15
Homeless Sydney Presentation Booklet Samuel Massey 3272904

Presentation - Summary Booklet

Embed Size (px)

DESCRIPTION

This booklet is a summary of plans, sections, elevations and details from the final crit on the 5th of November.

Citation preview

  • Homeless SydneyPresentation Booklet

    Samuel Massey3272904

  • Project SummaryNearly every day we encounter or ignore homeless people, without understanding their origin or plight. Sydneys homeless population numbers over fifteen thousand, of which 18% are youth. This figure represents a societal failure, and inspired my idea for a socially responsive architectural design. Set in Woolloomooloo, the proposed Street Smarts centre aims to provide a facility for homeless youth to find refuge as well as sup-port for a more independent life, with the design being in keeping with the locality. To achieve this goal, I researched barriers ex-perienced by homeless people and integrated my findings into the de-sign.In keeping with the urban feel, a mixed foyer model will be adopt-ed for the design and programming. The design consists of three connected building surrounding a courtyard; an adaptive reuse of an existing neighbouring building to the west for public functions, such as community workshops and caf/retail spaces; a three storey high hostel, resource and internet lounge, with kitchen and common rooms on the northern side; and a two storey building with meeting, training and clinical facilities, with long term accommodation to the south.

  • Woollahra

    Darling Point

    MAXIMUM OCUPATION

    SOLAR ACCESSSUN PROTECTION AND SCREENING, SOLAR ACCESS AND COLLECTION

    CROSS VENTILATIONVOID STACK EFFECT TO PURGE; OPERABLE FACADE FOR NATURAL VENTILATION;SINGE ROOM SPACE FOR CROSS VENTILATION

    THERMAL MASS / PASSIVE HEATING

    MOVEMENT & REUSEOFFSET AND PROJECTIONG WALLS TO MAKE AN INTERESTING FACADE, CREATE WALKWAYS AND MEETING NODES, REUSE OF EXISTING HOTEL ON FORBES STREET

    NEW GREEN SURFACES

    FORBES STREET

    FORBES STREET

    FORBES STREETTILBURY HOTEL

    FORBES STREET

    FORBES STREET

    FORBES STREET

    FORBES STREET

    FORBES STREET

    FACADE TREATMENTHERITAGE CONCERNS MIN. IMPACT ON HOTEL FACADE.PAINTED, PLANTED AND INTERACTIVE FACADES AND SCREENS TO BE PERSONALISED BY USERS.OPEABLE SCREENS AND FACADE FOR VIEWS, SOLAR PENETRATIN AND SECURITY.

    PLANTED ROOF GARDENS; PLANTER BOXES FOR VEGETABLES AND PLANTS.A PLACE OF RELAXATION, MEETING AND LEARNING.MAX. VIEWS OF SYDNEY SKYLINE

    NICHOLSON STREET BLAND STREET

    MAXIMUM OCUPATIONBDR

    Y

    BD

    RY

    NICHOLSON STREET BLAND STREET

    NICHOLSON STREET BLAND STREET

    NICHOLSON STREET BLAND STREET

    NICHOLSON STREET BLAND STREET

    NICHOLSON STREET BLAND STREET

    NICHOLSON STREET BLAND STREET

    NICHOLSON STREET BLAND STREET

    BD

    RY

    BD

    RY

    SUMM

    ER - DAWN

    VOID

    SUM

    MER

    - DU

    SKWINT

    ER - D

    USK

    WINTER - DAWN

    SUM

    MER

    - DU

    SKWINT

    ER - D

    USK

    VOIDSSEPARATION FROM EXISTING BUILDINGS; IDENTIFED AS HERITAGE

    LONGITUDINAL SECTION TRANSVRSAL SECTION

    LONGITUDINAL SECTION TRANSVRSAL SECTION

    LONGITUDINAL SECTION TRANSVRSAL SECTION

    LONGITUDINAL SECTION TRANSVRSAL SECTION

    LONGITUDINAL SECTION TRANSVRSAL SECTION

    LONGITUDINAL SECTION TRANSVRSAL SECTION

    TRANSVRSAL SECTION

    TRANSVRSAL SECTION

    MASSING & ZONING

    CONCRETE AND MASONRY CONSTRUCTION FOR DURABILITY AND THERMAL MASSCOUPLED WITH NATURAL VENTILATION FOR COOLING

    LEVEL ACCOMODATION TRAINING/OFFICE COMMUNAL CIRCULATION/FOYER PUBLIC

    ROOF - - 362.35 SQ.M. - -

    SECOND FLOOR 206.26 SQ. M. - 30SQ. M. 29.65 SQ. M. -

    FIRST FLOOR 343.06 SQ.M.- 30 SQ. M. 114.86 SQ. M. 175.92 SQ. M.

    GROUND FLOOR - 112.04 SQ. M. 194.56 SQ. M. 79.60 SQ. M 262.09 SQ. M.

    LOWER GROUND FLOOR - 126.12 SQ. M. - --

    SUB TOTALS 549.32 SQ. M. 238.16 SQ. M. 254.56 SQ. M. 586.46 SQ. M. 438.01 SQ. M.TOTALS 1628.5 SQ. M.

    SITE AREA 1025.7 SQ. M.

    CONTEXT

    CIRCULATION

    SHORT STAY HOSTELCOMMUNAL AREAS

    LONG TERM APARTMENTSSUPPORT/TRAINING ROOMSROOF TOP GARDEN

    PUBLIC FACILITIES;CAFEARTSPACE WORKSHOPDROPIN CENTREROOF TOP GARDENS

    ZONING DIAGRAM

    CONCEPT/SITE ANALYSIS RESPONSE

  • Woollahra

    Darling Point

    MAXIMUM OCUPATION

    SOLAR ACCESSSUN PROTECTION AND SCREENING, SOLAR ACCESS AND COLLECTION

    CROSS VENTILATIONVOID STACK EFFECT TO PURGE; OPERABLE FACADE FOR NATURAL VENTILATION;SINGE ROOM SPACE FOR CROSS VENTILATION

    THERMAL MASS / PASSIVE HEATING

    MOVEMENT & REUSEOFFSET AND PROJECTIONG WALLS TO MAKE AN INTERESTING FACADE, CREATE WALKWAYS AND MEETING NODES, REUSE OF EXISTING HOTEL ON FORBES STREET

    NEW GREEN SURFACES

    FORBES STREET

    FORBES STREET

    FORBES STREETTILBURY HOTEL

    FORBES STREET

    FORBES STREET

    FORBES STREET

    FORBES STREET

    FORBES STREET

    FACADE TREATMENTHERITAGE CONCERNS MIN. IMPACT ON HOTEL FACADE.PAINTED, PLANTED AND INTERACTIVE FACADES AND SCREENS TO BE PERSONALISED BY USERS.OPEABLE SCREENS AND FACADE FOR VIEWS, SOLAR PENETRATIN AND SECURITY.

    PLANTED ROOF GARDENS; PLANTER BOXES FOR VEGETABLES AND PLANTS.A PLACE OF RELAXATION, MEETING AND LEARNING.MAX. VIEWS OF SYDNEY SKYLINE

    NICHOLSON STREET BLAND STREET

    MAXIMUM OCUPATIONBDR

    Y

    BD

    RY

    NICHOLSON STREET BLAND STREET

    NICHOLSON STREET BLAND STREET

    NICHOLSON STREET BLAND STREET

    NICHOLSON STREET BLAND STREET

    NICHOLSON STREET BLAND STREET

    NICHOLSON STREET BLAND STREET

    NICHOLSON STREET BLAND STREET

    BD

    RY

    BD

    RY

    SUMM

    ER - DAWN

    VOIDSU

    MM

    ER -

    DUSKW

    INTER

    - DUS

    K

    WINTER - DAWN

    SUM

    MER

    - DU

    SKWINT

    ER - D

    USK

    VOIDSSEPARATION FROM EXISTING BUILDINGS; IDENTIFED AS HERITAGE

    LONGITUDINAL SECTION TRANSVRSAL SECTION

    LONGITUDINAL SECTION TRANSVRSAL SECTION

    LONGITUDINAL SECTION TRANSVRSAL SECTION

    LONGITUDINAL SECTION TRANSVRSAL SECTION

    LONGITUDINAL SECTION TRANSVRSAL SECTION

    LONGITUDINAL SECTION TRANSVRSAL SECTION

    TRANSVRSAL SECTION

    TRANSVRSAL SECTION

    MASSING & ZONING

    CONCRETE AND MASONRY CONSTRUCTION FOR DURABILITY AND THERMAL MASSCOUPLED WITH NATURAL VENTILATION FOR COOLING

    LEVEL ACCOMODATION TRAINING/OFFICE COMMUNAL CIRCULATION/FOYER PUBLIC

    ROOF - - 362.35 SQ.M. - -

    SECOND FLOOR 206.26 SQ. M. - 30SQ. M. 29.65 SQ. M. -

    FIRST FLOOR 343.06 SQ.M.- 30 SQ. M. 114.86 SQ. M. 175.92 SQ. M.

    GROUND FLOOR - 112.04 SQ. M. 194.56 SQ. M. 79.60 SQ. M 262.09 SQ. M.

    LOWER GROUND FLOOR - 126.12 SQ. M. - --

    SUB TOTALS 549.32 SQ. M. 238.16 SQ. M. 254.56 SQ. M. 586.46 SQ. M. 438.01 SQ. M.TOTALS 1628.5 SQ. M.

    SITE AREA 1025.7 SQ. M.

    CONTEXT

    CIRCULATION

    SHORT STAY HOSTELCOMMUNAL AREAS

    LONG TERM APARTMENTSSUPPORT/TRAINING ROOMSROOF TOP GARDEN

    PUBLIC FACILITIES;CAFEARTSPACE WORKSHOPDROPIN CENTREROOF TOP GARDENS

    ZONING DIAGRAM

    CONCEPT/SITE ANALYSIS RESPONSE

  • Woollahra

    Darling Point

    N

    S

    E

    W

    NE

    NW

    SE

    SW

    10

    20

    30

    40

    50

    60

    70

    21 JUNE

    26 MAY

    14 APR

    21 MAR

    26 FEB

    16 JAN

    22 DECAMPM

    7

    6

    5

    43

    2 112 11 10 9

    87

    6

    5

    21 JUNE

    19 JULY

    31 AUG

    23 SEPT

    17 OCT

    27 NOV

    22 DEC

    OUTDOOR AREA

    UP

    VOID

    UP

    UP

    Low ShrubGrassesSmall Trees

    Medium Shrub

    Low ShrubGrasses Vegetables

    Medium Shrub

    Low ShrubGrassesSmall Trees

    Medium Shrub

    NICHOLSON STREET

    ARTSPACE

    FORB

    ES S

    TREE

    T

    LEVEL ACCOMODATION TRAINING/OFFICE COMMUNAL CIRCULATION/FOYER PUBLIC

    ROOF - - 362.35 SQ.M. - -

    SECOND FLOOR 206.26 SQ. M. - 30SQ. M. 29.65 SQ. M. -

    FIRST FLOOR 343.06 SQ.M.- 30 SQ. M. 114.86 SQ. M. 175.92 SQ. M.

    GROUND FLOOR - 112.04 SQ. M. 194.56 SQ. M. 79.60 SQ. M 262.09 SQ. M.

    LOWER GROUND FLOOR - 126.12 SQ. M. - --

    SUB TOTALS 549.32 SQ. M. 238.16 SQ. M. 254.56 SQ. M. 586.46 SQ. M. 438.01 SQ. M.TOTALS 1628.5 SQ. M.

    SITE AREA 1025.7 SQ. M.

    SITE AND LANDSCAPE PLAN1:200

    Site and Landscape Plan

  • Woollahra

    Darling Point

    N

    S

    E

    W

    NE

    NW

    SE

    SW

    10

    20

    30

    40

    50

    60

    70

    21 JUNE

    26 MAY

    14 APR

    21 MAR

    26 FEB

    16 JAN

    22 DECAMPM

    7

    6

    5

    43

    2 112 11 10 9

    87

    6

    5

    21 JUNE

    19 JULY

    31 AUG

    23 SEPT

    17 OCT

    27 NOV

    22 DEC

    OUTDOOR AREA

    VOID

    UP

    VOID

    VOID

    UP

    CAFE & TRAININGKITCHEN

    1-Low Shrub 02

    1-Low Shrub 041-Low Shrub 04

    1-Low Shrub 05

    1-Low Shrub 02

    UP CLASSROOM

    DROP IN CENTRE

    PROCESSING/INTERVIEW

    'TILBURY HOTEL' CAFE

    AC

    CE

    SS

    AB

    LE W

    C

    OFFICE

    Stair: Flr-to-Flr Height does not allow any risers.

    VOID

    VOID

    Grasses

    Low ShrubGrassesSmall Trees

    Medium Shrub

    Low ShrubGrasses Vegetables

    Medium Shrub

    Low ShrubGrassesSmall Trees

    Medium Shrub

    NICHOLSON STREET

    ARTSPACE

    FORB

    ES S

    TREE

    T

    LEVEL ACCOMODATION TRAINING/OFFICE COMMUNAL CIRCULATION/FOYER PUBLIC

    ROOF - - 362.35 SQ.M. - -

    SECOND FLOOR 206.26 SQ. M. - 30SQ. M. 29.65 SQ. M. -

    FIRST FLOOR 343.06 SQ.M.- 30 SQ. M. 114.86 SQ. M. 175.92 SQ. M.

    GROUND FLOOR - 112.04 SQ. M. 194.56 SQ. M. 79.60 SQ. M 262.09 SQ. M.

    LOWER GROUND FLOOR - 126.12 SQ. M. - --

    SUB TOTALS 549.32 SQ. M. 238.16 SQ. M. 254.56 SQ. M. 586.46 SQ. M. 438.01 SQ. M.TOTALS 1628.5 SQ. M.

    SITE AREA 1025.7 SQ. M.

    SITE AND LANDSCAPE PLAN1:200

  • Woollahra

    Darling Point

    LIBRARY/READING

    COMPUTER KIOSK

    CLASS ROOM

    STORE

    UP

    UP

    OUTDOOR AREA

    VOID

    COMMON ROOM

    UP

    UP

    VOID

    VOID

    VOID

    CAFE & TRAININGKITCHEN UP CLASSROOM

    UP

    MALE HOSTEL - BEDROOMS

    COMMON ROOM

    VOID

    UP

    UP

    DROP IN CENTRE

    OFFICE /RECEPTION

    COMPUTER KIOSKCOMMON ROOM

    KITCHEN

    L'DRY

    ACC

    ESSA

    BLE

    WCCHILD CARE / TRAINING

    ACCESSABLE WC

    UNI SEX WC

    BIKE

    STO

    RAG

    E

    PROCESSING/INTERVIEW

    'TILBURY HOTEL' CAFE

    WORKSHOP (ARTSCAPE)COURTYARD

    ACC

    ESSA

    BLE

    WC CLINICTRAINING

    ROOM

    ENTRY

    VOID

    TRAININGROOM OFFICE

    ENTRY/MINOR FOYERENTRY/MINOR FOYER

    UP

    OFFICE

    HOSTEL FOYER

    LEVEL ACCOMODATION TRAINING/OFFICE COMMUNAL CIRCULATION/FOYER PUBLIC

    ROOF - - 362.35 SQ.M. - -

    SECOND FLOOR 206.26 SQ. M. - 30SQ. M. 29.65 SQ. M. -

    FIRST FLOOR 343.06 SQ.M.- 30 SQ. M. 114.86 SQ. M. 175.92 SQ. M.

    GROUND FLOOR - 112.04 SQ. M. 194.56 SQ. M. 79.60 SQ. M 262.09 SQ. M.

    LOWER GROUND FLOOR - 126.12 SQ. M. - --

    SUB TOTALS 549.32 SQ. M. 238.16 SQ. M. 254.56 SQ. M. 586.46 SQ. M. 438.01 SQ. M.TOTALS 1628.5 SQ. M.

    SITE AREA 1025.7 SQ. M.

    LOWER GROUND FLOOR 1:100

    GROUND FLOOR 1:100

    FIRST FLOOR 1:100

    SECOND FLOOR 1:100

    Floor Plans

  • SUM

    MER WIN

    TER

    rainwater is collected from drains.stored underground and then used to ush wc's.total water saved is 130 tonnes/yr

    DETAIL A

    highest eciency lighting with daylightsceced dimming min. light use and cooling

    roof space for teaching and learningPV panels

    auto vents implementsummer night cooling.high thermal capacitystructure used to remaincoolth

    thermal massexposed concrete

    underoor heating has a large area. this allows low grade heatto be sucient to meet heatingdemands and heat pumps to operate at max eciency

    ground source heat pump provides space and water heating.electric pump - 1 unit of electricity consumed by the pump, 4 units of heat Is returnedtotal heat demands: 8mwhrs/yrheat pump carbon intensity: 0.11kgco2/kwhrcompared to gas: 0.26kgco2/kwhrcompared to electric: 0.33kgco2/kwhr

    80m

    SECTION B1:100

    SUM

    MER WIN

    TER

    rainwater is collected from drains.stored underground and then used to ush wc's.total water saved is 130 tonnes/yr

    DETAIL A

    highest eciency lighting with daylightsceced dimming min. light use and cooling

    roof space for teaching and learningPV panels

    auto vents implementsummer night cooling.high thermal capacitystructure used to remaincoolth

    thermal massexposed concrete

    underoor heating has a large area. this allows low grade heatto be sucient to meet heatingdemands and heat pumps to operate at max eciency

    ground source heat pump provides space and water heating.electric pump - 1 unit of electricity consumed by the pump, 4 units of heat Is returnedtotal heat demands: 8mwhrs/yrheat pump carbon intensity: 0.11kgco2/kwhrcompared to gas: 0.26kgco2/kwhrcompared to electric: 0.33kgco2/kwhr

    80m

    SECTION C1:100

  • highest eciency lighting with daylightsceced dimming min. light use and cooling

    thermal massexposed concrete

    summer sun is occludedby the angle of the facade

    auto vents implementsummer night cooling.high thermal capacitystructure used to remaincoolth

    mechanical intake, natural outlet

    screen to southern facadeservices behind

    roof space for teaching and learningPV panels

    stack eect

    underoor heating has a large area. this allows low grade heatto be sucient to meet heatingdemands and heat pumps to operate at max eciency

    rainwater is collected from drains.stored underground and then used to ush wc's.total water saved is 130 tonnes/yr

    ground source heat pump provides space and water heating.electric pump - 1 unit of electricity consumed by the pump, 4 units of heat Is returnedtotal heat demands: 8mwhrs/yrheat pump carbon intensity: 0.11kgco2/kwhrcompared to gas: 0.26kgco2/kwhrcompared to electric: 0.33kgco2/kwhr

    80m

    MIX MODE

    PASSIVE

    Eco Performance Diagram

    Courtyard - Night Time

  • Hostel Foyer - Main Entry

    Hostel Foyer - Bland Street Entry

    Bland StreetNIcholson Street

  • Hostel Corridor

    Concept Sketches - Hostel Rooms

    Public Entry

    Apartment Living Room Apartment Bedroom

    Roof Terrace Courtyard