PRE-MONSOON CHECKLIST

Pre Monsoon-Check List

Embed Size (px)

DESCRIPTION

Checklist

Citation preview

Slide 1

PRE-MONSOON CHECKLIST

INDEXROOFTERRACEAT VERTICAL FACES STORM WATER DRAINS / PIPESROADS & DEVELOPMENTMISC. POINTSINTERIORSUTILITYEMERGENCY TOOLSRAIN WATER HARVESTING

ROOF :-

Cleaning of RoofCleaning of Rain water GutterReplacement of broken Sheets (FRP/polycarbonate/AC/Metal etc)Replacement of Broken glasses for north light structuresSealing of dummy Holes , loose screws etc Appropriate treatments with elastomeric compounds (Kemper/ Isothene) for Metal to FRP / polycarbonate & Metal to RCC structuresVerification of flashings at Junction between Roof & cladding

TERRACE :-

Cleaning of TerraceCleaning the mouth of Down take pipeFixing of Screen at the mouth of Down take to arrest the solid particlesRectification of damaged waterproofingRectification of Cracks, potholes with appropriate chemical coatings( Dr. Fixit,Fosroc,tapecrete etc.)Closing of Cutouts lefts for Cable, pipe entry, etcFixing of Vent Cowls over PipesClosing of open ducts, light courts, lift shafts according to site condition, If applicableSlope at the top of parapet wall

AT VERTICAL FACES:-

Sealing of cracks in wall/plasterClamping of Down take pipesJunction of gutter downspout to pipeSealing of junctions around window, doors, rolling shutters, glazing etc.Replacement of Broken glasses of window, glazing etcLowering the flap of louvered windowsOutward slope at window sill levelSealing of Joints around cutouts, holes made for Utilities (pipes, ducts etc)Rectification of vertical flashings of sheets against leakages

STORM WATER DRAINS/PIPES:-

Cleaning of Drains,pipes,chambers etcProper Slope to drainsCleaning the Area below gratings Verification of Down take pipe connection in Storm water drain Finishing of Chambers inside & outsideReplacement of broken chamber covers, pipesPhysical Testing of line to observe the flow, stagnancy , blockage of water etcOpening the valves In dyke walls of oil yard etcAlt. arrangement near rain water harvesting pit against over flow

ROADS & DEVELOPMENT:-

Cleaning of Roads & soccer drains Removal of obstructions to surface run-off.Identification & rectification of water stagnancy areas.Feeling of Exposed grove with Bitumen Rectification of cracks & potholes with epoxy mortar Cleaning of weep holesMouth cleaning outside compound at discharge point Esurience of water discharge at nearest water streamIdentification & demarcation of landslide areas Back filling around critical structure elements such as Foundation, raft etc

MISC. POINTS:-

Provision of Sump & Sump pit in the underground structures such as basement, pump room etcNegative Waterproofing for the under ground structures if applicable/requiredChecking & fixing covers for water tanks, & septic tanks ,utility/service trenches etc.Check the locations near retaining walls for any voids on the rear sides of the wall for any voids , trenches and fill them up above the level of the adjoining ground so as to reduce pressure on the wall by avoiding the storm water to flow abutting the wall.Security gate track cleaning & covering the motor

BUILDING INTERIORS:-

Clean carpets and rugs regularly to reduce musty smell & water and insect infestation respectivelyProtect wooden cupboards, desk drawers from moisture with appropriate majors Protect wooden flooring from moisture by properly waxed (polished) to protect them from moistureDestroy termite infestationwhich is a major problem where water leakage or high humidity exists.Install ventilators to remove dampness in humid areasProvide the door mats.

UTILITIES:-Check Transformer Oil Insulation resistance, filtration of Transformer oil to be done.Check Transformer safety relays operation B relay, Oil Temp., winding temp., Oil Surge relay.Check Transformer Cable end Boxes for ingress protection level if found in bad condition then make proper sealing of all joints to avoid ingress of moisture.Check HT Panel relays for satisfactory operations.Provide Space heaters in HT Cable compartments.Check LT Panels for ingress protection if found not up to mark, then replace gaskets, tighten the panel covers.Check insulation resistance of LT Panel.Check space heaters operations in LT Panels.Check whether HT & LT Panel rooms are well protected from Rains & provide enough lighting & if necessary space heating in case of high moisture area.

UTILITIES:-Check bus duct for ingress protection failure, space heaters operation.Check whether LT Panel is not under area where leakage can happen in rainy season.Check Earthing Values, if found not OK then do necessary compound filling work.Check tightness of all earthing joints.Check Lightening Arrestor connectivity to earth pits.Check earthing connections to all machines & equipments, every equipment must have two distinct earth connections.

EMERGENCY TOOLS:-Sump pumpHDPE Pipe 50 RmtPolythene paper 200 SqmSilicon SealantWaterproofing chemical compoundsDrill Machine

`

ARTIFICIAL RECHARGE : RECHARGE WELLRECHARGE PIT /SHAFTDUG WELLFLOODINGPERCOLATION TANKSTREAM AUGMENTATIONDITCH & FURROW SYSTEM