ByN.SENTHIL KUMAR
AGM
Presentation - Olympia Technology Park
1. About Olympia Group
Background:
The Olympia Group was born out of the alliance of Two strong business houses –The Khivraj Group & The MK Group.
The Chennai-based renowned Khivraj Group, has over 5 decades of successful business history spanning variousindustries such as Real Estate, Automobile, Retail and Wind Power Generation Led by Mr. Ajit Kumar Chordia & MrBharat Kumar Chordia.
Mr Ajit Kumar Chordia, the Managing Director is also an Founding member of IGBC and actively involved inIGBC.
The MK Group Kolkata have an impressive track record of large-scale property development in several sectors ofReal Estate - MSB Residential Apartments, Clubhouses and Shopping Malls among others represented by MrChandrakant Kankaria.
Mr. Ajit Kumar Chordia
Mr. Chandrakant Kankaria
Mr. Bharat Kumar Chordia
Projects – A snap shot
OLYMPIA TECH PARK
GUINDY• Sprawling 2 million Sq.ft. campus
• LEED Certified Gold Rated Green
Building by USGBC
• In operation for the past 14 Years
• IGBC Platinum Certified Building
OLYMPIA PLATINA• 100,000 Sq.ft. of completed space
• Adjacent to Olympia Technology
Park
• Fully Occupied
• Under Certification of IGBC
Platinum Rating
OLYMPIA TEKNOS• 130,000 Sq.ft. of completed space
• Structure of B+S+10
• Typical floor Plate (sft) 13,000
• Fully Occupied
• Under Certification of IGBC
Gold Rating
OLYMPIA NATIONAL
TOWERS• Total Area – 72,904 Sq.ft
• Building Structure – 2B+Stilt+10
• Typical floor Plate 2 – 10 – 7,424 Sq.ft
• Fully Occupied
• Under Certification of IGBC
Gold Rating
OLYMPIA INSPIRE
GUINDY• Total Area – 2,00,000 Sq.ft
• Building Structure – 2B+Stilt+10
• Awaiting CC
• Under Certification of USGBC
Gold Rating
OLYMPIA OPALINE• Types of Flats: 2, 3 BHK
• Project Status: Completed
- No of Flats – 1200
OLYMPIA OPALINE
SEQUEL• Types of Flats: 3 & 4 BHK
• Apartment Range: 1145 sq.ft – 2343
Sq.ft
• No. of Flats: 608
- Project completed
OLYMPIA SKY VILLAS• Types of Flats: 4 BHK
• Apartment Range: 6150 sq.ft – 6300
sq.ft
• No. of Flats: 18 Luxury Duplex
- Project completed & Occupied
PARK RESIDENCES
BY OLYMPIA• Total Area – 1,05,000 Sq.ft
• Luxury Apartments
• Project Completed and Occupied
• Gold Certified under IGBC Green Home
Rating System.
Education Projects – A snap shot
VELAMMAL NEXTGEN SCHOOL
• State of Art school for Velammal group of schools designed by expats working at RSP. The concept of learning street is the major highlight of the design.
• Total Area is 90KSF on 1.35 Acres of land.
• Project delivered and school is in operations for last couple of years.
KC HIGH SCHOOL
• School for KC High run by Mrs Valli to have their Kotturpuram school is relocated and cater for expansion.
• School affiliated to Cambridge International Board.• Total Area of 1.3 lakh Sq.ft on 3.25 Acres of land.• Amenities like Basket ball court, Auditorium, Mini
Soccer Field, Swimming pool etc. • Project delivered and school is in operations for
last couple of years.
2. OTP Energy Consumption Overview
Energy Sources of Olympia Technology Park
ROOF TOP SOLAR
OLYMPIA
ENERGY
SOURCE
WIND ENERGY TNEB GRID
DG – CAPTIVE
Energy Consumption Details for 3 Years
Source of Energy Units in KWh
2017-18 2018-19 2019-20
TNEB 11153209 3725848 5612421
Diesel Generators 1453610 1904570 705110
Solar Energy 658436 1582834 1628935
Wind Energy 17898006 22639484 21433293
Total 31163261 29852736 29379759
Description
Units in KWh
2017-18 2018-19 2019-20
Green Energy 18556442 24222318 23062228
Non-Green Energy 12606819 5630418 6317531
Total 31163261 29852736 29379759
0%
20%
40%
60%
80%
100%
2017-18 2018-19 2019-20
60%
81% 78%
40%
19% 22%
Green Energy Non-Green Energy
Energy Consumption FY 2019-20
Description of Energy Source
EnergyConsumption
( in KWh )
TNEB 5612421
Diesel Generators 705110
Solar Energy 1628935
Wind Energy 21433293
Total 29379759
TNEB Energy
19%
Diesel Generators
2%
Solar Energy 6%
Wind Energy
73%
TNEB Energy Diesel Generators Solar Energy Wind Energy
3. OTP Specific Energy Consumption
Specific Energy Consumption – Past 3 years
Parameters Units 2017-18 2018-19 2019 - 20
Total Annual Energy Consumption KWh 31163261 29852736 29379759
Built Up Area Sq. M 181631 181631 181631
Specific Electrical Energy Consumption
KWh / Sq.M 171.57 164.36 161.76
171.57
164.36
161.76
156
158
160
162
164
166
168
170
172
174
2017-18 2018-19 2019 - 20
Specific Energy Consumption
Year on Year Improvement of Specific Energy Consumption
Description 2017-18 2018-19 2019-20
Specific Energy Consumption 171.57 164.36 161.76
Variation - 4.39 1.61
Improvement % - 4.39 % 1.61 %
Reasons for Improvement in SEC :
• Conversion of existing PL light fittings into LED advance lighting system in Phase -1 & 3 liftlobbies with automation control.
• Conversion of DX AC Units into Chilled water operated CSU units in Phase -1 & 3 lift lobby.
4. Information on Competitors, National & Global Benchmark
Information on Competitors, National & Global Benchmark
Sl.No Competitor Name SEC
1 Tata Consultancy Services, Cochin 81.2
SEC Benchmark - Competitor:
EPI Bench Mark for Office Buildings
Climate Zone Less than 50% AC
More than 50% AC
Warm & Humid 101 182
Composite 85 179
Hot & Dry 90 173
Moderate 94 179
National SEC Bench Mark ( BEE ):
Office Building EPI depends upon multiple factors like climate zone, operating hours, occupancy trends etc..
Olympia Tech Park Campus comes under mixed category. Combination of Office, Data labs, Food court & Amenities, Banks, ATM and GYM etc. with 95% Air conditioned space.
Chennai comes under Warm & Humid Climate Zone and our campus comes under the category of more than 50 % Airconditioned area. Hence EPI Bench Mark as BEE - 182.
Our EPI FY 2019-20 - 161.76
Road Map for Further Improvement of SEC
Optimum utilization of HVAC System.
Continuous monitoring and audits of energy.
Maximize utilization of Day Light effectively andreduce the lighting consumption in day time.
Greater Use of Energy Efficient Equipment's
Greater Use of energy efficient lights
Inclusion of digital technologies in operations ofbuilding and management of energy.
Major Encon Project Planned FY 2020-21
• Installation of Auto Tube Cleaning Technology for 3 Nos of 750 TR Water Cooled Chillers to improve the chiller Efficiency and save the energy.
Project Cost – INR 2.56 Millions.
• Installation of Control Command Centre for enhancement of IBMS System in the view effective monitoring and help us for energy saving in HVAC Systems.
Project Cost – INR 10.2 Millions.
5. Energy Savings Projects Implemented
in last 3 Years.
Energy Savings Projects Implemented in last 3 Years
Important Projects in 2017- 18, 2018-19 & 2019-20
Installation of additional one water cooled chiller.
Conversion of PL light fittings into LED light fitting in various locations of Office Premises.
Conversion of existing PL light fittings into LED advance lighting system in Phase -1 & 3 lift lobbies with automation control
Conversion of DX AC Units into Chilled water operated CSU units in Phase -1 & 3 lift lobby.
Year No of ProposalsInvestments
( in Million INR) Savings
( in Million INR ) Payback
( Months )
2017 -18 7 31.68 17.59 21
2018 -19 4 9.48 3.91 29
2019 -20 2 1.42 0.75 22
Encon Project Implemented in 2019-20
Converted the 5.5 TR DXC Unit – 8 Nos into Chilled Water CSU Unit – 6 Nos in Phase -1 & 2 lift lobby area.
Optimization the energy consumption and reduced the common area energy consumption.
Energy Saved - 62437 Units / Year
Cost Saving Achieved – INR 5.62 Lakhs / Year
Investment Cost – INR 8.02 Lakhs
Payback Period - 17 Months
During CSU ReplacementBefore
Conversion of DX Units to Chilled Water CSU Unit
6. Innovative Projects Implemented.
Innovative Projects Implemented
Source of Idea Solution Advantage
Non availability of alternate fire fighting arrangements in HSD Yard for the existing 50 Ltrs DCP Extinguisher available.
Worked out the alternate option to implement 200 Ltrs AFF Mechanical Foam Fire Extinguisher system
Implementation Cost – INR 1.18 Lakhs
Two modes of fire extinguishing arrangements available for HSD Yard.
Reliability of safety in HSD yard is increased.
AFFF ( Aqueous Film Forming Foam ) Fire Fighting System for HSD Yard
7. Utilisation of Renewable Energy
Sources.
Utilisation of Renewable Energy Sources FY 19-20
Type of RE Type of Energy Onsite/Off siteInstalled Capacity
(MW)Generation
(Million Units)% of Overall
Electrical Energy
Solar PV Electrical Onsite 1.1 1.62 5.54%
Wind Electrical Off site 15.15 21.43 72.95%
Wind – 72.95% (21.42 Million units))
Solar - 5.54% (1.62 Million units)
Investment Made & Capacity Addition in last 3 years
Project Name TypeInstalled
Capacity (MW) Year of Installation Investment Cost
Roof Top Solar Plant Onsite
Renewable Energy 1.1 June -2017 INR – 5.08 Cr
Year Energy Generation ( in KWh ) Remarks
2017-18 658436Installed in June -2017 and commenced the partial generation.
2018-19 1582834
2019-20 1628935
PROJECT DETAILS
Capacity 1.1 MW
Type Direct Online Grid
Make of Solar PV Panel Trina
Rating & Qty. of Solar PV Panel
315 Watts, 3510 Nos
Make of Inverter Delta
Rating & Qty. of Inverter 50 KW , 19 Nos
Energy Generation / Year ( in KWh )
1582834
Investment Cost ( in INR ) 5.08 Cr
ROI ( Months ) 46
RPO Obligation
Year Solar Non – Solar Total
2017-18 5 % 9 % 14 %
2018-19 -- -
2019-20 6.75 % 10.25% 17 %
RPO Achieved at site
Year Solar Non – Solar Total
2017-18 2.11 % 57.43 % 59.55 %
2018-19 5.3 % 75.84 % 81.14 %
2019-20 5.54 % 72.95 % 78.50 %
RPO Target fixed in Tamil Nadu
Reference Source
https://www.iexindia.com/
Group Total Capacity & Unit Capacity ( MW )
WINDMIL DETAILS – OFF SITE
S.No WEG HT SC NOCapacity in
MW Location
1 79204721737 0.8
Theni, Tirunelveli,
Udumalaipet.
2 59224760079 0.85
3 59224760083 850
4 79204720772 0.75
5 79204720517 0.95
6 79204720683 0.75
7 79204720684 0.75
8 79224723414 0.60
9 79224723413 0.60
10 39224340917 1.65
11 79244700344 2.0
12 79244700338 2.0
15 79204720531 0.95
16 79204721545 1.65
Total Capacity ( in MW ) 15.15
8. GHG Inventorisation.
GHG Inventorisation
Year Energy Consumption Details ( in Kwh ) Ton of CO 2 Emission
TNEB Wind Solar DG Total TNEB DG Total
2017-18 11153209 17898006 658436 1453610 31163261 9145.6 828.6 9974.2
2018-19 3725848 22639484 1582834 1904570 29852736 3055.2 1085.6 4140.8
2019-20 5612421 21433293 1628935 705110 29379759 4602.2 401.9 5004.1
0
5000000
10000000
15000000
20000000
25000000
30000000
2016 -17 2017-18 2018-19 2019-20
Renewable Energy Usage in KWh
0
2000
4000
6000
8000
10000
12000
14000
2016 -17 2017-18 2018-19 2019-20
Reduction of CO 2 Emission ( in Ton
Target for CO 2 Emission Reduction
Action Plan :
a. Encourage the usage of Public Transportation and shuttle services by Employees.
b. Exploring replacement of Existing DG sets into Hybrid DG Sets to reduce the diesel consumption and operate DG Sets by using Biofuel.
c. Increase the usage of renewal energy and reduce the energy usage of Utility and DG Sets.
9. Green Supply Chain Management
Green Purchase Policy
Green Purchasing is the practice of procuring goods and services that cause less harm to the environment, and the living beings that depend upon it for survival. Olympia Tech Park will strive to purchase materials that are:
Durable, as opposed to single use or disposable
Non-toxic or minimally toxic, preferably biodegradable
Highly energy-efficient
Recyclable or safely disposable
Made from raw materials obtained in an environmentally sound, sustainable manner
The cause of minimal or no environmental damage during normal use or maintenance.
Shipped with minimal packaging (consistent with care of the product), preferably made of recycled and/or recyclable materials
Products which have obtained Greenpro or any other Eco labeling
The Products should have low VOC and lesser health impacts
The products should be local materials sourced within 400km range
Information on other Green Projects implemented
Sl. No Project Status
1 Olympia-Merlin Reflection IGBC Pre- certified Platinum
2 Olympia Platina Under Certification – Attempting for IGBC Platinum Rating
3 Olympia Park Residences Achieved IGBC Gold Rating.
4 Olympia – Teknos Under Certification – Attempting for IGBC Gold Rating
5 Olympia – National Under Certification – Attempting for IGBC Gold Rating
6Olympia – Goodwood Residence
Pre-certified IGBC Platinum Rating
7 Olympia – InspireUnder Certification – Attempting for LEED BD+CPlatinum Rating
8 Olympia – Cyberspace Under WELL Certification
10. Team Work, Employee Involvement &
Monitoring
Daily Monitoring System
Monitor the Energy, Water Consumption details on daily basis.
Updation of Daily Energy & Water Consumption data along with cumulative consumption data. Compare the data with previous days.
Monitoring of HVAC Energy Consumption, Common Area consumption & Occupant Energy usage details on daily basis.
Monitoring of operation parameter of MEP Equipment on daily basis and take the action if any abnormality.
Monitoring of raw water procurement and STP treated water usage details on daily basis. Take the necessary action to minimise raw water procurement.
Monitoring of Employee , Visitor head count on daily basis.
Monitoring of Two Wheeler, Four Wheeler count on daily basis and take the action to increase the usage of public transport, shuttle services.
Monitoring
Use of Advanced Equipments and Tools for Monitoring.
Integrated Building Management System for Monitoring and Control.
Thermal Image Scanner Power Quality Analyser Anemometer
Review Meeting Chaired by
1st level of review meeting is being conducted & chaired by Shift Engineer on weekly basis.
2nd level of review meeting is being conducted & chaired by Technical Manager level once in two weeks.
3rd level of review meeting is being conducted & chaired by Property Manager once in a month.
4th level of review meeting is being conducted & chaired by Top Management once in 3 months.
Discussion Points :
It is a practice to conduct the review meeting with in-house team ( Technical, HK & Security team ) to discuss the below mentioned points.
a. Further improvement of building operations.
b. Optimisation of Energy & Water Consumption.
c. Usage of day light effectively and reduce the usage of lights during day time.
d. Awareness training on energy conservation measures.
Energy Efficiency/ Awareness Training Program
Projects Implemented through Kaizens
Source of Idea Solution Advantages
Take the safety measures for prevention of COVID -19 by using in house team.
Arrangement of foot operated type hand sanitizer dispenser by using PVC pipe and fittings.
Involving in house team to arrange food operated Hand Sanitizer -15 Nos required for common area.
Implementation Cost INR – 7500 / ( Rate / Each – INR 500 )
Avoided the expenses on procurement of automatic hand sanitizer dispenser for common area.
Cost saving of INR – 60,000 / -
Usage of in-house team effectively during lockdown
Foot Operated Hand Sanitizer Dispenser
11. Implementation of ISO 50001 / Green CO /
IGBC Rating
IGBC Rating
Olympia Technology Park has obtained Platinum Certification in June -2020 from IGBC for existing building category
SCORE CARD:
IGBC Rating
S.No CREDIT NAME POINTS ACHIEVED
1 Site Facility & Management 14
2 Water Efficiency 26
3 Energy Efficiency 26
4 Health & Comfort 10
5 Innovation Category 12
Total Points 88
Certified 50-59 points, Silver 60-69 Points, Gold 70-79 Points, Platinum 80-100 points.
Total Points Targeted 90
Points Achieved 88
Targeted Rating Platinum
Achieved Rating Platinum
Implementation of ISO 50001
Engaged an ISO 50001 Certified Agency & Energy Auditor to implement ENMS at site by co-ordinating with IGBC.
Awaiting for proposal from IGBC to obtain ISO 50001 Certification.
12. Long Term Vision on Energy Efficiency
Long Term Vision on Energy Efficiency
LONG TERM TARGET ON ENERGY EFFICIENCY
Increase the usage of renewable energy from 78 % to 85 %
Improve the EPI from 161.36 to 150
Enhancement of onsite solar energy from 1.1 MW to 1.2 MW
Optimization of Annual Energy in Chiller Consumption of Chiller – 68.27 Lakhs Units to 60 Lakhs units
Other Relevant Information
USGBC LEED Certification for GOLD
Olympia Technology Parkwas awarded “The BRY AIRAWARDS 2008” for the “BestHVAC Design” and thisaward is in its 3rd year andconsidered as prestigiousfor it certifies excellence inEnergy conservation &Innovative design in HVAC.
Best HVAC Design Award
Excellent Energy Efficient Unit Award-2019 from CII
Other Relevant Information
Postal Dept. has released the special cover with Olympia Tech Park image on
29.12.2006
Best Green Building Award
Girem Award wasconferred uponOlympia TechnologyPark for the best greenbuilding in India -2009.