An energy crisis is any great shortfall (or price rise) inthe supply of energy resources to an economy. Itusually refers to the shortage of oil and additionally toelectricity or other natural resources.
What Is Energy Crises?
8/13/2019 Presentation on Energy Crisis (Faizan)
3/26
Electricity Crisis in Pakistan is one of the severe
challenges the country is facing today. Electricity isessential part of our daily life and its shortage hasseverely affected the economy and overall living of ours.Pakistan is currently facing up to 18 hours of electricity
outage a day, is expected to face more if not dealt within time.
Introduction
8/13/2019 Presentation on Energy Crisis (Faizan)
4/26
Current Energy Annual Shortfall goes even up to 5,000 MW Annual Increase in Energy Demand: 8-12%
Peak Demand: 13,000 18,000 MWTodays Energy Shortfall: 3,059 MW
Current Energy Crises
8/13/2019 Presentation on Energy Crisis (Faizan)
5/26
8/13/2019 Presentation on Energy Crisis (Faizan)
6/26
Hydropower
CoalOil (conventional/diesel) & Gas (indigenous/import) Nuclear
Conventional options for
power generation
8/13/2019 Presentation on Energy Crisis (Faizan)
7/26
Present demand of electricity in country in actual isabove 17,000 MW and will be 30,000 MW by year 2017Energy deficit was 3,000 to 5,000 MW .Hydropower Potential - 100,000 MW70 % of hydro potential lies in KPK
Hydropower Energy
8/13/2019 Presentation on Energy Crisis (Faizan)
8/26
Current Hydropower stations:Tarbella Dam : 3,478 MW
Ghazi Brotha: 1450 MWMangla 1,000 MWWarsak 240 MWChashma 184 MW
Potential Hydropower stations:Diamer-Bhasha Dam 4500 MWMunda Dam Swat river in Mohamand Agency 740 MWKalabagh Dam 2400-3600 MWBunji Dam 5400 MW
Hydropower Stations.
8/13/2019 Presentation on Energy Crisis (Faizan)
9/26
8/13/2019 Presentation on Energy Crisis (Faizan)
10/26
Pakistan has around 30 thousand metric tons ofuranium.
Pakistan has two nuclear reactors of 425 MW power. It is only 2.4 % of the electricity production.
Nuclear Energy
8/13/2019 Presentation on Energy Crisis (Faizan)
11/26
Pakistan produces only 0.2 % of its power through coal.The current coal production in Pakistan is only 3.5million tons per year.In Pakistan, there are plans to build only two 300 MWcoal-fired plants at Thar.
Coal Energy
8/13/2019 Presentation on Energy Crisis (Faizan)
12/26
8/13/2019 Presentation on Energy Crisis (Faizan)
13/26
Crises in hydropower energyCrises in coalCrises in oil & gasCrises in nuclearPoor governance
CorruptionElectricity theft
Causes of energy crises
8/13/2019 Presentation on Energy Crisis (Faizan)
14/26
Environmental impact Provincial disputes
Geological Long development and construction phase Financing Snow melt unpredictability (climate
change?)
Hydropower
8/13/2019 Presentation on Energy Crisis (Faizan)
15/26
Mining challenges (deep mining technology and lack ofexpertise) Quality of coal Water requirement Long development and construction phase Financing
Environmental impact
Coal
8/13/2019 Presentation on Energy Crisis (Faizan)
16/26
Indigenous resources depleting (oil & gas reserves) Imported oil based energy expensive and price volatile
Iran pipeline - International politicsBurden of energy insecurity
Oil & Gas
8/13/2019 Presentation on Energy Crisis (Faizan)
17/26
Obstacles due to international concernsFinancing
Long lead timeProject execution delays and cost overrunsCost of waste management
Nuclear
8/13/2019 Presentation on Energy Crisis (Faizan)
18/26
8/13/2019 Presentation on Energy Crisis (Faizan)
19/26
In any case, renewable resources of energy like solarenergy and wind energy should be explored.
Neighboring China is rapidly moving towardsalternative energy.Lack of transparency is the biggest hurdle in developmentof alternative energy.In one report, Nepra did not allow setting up of wind
mills in Sind as the power companies demanded 8 centsper unit and Nepra was adamant to pay Rs 7.5. This wasback in 2007. Now in 2011, Nepra is willing to pay 16cents per unit, to the same companies, how ironical?
POOR POLICY MAIKNG:
8/13/2019 Presentation on Energy Crisis (Faizan)
20/26
8/13/2019 Presentation on Energy Crisis (Faizan)
21/26
SOLUTIONS
8/13/2019 Presentation on Energy Crisis (Faizan)
22/26
Solar power (photovoltaic or thermal) is anotheralternative energy source option that is generally
considered feasible for tropical and equatorialcountries.Solar plants are generally used in caseswhere smaller amounts of power are required atremote locations.Solar power is also the most
expensive of all options making it less attractive.
SOLAR ENERGY
8/13/2019 Presentation on Energy Crisis (Faizan)
23/26
8/13/2019 Presentation on Energy Crisis (Faizan)
24/26
8/13/2019 Presentation on Energy Crisis (Faizan)
25/26
Energy Crisis has, more or less, plagued all sectors ofPakistans machinery ranging from economy to
industry, agriculture to social life, inflation topoverty and it is hampering national progress in adrastic manner. Nonetheless, menace of energy crisiscan be overwhelmed by government throughmaking effective policies and its proactive
implementation. Simultaneously, it is theresponsibility of us, the people of Pakistan, to utilizethe available energy astutely and wisely to play ourdue role for progress of the country.
Conclusion.
8/13/2019 Presentation on Energy Crisis (Faizan)