    Client : Mahanadi Coalfields LimitedContrctor : IVRCL-AMR JVProject Cost : 251.34 cr

    RITES Fee : 6.56 crProject length : 41.6 Km + 6.22 Km diversion roadProject Importance

    a) All roads inside Talcher Coal Mines spreading over 5-areas

    b) All transportation road of Rigid Pavementc) Use of Fiber-Reinforced Concreted) Use of slip-form pavere) PQC of 192,000cum, DLC of 82,000cum, HYSD of 6000MT

    CURRENT ASSIGNMENT

    Consultancy services for supervision the work of "Strengthening &widening of coal transportation road at Talcher coalfields of MCL

  • 8/10/2019 Presentation J K Rout

    4/27

    Layout Plan for Project Road

  • 8/10/2019 Presentation J K Rout

    5/27

    Typical Cross Section of Road

  • 8/10/2019 Presentation J K Rout

    6/27

  • 8/10/2019 Presentation J K Rout

    7/27

    Consultancy services for supervision the work of"Strengthening & widening of coal transportation road atTalcher coalfields of MCL

    As Highway engineer , responsible for all field activities

    including site testing's, level checking and all sitemeasurements.Responsible for TBM checking, FRL modification(if any),Hindrance removal, Site data storage.

    Responsible for strict adherence to mines safety rules.Implementation of approved work programme.

    My Involvement

  • 8/10/2019 Presentation J K Rout

    8/27

    My Involvement

  • 8/10/2019 Presentation J K Rout

    9/27

    1) Working in remote locations inside coal mines with all dustand humidity2) Without any communication and proper transportation3) Extended working hours usually beyond working hours

    Improvements Suggested / Implemented

    Work Challenges

    Use of Helmet/Mask and safety shoe.Problem with design of super-elevation shorted out .Problem with frequent changing OGL in mines roadsaddressed.

  • 8/10/2019 Presentation J K Rout

    10/27

    Project Handled by me while working with RITES in the last9 Years

    Projects PositionConsultancy services for supervision the work of"Strengthening & widening of coal transportation roadat Talcher coalfields of MCL". Duration- April 2013 to April 2014, Location- Talcher, Odisha.

    Highway Engineer-I

    Preparation of Pre-feasibility Study Report for SelectedState Highway Corridors for taking up in PPP Mode. Highway Engineer

    DPR for construction of diversion road from check-postof Lingaraj OCP to NH-200 for coal evacuationincluding a flyover and ROB on the level crossing

    (2.0km long) at Lingaraj area of Talcher coalfields ofMCL.

    Project co-ordinator

    Feasibility & Detailed Project Report for developmentof common rail/road corridor to meet the requirementof large industries at Mahanadi-Angul-Talcher Belt.

    Quantity Surveyor

    Widening & Strengthening Of Road from Balinga toTaparia for a length of 21.96 km in three packagesunder Basundhara Area of MCL in Sundar arh District

  • 8/10/2019 Presentation J K Rout

    11/27

    Client:- Kolkata Municipality Corporation (KMC) for all three projects

    Involvement:-Supervision, quality control, recording measurements of works.Preparation of IPC, variation reports etc.Checking deficiencies in working drawing correcting same.

    Facilitating redesign of structural members wherever necessary.To review of contractors detailed works programme, Monitoringprogress and checking resources deployed against of worksprogramme, documentation as per ISO-9000

    1.Construction of RCC Deck Slab supported on RCC MS line bored pile, beamincluding pavement for Hooghly River front Development work of KMC from BajaKadamtala Ghat upto Fairlie Ferry Ghat at Kolkata. Project Cost = 25.34 Cr.

    2. Development of Rabindranath Tagores Memorial Garden including repairing &renovation of existing double storied building (Red House) at Nimtala Burning Ghatof K.M.C. in Kolkata. Project Cost = 2.32 Cr.

    3. Expansion of the Nimtala Burning Ghat in Kolkata, Project Cost = 13.66 Cr.

  • 8/10/2019 Presentation J K Rout

    12/27

    1) Hooghly River front Development work

    Original area of project could not be handed over to working agency due to lackof clearance from Ministry of Defence. So project was relocated to ArmeniumJetty to Millenium park. Since that area was a jetty during British period lots ofdebris like wood, iron pieces encountered during piling work. So many places itbecame impossible to carry piling work

    Work Challenges

    2) D evelopment of Rabindranath Tagores Memorial Gardena) The working platform was low. Piling work disrupted due to tidal water fluctuation

    around full moon days and new moon days. And contractors claim was workingplatform was well above highest water level indicated in tender drawing.

    b) Superstructure was ISMB 500s to be bolted on pile cap which was round inshape and exact same diameter of pile. ISMB 450 and ISMB 300 were to bebolted to ISMB 500. It was not possible to fix ISMB 500 parallel to each other aspiles shifted.

  • 8/10/2019 Presentation J K Rout

    13/27

    3) Expansion of the Nimtala Burning Ghat in Kolkata

    Land was not free as many religious structures were to be shiftedSheet piling upto 24 meter was necessary as construction of basement was to beunderwater. But progress was slow/not satisfactory as working agency wasdriving sheet piles manually

    Work Challenges

    Improvements Suggested / Implemented

    1) Hooghly River front Development work After several site visits by higher officials of KMC, RITES and discussionsdesign was modified. Pile points sifted, where piles could not reach to desireddepth additional piles introduced. Some places ISMB sections used in

    superstructure.

  • 8/10/2019 Presentation J K Rout

    14/27

    Improvements Suggested / Implemented

    2) D evelopment of Rabindranath Tagores Memorial Gardena) Working agency agreed to stop work during high tide rainy season and start work

    in winter where tide is low. The work was executed in planned manner with helpof tide table.

    b) Pile cap was modified to bigger rectangular shape.

    3) Expansion of the Nimtala Burning Ghat in Kolkata

    Land was cleared by co-operation from local people Vibro-shinker used to speed up sheet piling work

  • 8/10/2019 Presentation J K Rout

    15/27

    Project in Picture(Hooghly River front Development work)

  • 8/10/2019 Presentation J K Rout

    16/27

    Project in Picture(Development of Rabindranath Tagores Memorial Garden)

  • 8/10/2019 Presentation J K Rout

    17/27

    Project in Picture(Expansion of the Nimtala Burning Ghat in Kolkata)

  • 8/10/2019 Presentation J K Rout

    18/27

    DPR for construction of diversion road from check-post of Lingaraj OCPto NH-200 for coal evacuation including a flyover and ROB on the levelcrossing (2.0km long) at Lingaraj area of Talcher coalfields of MCL.

    Importance:- 2 Km road includes 1.2Km elevated corridorincluding one ROB, One Flyover, One connecting Ramp andone Underpass,Project Cost:- 125 Cr.

    RITES DPR Fee:- 1.1 Cr.Involvement:- (i) Topographic Survey

    (ii) Rate Analysis(iii) Quantity Estimation(iv) Bid Document Preparation(v) Approval of GAD from Railway

  • 8/10/2019 Presentation J K Rout

    19/27

    DPR for construction of diversion road from check-post of Lingaraj OCPto NH-200 for coal evacuation including a flyover and ROB on the levelcrossing (2.0km long) at Lingaraj area of Talcher coalfields of MCL.

    LAYOUT PLAN

  • 8/10/2019 Presentation J K Rout

    20/27

    Detailed Report on Comprehensive Rail, Road & Pipe Line Corridorin Meramundali Angul Talcher Chhendipada Belt

    1.Outer Corridor (Jarapada on NH-42 to Godibandha on NH-23)4-lane divided carriageway , Length = 131.6 KmEstimated cost = 571 cr

    2.Inner Corridor (Jarasingha on SH-63 to Putagaria on outer Corridor)

    2-lane undivided carriageway , Length = 30.1 KmEstimated cost = 201 cr

    3.Patrapada Mine link Corridor(Km 34 of SH-63 to Patrapada village)

    4-lane divided carriageway , Length = 21.8 KmEstimated cost = 241 cr , Total Project Cost = 1014 Cr.RITES Fee = 1.15cr (Highway Div share)

  • 8/10/2019 Presentation J K Rout

    21/27

    Scope :- 1) Detailed Site Reconnaissance

    2) Traversing using GPS 3) Topographic survey4) Traffic Survey and Projection

    5) Pavement Condition survey and Design6) Cost Estimate

    Involvement :- 1) Detailed Site Reconnaissance of whole 182km 2) Establishing Traverse point using GPS 3) Topographic survey4) Cost Estimate

    Detailed Report on Comprehensive Rail, Road & Pipe Line Corridorin Meramundali Angul Talcher Chhendipada Belt

  • 8/10/2019 Presentation J K Rout

    22/27

  • 8/10/2019 Presentation J K Rout

    23/27

    Client : Mahanadi Coalfields LimitedContrctor : HSCL & EPILProject Cost : 22 crProject length : 21.96 KMProject Importance

    a) Project roads is connecting 2 states ( Odisha &Chhattisgarh)

    b) Use of slip-form paver

    Rate Analysis and Cost Estimation for the works to be carriedfor Package I from Dankuni to Chandannagar.

    Widening & Strengthening Of Road from Balinga toTaparia for a length of 21.96 km in three packages underBasundhara Area of MCL in Sundargarh District (Orissa).

  • 8/10/2019 Presentation J K Rout

    24/27

    Non availability of construction material within the nearvicinity of the project road,Work supervision inspite of High volume of traffic due toCoal transport

    Improvements Suggested / Implemented

    Work Challenges

    Supervision of Construction of works.Measurements of completed works. Sole responsible regarding quality conformity tests.

  • 8/10/2019 Presentation J K Rout

    25/27

    So far my six years stint with the RITES has been quitesatisfying and enriching in terms of the breadth of theknowledge and experience I have gained while working onvarious challenging projects in diverse geographical

    conditions.I got a wide exposure which has also provided me thenecessary depth and the confidence to be able to hold myown against the very best.I enjoyed the challenges such as coordination with variousstake holders and performed my duties to the best possiblemanner in the interest of the projects.

    Working with RITES

  • 8/10/2019 Presentation J K Rout

    26/27

    While working on various projects I enhanced my Projectmanagement Skills required in the atmosphere that isintensively competitive, I have always maintained aconsistent performance in the projects I have been sent or

    assigned.One of my strongest points is my sincerity and strongcommitment towards the work which motivates me to takeinitiatives in challenging situations.I am sure with the varied experience and learning that I havegained in such a short period will take me a long way inRITES.

    Working with RITES

  • 8/10/2019 Presentation J K Rout

    27/27

    THANK YOU