Pre-Proposal Conference Professional Engineering Services for Restoration Project RFP 6000000605 South Florida Water Management District Headquarters November 21, 2013 B-1 Auditorium

Pre-Proposal Conference Professional Engineering Services for Restoration Project

  • Upload
    gautam

  • View
    35

  • Download
    0

Embed Size (px)

DESCRIPTION

Pre-Proposal Conference Professional Engineering Services for Restoration Project RFP 6000000605. South Florida Water Management District Headquarters. November 21, 2013 B-1 Auditorium. Agenda. 1. Welcome and Introduction 2. Overview of Solicitation Document - PowerPoint PPT Presentation

Citation preview

Page 1: Pre-Proposal Conference  Professional Engineering Services  for Restoration Project

Pre-Proposal Conference Professional Engineering Services

for Restoration Project RFP 6000000605

Pre-Proposal Conference Professional Engineering Services

for Restoration Project RFP 6000000605

South Florida Water Management District

Headquarters

South Florida Water Management District

Headquarters

November 21, 2013B-1 Auditorium

November 21, 2013B-1 Auditorium

Page 2: Pre-Proposal Conference  Professional Engineering Services  for Restoration Project

AgendaAgenda

1. Welcome and Introduction

2. Overview of Solicitation Document

3. Schedule, Rules of Engagement, and Communications

4. Statement Of Work

5. Questions and Answers

1. Welcome and Introduction

2. Overview of Solicitation Document

3. Schedule, Rules of Engagement, and Communications

4. Statement Of Work

5. Questions and Answers

Page 3: Pre-Proposal Conference  Professional Engineering Services  for Restoration Project

Overview of SolicitationOverview of Solicitation

Objective

Obtain the services of multiple consultants with the capability to provide professional engineering services.

Objective

Obtain the services of multiple consultants with the capability to provide professional engineering services.

Page 4: Pre-Proposal Conference  Professional Engineering Services  for Restoration Project

PROFESSIONAL ENGINEERING SERVICES FOR RESTORATION PROJECT

PROFESSIONAL ENGINEERING SERVICES FOR RESTORATION PROJECT

This RFP is issued subject to the legal requirements established under the Consultants' Competitive Negotiation Act, Section 287.055, Florida Statutes.

Purpose: The purpose of this RFP is solicit qualifications and technical proposals to provide engineering services for the District’s Restoration Project which includes accomplishing the needs of the environment and meeting water quality requirements. Multiple contract awards are anticipated. Contracts will be for a three year period with two, one year options to renew.

Inquiry Period: Direct All Inquiries to:

November 6, 2013 – November 25, 2013 Procurement:

Telephone No:

E-Mail:

Fax No:

Bernadette Harrison, Contract Specialist

(561) 682-6378

[email protected]

(561) 682-5587

Inquiries will be received between the hours of 8:00 A.M. and 5:00 P.M. weekdays.

Note: All technical inquiries must be submitted in writing via Fax or E-Mail.

Deadline For RFP Submission: 

FRIDAY, DECEMBER 6, 2013 - 2:30 P.M. 

1 Original and 6 Copies to be SubmittedALL RESPONSES MUST BE SUBMITTED IN A SEALED ENVELOPE OR BOX

Confirmation of timely receipt may be made by calling (561) 682-2715

Page 5: Pre-Proposal Conference  Professional Engineering Services  for Restoration Project

Request for Proposals –

Part 1. General Guidelines and Information

Part 2. Instructions for Preparing Responses

Part 3. Statement of Work

Part 4. Evaluation Criteria and Standards

Part 5. Small Business Enterprise (SBE) Program

Attachments

Request for Proposals –

Part 1. General Guidelines and Information

Part 2. Instructions for Preparing Responses

Part 3. Statement of Work

Part 4. Evaluation Criteria and Standards

Part 5. Small Business Enterprise (SBE) Program

Attachments

Solicitation DocumentSolicitation Document

Page 6: Pre-Proposal Conference  Professional Engineering Services  for Restoration Project

RFP Part 1

General Guidelines & Information

RFP Part 1

General Guidelines & Information

Page 7: Pre-Proposal Conference  Professional Engineering Services  for Restoration Project

Responsiveness ConditionsResponsiveness Conditions

Timely Submission Compliance Disclosure Form

(Attachment 2, pg. 45-48) Completed in full and signed

on page 3 where you will commit to meet SBE goals assigned to work orders and on page 4 which is the Non Collusion Certification.

Timely Submission Compliance Disclosure Form

(Attachment 2, pg. 45-48) Completed in full and signed

on page 3 where you will commit to meet SBE goals assigned to work orders and on page 4 which is the Non Collusion Certification.

Page 8: Pre-Proposal Conference  Professional Engineering Services  for Restoration Project

RFP Part 2 Response Format

RFP Part 2 Response Format

Font: Times Roman, Size 10 Margins: One inch page margins (except for tables,

charts, graphs) Paper: 8 ½” x 11 (except for org charts and matrices

which may be 11” x 17” Organize and tab according to Part 2.1 directions. Bound in no larger than a 1” three-ring binder Page Limits

Cover Letter – 2 pages maximum

Part 2, Tab H Proposed Approach and Methodology

– 6 pages maximum

Font: Times Roman, Size 10 Margins: One inch page margins (except for tables,

charts, graphs) Paper: 8 ½” x 11 (except for org charts and matrices

which may be 11” x 17” Organize and tab according to Part 2.1 directions. Bound in no larger than a 1” three-ring binder Page Limits

Cover Letter – 2 pages maximum

Part 2, Tab H Proposed Approach and Methodology

– 6 pages maximum

Page 9: Pre-Proposal Conference  Professional Engineering Services  for Restoration Project

Tab A - Title Page (RFP number and Title, Prime Consultant’s Name and Date of Submittal)

Tab B - Table of Contents

Tab C - Cover Letter (2 pages maximum)

Tab A - Title Page (RFP number and Title, Prime Consultant’s Name and Date of Submittal)

Tab B - Table of Contents

Tab C - Cover Letter (2 pages maximum)

RFP Part 2 Response Format

RFP Part 2 Response Format

Page 10: Pre-Proposal Conference  Professional Engineering Services  for Restoration Project

Tab D – Responsiveness Conditions Timely Submission – no later than 2:30

pm on December 6, 2013 Insert Compliance Disclosure Form:

Must be completed in full & signed on pages 3 and 4 (Team Composition Plan and Non Collusion Certification)

Tab D – Responsiveness Conditions Timely Submission – no later than 2:30

pm on December 6, 2013 Insert Compliance Disclosure Form:

Must be completed in full & signed on pages 3 and 4 (Team Composition Plan and Non Collusion Certification)

RFP Part 2Response Format

RFP Part 2Response Format

Page 11: Pre-Proposal Conference  Professional Engineering Services  for Restoration Project

RFP Part 2Response Format

RFP Part 2Response Format

Tab E. Responsibility DocumentationMinimum License Requirements Evidence of Insurance - $5M G/L & $1M A/L and

P/L, Workers CompReference Forms – Page 52 (minimum of 6)Good Standing with Fla. Secretary of State

Tab E. Responsibility DocumentationMinimum License Requirements Evidence of Insurance - $5M G/L & $1M A/L and

P/L, Workers CompReference Forms – Page 52 (minimum of 6)Good Standing with Fla. Secretary of State

Page 12: Pre-Proposal Conference  Professional Engineering Services  for Restoration Project

Tab F – Proposed Project Team – Include org chart and resumes of key individuals

Tab G – Qualifications & Experience

Tab H – Proposed Approach and Methodology

Tab I – Quality Assurance/Quality Control

Tab J – Management Capability

Tab F – Proposed Project Team – Include org chart and resumes of key individuals

Tab G – Qualifications & Experience

Tab H – Proposed Approach and Methodology

Tab I – Quality Assurance/Quality Control

Tab J – Management Capability

RFP Part 2Response Format

RFP Part 2Response Format

Page 13: Pre-Proposal Conference  Professional Engineering Services  for Restoration Project

Evaluation CriteriaEvaluation Criteria Maximum Points

Proposed Project Team, Staffing Availability & Workload Distribution

1-10

Qual/Exp of firm and Subcontractors 1-40Proposed Approach & Methodology 1-20Quality Assurance/Quality Control 1-15Management Capabilities & Office

Locations1-10

Volume of Previous District Work 5

Total possible points 100

Page 14: Pre-Proposal Conference  Professional Engineering Services  for Restoration Project

Oral PresentationsOral Presentations

Short listed respondents will be advised of the date/time of teleconference or on-site meeting

Maximum of 20 points per evaluator Sum of written evaluation and oral

presentation scores will determine final ranking.

Short listed respondents will be advised of the date/time of teleconference or on-site meeting

Maximum of 20 points per evaluator Sum of written evaluation and oral

presentation scores will determine final ranking.

Page 15: Pre-Proposal Conference  Professional Engineering Services  for Restoration Project

Solicitation ScheduleSolicitation Schedule

Deadline for Inquiries November 25, 2013 5:00 p.m.

Deadline for Proposals December 6, 2013, 2:30 p.m.

20-30* day period for evaluation – January 2014 Oral Presentations – To be determined Approval & Posting – February 2014* Contract Execution

* May change depending on number of proposals received.

Deadline for Inquiries November 25, 2013 5:00 p.m.

Deadline for Proposals December 6, 2013, 2:30 p.m.

20-30* day period for evaluation – January 2014 Oral Presentations – To be determined Approval & Posting – February 2014* Contract Execution

* May change depending on number of proposals received.

Page 16: Pre-Proposal Conference  Professional Engineering Services  for Restoration Project

Solicitation / Addenda:

http://www.sfwmd.gov

Select Businesses, Procurement, Current

Solicitations/Contract Opportunities Calendar

Contact: Bernadette Harrison, [email protected] (561) 682- 6378

Technical questions accepted in writing until 11/25/2013

Solicitation / Addenda:

http://www.sfwmd.gov

Select Businesses, Procurement, Current

Solicitations/Contract Opportunities Calendar

Contact: Bernadette Harrison, [email protected] (561) 682- 6378

Technical questions accepted in writing until 11/25/2013

CommunicationsCommunications

Page 17: Pre-Proposal Conference  Professional Engineering Services  for Restoration Project

SMALL BUSINESS ENTERPRISE (SBE)

PROGRAM

SMALL BUSINESS ENTERPRISE (SBE)

PROGRAM

Guidelines and Information Guidelines and Information

Page 18: Pre-Proposal Conference  Professional Engineering Services  for Restoration Project

SBE Guidelines and Information SBE Guidelines and Information

SBE Rule 40E-7.670 (3) (c) – Work Order Proposal Compliance Disclosure Form

Identify SBE SubcontractorsProposer’s commitment to meet SBE goals

assigned to Work Orders

SBE Rule 40E-7.670 (3) (c) – Work Order Proposal Compliance Disclosure Form

Identify SBE SubcontractorsProposer’s commitment to meet SBE goals

assigned to Work Orders

Page 19: Pre-Proposal Conference  Professional Engineering Services  for Restoration Project

SBE Guidelines and Information (continue)

SBE Guidelines and Information (continue)

SBE Goal Setting Process for Work Orders SBE Goal is assigned Work Order Contractor submits cost proposal Contractor submits SBE Utilization Plan

SBE Utilization Plan SBE Subcontractor Participation Schedule Statement of Intent to Perform as a SBE

Subcontractor Proof of Certification

SBE Goal Setting Process for Work Orders SBE Goal is assigned Work Order Contractor submits cost proposal Contractor submits SBE Utilization Plan

SBE Utilization Plan SBE Subcontractor Participation Schedule Statement of Intent to Perform as a SBE

Subcontractor Proof of Certification

Page 20: Pre-Proposal Conference  Professional Engineering Services  for Restoration Project

STATEMENT OF WORK STATEMENT OF WORK

OVERVIEW OVERVIEW

Page 21: Pre-Proposal Conference  Professional Engineering Services  for Restoration Project

QuestionsQuestions