MARİN TEKNİK SHIPPING CONSULTING INDUSTRY & TRADE LTD.

DENİZCİLİK DANIŞMANLIK SAN.ve TİC. LTD.

MARİN MAKİNA

ENGINEERING CONSULTING INDUSTRY & TRADE LTD.

MÜHENDİSLİK DANIŞMANLIK SAN.ve TİC. LTD.

PREFABRICATING &

RENEWAL JOBS

UPDATED: 12th February 2019

Page 2: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested
Page 3: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested

F – 513 BURGAZADA & F-514 KINALIADA CORRETTE NAVY VESSELS

NEW PREFABRICATED NAVY VESSELS AFTER SEA TRIAL RENEWED LEAKAGE VALVES &

ACTUATORS.

DATES :

2018.10.01-08 2018.10.15-26 2018.11.05-24

2018.11.28-12.13 2019.01.02-08 2019.02.06-12

Page 4: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested

2018.11.02 - 05

M/Tug ALP STRIKER

( 9737230 )

MGO SETTLING TANK CLEANING FOR

HOT WORK .

DAMAGE AREA STEEL PLATE RENEWAL

700 x 500 x 10 mm WITH AH336 STEEL

PLATE LR.APPROVAL.

(NEMRUT BAY ANCHORAGE AREA )

(DNV-GL CLASS UNDER CONTROL )

Page 5: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested
Page 6: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested

2018.08.24 – 2018.10.19

M/T NOBLE SPIRIT

( 9213909 )

ALL CALIBRATION JOBS & ELECTRIC

EQUIPMENT OVERHAUL / CLEANING / CHECH &

GAUGE /TRANSMITTER / LEVEL

GAUGES/FLOWMETERS /TEMP. PRESS.CONTROLLERS

ETC.

AUX.ENGINE GOVERNORS OVERHAULED & M/E

EXH.VALVE SPINDLES + SEATS RECONDATIOND &

CARGO VALVE ACTUATORS OVERHAULED & SPLIT

CLIMA INNER & OUTER UNITS INSTALL TO BRIDGE

PORTSIDE .

MOL TANKSHIPS MANAGEMENT

( Europe ) LTD.

Page 7: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested
Page 8: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested

2018.08.25 – 2018.09.05

M/T PHOENIX ADMIRAL ( 9482603 )

ALL CALIBRATION JOBS & ELECTRIC

EQUIPMENT OVERHAUL / CLEANING / CHECH & GAUGE /TRANSMITTER / LEVEL

GAUGES/FLOWMETERS /TEMP. PRESS.CONTROLLERS ETC.

C/R PACKAGE TYPE AIR CON REPAIR & AIR CON + FRIDGE SYSTEMS INSPECTIONS & SSAS + RADIO

ANTENNA / CONNECTIONS INSPECTIONS & PURIFIER BOWL DAMAGE PEPAIR + BALLANCE .

MOL TANKSHIPS MANAGEMENT

( Europe ) LTD.

Page 9: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested
Page 10: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested

2018.04.11 – 2018.05.05

M/T PIGEON POINT

( 9322396 )

ALL CALIBRATION JOBS & ELECTRIC

EQUIPMENT OVERHAUL / CLEANING / CHECH &

GAUGE /TRANSMITTER / LEVEL

GAUGES/FLOWMETERS /TEMP. PRESS.CONTROLLERS

ETC.

MOL TANKSHIPS MANAGEMENT

( Europe ) LTD.

Page 11: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested
Page 12: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested

2018.04.11 – 2018.05.05

M/T PIGEON POINT

( 9322396 )

M/E EXH.VALVE SPINDLES + SEATS RECONDATIONED

& CARGO VALVE ACTUATORS OVERHAULED & AIR

CON + FRIDGE SYSTEMS INSPECTIONS &

MICROMETERS +TORQUE METERS + INSULATION

TESTER S CALIBRATION.

MOL TANKSHIPS MANAGEMENT

( Europe ) LTD.

Page 13: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested
Page 14: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested

2018.01.29 – 2018.02.01

M/T MARIANNA V.V

( 9259707 )

LIFEBOATS BLOCKS PREFABRICATED 4 PCS.

& LOAD TESTED & MAKER CERTIFICATED .

CLEMENT NAVIGATION S.A.

Page 15: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested
Page 16: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested

2017.12.29 – 2018.01.20

M/T SAN FERNANDO

( 9322384 )

ALL CALIBRATION JOBS & ELECTRIC

EQUIPMENT OVERHAUL / CLEANING / CHECH &

GAUGE /TRANSMITTER / LEVEL GAUGES /

FLOWMETERS /TEMP. PRESS.CONTROLLERS &

ALTERNATOR CLEANING + CHECK ETC.

MOL TANKSHIPS MANAGEMENT

( Europe ) LTD.

Page 17: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested
Page 18: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested

2017.12.29 – 2018.01.20

M/T SAN FERNANDO

( 9322384 )

ALL CALIBRATION JOBS & ELECTRIC

EQUIPMENT OVERHAUL / CLEANING / CHECH &

GAUGE /TRANSMITTER / LEVEL GAUGES /

FLOWMETERS /TEMP. PRESS.CONTROLLERS

ETC.

MOL TANKSHIPS MANAGEMENT

( Europe ) LTD.

Page 19: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested

b

Page 20: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested

2017.12.04 – 20

M/T IMPROS

( 9259692 )

LIFEBOATS BLOCKS PREFABRICATED 4 PCS.

& LOAD TESTED & MAKER CERTIFICATED .

CLEMENT NAVIGATION S.A.

Page 21: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested
Page 22: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested

2017.11.14

M/V LEMLAND

( 9415040 )

FRIDGO COMPRESOR SUCTION VALVE RENEWED

SYSTEM VACUMED & REFILL NEW GAS

& DELIVERIED TO VESSEL

WORKING CONDITION .

FLINTER - BARENDRECHT,

NETHERLANDS

Page 23: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested
Page 24: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested

2017.09.12

M/V GLOBAL VISION

( 9687758 )

SEA CHEST STEAM LINE BROKEN PIPE & VALVE

RENEWED WITH NEW PIPE & VALVE .

( NKK CLASS UNDER CONTROL )

NYK LINE TOKYO

Page 25: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested
Page 26: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested

2017.07.01 - 08

M/V KENT TRADER

( 9236652 )

MAN B&W 70MC PISTON CROWN

RECONDATIONED

LOMAR SHIP LTD./UK

Page 27: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested
Page 28: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested

2017.07.01 - 08

M/V KATHARINAS

( 9236652 )

MAK8M20 CRANKSHAFT

RECONDATIONED

Page 29: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested
Page 30: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested

2017.06.28 - 2017.07.03

Self Disch.Barge ARKAD V

( 8956516 )

SHELL PLATE RENEWAL

( GL CLASS UNDER CONTROL )

İSKOLDEN

TAŞIMACILIK VE TİC.A.Ş.

Page 31: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested
Page 32: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested

2017.06.13 - 17

SPECIAL DRAIN SPACE FOR

OVERFLOW HEADS PREFABRICATED

ATLAS MARINE VALVES

SINGAPORE

Page 33: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested
Page 34: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested

2017.06.08

M/V ANWAT AL KHALIJ

( 9313424 )

FRAMO MANIFOLD PREFABRICATED

ON PLACE & TESTED & WORKING CONDITION

DELIVERIED.

PLATINUM MARINE SERVICES

BELIZE

Page 35: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested
Page 36: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested

2017.01.27 - 28

M/V ROSINA TOPIC

( 9193707 )

CLEANED THE OLD GAS FROM SYSTEM, FLUSHING

WITH NITROGEN , PRESSURE & LEAKAGE TESTED ,

EVACUATION OF THE SYSTEM BY VACUM PUMP , NEW

GAS & OIL REFILLED TESTED & WORKING

CONDITION DELIVERIED.

IHI & IMBV

Page 37: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested
Page 38: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested

2016.10.10 - 12

M/V CANOPUS

( 9319868)

MAIN SWITCHBOARD DAMAGE ARE

BOW THRUSTER & ESB BREAKERS

( 2 pcs) + AUX.BREAKERS ( 3 pcs ) RENEWED

WITH OUR SUPPLY EQUIPMENT.

DORIS MARITIME SERVIS S.A.

SWITZERLAND

Page 39: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested
Page 40: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested

2016.05.15 - 20

M/V ASIA ZIRCON II

( 9330678)

PORT CHAIN LOCKER DAMAGE AREA REPAIRED &

PORT CHAIN SECURITY DEVICES COMPLETE

PREFABRICATED AND INSTALLED.

ANCHOR + 12 Length ANCH.CHAIN CABLE

INSTALLED TO PLACE.

COLUMBIA SHIPMAN.SNG.

SINGAPORE

Page 41: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested
Page 42: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested

2016.05.15 - 20

HATCH COVER WEDGE

550 SETS PREFABRICATED

ARMA MARINE

SERVICES

Page 43: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested

HATCH COVER WEDGE PREFABRICATION

Page 44: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested

2016.03.27 – 2016.04.30

M/T AMBASSADOR NORRIS

( 9223722 )

SPARE AIR COND.COMP.INSTALL TO SYSTEM AT

DRYDOCK.

MOL TANKSHIPS MANAGEMENT

( Europe ) LTD.

Page 45: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested
Page 46: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested

2016.03.27 – 2016.04.30

M/T AMBASSADOR NORRIS

( 9223722 )

ALL CARGO VALVES ACTUATORS OVERHAULED

AT DRYDOCK.

MOL TANKSHIPS MANAGEMENT

( Europe ) LTD.

Page 47: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested
Page 48: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested

2016.03.27 – 2016.04.30

M/T AMBASSADOR NORRIS

( 9223722 )

M/E PISTON CROWNS & M/E EXH.VALVE

SPINDLES + SEATS RECONDATIONED.

( MAKER MITSUI ENGINEER UNDER CONTROL )

MOL TANKSHIPS MANAGEMENT

( Europe ) LTD.

Page 49: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested
Page 50: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested

2016.03.27 – 2016.04.30

M/T AMBASSADOR NORRIS

( 9223722 )

ALL D/G & EMERG.ALTERNATORS AND BREAKERS

CONTROL & CLEANING & WORK TEST & REPORTS.

FRAMO POWERPACK CONTROL & CLEANING & WORK

TEST & REPORTS.

ALL CALIBRATION JOBS & CERTIFICATION &

REPORTS AT DRY DOCK.

(ODME / INNERT GAS SYSTEM/OWS / FIX GAS DEDEC.SYSTEM/BALLAST &

CARGO TANK LEVEL SYSTEM + TRANSMITTERS / TEMP.CONTROLLERS

/DRAFT GAUGE /FIRE ALARM SYSTEM ETC.

( NKK CLASS UNDER CONTROL )

MOL TANKSHIPS MANAGEMENT

( Europe ) LTD.

Page 51: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested
Page 52: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested

2016.03.27 – 2016.04.30

M/T AMBASSADOR NORRIS

( 9223722 )

ACCOM.LADDERS & WINCH REPAIR .

( NKK CLASS UNDER CONTROL )

MOL TANKSHIPS MANAGEMENT

( Europe ) LTD.

Page 53: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested
Page 54: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested

2016.01.22 – 26

M/V KEOYANG MAJESTY

( 9131072 )

AUX.BOILER 5 YEARS OVERHAUL & CONTROL

SAFETY DEVICES CHECKS.

( KR CLASS UNDER CONTROL )

ATLAS MARINE VALVES

Page 55: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested
Page 56: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested

2015.11.04 – 15

M/T AMBASSADOR NORRIS

( 9223722 )

M/E EXH.VALVE SPINDLES + SEATS RECONDATIONED.

( MAKER MITSUI ENGINEER UNDER CONTROL )

STEERING GEAR SYSTEM & MOORING EQUPMENT

INSPECTION

REF.COMPRESORS & AIR CON COMP. OVERHAULED.

ALL CALIBRATION JOBS & CERTIFICATION &

REPORTS AT DRY DOCK.

(ODME / INNERT GAS SYSTEM / OWS / FIX GAS DEDEC.SYSTEM/BALLAST &

CARGO TANK LEVEL SYSTEM + TRANSMITTERS / TEMP.CONTROLLERS

/DRAFT GAUGE /FIRE ALARM SYSTEM ETC.

( NKK CLASS UNDER CONTROL )

MOL TANKSHIPS MANAGEMENT

( Europe ) LTD.

Page 57: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested
Page 58: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested

2015.06.26 – 28

M/T BLUE ROSE

( 9335915 )

#6 CARGO MANIFOLD LINE RENEWAL

( NKK CLASS UNDER CONTROL )

ACE TANKERS CV.

Page 59: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested
Page 60: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested

2015.05.26 – 28

M/V ETHEL L

( 9450806 )

PS.PILOT SLANT LADDER DAMAGE REPAIR

( NKK CLASS UNDER CONTROL )

WALLEM SHIPMANAGEMENT LTD.

Page 61: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested
Page 62: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested

2015.03.01 – 03

M/V JIN SUI

( 9446934 )

#1 CARGO HOLD TANK TOP DAMAGED STELL PLATE

RENEWAL.

( ABS CLASS UNDER CONTROL )

GOLDBEAM INTER.LTD.

Page 63: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested
Page 64: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested

2014.12.01 – 06

SCHLUMBERGER

SCAFFOLDING & LADDERS & PLATFORMS NEW

PREFABRICATED & INSTALLED TO PLACE.

( SHELL ENGINEERS UNDER CONTROL )

PROSAM ENGINEERING

Page 65: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested
Page 66: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested

2014.12.07 – 09

M/V JIAN QIANG

( 9123623 )

#2 CRANE JIB DAMAGE REPAIR.

( NKK CLASS UNDER CONTROL )

COSCO HK.SHIPPING CO.

Page 67: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested
Page 68: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested

2014.09.13 – 19

M/V PERGE

( 8027573 )

STB & PS ACCOM.LADDERS PREFABRICATED &

INSTALLED.

POLARIS SHIPPING S.A.

Page 69: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested
Page 70: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested

2014.06.17 – 2014.07.08

M/T ABNVIG8 GEREKAS

& M/T ODOMOS

A15 TYPE 15m ALUN_MINIUM WHARF LADDERS

PREFABRICATED.

WORLD TANKERS UK LTD./UK.

Page 71: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested
Page 72: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested

2014.05.28 - 2014.06.17

TRANSSHIPPER ISKEN

PORTSIDE FENDER RENEWAL

( GL CLASS UNDER CONTROL )

İSKOLDEN

TAŞIMACILIK VE TİC.A.Ş.

Page 73: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested
Page 74: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested

2014.05.28 - 2014.06.17

TRANSSHIPPER ISKEN

#2 & #3 CRANE PEDESTAL CRACK REPAIR

( MAKER & GL CLASS UNDER CONTROL )

İSKOLDEN

TAŞIMACILIK VE TİC.A.Ş.

Page 75: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested
Page 76: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested

2014.05.28 - 2014.06.17

TRANSSHIPPER ISKEN

SHELL PLATE RENEWAL

(GL CLASS UNDER CONTROL )

İSKOLDEN

TAŞIMACILIK VE TİC.A.Ş.

Page 77: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested
Page 78: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested

2014.06.03 - 17

Self Disch.Barge ARKAD IV

( 8956504 )

PUSH POINT STEEL RENEWAL

( GL CLASS UNDER CONTROL )

İSKOLDEN

TAŞIMACILIK VE TİC.A.Ş.

Page 79: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested
Page 80: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested

2014.01.19 - 22

M/V RM POWER

( 9264128 )

HOLD DAMAGE REPAIRS

WEB LINES S.A./B.V.I

Page 81: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested
Page 82: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested

2013.10.31 - 2013.11.04

TRANSSHIPPER ISKEN

#1 CRANE PEDESTAL CRACK REPAIR

( MAKER & GL CLASS UNDER CONTROL )

İSKOLDEN

TAŞIMACILIK VE TİC.A.Ş.

Page 83: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested
Page 84: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested

2013.09.05 - 17

M/V ORIENT JASMINE

( 9514327 )

ACCOM.LADDER PREFABRICATED & INSTALL TO

PLACE.

( NKK CLASS UNDER CONTROL )

IHI & IMBV

Page 85: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested
Page 86: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested

2013.06.11 - 25

TRANSSHIPPER ISKEN

STB.SIDE FENDER RENEWAL

( GL CLASS UNDER CONTROL )

İSKOLDEN

TAŞIMACILIK VE TİC.A.Ş.

Page 87: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested
Page 88: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested

2012.07.09 - 12

M/V ORIENT JASMIN

( 9514327 )

ACCOM.LADDER PREFABRICATED & INSTALL TO

PLACE.

( NKK CLASS UNDER CONTROL )

IHI & IMBV

Page 89: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested
Page 90: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested

2012.05.06 - 13

Self Disch.Barge ARKAD V

( 8956516)

PUSH POINT STEEL RENEWAL

( GL CLASS UNDER CONTROL )

İSKOLDEN

TAŞIMACILIK VE TİC.A.Ş.

Page 91: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested
Page 92: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested

2011.08.04 - 06

M/V NYACK PRINCESS

( 8308953)

CRANE JIB DAMAGE REPAIR

( LR. CLASS UNDER CONTROL )

ROYMAR MARINE S.A./USA

Page 93: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested
Page 94: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested

2010.03.23 - 2011.02.19

F 512 BUYUKADA

BLOCK PREFABRICATED

( NAVY ENGINEERS UNDER CONTROL )

STM.A.Ş.

Page 95: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested
Page 96: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested

2011.02.12 - 23

M/V ERK

( 8313386 )

HEAD ON COLLISION

DAMAGE REPAIR AT PARANA RIVER ( ARJANTINA )

( P & I CLUB + NKK CLASS UNDER CONTROL )

IST SHIPPING S.A / PANAMA

Page 97: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested
Page 98: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested

2010.12.13 - 20

TRANSSHIPPER ISKEN

ISKEN CRANE SUPPORTS PREFABRICATED

(GL CLASS UNDER CONTROL )

İSKOLDEN

TAŞIMACILIK VE TİC.A.Ş.

Page 99: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested
Page 100: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested

2010.11.07 - 09

M/V CMA CGM ALABAMA

(9128180 )

ALUMINIUM ACCOM.LADDER

DAMAGE REPAIR

CONTI WELLINGTON / GERMANY

Page 101: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested
Page 102: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested

2010.01.05 - 10

M/V YASEMIN

(9136838 )

HULL DAMAGE REPAIR .

CRANE DAMAGE REPAIR.

( NKK CLASS UNDER CONTROL )

IST SHIPPING S.A. / PANAMA

Page 103: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested
Page 104: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested

2009.12.01 - 16

M/V YASIN C

CRANE DAMAGE REPAIR.

( LR. CLASS UNDER CONTROL )

BERGEN SHIPPING S.A.

Page 105: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested
Page 106: PREFABRICATING & RENEWAL JOBS · 2019-03-29 · 2017.01.27 - 28 . m/v rosina topic ( 9193707 ) cleaned the old gas from system, flushing with nitrogen , pressure & leakage tested

2009

TRANSSHIPPER ISKEN

ANCHORAGE ARRANGEMENT

PREFABRICATED & INSTALLED

(GL CLASS UNDER CONTROL )

İSKOLDEN

TAŞIMACILIK VE TİC.A.Ş.