Upload
navb-cnac-constructiv
View
215
Download
0
Embed Size (px)
DESCRIPTION
http://cnac.constructiv.be/~/media/Files/NAVBCNAC/Over%20het%20NAVB/Downloads/Presentatie%20FOD_NL.pdf
Citation preview
Karel Van Damme
Adviseur Minister van Werk
Monica De Coninck
1
Manufacturing industry
Core activity Cleaning services
Security/ Surveillance
Independent workers
Construction
(new building)
Company A
Company B
Company B1
Company B2
Company C
Company C1
Company D
2
SLIC THEMATIC DAY – BRUSSELS , 22 NOVEMBER 2010
A1
OWNER
B1
CONTRACTOR
SUBCONTRACTOR C
(masonry)
Company C1
Company C2
SUBCONTRACTOR
D
(ellectrical instalation)
Company D1
SUBCONTRACTOR D
(Roofs)
• 47 workers on site
• owner: safety coordinator
• contractor: supervision team
• 10 bogus independent workers
contracted by C1/ 8 bogus contracted
by C2/ 2 by D
• 13 undeclared workers: 1 for C1, 2
for D2, 9 for D and 1 hired from an
alleged independent worker rendering
services to D1
• 4 immigrant workers with illegal
residence (3 working for D and 1 for C1)
• 5 temporary workers placed by company
ABC, which was contracted by B1
• No workers representatives for OSH
• Company D1 not authorized to render
services in construction
3
MODEL VAN AANBIEDINGEN
4
Opdrachtgever/Donneur d’ordre
contr
subc
2a
subc
1 subc
2b
sc
3a
sc
3b
sc
3c
5
(Her)inschakeling oudere werknemers
CHATBOX
• Huisarts
• Arbeidsgeneesheer
• Adviserend geneesheer
WANNEER BEGINNEN?
AANGEPASTE JOBS?
• Machines bedienen, organiseren,
controleren
• Opleidingen geven op de vloer… 6
Bestaande regelgeving en initiatieven
• Ervaringsfonds
• Nieuwe pestwet
• cao 104
• Aanpak hoofdstuk V – tijdelijke of mobiele
bouwplaatsen
7
Via 7 samenwerkingsprotocols: 12.500
werknemerswerkplekken
• Hout PC 126: werknemers (2000)
• Textiel PC 214: werknemers (1.062)
• Textiel PC 120: werknemers (312)
• BOUW PC 124: werknemers (4.763)
• Eweta PC 327.03: werknemers (300)
• Transport en Logistiek PC 140.03: werknemers
(300)
8
Deloyale concurrentie bekampen Combattre la compétition déloyale
9