27/10/2014

• GENOVA 27/10/2014

• Tipologie e caratteristiche di navi con propulsione GNL e

ConferenzaGNL 2014

propulsione GNL e relative sistemazioni degli impianti

• M.E.S.

• MARINE ENGINEERING SERVICES

Page 2: Presentazione La Valle Mes-Fincantieri bunkering (Ge 27-10

M.E.S. – Marine Engineering Services S.r.l.

�Established on 1986 by Ing Giorgio La Valle

�Specialized in gas carriers, chemical tankers and

bitumen carriers

About 100 ships built with MES design

INTRODUCTION ESTABLISH

MENT

1986

SPECIALIZED

Gas Carriers

ChemicalTankers

BitumenCarriers

Introduction ConferenzaGNL 2014

�About 100 ships built with MES design

�Market: worldwide

�Headquarters: Trieste (Italy)

Carriers

MARKET

Italy

Turkey

Vietnam

China

Korea

Indonesia

Poland

The Netherlands

Finland

Page 3: Presentazione La Valle Mes-Fincantieri bunkering (Ge 27-10

Site office

COMPANY PROFILE

SITE OFFICE

ConferenzaGNL 2014

SITE OFFICE

•Turkey

•Vietnam

•Indonesia

•China

•South Korea

•Poland

SITE Office – Up to 18 surveyors

TurkeyVietnam

IndonesiaChina

South KoreaPoland

Page 4: Presentazione La Valle Mes-Fincantieri bunkering (Ge 27-10

Activity

ACTIVITY

� DESIGN

� SURVEY DURING SHIP CONSTRUCTION

� CONSULTANCY

ACTIVITY

ConferenzaGNL 2014

ACTIVITY

Design:

•Chemicaltankers

•Gas carriers

•Bitumentankers

•RoRo

•Ferry

•Various

� SPECIALISTIC CALCULATIONS

� LOADING COMPUTER

� OTHERS…

•Various

Survey:

•On-site (up to 18 surveyors at full capacity)

Page 5: Presentazione La Valle Mes-Fincantieri bunkering (Ge 27-10

Under Construction

Chemical Tankers under construction

19800 dwt – NINGBO XINLE SHIPYARD (RINA)

Chemical tanker

19800 dwt

ConferenzaGNL 2014

2 VESSELS

Page 6: Presentazione La Valle Mes-Fincantieri bunkering (Ge 27-10

Under Construction

Chemical Tankers under construction

25000 dwt – AVIC DINGHENG SHIPYARD

Chemical tanker

25000 dwt

ConferenzaGNL 2014

10 VESSELS

Page 7: Presentazione La Valle Mes-Fincantieri bunkering (Ge 27-10

Key points\D

KEY POINTS

�TAILOR MADE DESIGN

�HIGH PERFORMANCES

� speed-power ratio (low fuel consumptions)

� main dimensions optimization (reduce total ship cost)

�QUALITY

KEY POINTS

ConferenzaGNL 2014

KEY POINTS

•TAILOR MADE

DESIGN

•HIGH

PERFORMANCE

•QUALITY

•CONTINUOUS

FEEDBACK

•EXPERIENCE

� Drawings / Documentation

� Support / Assistance

� ISO9001

�CONTINUOUS FEEDBACK

� RINA support/approval over almost our 100 of ships

� Production (Shipyard / Survey activity)

� During ship’s life (Shipowners)

� Assistance for equipment tenders (Shipyard/Shipowner)

�EXPERIENCE� 40 years in ship design

� Survey

� Innovation

Page 8: Presentazione La Valle Mes-Fincantieri bunkering (Ge 27-10

Products

PRODUCTS

see the complete REFERENCE LIST

on our web page:

www.mes.it

PRODUCTS

ConferenzaGNL 2014

PRODUCTS

•Gas carriers

•Chemical tankers

•Bitumen carriers

•Ro-Ro

•Ferry

•Various

Page 9: Presentazione La Valle Mes-Fincantieri bunkering (Ge 27-10

Gas carriers

GAS CARRIERS

�LPG (-48°C)

�LEG (-104°C)

�LNG (-163°C)

ConferenzaGNL 2014

Gas Carriers

•LPG•LEG•LNG•Dual FuelPropelledShips

�DUAL FUEL PROPELLED SHIPS

�Ro-Ro

�Ro-Pax / Ferry

�Chemical/Product/LPG&LEG

�LNG

�Cruise

Page 10: Presentazione La Valle Mes-Fincantieri bunkering (Ge 27-10

DUAL FUEL PROPULSION – PROBLEMS

�BOIL-OFF

�ONBOARD ARRANGEMENT (depending on kind of ships)

�LOW TEMPERATURE DISTRIBUTIONS

LNG

Dual Fuel propulsion

ConferenzaGNL 2014

REQUIREMENTS

•LNG carriage

•Dual Fuelpropulsion

•Profitabilitycomparison

•LNG capacityoptimization

Dual fuel PROBLEMS

�BUNKERING

�LNG SYSTEM LOGISTIC

Page 11: Presentazione La Valle Mes-Fincantieri bunkering (Ge 27-10

Dual fuel SOLUTIONS

DUAL FUEL PROPULSION – SOLUTIONS

� BOIL-OFF � SEMIPRESS LNG TANKS 6÷10 bar, up to -163 °C

ADVANTAGE: lng carriage with containment without need of burning boil-off

gas (up to abt. 30 days) � INCREASE OF THE HOLDING TIME

�ONBOARD ARRANGEMENT (depending on kind of ships)

Different selection of tanks: cylindrical/bilobes, single shell/double

LNG

Dual Fuel propulsion

ConferenzaGNL 2014

REQUIREMENTS

•LNG carriage

•Dual Fuelpropulsion

•Profitabilitycomparison

•LNG capacityoptimization

� Different selection of tanks: cylindrical/bilobes, single shell/double

shell

� Chemical/product/LPG&LEG : on deck / cargo area

� Ferry / Cruise : in Engine Room

� RoRo : trailers on deck

�TEMPERATURE DISTRIBUTIONS / HULL STEEL

PROPERTIES SELECTION

�BUNKERING

�LNG SYSTEM LOGISTIC

Page 12: Presentazione La Valle Mes-Fincantieri bunkering (Ge 27-10

Dual fuel SOLUTIONS

DUAL FUEL PROPULSION – SOLUTIONS

� BOIL-OFF � SEMIPRESS LNG TANKS 6÷10 bar, up to -163 °C

ADVANTAGE: lng carriage with containment without need of burning boil-off gas

(up to abt. 30 days) � INCREASE OF THE HOLDING TIME

LNG

Dual Fuel propulsion

ConferenzaGNL 2014

REQUIREMENTS

•LNG carriage

•Dual Fuelpropulsion

•Profitabilitycomparison

•LNG capacityoptimization

PRISMATIC TANKS

T=-163°C – Atmospheric press.

SEMIPRESS TANKS

Page 13: Presentazione La Valle Mes-Fincantieri bunkering (Ge 27-10

Dual fuel SOLUTIONS

ONBOARD ARRANGEMENT - SELECTION OF TANKS

� Independent CYLINDRICAL tanks (Single wall /

Double wall)

� Independent BILOBE tanks (Single wall)

Arrangement under deck

LNG

Dual Fuel propulsion

ConferenzaGNL 2014

TYPES

•Cylindrical

•Bilobe

•9% Ni steel

Insulation:

•Polyuretane

•Vacuum + perlite/multy layer insulation

� Arrangement under deck

� Arrangement on exposed decks

� Semipressurized

� LNG at 6 ÷ 10 bar, -163 °C

•Semipress

Page 14: Presentazione La Valle Mes-Fincantieri bunkering (Ge 27-10

Dual fuel SOLUTIONS

DUAL FUEL PROPULSION – SOLUTIONS

� ONBOARD ARRANGEMENT (depending on kind of ships)

� Chemical/product/LPG&LEG: on deck / cargo area

(CHECK STABILITY!)

LNG

Dual Fuel propulsion

ConferenzaGNL 2014

REQUIREMENTS

•LNG carriage

•Dual Fuelpropulsion

•LNG capacityoptimization

LNG Tanks capacity

0

500

1000

1500

2000

2500

0 1000 2000 3000 4000 5000 6000 7000

LNG navigation range [nm]

Ta

nk

ca

pa

city

[m

3] 0% Port @ LNG

25% Port @ LNG

50% Port @ LNG

75% Port @ LNG

100% Port @ LNG

BILOBE TANKS

Page 15: Presentazione La Valle Mes-Fincantieri bunkering (Ge 27-10

Dual fuel SOLUTIONS

DUAL FUEL PROPULSION – SOLUTIONS

� ONBOARD ARRANGEMENT (depending on kind of ships)

� Ferry / Cruise : in dedicated tank room

LNG

Dual Fuel propulsion

ConferenzaGNL 2014

REQUIREMENTS

•LNG carriage

•Dual Fuelpropulsion

•LNG capacityoptimization

Page 16: Presentazione La Valle Mes-Fincantieri bunkering (Ge 27-10

Dual fuel SOLUTIONS

DUAL FUEL PROPULSION – SOLUTIONS

� ONBOARD ARRANGEMENT (depending on kind of ships)

� Ferry / Cruise : in dedicated tank room

LNG

Dual Fuel propulsion

ConferenzaGNL 2014

REQUIREMENTS

•LNG carriage

•Dual Fuelpropulsion

•LNG capacityoptimization

Page 17: Presentazione La Valle Mes-Fincantieri bunkering (Ge 27-10

Dual fuel SOLUTIONS

DUAL FUEL PROPULSION – SOLUTIONS

� ONBOARD ARRANGEMENT (depending on kind of ships)

� RoRo : trailers on weather deck + docking station

LNG

Dual Fuel propulsion

ConferenzaGNL 2014

REQUIREMENTS

•LNG carriage

•Dual Fuelpropulsion

•LNG capacityoptimization

Page 18: Presentazione La Valle Mes-Fincantieri bunkering (Ge 27-10

WARTSILA & FINCANTIERI

CO-OPERATION WITH WARTSILA & FINCANTIERI

Necessity to reduce at minimum possible the B.O.G. and maximixe the holding time

� double wall (vacuum insulation + M.L.I. or Perlite)

� cooling down calculations and FEM process simulations

RO-RO PAX

DUAL FUEL

ConferenzaGNL 2014

SOLUTIONS FOR D.F. PROPULSION

•Double wall tanks

•Insulation:

Vacuum +

M.L.I.

•FEM analysis

Capacity : 2 x 280 m3� cooling down calculations and FEM process simulations

(Transient thermal analysis)

� thermal stress analysis

280 m3

Max Pressure : 10,5 bar

Double wall pipes

Double Wall tank

Tank Connection Space

Annular Ring

Double Wall Pipes Connection

Page 19: Presentazione La Valle Mes-Fincantieri bunkering (Ge 27-10

Necessity to reduce at minimum possible the B.O.G. and maximixe the holding time

� double wall (vacuum insulation + M.L.I. or Perlite)

� cooling down calculations and FEM process simulations

DOUBLE WALL TANK

ConferenzaGNL 2014

SOLUTIONS FOR D.F. PROPULSION

•Double wall tanks

•Insulation:

Vacuum +

M.L.I.

•FEM analysis

Tank Connection Space

Outer shell� cooling down calculations and FEM process simulations (Transient thermal analysis)

� thermal stress analysis

Double Wall Pipes Connection

Inner shell

M.L.I. + Vacuum

Cradle

Page 20: Presentazione La Valle Mes-Fincantieri bunkering (Ge 27-10

Dual fuel SOLUTIONS

DUAL FUEL PROPULSION – SOLUTIONS

�TEMPERATURE DISTRIBUTIONS ANALYSIS � HULL

STEEL PROPERTIES SELECTION

ANALYSIS TO BE

CARRIED OUT IN

PRELIMINARY

STAGE OF DESIGN!

ConferenzaGNL 2014

TEMPERATURE DISTRIBUTION ANALYSIS

2

1

2

3

4

Page 21: Presentazione La Valle Mes-Fincantieri bunkering (Ge 27-10

Dual fuel SOLUTIONS

Double wall pipes

STQ QUEBEC FINCANTIERI

ConferenzaGNL 2014

F.E.M. thermal calculations

Page 22: Presentazione La Valle Mes-Fincantieri bunkering (Ge 27-10

Dual fuel SOLUTIONS

DUAL FUEL PROPULSION – SOLUTIONS

� BUNKERING

Application of the OCIMF requirements for LPG/LNG carriers

LNG

Dual Fuel propulsion

ConferenzaGNL 2014

BUNKERING

•Semi-enclosed

•On exposed deck

•Docking station

•Loading arms

•Raised platforms

Page 23: Presentazione La Valle Mes-Fincantieri bunkering (Ge 27-10

Dual fuel SOLUTIONS

RO-RO FERRY - FINCANTIERI

BUNKER STATION

• Bunkering by trucks

• Semi-enclosed space

• Mechanical ventilation

OCIMF Regulations

STQ QUEBEC FINCANTIERI

MAIN

CHARACTER.

•Dual fuelPropulsion

•Trasport of passengers

•Trasport of car/trucks

ConferenzaGNL 2014

• OCIMF Regulations

• Gas detection

• Dry Powder

• Airlock

• Hazardous Area

Page 24: Presentazione La Valle Mes-Fincantieri bunkering (Ge 27-10

FINCANTIERI

http://www.rai.tv/dl/RaiTV/programmi/media/ContentItem-bebacf7c-d60e-47a1-bd9c-fd3a067ca7d4.html

STQ FERRY

ConferenzaGNL 2014

Page 25: Presentazione La Valle Mes-Fincantieri bunkering (Ge 27-10

FINCANTIERI

http://www.rai.tv/dl/RaiTV/programmi/media/ContentItem-bebacf7c-d60e-47a1-bd9c-fd3a067ca7d4.html

STQ FERRY

ConferenzaGNL 2014

Page 26: Presentazione La Valle Mes-Fincantieri bunkering (Ge 27-10

FINCANTIERI

http://www.rai.tv/dl/RaiTV/programmi/media/ContentItem-bebacf7c-d60e-47a1-bd9c-fd3a067ca7d4.html

STQ FERRY

ConferenzaGNL 2014

Page 27: Presentazione La Valle Mes-Fincantieri bunkering (Ge 27-10

FINCANTIERI

http://www.rai.tv/dl/RaiTV/programmi/media/ContentItem-bebacf7c-d60e-47a1-bd9c-fd3a067ca7d4.html

STQ FERRY

ConferenzaGNL 2014

Page 28: Presentazione La Valle Mes-Fincantieri bunkering (Ge 27-10

LNG PROCESS

LNG PROCESS

�LNG bunkering system general arrangement

�LNG bunker station venting and hazardouszones

�LNG bunkering station lay-out

�LNG system plot plan

LNG system operation diagrams

LNG SYSTEM

ConferenzaGNL 2014

�LNG system operation diagrams

�LNG vaporizers skid

�Heating water system skid

�Guidelines for LNG piping - scope of supply

�Technical Specification of Main LNG fuel system

Page 29: Presentazione La Valle Mes-Fincantieri bunkering (Ge 27-10

Super Green Ship

LNG SYSTEM LOGISTIC

SUPER GREEN SHIP – 40.000 m3 LNG

�MEDIUM SIZE

WORLDWIDE NAVIGATION

Super Green Ship

40,000 m3 LNG

ConferenzaGNL 2014

LNG SYSTEM LOGISTIC

�WORLDWIDE NAVIGATION

�HARBOURS WITH LIMITATIONS (max

dimensions; low draft; etc..)

�USE: Gas distribution door2door

� Terminal on-shore

� FSRU

Page 30: Presentazione La Valle Mes-Fincantieri bunkering (Ge 27-10

Super Green Ship

SUPER GREEN SHIP – 40.000 m3 LNG

Super Green Ship

40,000 m3 LNG

ConferenzaGNL 2014

MAIN CHARACTER.

•Bilobe tanks

•9% Nickel

•Insulation: poliurethane

•Onboardregasific. plantunit

•Twin screw / •Twin screw / twin skeg

•Higher safety

•Low draft

•Slow steaming

•Lowconsumption

•Dual Fuel

Page 31: Presentazione La Valle Mes-Fincantieri bunkering (Ge 27-10

BUNKERING VESSELS

3000 m3 LNG bunkering vessel for U.S. market

MAIN DIMENSIONS

Lenght overall : abt. 90.0 m

Lenght between perpendiculars : abt. 85.0 m

Breadth : abt. 15.0 m

3000 m3 LNG

Bunkering Vessel

MAIN

CHARACTER.

•LNG (-163°C) at 5 bars

ConferenzaGNL 2014US bunkering vessel

Breadth : abt. 15.0 m

Installed Power : 2700 kW

Service Speed : 14.3 knots

Page 32: Presentazione La Valle Mes-Fincantieri bunkering (Ge 27-10

US bunkering vessel

3000 m3 LNG bunkering vessel for U.S. market

3000 m3 LNG

Bunkering Vessel

REFERENCES

•8 sistershipsalready built(3300 cbmLPG)

ConferenzaGNL 2014

Page 33: Presentazione La Valle Mes-Fincantieri bunkering (Ge 27-10

CONCLUSION

CONCLUSION

� Gas handling needs specialistic knowledge:� thermodynamics

� safety concepts /Rules

� materials / metallurgy / special welding

� technological limits

� assembly

� Designer to give specialistic assistance to the Client:

CONCLUSION

ConferenzaGNL 2014

� Designer to give specialistic assistance to the Client:� HAZID (design) / HAZOP (operative risks)

� transfer / bunkering

� gas freeing / gassing-up / cooling down

Page 34: Presentazione La Valle Mes-Fincantieri bunkering (Ge 27-10

Contacts

THANKS FOR THE ATTENTION

Visit us on the web : www.mes.it

ConferenzaGNL 2014

Visit us on the web : www.mes.it

Follow us on (Marine Engineering Services Srl)

M.E.S. – Marine Engineering Services S.r.l.

[email protected]

[email protected]

Page 35: Presentazione La Valle Mes-Fincantieri bunkering (Ge 27-10

Confidentiality ConferenzaGNL 2014

The images contained in this presentation are confidential and can be used only for the present Conference.

A dedicated presentation will be supplied for any other use (WEB, etc…)