Pre-Feasibility Report
M/s. Hexane Pharmachem Industries
Page 1 of 17
PRE FEASIBILITY REPORT
FOR OBTAINING ENVIRONMENTAL CLEARANCE
For the Proposed Synthetic Organic Chemical
Manufacturing unit
of
M/s. Hexane Pharmachem Industries
Plot No.4, Block No.253, Village: Nananpur,
Taluka: Prantij, Dist.: Sabarkantha
Gujarat_383210
Contact No.: 9426186095
Email: [email protected]
Prepared By:
T. R. ASSOCIATES
C-605/A, Ganesh Meridian, Opp. Kargil Petrol Pump,
S. G. Highway, Ahmedabad
Contact No.: 98253 71099
Email: [email protected]
MAY 2017
Pre-Feasibility Report
M/s. Hexane Pharmachem Industries
Page 2 of 17
1. Introduction
M/s. HEXANE PHARMACHEM INDUSTRIES is a partnership firm proposing to set up
a small scale synthetic organic chemical Manufacturing unit at Plot No.4, Block No.253,
Village: Nananpur, Taluka: Prantij, Dist.:Sabarkantha, Gujarat_383210.
2. Project Proponent and their back ground
Company is promoted by its partner. Detail of partners is as given below.
Sr.
No.
Name of the Partner
with Mobile no.
Address Education Past
experience
1 Navneet patel
(9426186095)
A-11, Bansidhar
Society,
Mahavirnagar,
Himatnagar, Gujarat.
Electrical
Engineer
10 yrs. In
pharma
business &
17 yrs. In
ceramics
business
2 Sachin patel
(9426722722)
10, Bhagwan Society,
Mahavira nagar,
Himatnagar, Gujarat.
B. Com. 12 yrs. In
ceramic
business
3. Brief description of nature of the project:
M/s. Hexane Pharmachem Industries is proposing to manufacture synthetic organic
chemical (catalyst) at Plot No.4, Block No.253, Village: Nananpur, Taluka: Prantij, District:
Sabarkantha, Gujarat_383210. Proposed products will be used in pharmaceutical
products, agro based products & in different types of polymers.
The proposed final product synthetic organic chemical attracts Environmental Clearance
(EC) from Ministry of Environment, Forest & Climate Change (MoEFCC), New Delhi. It
falls under Category 5(f) as stated in Environment Impact Assessment Notification
Published on 14th September, 2006. Further, the location of the proposed project is outside
the notified industrial estate. Hence, the project proponent has to obtain the EC from the
Ministry of Environment, Forest & Climate Change, New Delhi. M/s. T. R. Associates has
been appointed to carry out EIA/EMP studies for obtaining Environmental Clearance.
The total land area of company is 6077 m2 out of which 2085 m2 (34.3 % of total land) area
will be used for greenbelt development. The estimated cost of the proposed project is 3
Crores. Total budget allocation towards Environmental Management Facilities will be
Pre-Feasibility Report
M/s. Hexane Pharmachem Industries
Page 3 of 17
approx. Rs. 35 Lakhs. Total 12 persons will be employed including skilled persons,
unskilled persons and office staff.
Need for the project and its importance to the country and or region:
Industrial chemicals are the chemicals which are manufactured for different industrial
applications. These chemicals are found in fuels, dyes, anti freezes, explosives, lubricants,
insulators therefore forth. This can also be employed for research purposes within military
and warfare centers.
Looking to the product profile, it is required to take Environmental Clearance. In India,
good quality raw materials are available at cheap rates, enabling the manufacturing at low
cost. This increases the profit margin as compared to other players in the world. To meet
the current and future market demand, the project proponent intends to start a new unit.
Looking to the market demand, the proposed project is feasible at stated location.
Imports v/s Indigenous production:
Indian market is open and big that is why every kind of import is booming. Indian
industrialist must understand the fact that it’s no more a regional shift, it is a global shift.
Indian technology should be upgraded an updated at par with international standards.
The working environment in India has changed tremendously. Earlier the trade fairs were
hardly participated by foreign chemical manufacturing companies where as now it is
flooded with global suppliers.
Export Possibility:
There is good possibility for export. But recently we will focus on local sale market for
distribution.
Employment Generation (Direct and Indirect) due to the project:
This project will provide direct employment to 12 persons whereas it will provide
employment to many others indirectly. Plywood and Laminated sheet manufacturing
industries provide employment to large number of people.
4. Project Description
(i) Type of project including interlinked and interdependent projects:
Various Synthetic organic chemical are used in production of pharmaceutical
products, agrobased products & different types of polymers. So pharma industries,
agrobased industries and polymers manufacturing units will be interdependent on
our catalyst based products.
Pre-Feasibility Report
M/s. Hexane Pharmachem Industries
Page 4 of 17
(ii) Location
Proposed project is to be located at Plot No.4, Block No.253, Village: Nananpur,
Taluka: Prantij, Dist.: Sabarkantha, Gujarat_383210
Geographic Coordinates
Node Latitude Longitude
A 23° 31’ 29.2044”N 72° 56’ 55.14” E
B 23° 31’ 28.5816”N 72° 56’ 55.032” E
C 23° 31’ 27.4152”N 72° 56’ 59.136” E
D 23° 31’ 29.964”N 72° 56’ 59.4996” E
Google image showing proposed project site is given below;
Pre-Feasibility Report
M/s. Hexane Pharmachem Industries
Page 5 of 17
Google image showing 1, 5, 10 Km radius area from the project site
Salient features in the surroundings area of the proposed site within 10 km radius are as
follows:
Sr. No. Important Features Description
1 Location Plot No.4, Block No.253, Village: Nananpur, Taluka:
Prantij, Dist.: Sabarkantha, Gujarat_383210
2 GPS Coordinates Node Latitude Longitude
A 23° 31’ 29.2044”N 72° 56’ 55.14” E
B 23° 31’ 28.5816”N 72° 56’ 55.032” E
C 23° 31’ 27.4152”N 72° 56’ 59.136” E
D 23° 31’ 29.964”N 72° 56’ 59.4996” E
3 Temperature Range 11.5˚C to 48.5˚C (average)
4 Mean Sea Level 135 m
5 Annual Rain Fall 797 mm (average)
6 Nearest Railway
Station
Hapa Road Railway Station – 2.18 km in NNW
direction
7 Nearest Airport Ahmedabad Airport – 59.84 km in SW direction
8 Nearest Town Himatnagar – 7.0 km in NNE direction
9 Nearest Village Nananpur - km in ENE direction
10 Nearest National
Highway
NH 8 – 0.71 km in WNW direction
Pre-Feasibility Report
M/s. Hexane Pharmachem Industries
Page 6 of 17
Sr. No. Important Features Description
11 Nearest River/Water
body
Hathmati River – 4.6 km in SE direction
Hathmati Canal – 0.8 km in NW direction
12 National Parks /
Sanctuary
None within 10 km radius.
(iii) Alternative Sites considered
No other sites were selected.
(iv) Size or magnitude of operation
List of Proposed Products
Sr. No. Products List Quantity (MT/Month)
1 Benzyl Triphenyl Phosphonium Choride 1
2 Cetramide 1
3 Cetramide Strong Solution 40 % 1
4 Cetyl Pyridinium Choride 1
5 Cetyl Trimethyl Ammonium Bromide 1
6 Cetyl Trimethyl Ammonium Chloride 30 % 1
7 Ethyl Triphenyl Phosphonium Bromide 1
8 Lauryl Pyridinium Chloride 1
9 Methyl Tributyl Ammonium Chloride 75 % 5
10 Methyl Trioctyl Ammonium Chloride 95 % 1
11 Methyl Triphenyl Phosphonium Bromide 3
12 Phenyl Trimethyl Ammonium Chloride 2
13A Tetra Butyl Ammonium Bromide (Powder) 10
13B Tetra Butyl Ammonium Bromide (Solution) 25
14 Tetra Butyl Ammonium Chloride 2
15 Tetra Butyl Ammonium Hydrogen Sulphate 2
16 Tetra Butyl Ammonium Iodide 1
17 Tetra Methyl Ammonium Chloride 2
18 Tetra Octyl Ammonium Bromide 2
19 Tetra Ethyl Ammonium Bromide 5
20 Tri Ethyl Benzyl Ammonium Chloride 5
21 Benzalkonium Chloride 50 % 1
22 Benzyl Tri Butyl Ammonium Bromide 1
23 Benzyl Tri Butyl Ammonium Chloride 1
24 Butyl Triphenyl Phosphonium Bromide 2
25 Butyl Triphenyl Phosphonium Chloride 1
26 Cetyl Dimethyl Benzyl Ammonium Bromide 1
27 Cetyl Dimethyl Benzyl Ammonium Chloride 1
28 Dodecyl Trimethyl Ammonium Chloride 1
Pre-Feasibility Report
M/s. Hexane Pharmachem Industries
Page 7 of 17
29 Mesetronium Ethosulphate 1
30 Methyl Triphenyl Phosphonium Chloride 2
31 Methyl Triphenyl Phosphonium Iodide 1
32 Tetra Phenyl Phosphonium Bromide 1
33 Tri Ethyl Methyl Ammonium Chloride 1
34 Tri Ethyl Butyl Ammonium Bromide 1
35 Benzyl Tri Methyl Ammonium Chloride (Powder) 16
Total 105
(v) Project description with process details
Details of manufacturing process are given in Annexure- 3 of Form- 1.
(vi) Raw material required along with estimated quantity
Details of raw material consumption are given in Annexure- 1 of Form- 1.
(vii) Resource optimization/ recycling and reuse envisaged in the project, if any, should
be briefly outlined.
Latest Process technology will be adopted as available in market with optimum
resources requirement with highest yield and less waste and pollution generation.
Treated industrial effluent will be reused in industrial activities. In addition to this,
all the feasible cleaner production technologies will be adopted.
(viii) Availability of water its source, Energy/ power requirement and source should be
given.
Energy/power requirement will be 100 HP which will be procured through Uttar
Gujarat Vij Company Limited.
The total water requirement will be 29.5 kl/day which will be fulfilled by our
adjoining industry Borewell.
(ix) Quantity of wastes to be generated (liquid and solid) and scheme for their
Management/disposal
Hazardous Waste Generation and Disposal
Details of hazardous waste generation and its disposal are given in Annexure- 6 of
Form- 1.
Wastewater Generation and Disposal Facility
Pre-Feasibility Report
M/s. Hexane Pharmachem Industries
Page 8 of 17
Details of domestic as well as industrial wastewater generation and its disposal are
given in Annexure- 4 & 5 of Form- 1.
(x) Schematic representations of the feasibility drawing which give information of
EIA purpose
1. Site Analysis
(i) Connectivity
Nearest Railway
station
Hapa Road Railway
station (Ahmedabad –
Himatnagar)
2.18 km (NNW)
Nearest National
Highway
NH 8 0.71 km (WNW)
Nearest State Highway SH 237 2.42 km ( NNE)
Nearest airport Ahmedabad 59.84 km (SW)
Pre-Feasibility Report
M/s. Hexane Pharmachem Industries
Page 9 of 17
(ii) Land Form, Land use and Land ownership.
Proposed project site has already been procured by proponent and it is an open area
which is presently not being used for any purposes.
Pre-Feasibility Report
M/s. Hexane Pharmachem Industries Page 10 of 17
(iii) Existing Land Use Pattern
Pre-Feasibility Report
M/s. Hexane Pharmachem Industries Page 11 of 17
(iv) Topography Map
Proposed
project site
M/s. Hexane
pharmachem
Industries
Pre-Feasibility Report
M/s. Hexane Pharmachem Industries
Page 12 of 17
(v) Existing Infrastructure
(1) Nearest railway station: Hapa road railway station is 2.18 km away from the
project site
(2) Nearest highway: National Highway 8 is 0.71 km away from the project site.
(3) Nearest airport: Ahmedabad Airport is 59.84 km from the project site.
(4) Power: 100 HP from Uttar Gujarat Vij Company Limited.
(5) Water: Source of the water will be a borewell (adjoining company).
(6) Basic amenities: Good road connectivity with state and national highway.
(vi) Soil classification of Sabarkantha District
Major soil types: Sandy soils & Loam, Brown to black soils, Black cotton soils.
Sand, goradu and medium black are the three main types of soil found in almost all
talukas of Sabarkantha district. Sandy soil is chiefly found in the central part of the
district covering mostly Modasa, Meghraj, Malpur, Himmatnagar, Bhiloda and Idar
talukas. The goradu soil covers Modasa, Prantij, Himmatnagar, Bhiloda and Malpur
talukas and the medium black soil covers Khedbrahma, Vijaynagar, Bayad and Idar
talukas.
(vii) Climate data from secondary source
Sabarkantha district is located in east of Gujarat, comes under normal rainfall areas
in Gujarat, having sub-tropical climate with moderately low humidity. The main
seasons prevailing in the district are (a) monsoon - mid of June to October, (b) winter
- November to February, and (c) summer – March to June.
Temperature
The maximum daily temperature during the year ranges from 31.0 °C in January to
48.5 °C in May while minimum temperature ranges from 11.5 °C in January to 27.5°C
in May.
Humidity
Maximum humidity ranges from 81.0% to 25.5%.
Wind
The wind speed ranges from 88.0 to 184.9 km/day, whereas evapo-transpiration
ranges from 3.5 to 7.8 mm/day.
Pre-Feasibility Report
M/s. Hexane Pharmachem Industries
Page 13 of 17
Rainfall
Sabarkantha district receives much of its rainfall from the south-west monsoon
during the period between June & October; its maximum intensity being in the
month of July & August. Total rainy days ranges from 20 to 30 days/year. The
average annual rainfall of the district ranges from 665 mm to 815 mm.
(viii) Social Infrastructure available.
Industrialisation/Entrepreneurship:
The district is rich in respect of mineral resources. The important minerals in the
district are like, Lime stone, China clay, Sand stone, Bauxite, fire clay and Granite
etc. The minerals are mainly found in Khedbrahma, Idar, bhiloda, Himatnagar,
Meghraj, Vijaynagar, Malpurtaluka. Available resources provide the scope of
mineral based Industries. At present many minerals based industries are
functioning in the district. There are three big industrial estates in the district which
are at Idar, Himatnagar, and Talod in addition to that there is one estate run by co-
operative in Idar block. Sabarkantha district is an industrially backward district of
Gujarat State. The economy of the district is heavily dependent on Agriculture and
Dairy Farming. Sabar Dairy is having 1804 registered Milk Co-operative Societies
with active membership of 332838 members. Production of large quantities of clay,
silica sand and bauxite has opened up new avenues for the glass, tiles, fine bricks
and crockery. Food processing and textiles are the other emerging sectors, which
have opened up new opportunities for investment & employment generation.
There is no SEZ, Export Promotion center and common facility center in the district.
Marketing Potential:
There are 6 APMCs (Agriculture Produce Marketing Committees) and 7 market
yards in the district at almost all the block headquarters except Vijaynagar and
Poshina taluka. There is no accredited ware house exists in the district. Moreover,
there is no Availability of pledge loan/warehouse receipt loan facilities for farmers.
Hence, there is an immense need for accredited ware housing for farmers in the
district which can free the farmers from distressed selling of their crops and help to
get extended credit facility and interest subvention also on Negotiable warehouse
receipt. The Government of India has formulated a back ended capital investment
subsidy scheme for construction/modernisation/expansion of cold storage with an
objective of reducing post-harvest loses by controlled modified atmosphere storage
system. Moreover, GOI also extends capital investment subsidy scheme “Integrated
Scheme for Agricultural Marketing” for construction/modernisation/expansion of
Rural Godowns for storage of farm produces intended to befit the small farmers
Pre-Feasibility Report
M/s. Hexane Pharmachem Industries
Page 14 of 17
who find it difficult to retain their produce in good intact marketable condition till
it reach to the market.
2. Planning Brief
(i) Planning Concept (type of industries, facilities transportation etc) Town and
Country Planning/Development authority Classification.
Proposed project site is located near to National Highway 8 and well connected to the
internal roads and highways. The site is well connected to Himmatnagar,
Gandhinagar as well as Ahmedabad region, where all the infrastructural and
transportation facilities are available.
Under Small scale industrial sector Walls & Floor Tiles (Ceramics), Chemicals, Plastic
& Plastic products and Commercial office and household equipment’s are some of the
major industry groups in the district. Sabarkantha houses over 8,000 Small Scale
Industries having employment to 34,200 people in the district. Total investment in the
SSI sector in the district during 2006-07 were to the tune of Rs. 43,813 Lacs, Ceramics
sector (Walls & Floor Tiles) has attracted investments to the tune of Rs. 7,412 Lacs
highest among all the sectors in the year 2006-07. Other sectors such as food
processing, textiles, cement, paper & pulp and chemicals have also been growing at a
steady pace in the district.
(ii) Population
Description No.
Population Total : 24,28,589 Person
Male : 12,44,231 Person
Female: : 11,84,358 Person
Population density 328 persons per sq. km.
Village Population Total: 20,64,869 Person
Urbanised Population Total: 3,63,720 Person
Population increase rate N.A
Male- Female ratio 1000 : 952
Scheduled Caste population 1,87,685 persons
Scheduled Tribe population 5,42,156 persons
Pre-Feasibility Report
M/s. Hexane Pharmachem Industries
Page 15 of 17
(iii) Land use planning (breakup along with green belt etc).
Sr.
No. Particular Area (m2)
1 Built Up Area + Open Area 3,992
2 Green belt area 2085
Total 6077
(iv) Assessment of Infrastructure Demand (Physical & Social).
Surrounded villages in 10 km area from the project site are having all the necessary
physical and social infrastructure facilities due to agricultural activities, animal husbandry
and industrial development within the area as well the nearby Prantij town & Sabarkantha
District.
(v) Amenities/Facilities.
All the basic amenities/facilities such as power connection & power back-up, drinking
water, internal roads, water & wastewater treatment plant etc. will be provided.
3. Proposed Infrastructure
a. Industrial Area
Industry has provided approximately 1902 m2 built up area for industrial
process/manufacturing activity which provides all needed facility including proper
ventilation, safe handling system, etc.
b. Residential Area
Industry will provide labor quarter for their labors and provide all basic facilities to
them.
c. Green Belt.
2085 m2 area will be proposed for greenbelt development. In addition to this, project
proponent will participate in greenbelt development programs in nearby areas under
their CSR.
d. Social Infrastructure
The proponent will provide social infrastructure facilities within 10 km radius of the
proposed project.
Pre-Feasibility Report
M/s. Hexane Pharmachem Industries
Page 16 of 17
Education Facilities:-Many Facilities for village schools like game kits, drawing kits,
table-chairs; school construction (classroom/toilet/school boundary), ceiling fans/
coolers or books for school library are proposed.
Health Facilities:-Assistance to existing health facilities in nearest Hospital, for
improvement in health facilities or services.
e. Connectivity (Traffic and Transportation Road / Rail / Metro / Water ways
Proposed project site is located adjacent to National Highway 8 and well connected to
the internal roads and highways. The site is well connected to Prantij Town and
Sabarkantha District.
f. Drinking Water Management
In proposed project, out of 29.5 KLD water approximately 1.7 KLD water will be
consumed for domestic purpose
g. Sewerage System.
Domestic wastewater 1.6 KLD will be disposed off through Septic Tank/ Soak Pit
System.
h. Industrial Wastewater Management.
Industrial wastewater will be generated from boiler blow-down, cooling tower blow-
down, washing & RO-1 reject. All effluent will be collected in collection tank. Then
wastewater will be given neutralization treatment. After completion of neutralization,
wastewater will be taken to filter Press for chemical sludge separation. Filtrate will be
taken to an Evaporator followed by condenser. Condensate from evaporator will be
reused in Borewell RO-1.
ETP sludge (from filter press) along with evaporation residue from evaporator will be
disposed off at TSDF site. Thus, unit will maintain Zero Effluent Discharge.
i. Solid/Hazardous Waste Management
ETP waste + evaporation residue, discarded bags/barrels, used oil, process residue,
distillation residue, spent charcoal/spent carbon & off specification products will be the
main solid hazardous waste that will be generated from the proposed unit. Method of
disposal is shown in Annexure -6 of Form-1 .
Pre-Feasibility Report
M/s. Hexane Pharmachem Industries
Page 17 of 17
j. Power Requirement & Supply / source
Power requirement for the proposed project will be approx. 100 HP which will be
obtained from UGVCL.
4. Rehabilitation and Resettlement (R & R) Plan
Not applicable.
5. Project Schedule & Cost Estimates
(i) Likely date of start of construction and likely date of completion
(Time schedule for the project to be given)
Construction work is not yet started. Construction work for applied products will
be only started after obtaining EC.
(ii) Estimated project cost along with analysis in terms of economic viability of the
project.
Total cost of the entire project is approx. 3 Crore.
------------------------------