Constraints Description
Length 6 Km
Shilpa
Gas Agency
0.3 Hectare
Shivani
Farmhouse
0.2 Hectare
Residential
Houses
(340 Nos.)
10.5 Hectare
Schools
(2 Nos.)
0.2 Hectare
Godown (1 No.) 0.7 Hectare
Crossing
of
Delhi-Rohtak
Railway Line
-
Crossing of
NH-10
-
Land
Acquisition
60 Hectare
Master Plan Alignment
Zoomed Plan
Constraints
of Master
Plan
Alignment
Feasible
Solution
Shilpa
Gas Agency
(0.3 Ha)
At-Grade
Road (3 Km)
(Gas Agency
& Farmhouse
shall be
affected)
Shivani
Farmhouse
(0.2 Ha)
Residential
Houses
(340 Nos.,
10.5 Ha)
Tunnel (2 Km)
Schools
(2 Nos., 0.2
Ha)
Godown
(1 No., 0.7 Ha)
Elevated
Road (1 Km)
(Go-Down
shall be
affected).
Crossing
of
Delhi-Rohtak
Railway Line
Crossing of
NH-10
Master Plan Alignment
Total Cost Involvement
Length (in
km.)
(B)
Width (in m.)
(C )
Land Acquisition
Structures Affected
Construction Cost
(in crore INR)
(I)
Total Cost Involvement (in crore INR)
(J)=(E+H+I)
Area (Ha)
(D)
Cost(in
croreINR)(E )
No.
(F)
Area (Ha)
(G)
Cost (in
croreINR)(H)
6.0 100 40 296 3 1.2 19 870 1185
Master Plan Alignment
Construction Cost
Item Description Length (in km.)
Width (in m.)
Quantity(in sq.
m.)
Rate/km.(INR) Cost (INR)
Elevated Road Structure Part 1 30 30000 65,000 1,95,00,00,000
Tunnel Structure Part 2 30 3,000,000,000 6,00,00,00,000
At-Grade Road
6 Lane MV+2 Lane BRT+2 Lane NMT & Footpath + 4 Lane Service Road= 14 Lane
3 60 250,000,000 75,00,00,000
Total Construction Cost 8,700,000,000
870 Crore
Master Plan Alignment
Constraints Description
Length 7.4 km.
Shilpa Gas
Agency
0.3 Hectare
Shivani
Farmhouse
0.2 Hectare
Godown
(1 unit)
0.7 Hectare
Crossing of
Delhi-Rohtak
Railway Line
-
Crossing of
NH-10
-
Land
Acquisition
74 Ha
Option-I Alignment
Constraints of
Master Plan
Alignment
Feasible
Solution
Shilpa
Gas Agency
(0.3 Ha)
At-Grade Road
(6.4 Km length,
100m width)
(Gas Agency &
Farmhouse
shall be
affected)
Shivani
Farmhouse
(0.2 Ha)
Godown
(1 unit,
0.7 Ha)
Elevated Road
(1 Km length,
30m width)
(Godown shall
be affected).
Crossing of
Delhi –
Rohtak
Railway Line
Crossing of
NH-10
Option-I Alignment
Total Cost Involvement
Length (in
km.)
(B)
Width (in m.)
(C )
Land Acquisition
Structures AffectedConstruction
Cost(in crore INR)
(I)
Total Cost Involvement (in crore INR)
(J)=(E+H+I)Area
(Ha)
(D)
Cost
(in
crore
INR)
(E )
No.
(F)
Area
(Ha)
(G)
Cost
(in
crore
INR)
(H)
7.4 100 74 548 3 1.2 19 355 922
Option-I Alignment
Construction Cost
Item Description Length (in km.)
Width(in m.)
Quantity (in sq.
m.)
Rate/km.(INR) Cost (INR)
Elevated Road Structure Part 1 30 30000 65,000 1,950,000,000
At-Grade Road
6 Lane MV+2 Lane BRT+2 Lane NMT & Footpath + 4 Lane Service Road= 14 Lane
6.4 60 250,000,000 1,600,000,000
Total Construction Cost 3,550,000,000
355 Crore
Option-I Alignment
Constraints Description
Length 7 km.
Shilpa
Gas Agency
0.3 Hectare
Shivani
Farmhouse
0.2 Hectare
Madanpur-
Dabas
Main Road
(2.8 km.)
20m wide
Go-Down (1
No.)
0.7 Hectare
Crossing of
Delhi-Rohtak
Rly Line
-
Crossing of
NH-10
-
Land
Acquisition
42 Ha
Option-II Alignment
Zoomed Plan
Name of
Stretch
Feasible Solution
From
Kanjhawala
Road to
Madanpur
Dabas
Main Road
At-Grade Road (100m width
and 2 Km length)
Shilpa Gas Agency (0.3 Ha)
and Shivani Farmhouse (0.2
ha) shall be affected.
20 Ha land acquisition shall
be required.
Madanpur-
Dabas
Main Road
(20m wide)
-Elevated Road (2.8 Km
length, 24m width) over 40m
wide land.
75 Houses (4.5 Ha) shall be
affected.
5.6 Ha land acquisition shall
be required.
From
Madanpur
Dabas Road
to Delhi-
Rohtak
Railway Line
At-Grade Road (1.2 Km
length, 100m width).
12 Ha land acquisition shall
be required.
From Delhi-
Rohtak
Railway Line
to NH-10
Elevated Road (1 Km
length, 30m width) over 40m
wide land.
1 Godown (0.7 Ha) shall be
affected.
4 Ha land acquisition shall
be required.
Option-II Alignment
Zoomed Plan
Length (in km.)
(B)
Width (in m.)
(C )
Land Acquisition
Structures AffectedConstruction
Cost(in crore
INR)(I)
Total Cost Involvement
(in croreINR)
(J)=(E+H+I)
Area
(Ha)
(D)
Cost
(in
crore
INR)
(E )
No.
(F)
Area
(Ha)
(G)
Cost
(in
crore
INR)
(H)
7.0
40m in 3.8 Km
100m in 3.2 Km
41.6 308 78 5.7 91 821 1220
Total Cost Involvement
Option-II Alignment
Construction Cost
Item Description Length (in km.)
Width(in m.)
Quantity (in sq.
m.)
Rate/km.(INR) Cost (INR)
At-Grade Road (KanjhawalaRoad to MadanpurDabas Road)
6 Lane MV+2 Lane BRT+2 Lane NMT & Footpath + 4 Lane Service Road= 14 Lanes
2 60 250,000,000 500,000,000
Elevated Road (Madanpur Dabas Main Road)
Structure Part 2.8 30 84,000 65,000 5,460,000,000
At-Grade Road (MadanpurDabas Road to Delhi-RohtakRailway Line)
6 Lane MV+2 Lane BRT+2 Lane NMT & Footpath + 4 Lane Service Road= 14 Lanes
1.2 60 250,000,000 300,000,000
Elevated Road (Delhi-Rohtak Railway Line to NH-10)
Structure 1 30 30,000 65,000 1,950,000,000
Total Construction Cost 8,210,000,000
821 Crore
Option-II Alignment
Comparative Statement
Alignment Length
(inkm.)
Width
(in m.)
Land Area to
be acquired
(in hectare)
No. ofAffected
Structures
Cost for Acquisition
of Land and
Compensation for
Structure Demolition(in crore)
Construction Cost
(in crore)
Total Cost
(incrore)
Master Plan
Alignment
6.0 40m (3 km.)100m (3 km.)
40 3 315 870 1185
Option-I 7.4 100m (6.4 km.)40m (1 km.)
74 3 567 355 922
Option-II 7.0 40m (3.8 Km)100m (3.2 Km)
41.6 78 399 821 1220
Conclusion & Recommendations
• Option-I and Option-II alignments are longer than the Master Planalignment.
• Major parts of the Master Plan and Option-II alignments requireelevated road/ tunnel while Option-I alignment may beimplemented as at-grade road with only 1 Km elevated road atDelh - Rohtak Railway line and NH-10 crossing.
• Major parts of the Master Plan and Option-II alignments havewidth limitations while Option-I alignment runs in 100m widthexcept at Delhi - Rohtak Railway line and NH-10 crossing.
• The cost of land acquisition & structure demolition compensationfor Option-I alignment is much more than that of Master Plan andOption-II alignment.
• Master Plan & Option-I alignment affect only 3 existing structureswhile Option-II alignment affects a total of 78 structures.
• Construction cost of Option-I alignment (with the proposedfeasible solution) is only 40% of that of Master Plan and Option-IIalignments.
• Option-I alignment involves minimum cost as compared to costinvolvement in Master Plan and Option-II alignments.
• Considering the factors related to technical feasibility, financialinvolvement, land acquisition, structure demolition, ease ofconstruction etc., Option-I is the best suited alignment forproviding connectivity between Kanjhawala Road and NH-10 andrecommended for consideration as new alignment of UER-II.