Gantt Diagram

CARE 6 & 10 implementations

Walk through our project

CARE 4 implementations

Project results

Introduction

Future proposals

Agenda

Page 3: Presentación8888888_final

GANTT DIAGRAM

2

PERCENT Week

COMPLETED 1 2 3 4 5 6 7 8 9

Time Studies CARE 6 100%

Time Studies CARE 10 100%

Time Studies CARE 4 100%

Pneumatic Gauge 100%

Autocontrol Modifications 100%

Time Studies line CP 100%

Layout Modifications 100%

Tests 100%

Reduction CARE 6 100%

Reduction CARE 10 100%

Reduction CARE 4 75%

ACTIVITY

Activities completed

Activities in process

PERCENT Week

COMPLETED 1 2 3 4 5 6 7 8 9

Time Studies CARE 6 100%

Time Studies CARE 10 100%

Time Studies CARE 4 100%

Pneumatic Gauge 100%

Autocontrol Modifications 100%

Time Studies line CP 100%

Layout Modifications 100%

Tests 100%

Reduction CARE 6 100%

Reduction CARE 10 100%

Reduction CARE 4 75%

ACTIVITY

Page 4: Presentación8888888_final
Page 5: Presentación8888888_final

CENTRAL PLATE

PP K2

HUB FLANGE ASSYDOUBLE CLUTCH

Page 6: Presentación8888888_final

PP K2: CARE STATION 6

5

Time studies (CARE 6)

Process Capability analysis(drilling stations)

Pneumatic gauge development

Autocontrol modification

Actualization of CARE visual aids and control plan

Page 7: Presentación8888888_final

6

CP: CARE STATION 10

Time studies (CARE 10, machiningarea, balancing area=)

Process Capability analysis(Driling machines)

Parallelism tables in line

Extra Plug inspection devices

Actualization of CARE visual aids and control plans

Page 8: Presentación8888888_final

Automatization of parallelism in line

7

120 °

Page 9: Presentación8888888_final

WALK THROUGH OF OUR PROJECT

Page 10: Presentación8888888_final

9

HUB FLANGE ASSY: CARE STATION 4

Time studies

Autocontrol modification

Layout modification

Runout analysis through process

WIP elimination

Page 11: Presentación8888888_final

Automatizated Hub Flange

10

Broaching Station

Pieces from

riveting process

Pieces to runoutInspection Station

Page 12: Presentación8888888_final

DRY PROCESS

11

Page 13: Presentación8888888_final

HOURS REDUCED

12

HOURS PER YEAR: 13,637

50% REDUCED: 6,818.5

HOURS PER YEAR: 6,940.6

TOTAL HOURS PER YEAR : 34,756.2

HOURS PER YEAR: 14,178.7

50% REDUCED: 7,089.3

CARE STATION 6

CARE STATION 10

CARE STATION 4

40% REDUCTION

$ 728,249.17

Page 14: Presentación8888888_final

13

Future proposals

Pneumatic PP K1 Pneumatic flywheel G81

Page 15: Presentación8888888_final

14