Gantt Diagram
CARE 6 & 10 implementations
Walk through our project
CARE 4 implementations
Project results
Introduction
Future proposals
Agenda
GANTT DIAGRAM
2
PERCENT Week
COMPLETED 1 2 3 4 5 6 7 8 9
Time Studies CARE 6 100%
Time Studies CARE 10 100%
Time Studies CARE 4 100%
Pneumatic Gauge 100%
Autocontrol Modifications 100%
Time Studies line CP 100%
Layout Modifications 100%
Tests 100%
Reduction CARE 6 100%
Reduction CARE 10 100%
Reduction CARE 4 75%
ACTIVITY
Activities completed
Activities in process
PERCENT Week
COMPLETED 1 2 3 4 5 6 7 8 9
Time Studies CARE 6 100%
Time Studies CARE 10 100%
Time Studies CARE 4 100%
Pneumatic Gauge 100%
Autocontrol Modifications 100%
Time Studies line CP 100%
Layout Modifications 100%
Tests 100%
Reduction CARE 6 100%
Reduction CARE 10 100%
Reduction CARE 4 75%
ACTIVITY
CENTRAL PLATE
PP K2
HUB FLANGE ASSYDOUBLE CLUTCH
PP K2: CARE STATION 6
5
Time studies (CARE 6)
Process Capability analysis(drilling stations)
Pneumatic gauge development
Autocontrol modification
Actualization of CARE visual aids and control plan
6
CP: CARE STATION 10
Time studies (CARE 10, machiningarea, balancing area=)
Process Capability analysis(Driling machines)
Parallelism tables in line
Extra Plug inspection devices
Actualization of CARE visual aids and control plans
Automatization of parallelism in line
7
120 °
9
HUB FLANGE ASSY: CARE STATION 4
Time studies
Autocontrol modification
Layout modification
Runout analysis through process
WIP elimination
Automatizated Hub Flange
10
Broaching Station
Pieces from
riveting process
Pieces to runoutInspection Station
DRY PROCESS
11
HOURS REDUCED
12
HOURS PER YEAR: 13,637
50% REDUCED: 6,818.5
HOURS PER YEAR: 6,940.6
TOTAL HOURS PER YEAR : 34,756.2
HOURS PER YEAR: 14,178.7
50% REDUCED: 7,089.3
CARE STATION 6
CARE STATION 10
CARE STATION 4
40% REDUCTION
$ 728,249.17
13
Future proposals
Pneumatic PP K1 Pneumatic flywheel G81
14