PRESENTATION ON CIVIL WORKS
PROCESS FOR EXECUTION OF CIVIL WORKS IN THE DISTRICTS
1. PLANNING 2.QUALITY MEASURES3.METHODOLOGY4.CONVERGENCE
1.1.MONITORING STRUCTURE UNDER CIVIL WORK 1.1.MONITORING STRUCTURE UNDER CIVIL WORK AT DISTRICT LEVELAT DISTRICT LEVEL
COLLECTOR-CUMSSA COMMITTEE CHAIRMAN
DISTRICT PROJECT COORDINATOR
SENIOR TECHNICAL CONSULTANT AT DISTRICT LEVEL
TECHNICAL CONSULTANT AT EACH BLOCK .
SCHOOL MANAGEMENT COMMITTEE (SMC)
1.2.PLANNING PROCESS AT DISTRICT LEVEL.
1.3.FINANCIAL FLOW CHART OF SSA FUND
SSA PROJECT FUND
65% share Govt. of India
35% share State Govt.
State Project Office, OPEPA
District Project Office
DPO (PM) SMC(school Point)
BRC CRC
Civil Non- Civil
NPS, NUPS, ACR, Toilet, Repair, barrier free
elements etc.
SIG, TLM, RMG, Uniform, etc
1.4.MODE OF RELEASE OF FUNDS TO 1.4.MODE OF RELEASE OF FUNDS TO SMCSMC
State Project OfficeState Project Office
District Project OfficeDistrict Project Office
SMCSMC
For smooth and speedy progress of work the
funds are released to the S.M.C through
bank advice. Funds released in two phases
i.e, 75% of the estimated costs to start up the
work up to roof casting level and rest 25%
is released for completion of work. Second
installment is released only on receiving of
utilization certificate from the SMC.
Utilization certificates are prepared as per
measurement recorded by block level
engineers in the MB and duly check
measured by District engineer there on.
Construction manual (local language / graphical representation); Leaflets explaining construction specifications and procedures (local language), Training module revised;
Regular Trainings are being imparted to SMCs & Engineers to familiarize the process of construction works through community, roles & responsibilities of SMCs & Engineers.
Uniform UC format, Separate SMC training on accounts maintenance conducted by Finance Consultants
2.1.CAPACITY BUILDING2.1.CAPACITY BUILDING
2.2.TRAINING AT GRASS ROOT LEVEL2.2.TRAINING AT GRASS ROOT LEVEL
Roles & responsibilities of SMCs & technical personnelAccounts managementChoosing suitable plansInvolving the community in engaging labours, buying materials & overseeing the constructionEnsuring the quality of constructionPost construction maintenance leading to sustainabilityA Documentary Film, some Training modules and leaflets prepared in local language.
SMC TRAININGSMC TRAINING
MASONS TRAININGMASONS TRAINING
Adopting cost effective technologies & Maintaining design specificationsManuals developed in
local language- “Sikshya Needa”
2.3.BUILDING PLANS & 2.3.BUILDING PLANS & DESIGNSDESIGNS
SITE SPECIFIC PLAN/ DESIGNSSITE SPECIFIC PLAN/ DESIGNS Site specific plan with a view for future expansion. Encouragement to use of local skill and materials for cost effective. Adoption of multi hazard resistant features.
FLOOD: Fixing of plinth level basing on the recorded H.F.L. Stair case to the terrace of the school in areas subjected to frequent flooding.
CYCLONE : Restricted openings & its placements
EARTHQUAKE : Hazard zone maps available in the Vulnerability Atlas used to decide mitigation measures. Horizontal bands at plinth level & lintel levels and vertical reinforcements provided following
Codal specifications to act as a box like structure
2.4.MONITORING AND SUPERVISION2.4.MONITORING AND SUPERVISION Monthly Review Meeting held at State Project
Office. Zonal Review meeting, comprising 7 to 8 district in
each group is also held in every month by the State Project Engineers.
Monthly Review meetings are held in District Project Office by the Collector-cum-Chairman.
Weekly Review meetings are held in District Project Office of the technical personals.
Meetings with SMC are also conducted by the technical personals.
2.5.THIRD PARTY EVALUTION2.5.THIRD PARTY EVALUTION
The National Institute of Technology (NIT), Rourkela has been awarded to conduct 3rd party evaluation in 30 districts of Orissa. The evaluation work is in process.
3.1.Method of implementation of civil work at field 3.1.Method of implementation of civil work at field levellevel
PRE CONSTRUCTION SMC TRAINING & FOLLOW UP DURING CIVIL CONSTRUCTIONS ENSURES
Proper management of accounts & assets Cost effective decisions Meaningful participation Optimizing cost & ensuring quality Acceptable workmanship Creation of Child Friendly & Learning Environment Sustainable approach envisages raising of corpus fund & post
maintenance activities
PROVISION OF ESSENTIAL FEATURE IN BUILDING
Drip Course, Plinth Protection, Rain water Drainage spouts etc.
OTHER IMPORTANT BUILDING COMPONENTS
Ramps with hand rail for CWSN students, fire fighting equipments are provided.
ATTRACTIVE & LEARNING ENVIRONMENT
Child Friendly Elements such as Swing, Slide, See-saw etc.,
In built learning components such as wall pictures, wall painting, grills depicting alphabets & numbers, Children’s chalk board, learning corners, verandah with a different get up etc.
3.2. ESSENTIAL FEATURES3.2. ESSENTIAL FEATURES
3.3.QUALITY CONTROL MEASURES3.3.QUALITY CONTROL MEASURES
Various tests for materials like cement,
steel, bricks, fine and coarse aggregates
are conducted before and during
execution of work.
Workshops & Seminars for updating the
technical knowledge.
Manuals & Leaflets are distributed
among SMCs during training for
dissemination of knowledge regarding
quality.
4.1.CONVERGENCE WITH GOVT 4.1.CONVERGENCE WITH GOVT DEPARTMENTSDEPARTMENTS
Convergence Programme : A number of convergence meetings are
held with RD Department regarding provision of toilet and water supply facility to each school under the chairmanship of Collector.
RWSS/TSC (Total Sanitation Campaign) have made a target to provide separate toilets for boys and girls in all school.
The Technical personnel of RD & the SSA have constituted a technical taskforce for implementation of such programme timely and successfully.
4.2.CONVERGENCE 4.2.CONVERGENCE FACTORFACTOR
Convergence Programme : Toilet & Drinking Water facilities in
Rural areas are executed through EE, RD.
Toilet & Drinking Water facilities in Urban areas are executed through SSA
Girls’ Toilet both in Rural & Urban areas is executed through SSA
Executive Engineer, RWSS is one of the member of District SSA Committee.
District Project Coordinator, SSA is one of the member of the TSC
Rural Urban
Toilet RD SSA
Girls’ Toilet SSA SSA
Drinking Water RD SSA
Deptt. of Rural Development
Toilet (Rural)
Drinking Water (Rural)
Drinking Water(Urban)
Girls’ Toilet(Urban & Rural)
Toilet(Urban)
SSA