation (RTC) the tube has not reached

NEW RTC - Components

Upper-Ring - PA 6.10 GF30

Clamping ring – CW614 N

O-Ring - EPDM

Sleeve – PA6.6 GF 30

Body - CW614 N

O-Ring - NBR

02/11/2015 22

Page 23: Presentazione standard di PowerPointparsian-enterprise.ir/wp-content/uploads/2017/01/...02/11/2015 25 Improvements RTC vs 800 ① ② ① In this situation (RTC) the tube has not reached

Tube requirementISO 7628DIN 74324DIN 73328

Operating heat rangeFrom -40°C to +100°C

Working pressureMax 15 bar

Good resistence UV rays

Good insertion forceaccording to ISO 7628

Possibility to remove the tube

NEW RTC – Technical requirement

02/11/2015 23

Page 24: Presentazione standard di PowerPointparsian-enterprise.ir/wp-content/uploads/2017/01/...02/11/2015 25 Improvements RTC vs 800 ① ② ① In this situation (RTC) the tube has not reached

NEW RTC – Operation seat

02/11/2015 24

Page 25: Presentazione standard di PowerPointparsian-enterprise.ir/wp-content/uploads/2017/01/...02/11/2015 25 Improvements RTC vs 800 ① ② ① In this situation (RTC) the tube has not reached

02/11/2015 25

Improvements RTC vs 800

① ②

① In this situation (RTC) the tube has not reached the correct depth of coupling but it is

retained anyway inside the fitting. A leakage points out this situation to the operator.

②In this situation (800) the tube has not reached the correct depth of coupling so it is not

retained into the fitting.POTENTIAL DANGER SITUATION!!!

Page 26: Presentazione standard di PowerPointparsian-enterprise.ir/wp-content/uploads/2017/01/...02/11/2015 25 Improvements RTC vs 800 ① ② ① In this situation (RTC) the tube has not reached

02/11/2015 26

Using suggestion - RTC

To guarantee right depth of coupling, SIRIT suggests to use marked tube with depth of coupling and follow assembling instructions.

The tube must be cut at correct angle with max. tolerance of 15° so we suggest to use the tube cutter shown in our catalogue. «H» distance between two marks is the right depth of coupling.

Page 27: Presentazione standard di PowerPointparsian-enterprise.ir/wp-content/uploads/2017/01/...02/11/2015 25 Improvements RTC vs 800 ① ② ① In this situation (RTC) the tube has not reached

02/11/2015 27

Using suggestion - RTC

Cut the tube as close as possible to the mark. Next mark shown on the tube, after assembling, must arrive very close to the fitting as shown on presentation.

For the correct working of the fitting, it's fundamental that the tube is pushed to the depth of the connection as prescribed in the catalogue.

Page 28: Presentazione standard di PowerPointparsian-enterprise.ir/wp-content/uploads/2017/01/...02/11/2015 25 Improvements RTC vs 800 ① ② ① In this situation (RTC) the tube has not reached

02/11/2015 28

SIRIT RTC – Pivoted stud

The RTC pivoted stud reduces the overall dimension

Page 29: Presentazione standard di PowerPointparsian-enterprise.ir/wp-content/uploads/2017/01/...02/11/2015 25 Improvements RTC vs 800 ① ② ① In this situation (RTC) the tube has not reached

Assembled adaptor

02/11/2015 29

More configuration flexibility

Page 30: Presentazione standard di PowerPointparsian-enterprise.ir/wp-content/uploads/2017/01/...02/11/2015 25 Improvements RTC vs 800 ① ② ① In this situation (RTC) the tube has not reached

New assembly line

All clamping rings are controlled 100% by DOSS machine.The controls are:

• Internal diameter• External diameter of the clamp• Total length of the clamp• Size of clamping ring• Presence of tooth on all diameter

02/11/2015 30

Page 31: Presentazione standard di PowerPointparsian-enterprise.ir/wp-content/uploads/2017/01/...02/11/2015 25 Improvements RTC vs 800 ① ② ① In this situation (RTC) the tube has not reached

For the new product RTC we have installed a new assembly machine

100% Inspection of presenceComponents and test

Production and quality control

02/11/2015 31

Page 32: Presentazione standard di PowerPointparsian-enterprise.ir/wp-content/uploads/2017/01/...02/11/2015 25 Improvements RTC vs 800 ① ② ① In this situation (RTC) the tube has not reached

Camera control to verify if the upper-ring is in the correct position and clamping ring presence.

New assembly line

02/11/2015 32

Page 33: Presentazione standard di PowerPointparsian-enterprise.ir/wp-content/uploads/2017/01/...02/11/2015 25 Improvements RTC vs 800 ① ② ① In this situation (RTC) the tube has not reached

Verify if the external o-ring is present

New assembly line

02/11/2015 33

Page 34: Presentazione standard di PowerPointparsian-enterprise.ir/wp-content/uploads/2017/01/...02/11/2015 25 Improvements RTC vs 800 ① ② ① In this situation (RTC) the tube has not reached

New assembly line

All fittings assembled are controlled and tested to 100%

Leak test at 1,3bar

02/11/2015 34

Page 35: Presentazione standard di PowerPointparsian-enterprise.ir/wp-content/uploads/2017/01/...02/11/2015 25 Improvements RTC vs 800 ① ② ① In this situation (RTC) the tube has not reached

All fittings assembled are controlled and tested to 100%

Complete traceability of every fitting component Laser marking

New assembly line

02/11/2015 35

*100 %*

Page 36: Presentazione standard di PowerPointparsian-enterprise.ir/wp-content/uploads/2017/01/...02/11/2015 25 Improvements RTC vs 800 ① ② ① In this situation (RTC) the tube has not reached

Flexibility and double functions

*Each dimension of tube one specific tool

RTC Tool

02/11/2015 36

Page 37: Presentazione standard di PowerPointparsian-enterprise.ir/wp-content/uploads/2017/01/...02/11/2015 25 Improvements RTC vs 800 ① ② ① In this situation (RTC) the tube has not reached

Before recovering the tube to pump down the air brake system

Verify if the tool is of the correct dimension for the

tube you need to recover

Verify if the tool is damaged

Pull the tube to avoid that the clamping ring

inside the fitting blocks

Clean the surface where the tube enter into the fitting

Plastic tool is safer for fittings integrity

RTC Tool - Precautions

02/11/2015 37

Page 38: Presentazione standard di PowerPointparsian-enterprise.ir/wp-content/uploads/2017/01/...02/11/2015 25 Improvements RTC vs 800 ① ② ① In this situation (RTC) the tube has not reached

1 2 3

Position the RTC TOOL with SIDE B oriented towards the upper-ring and then join together the two semi-spheres around the tube.

Put pressure on the sides of the two semi-spheres to join them together around the tube.

Press strongly on the two semi-spheres inside the upper-ring and pull out the tube.

Recoverability of the tube

02/11/2015 38

Page 39: Presentazione standard di PowerPointparsian-enterprise.ir/wp-content/uploads/2017/01/...02/11/2015 25 Improvements RTC vs 800 ① ② ① In this situation (RTC) the tube has not reached

Sirit customers

SIRIT

02/11/2015 39

Page 40: Presentazione standard di PowerPointparsian-enterprise.ir/wp-content/uploads/2017/01/...02/11/2015 25 Improvements RTC vs 800 ① ② ① In this situation (RTC) the tube has not reached

SIRIT Customers

02/11/2015 40

Page 41: Presentazione standard di PowerPointparsian-enterprise.ir/wp-content/uploads/2017/01/...02/11/2015 25 Improvements RTC vs 800 ① ② ① In this situation (RTC) the tube has not reached

SIRIT Customers

02/11/2015 41

Page 42: Presentazione standard di PowerPointparsian-enterprise.ir/wp-content/uploads/2017/01/...02/11/2015 25 Improvements RTC vs 800 ① ② ① In this situation (RTC) the tube has not reached

SIRIT trucks Customers

02/11/2015 42

Page 43: Presentazione standard di PowerPointparsian-enterprise.ir/wp-content/uploads/2017/01/...02/11/2015 25 Improvements RTC vs 800 ① ② ① In this situation (RTC) the tube has not reached

SIRIT Valves customers

02/11/2015 43

Page 44: Presentazione standard di PowerPointparsian-enterprise.ir/wp-content/uploads/2017/01/...02/11/2015 25 Improvements RTC vs 800 ① ② ① In this situation (RTC) the tube has not reached

SIRIT trailers customers

02/11/2015 44

Page 45: Presentazione standard di PowerPointparsian-enterprise.ir/wp-content/uploads/2017/01/...02/11/2015 25 Improvements RTC vs 800 ① ② ① In this situation (RTC) the tube has not reached

SIRIT Buses customers

02/11/2015 45

Page 46: Presentazione standard di PowerPointparsian-enterprise.ir/wp-content/uploads/2017/01/...02/11/2015 25 Improvements RTC vs 800 ① ② ① In this situation (RTC) the tube has not reached

Customers that produce Air brake fittings

02/11/2015 46

Page 47: Presentazione standard di PowerPointparsian-enterprise.ir/wp-content/uploads/2017/01/...02/11/2015 25 Improvements RTC vs 800 ① ② ① In this situation (RTC) the tube has not reached

o ZINC-PLATED BRASS FITTING WITH O-RING SEALING

o TUV functional test and AQM corrosion test

o Safety Collar RTAU Anti-Unscrewing and Anti-Unthreading

Sirit Railway Division

02/11/2015 47

Page 48: Presentazione standard di PowerPointparsian-enterprise.ir/wp-content/uploads/2017/01/...02/11/2015 25 Improvements RTC vs 800 ① ② ① In this situation (RTC) the tube has not reached

Railway Customers

02/11/2015 48

Page 49: Presentazione standard di PowerPointparsian-enterprise.ir/wp-content/uploads/2017/01/...02/11/2015 25 Improvements RTC vs 800 ① ② ① In this situation (RTC) the tube has not reached

• Vast stock of the products in catalogue

Stock

02/11/2015 49

Page 50: Presentazione standard di PowerPointparsian-enterprise.ir/wp-content/uploads/2017/01/...02/11/2015 25 Improvements RTC vs 800 ① ② ① In this situation (RTC) the tube has not reached

Website: www.tosi.itwww.sirit.it Contact: [email protected]

Thank you!!!