4
1 © 2 0 0 8 S p o n g e - J e t I n c . A l l r i g h t s r e s e r v e d . Preparing Gas Pipeline Weld Seams on Po River •Major river, spanning east to west Italy •Sensitive residential environment; cultivated fields and populated villages •New pipeline development •Weld seam preparation

Preparing Gas Pipeline Weld Seams on Po River

Embed Size (px)

DESCRIPTION

Preparing Gas Pipeline Weld Seams on Po River. Major river, spanning east to west Italy Sensitive residential environment; cultivated fields and populated villages New pipeline development Weld seam preparation. Preparing Gas Pipeline Weld Seams on Po River. Project Details: - PowerPoint PPT Presentation

Citation preview

1

©20

08 S

pong

e-Jet Inc. A

ll rights re

served.

Preparing Gas Pipeline Weld Seams on Po River

• Major river, spanning east to west Italy

• Sensitive residential environment; cultivated fields and populated villages

• New pipeline development

• Weld seam preparation

2

©20

08 S

pong

e-Jet Inc. A

ll rights re

served.

Preparing Gas Pipeline Weld Seams on Po River

Project Details:

- 35cm(14in) diameter pipe welded every 10m(33ft)

- River-crossing sections 2km(1.25miles)

- Total project 18km(11miles)

Specifications:

- Metal cleaned, then profiled to 50microns(2mils)

- SA2.5 / NACE 2 / SP-10

- To “White Blast Cleaning”

3

©20

08 S

pong

e-Jet Inc. A

ll rights re

served.

Preparing Gas Pipeline Weld Seams on Po River

Chose Sponge-Jet based on:

• Conventional abrasive - hard to contain; potential water contamination

• Sponge Media is easily contained, collected and reused without leaving dust or pollutants in the pipe or air

• Used 200HP and 35-P Recycler

• Silver 80 Sponge-Media™

4

©20

08 S

pong

e-Jet Inc. A

ll rights re

served.

Preparing Gas Pipeline Weld Seams on Po River

Outcome:

• Sponge Media blasting allowed the pipeline to be built adjacent to a residential bridge, reducing the planned pipe length from 38km (23miles) to 18km (11miles) - saving 20km (12.5miles) of pipeline

• No contamination to the river or surrounding villages

• Reduced staging and transport costs: Sponge Media was reused on site, so that Sponge Media, blasting/recycling equipment, welding equipment, crane, generator and compressor were all on one vehicle