40
PRE-DELIVERY INSPECTION CHECK LIST General Remove wrapping and wash unit, removing all road debris. (Road salt, mud, snow, etc.) Inspect paint, decals and general appearance of unit. Verify that the owner’s manual is in the manual storage tube. Verify ‘SLOW MOVING VEHICLE’ sign (SMV) is on unit (if applicable and now installed for traffic) Verify that jacks are with the unit and function properly. Check wheel bolts for proper torque. Check for proper tire pressure (PSI). Verify that the wheel hubs are lubricated. Verify that locking pins and / or ram locks are in place. Lubricate all components as per operators manual recommendation. Check that all bolts and fasteners are at the proper torque specifications. (NOTE: All capscrews that have lock nuts that join moving pieces should not be tightened completely, they must allow movement. i.e. spring pressure kits, rock shaft connector, draft arm, etc. Check sprocket alignment and chain tension. (If applicable) Check locking collars and set screws for proper tension. (If applicable) Verify operation of lights. (If applicable) Verify the unit moves ‘IN’ and ‘OUT’ of transport without any binding. Verify that tires are tracking properly when in transport mode. Hydraulics Insure that all hydraulic hoses are routed properly and secured. Verify that all hydraulic fittings / hoses are secure and there are no oil leaks. Inspect all cylinders for leakage and the cylinder shaft for rust, pits, or scratches. Verify operation of all hydraulic functions - Cycle hydraulic cylinders to remove air from the system. Delivery Verify that ‘The customer is aware of warning decals and proper jack placement for transport.’. Verify that ‘The customer is aware of proper operation and transportation of the unit’. Verify that ‘The customer has received an operators manual’. Explain all maintenance and service intervals to the customer (From operators manual). Advise the customer of grease zerk locations and maintenance schedules. Level the unit per operators manual and instruct the customer on the proper procedures.

PRE-DELIVERY INSPECTION CHECK LIST - Riteway Mfg. · PDF filepre-delivery inspection check list . ... must be submitted on a properly completed claim form within 30 ... defective parts

  • Upload
    hatu

  • View
    225

  • Download
    7

Embed Size (px)

Citation preview

Page 1: PRE-DELIVERY INSPECTION CHECK LIST - Riteway Mfg. · PDF filepre-delivery inspection check list . ... must be submitted on a properly completed claim form within 30 ... defective parts

PRE-DELIVERY INSPECTION CHECK LIST General

Remove wrapping and wash unit, removing all road debris. (Road salt, mud, snow, etc.)

Inspect paint, decals and general appearance of unit.

Verify that the owner’s manual is in the manual storage tube.

Verify ‘SLOW MOVING VEHICLE’ sign (SMV) is on unit (if applicable and now installed for traffic)

Verify that jacks are with the unit and function properly.

Check wheel bolts for proper torque.

Check for proper tire pressure (PSI).

Verify that the wheel hubs are lubricated. Verify that locking pins and / or ram locks are in place.

Lubricate all components as per operators manual recommendation.

Check that all bolts and fasteners are at the proper torque specifications. (NOTE: All capscrews that have lock nuts that join moving pieces should not be tightened completely, they must allow movement. i.e. spring pressure kits, rock shaft connector, draft arm, etc.

Check sprocket alignment and chain tension. (If applicable)

Check locking collars and set screws for proper tension. (If applicable)

Verify operation of lights. (If applicable)

Verify the unit moves ‘IN’ and ‘OUT’ of transport without any binding.

Verify that tires are tracking properly when in transport mode. Hydraulics

Insure that all hydraulic hoses are routed properly and secured.

Verify that all hydraulic fittings / hoses are secure and there are no oil leaks.

Inspect all cylinders for leakage and the cylinder shaft for rust, pits, or scratches.

Verify operation of all hydraulic functions - Cycle hydraulic cylinders to remove air from the system. Delivery

Verify that ‘The customer is aware of warning decals and proper jack placement for transport.’.

Verify that ‘The customer is aware of proper operation and transportation of the unit’.

Verify that ‘The customer has received an operators manual’.

Explain all maintenance and service intervals to the customer (From operators manual).

Advise the customer of grease zerk locations and maintenance schedules.

Level the unit per operators manual and instruct the customer on the proper procedures.

Page 2: PRE-DELIVERY INSPECTION CHECK LIST - Riteway Mfg. · PDF filepre-delivery inspection check list . ... must be submitted on a properly completed claim form within 30 ... defective parts
Page 3: PRE-DELIVERY INSPECTION CHECK LIST - Riteway Mfg. · PDF filepre-delivery inspection check list . ... must be submitted on a properly completed claim form within 30 ... defective parts

P.O. Box 328 IMPERIAL, SASKATCHEWAN, CANADA S0G 2J0

TELEPHONE: (306)-963-2180 Fax: (306)-963-2660

SERVICE & WARRANTY POLICY

Rite Way Manufacturing Co. Ltd. (hereafter referred to as Rite Way) warrants each new machine to be

free from defects in materials and workmanship for a period of one (1) year from date of purchase

under normal agricultural use and service. In addition, Rite Way will supply at no charge, (F.O.B Rite

Way Factory) any part that has failed within the 2nd year. Rite Way’s obligation under this warranty is

limited to the repair or replacement of any defective parts of the equipment at its own discretion.

Any alterations, modifications or additions done to a finished product will void this warranty

unless prior written permission from Rite Way is obtained.

Items that are not manufactured by Rite Way are covered by the warranty of the supplier of

these items. We will therefore extend, without assuming any responsibility, any warranty given to us by

our suppliers.

This warranty shall-not apply to any machine, that in the company’s judgment has been

subjected to misuse, negligence or accident. In no event shall the owner be entitled to recover costs

for incidental, special or consequential damages such as, but not limited to; Loss of crop, loss of profit

or revenue, other commercial losses, inconvenience or rental costs.

This warranty shall not apply unless Rite Way or its designated dealer is promptly notified of

claimed defects and the allegedly defective part is held for inspection.

Repair parts purchased for machines ‘Out of Warranty’, are warranted to be free from defects

in material and workmanship under normal use and service for a period of ninety (90) days from the

date of delivery to the customer.

The warranty shall only become valid when delivery notification for warranty is received by

Rite Way within 20 days of the completion of sale.

OWNER’S / USERS OBLIGATION: It is the responsibility of the user to read the Operators Manual

and understand the safe and correct operating procedures as it pertains to the operation of the

product, and to lubricate and maintain the product according to the maintenance schedule in the

manual.

The user is responsible for inspecting the machine, and for having parts repaired or replaced

when continued use of the product could cause damage or excessive wear to any other parts. It is the

user’s responsibility to deliver their machine to a Rite Way dealer for service or replacement of

defective parts which are covered by the standard warranty.

Rite Way will not be held responsible for charges such as transportation, fuel, lodging when a

dealer / dealer representative travels to a customer location for warranty or inspection.

Page 4: PRE-DELIVERY INSPECTION CHECK LIST - Riteway Mfg. · PDF filepre-delivery inspection check list . ... must be submitted on a properly completed claim form within 30 ... defective parts
Page 5: PRE-DELIVERY INSPECTION CHECK LIST - Riteway Mfg. · PDF filepre-delivery inspection check list . ... must be submitted on a properly completed claim form within 30 ... defective parts

P.O. Box 328 IMPERIAL, SASKATCHEWAN, CANADA S0G 2J0 TELEPHONE: (306)-963-2180 Fax: (306)-963-2660

SERVICE AND WARRANTY CLAIMING PROCEDURES

1) ALL CLAIMS MUST BE HANDLED THROUGH A DEALER / DISTRIBUTOR. CLAIMS

MUST BE SUBMITTED ON A PROPERLY COMPLETED CLAIM FORM WITHIN 30 DAYS

FROM DATE OF REPAIR.

2) A WARRANTY REGISTRATION CLAIM FORM MUST BE ON FILE AT RITE WAY MFG.

TO VALIDATE WARRANTY.

3) DEFECTIVE PARTS ARE TO BE HELD AT THE DEALER / DISTRIBUTOR PLACE OF

BUSINESS UNTIL THE WARRANTY CLAIM FORM HAS BEEN PROCESSED BY RITE

WAY MFG. AND THE DISPOSITION OF PARTS HAS BEEN ADVISED.

4) PARTS THAT REQUIRE INSPECTION BY RITE WAY MFG. PERSONNEL MUST BE

ACCOMPANIED BY A RETURN GOODS FORM NUMBER AND MUST BE FREIGHT PRE-

PAID. RITE WAY WILL REFUND PRE-PAID FREIGHT CHARGES ON ANY ITEMS

DETERMINED TO BE DEFECTIVE.

5) RITE WAY WILL NOT ASSUME RESPONIBILITY FOR REPAIRS OR EXPENSES

INCURRED WITHOUT AUTHORIZATION. WARRANTY LABOUR IN EXCESS OF

$150.00 MUST BE AUTHORIZED BEFORE SUCH WORK IS PERFORMED AND

PHOTOGRAPHS BEFORE AND AFTER REPAIRS ARE REQUIRED.

6) WARRANTY LABOUR IS TO BE CLAIMED ON THE WARRANTY CLAIM FORM, ONLY IF

THE WARRANTY LABOUR WAS PERFORMED BY THE DEALER. TRAVEL TIME IS NOT

COVERED BY WARRANTY AND SHOULD NOT BE INCLUDED. RITE WAY RESERVES

THE RIGHT TO ADJUST OR ALLOCATE LABOUR TIMES AND VALUES BASED ON ITS

EXPERIENCE OF THE COMPANY PERSONNEL PERFORMING SIMILAR FUNCTIONS.

7) IT IS THE RESPONIBILITY OF THE DEALER TO ENSURE THAT THE WARRANTY

REGISTRATION FORMS ARE PROPERLY COMPLETED AND RETURNED TO RITE

WAY MFG., IMPERIAL, SASK.

Page 6: PRE-DELIVERY INSPECTION CHECK LIST - Riteway Mfg. · PDF filepre-delivery inspection check list . ... must be submitted on a properly completed claim form within 30 ... defective parts
Page 7: PRE-DELIVERY INSPECTION CHECK LIST - Riteway Mfg. · PDF filepre-delivery inspection check list . ... must be submitted on a properly completed claim form within 30 ... defective parts

RITE WAY MFG. CO. LTD.

P.O. Box 328 Imperial, Saskatchewan

Canada, S0G 2J0 Ph: (306) 963-2180 Fax: (306) 963-2660

Web Site: www.ritewaymfg.com E-mail: [email protected]

4120 Swing Hitch Land Roller Table of Contents

INTRODUCTION .......................................................................................................................................... 1

MANUAL DETAILS ...................................................................................................................................... 2

SPECIFICATIONS ........................................................................................................................................ 3

SAFETY RECOMMENDATIONS ................................................................................................................ 4

MAINTENANCE ........................................................................................................................................... 5

DECAL LOCATIONS .................................................................................................................................... 7

OPERATING INSTRUCTIONS ................................................................................................................... 9

ASSEMBLY INSTRUCTIONS .................................................................................................................... 10

PERFECT HITCH ....................................................................................................................................... 12

DRUM END CAP ASSEMBLY ................................................................................................................... 13

SLIDING TELSCOPIC HITCH ARM ASSEMBLY .................................................................................. 15

SLIDING HITCH & MAIN FRAME ASSEMBLY .................................................................................... 17

TRANSPORT FRAME & MAIN FRAME ASSEMBLY ............................................................................ 19

SLOW MOVING SIGN & LIGHT ASSEMBLY ......................................................................................... 21

HYDRAULIC ASSEMBLY .......................................................................................................................... 23

CTD 812 HUB BEAKDOWN ...................................................................................................................... 25

MONARCH 3-1/2” X 24” CYLINDER ....................................................................................................... 26

MONARCH 3-1/2” X 14” CYLINDER ....................................................................................................... 27

MONARCH 2” X 16” CYLINDER .............................................................................................................. 28

SIDE WIND PARKING JACK .................................................................................................................... 29

ACRE METER LOCATION ........................................................................................................................ 30

GRADE CHART .......................................................................................................................................... 31

TORQUE CHART ........................................................................................................................................ 32

NOTES.......................................................................................................................................................... 33

30 Oct. 2014

Page 8: PRE-DELIVERY INSPECTION CHECK LIST - Riteway Mfg. · PDF filepre-delivery inspection check list . ... must be submitted on a properly completed claim form within 30 ... defective parts

RITE WAY MFG. CO. LTD. INTRODUCTION 4120 SWING HITCH LAND ROLLER

1

INTRODUCTION

Thank you for making the decision to purchase a RITEWAY MACHINE. WE are pleased to welcome you as an owner of a product from RITWAY MFG. This product is the results of years of agricultural and engineering experience, and is built to give you many years of successful operating service.

For the most in efficiency and operation of your 20’ Swing Hitch Land Roller we have provided this Owner's Manual. Its preparation is the result of years of experience gained in field testing and normal usage of this, and similar implements. We urge you to carefully study this manual so that it will give you a thorough understanding of your 20’ Swing Hitch Land Roller before operation. We also urge your care of this manual so that it will be available for future reference when needed. If your manual should become lost or destroyed, a new copy can be purchased from your RITE WAY MFG. dealer. We will also be happy to answer any questions you might have concerning the use or care of this product.

Page 9: PRE-DELIVERY INSPECTION CHECK LIST - Riteway Mfg. · PDF filepre-delivery inspection check list . ... must be submitted on a properly completed claim form within 30 ... defective parts

RITE WAY MFG. CO. LTD. MANUAL DETAILS 4120 SWING HITCH LAND ROLLER

2

MANUAL DETAILS

Unit Model Number 20’ Swing Hitch Land Roller Manual Revision Number 1.0 Manual Revision Date Ø Manual Serial Number Range 14-41-2229

The area below is provided for the owner / end-user to make notes regarding the equipment.

Owner / Equipment Information

Serial Number of Unit Date of Purchase Dealer Name Dealer Address Dealer Phone Number Salesman Name Salesman Phone Number Notes:

Page 10: PRE-DELIVERY INSPECTION CHECK LIST - Riteway Mfg. · PDF filepre-delivery inspection check list . ... must be submitted on a properly completed claim form within 30 ... defective parts

RITE WAY MFG. CO. LTD. SPECIFICATIONS 4120 SWING HITCH LAND ROLLER

3

SPECIFICATIONS

General Information

Working width of 20’-00” (6.0 m) with a working length of 18’-8-1/2” (5.71 m) Transport width of 7’-7” (3.31 m) with a transport length of 26’-5” (8.34 m) Approximate working weight of 8,000 lbs. (3,630 kg) Adjustable hitch height c/w perfect hitch clevis Ø42” Drum (.500 to .600 wall thickness) Heavy duty Ø2-7/16” drum shaft and self-aligning roller bearing Two - 12.5L x 15 – Load Range “F”, 12 Ply highway service tires Base hitch (Perfect Hitch) Slow moving sign kit One – 20,000 lb. safety chain Light kit

Main Frame

High profile frame design 8” x 4” x .250w tube

Hydraulic System

Standard unit requires – 4 hydraulic banks Heavy duty hydraulic cylinders All hydraulic hoses

Options

Acre Meter Kit

Page 11: PRE-DELIVERY INSPECTION CHECK LIST - Riteway Mfg. · PDF filepre-delivery inspection check list . ... must be submitted on a properly completed claim form within 30 ... defective parts

RITE WAY MFG. CO. LTD. MAINTENANCE 4120 SWING HITCH LAND ROLLER

4

SAFETY RECOMMENDATIONS

1. Read the manual thoroughly and understand before operating or working on the machine.

2. Study all safety and warning decals on the implement.

3. Most accidents occur because of neglect or carelessness.

4. Do not allow riders on the tractor or implement during operation.

5. Do not allow children on or near the machine.

6. Connect the implement hitch to the tractor before operating the hydraulic system.

NOTE: Be aware of any hydraulic leaks.

7. Always throttle the tractor down and use caution when connecting the implement to the

tractor hitch.

NOTE: Never stand between the tractor and implement.

8. Lower the hitch jack onto firm ground and chock the tires when un-hooking implement from

tractor.

NOTE: Ensure the unit is on level ground prior to un-hooking tractor.

9. Exercise extra caution when working on hillsides or near ditches.

10. The tractor drawbar should be pinned during transport. The maximum speed while

transporting the LAND ROLLER should be no more than 18 MPH (29 KPH).

11. Proceed carefully when performing maintenance on the LAND ROLLER. The roller should

be on the ground in FIELD POSITION; however, if the nature of the work requires that the

LAND ROLLER is in the raised position, being sure to lock cylinders into position.

12. Keep hands and feet from underneath the LAND ROLLER during adjusting procedures.

13. Leave the LAND ROLLER lowered to the ground in FIELD POSITION when not in use. DO

NOT LOWER ON TO GROUND IN TRANSPORT POSITION.

14. Do not work on this machine when hydraulic system is under pressure.

15. Observe all laws and regulations when transporting unit on public roads.

16. Do not transport this machine on public roads unless all safety & maintenance checks have

been completed.

This machine will provide years of trouble-free & safe operation IF all maintenance and safety instructions are followed.

Page 12: PRE-DELIVERY INSPECTION CHECK LIST - Riteway Mfg. · PDF filepre-delivery inspection check list . ... must be submitted on a properly completed claim form within 30 ... defective parts

RITE WAY MFG. CO. LTD. MAINTENANCE 4120 SWING HITCH LAND ROLLER

5

MAINTENANCE

Grease as indicated (every 8 hours). Repack wheel hubs after the first 500 Road Travel Miles. Visually inspect wheel bolts for tightness. Torque to 110 lbs ft (149 Nm) after the first

few hours of operation and frequently thereafter.

ANNUALLY Inspect wheel bearings for tightness. Check wheel bolts for tightness. Check tire pressure. Fill to recommended levels as stated on tire. Visually inspect all bolts for tightness and check for loose or worn components. ANNUAL STORAGE Coat any exposed hydraulic cylinder shafts with thick oil. Lock all applicable safety locks and pins in place.

Figure A Figure B

Page 13: PRE-DELIVERY INSPECTION CHECK LIST - Riteway Mfg. · PDF filepre-delivery inspection check list . ... must be submitted on a properly completed claim form within 30 ... defective parts

RITE WAY MFG. CO. LTD. MAINTENANCE 4120 SWING HITCH LAND ROLLER

6

12.5L x 15 Tire – 12 Ply

Tire Pressure (Load Range F) – 90 psi (620 kPa) Wheel Nut, Stub Torque – 110 lbs ft (149 nm)

Roller Drum Bearing

Locking Collar – check

After first 8 hours then annually Allen Screw Torque – 10 lbs ft (13.5 Nm)

Figure C

Figure D

Page 14: PRE-DELIVERY INSPECTION CHECK LIST - Riteway Mfg. · PDF filepre-delivery inspection check list . ... must be submitted on a properly completed claim form within 30 ... defective parts

RITE WAY MFG. CO. LTD. DECAL LOCATION 4120 SWING HITCH LAND ROLLER

7

DECAL LOCATIONS

Page 15: PRE-DELIVERY INSPECTION CHECK LIST - Riteway Mfg. · PDF filepre-delivery inspection check list . ... must be submitted on a properly completed claim form within 30 ... defective parts

RITE WAY MFG. CO. LTD. DECAL LOCATION 4120 SWING HITCH LAND ROLLER

8

DECAL LOCATIONS

ITEM # QTY PART # DESCRIPTION

1. x8 060-0009 Amber Reflector 2. x1 060-0011 Caution escaping fluid hazard, escaping hydraulic …. 3. x1 060-0015 Important Block wheels before Unhooking 4. x2 060-0022 Red Reflector 5. x1 060-0028 Warning Lower or Block Elevated Components …. 6. x1 060-0029 Warning Stand Clear Of Hitch Tongue When

Unhooking…. 7. x1 060-0034 Serial Number Plate c/w rivets (510-0001) 8. x1 060-0038 Attention Ensure That All Cylinder Shafts Are Retracted

… 9. x3 060-0046 Grease Every 8 Hours 10. x1 060-0061 Important Hydraulic Hose Application (three colours) 11. x1 060-0067 Warning Check and Tighten Hub and Wheel Bolts 12. x2 060-0072 Riteway Mfg. (Large) 13. x1 060-0083 4100 14. x2 060-0092 Red Reflector

Model Description Unit Size Model Number: Example F1-20 HS Serial Number: Example 15-41-2285 Year Built Unit Built

Page 16: PRE-DELIVERY INSPECTION CHECK LIST - Riteway Mfg. · PDF filepre-delivery inspection check list . ... must be submitted on a properly completed claim form within 30 ... defective parts

RITE WAY MFG. CO. LTD. OPERATING INSTRUCTIONS 4120 SWING HITCH LAND ROLLER

9

OPERATING INSTRUCTIONS

ALWAYS CHOOSE A LEVEL AREA TO EITHER FOLD OR UNFOLD THE LAND ROLLER INTO OR OUT OF TRANSPORT POSITION.

Transport to Field Position

1. Park on level ground. 2. Remove each hydraulic axle cylinder lock up (item 10, page 15) and pin into position. 3. FROM INSIDE THE TRACTOR, lower the unit until the drum and frame are parallel

to the ground and just off the ground surface. 4. Use the hydraulic swing to rotate the frame and drum 90° 5. Raise the main axles completely. 6. Begin rolling in field position.

Field to Transport Position

1. STOP the tractor before trying to fold up the LAND ROLLER 2. Lift the unit slowly just off the ground. 3. Swing frame and drum back into transportation position. 4. Extend the axle cylinders completely. 5. Place each axle cylinder lock up (item 10, page 15) in place. 6. Unit is now ready for transportation.

Page 17: PRE-DELIVERY INSPECTION CHECK LIST - Riteway Mfg. · PDF filepre-delivery inspection check list . ... must be submitted on a properly completed claim form within 30 ... defective parts

RITE WAY MFG. CO. LTD. ASSEMBLY INSTRUCTIONS 4120 SWING HITCH LAND ROLLER

10

ASSEMBLY INSTRUCTIONS

General Information

1. Carefully read all assembly instructions prior to assembling unit. 2. Study the general layout of the machine. 3. Assemble the unit in a large open area free of obstacles. 4. Reference to “Left”, “Right”, and “Forward” and “Rear” are always determined from the rear of the machine

facing the direction of forward travel. 5. Removal of any paint over spray from inside bushings and pivot points eases installation. 6. Grease all points either during assembly or immediately after. 7. Double check wheel bolts.

Main Frame and Drum Assembly

8. Place drum weldment (item 1, page 13) on blocks. 9. Lower main frame (item 2, page 13) onto drum, make sure drum shafts line up with main frame bearing slots.

Block main frame on both sides as not to tip over. 10. Lower the main frame down on to drum shafts. Centre the drum in the main frame so the gap between the

main frame and drum edge at both ends of the drum are equal. Place the bearing (item 5, page 13) over the shaft and lift the main frame to align the bearing bolt holes.

11. Bolt the bearings into place using 5/8” x 2-1/4” capscrews (item 11, page 13) and 5/8” stover lock nuts and flat washers. Install the eccentric locking collar with a punch and hammer (TIGHTEN IN THE SAME DIRECTION OF FORWARD TRAVEL). Tighten the set screw. Use the required spacers (items 17, 18, 19 or 20, page 13, as required) and place them over the shaft. Insert a 1/2” x 3-1/4” capscrew (item 10, page 13) c/w 1/2” stover lock nut and washer through the drum shaft and drum collar (refer to page 13 for drum shaft installation). This will complete the drum and bearing assembly. Repeat for other side.

Transport Frame and Main Frame Axle Assembly

12. Install the transport frame weldment (item 5, page 19) onto main frame (item 4, page 19) using the transport pin (item 3, page 19) and 1/2” x 1-3/4” capscrews, washers and stover lock nuts.

13. Install the hydraulic cylinders to the main frame (item 2, page 19) to the main frame and transport frame weldments. The main frame connection will use the 1” x 3-1/2” cylinder pin and cotter pins (item 32 and 34, page 19) and the stroke connection will have to have the safety cylinder stop installed using the transport cylinder pin weldment (item 7, page 19) and 1” flat washer and cotter pin. Repeat for opposite side.

14. Extend the cylinders and place the safety cylinder stop over the shaft of the cylinder to prevent the cylinder from collapsing prior to the hydraulic fluid introduction. Use the 3/8” x 3” hitch pin and #9 hitch pin clips (items 17 and 33, page 19).

15. The axle stub mount weldments (item 6, page 19) can be installed using the 5/8” x 2 capscrews, flat washers and stover lock nuts. Repeat for opposite side.

16. The tire assemblies (item *, page 19) can now be mounted using the 9/16” wheel nut (item 25, page 19). Repeat for opposite side.

Main Frame and Sliding Hitch Assembly

17. First slide the sliding hitch weldment (item 4, page 15) into the hitch arm weldment (item 3, page 15) pin together using 1” x 6-1/4” useable hitch pin (item 15, page 15).

18. Insert the hitch arm pivot axle weldment into the main frame weldment (item 8, page 17) use a 3/4" x 2” capscrew, stover lock nut and washer.

19. Make sure the hitch arm weldment has two (x2) Connex steel bushings (item 9, page 17) installed in the pivot point. Install the hitch arm weldment (item 2, page 17) on to the main frame (item 7, page 17), use the hitch arm pivot pin weldment (item 8, page 17) with the hydraulic hose bracket and pivot axle spacer (items 4 and 34, page 17) fasten down with 1” x 3” capscrew, flat washer and spring lock nut. The hydraulic in-line lock

Page 18: PRE-DELIVERY INSPECTION CHECK LIST - Riteway Mfg. · PDF filepre-delivery inspection check list . ... must be submitted on a properly completed claim form within 30 ... defective parts

RITE WAY MFG. CO. LTD. ASSEMBLY INSTRUCTIONS 4120 SWING HITCH LAND ROLLER

11

valve can be installed now or wait until all the hydraulics are installed (this is the rough angles on all the hydraulic fittings.)

20. Install the hitch arm cylinder on the main frame (item 1, page 17) for the base use a 1" x 3-1/2 cylinder pin, and cotter pins. The stroke end will use the hydraulic stroke pin weldment (item 6, page 17) and 1” flat washer and cotter pin.

21. Install the cross member weldment (item 3, page 17) using 5/8” x 2” capscrew, flat washer and stover lock nut.

Main Frame and Sliding Hitch Assembly Front Details

22. Install the hydraulic cylinder to the hitch assembly (item 1, page 16) using 1” x 3-1/2” cylinder pins and cotter pins. The hydraulic fittings can be installed now or when ready for all hydraulic hose installation (this is the rough angles on all the hydraulic fittings.)

23. Install the perfect hitch assembly (item 16, page 15) using 1” x 6-1/2” capscrews, flat washers and stover lock nuts. Mount the safety chain (item 12, page 15) using 1” x 3” capscrew, flat washer and stover lock nut. Mount the 24” shepherds hook hose standoff (item 11, page 15) using ½” stover lock nut and washer. The manual tube (item 17, page 15) can be mounted using the 3/8” x 1-1/4” capscrew, flat washer and stover lock nut. The tip and chain holder (item 33, page 15) can now be mounted to the hitch arm weldment using 1/2” x 1-1/4” capscrews, flat washers and stover lock nuts.

Main Frame and Sliding Hitch Assembly Rear Details

24. With main frame in place lower hitch pivot cross weldment (item 4, page 15) on main frame (item 3, page 15), use 3/4 x 2-1/2 capscrew and 3/4 stover lock nut, (items 22 & 25, page 25).

25. Install the hydraulic lines, (refer to pages 21 & 22).

Hydraulic Assembly

26. For a detailed overhead schematic refer to pages 23 and 24. Decals

27. For decal placement follow pages 7 and 8. Light Kit Assembly

28. For light kit placement follow page 28 Acre Meter Assembly

29. For acre meter placement follow page 30 Slow Moving Vehicle Sign Assembly

30. For slow moving vehicle sign placement follow page 29.

Page 19: PRE-DELIVERY INSPECTION CHECK LIST - Riteway Mfg. · PDF filepre-delivery inspection check list . ... must be submitted on a properly completed claim form within 30 ... defective parts

RITE WAY MFG. CO. LTD. PERFECT HITCH ASSEMBLY 4120 SWING HITCH LAND ROLLER

12

PERFECT HITCH

This implement is equipped with a “PERFECT HITCH.’ If using a clevis, bolt onto the bottom of the base hitch using a grade 8 bolt and stover lock nut, to ensure the vertical loads are taken by the base hitch. If no clevis is used the perfect hitch base should be used with the clevis slot facing up on the base hitch. The purpose of the “Perfect Hitch” is to allow the operator to always use the tractor draw pin and maintain a tight, flexible connection. The sliding V-block has a polyurethane cushion which is made to flex. The cushion also acts as a shock absorber to reduce driveline stress, giving driveline components longer life. Do not remove all the cushions! NOTE: INSTALL THE PERFECT HITCH COMPONENTS WITH BOLT HEAD ON THE BOTTOM

AND THE TOP PLATE ON TOP. Always adjust the V-block to your tractor draw pin size.

ITEM # QTY PART # DESCRIPTION

1. 1 423-0005 Perfect Hitch (PPI-301VH)

2. 1 423-0006 Clevis Option, Slotted (PPI-208VR)

3. 1 526-7312 3/4” Stover Lock Nut, NC, Gr.8, Pltd.

4. 1 530-1263 3/4” x 5 -1/2” Capscrew, NC, Gr.8, Pltd.

ITEM# QTY PART# DESCRIPTION

1 1 423-0005 Base Hitch (PP1-301VH)

2 1 423-0017 PP1-302V Top Plate Perfect Hitch

3 1 423-0018 PP1-203VR V-Block

4 1 423-0019 PP1-205H Neoprene Cushion

5 1 526-1224 3/4” x 3” Capscrew, NC, Gr.5, Pltd.

Hitch (423-0005)

Clevis (423-0006)

Page 20: PRE-DELIVERY INSPECTION CHECK LIST - Riteway Mfg. · PDF filepre-delivery inspection check list . ... must be submitted on a properly completed claim form within 30 ... defective parts

RITE WAY MFG. CO. LTD. DRUM END CAP ASSEMBLY 4120 SWING HITCH LAND ROLLER

13

DRUM END CAP ASSEMBLY

Coupling Nut Assembly

Page 21: PRE-DELIVERY INSPECTION CHECK LIST - Riteway Mfg. · PDF filepre-delivery inspection check list . ... must be submitted on a properly completed claim form within 30 ... defective parts

RITE WAY MFG. CO. LTD. DRUM END CAP ASSEMBLY 4120 SWING HITCH LAND ROLLER

14

DRUM END CAP ASSEMBLY Coupling Nut Assembly

ITEM # PART # DESCRIPTION

1. 105-0155 20’ Drum Weldment 2. 105-0239r3 Main Frame Weldment 3. 261-6001 Ø3-11/16” x 1-15/16” Split Taper Bearing c/w Lock Collar 4. 292-4018 Ø2-7/16” Eccentric Lock Collar, Pltd. 5. 292-4022 Ø2-7/16”, 4 – Bolt Flange Bearing, Ina 6. 525-0510 5/16” x 1-1/4” Capscrew, NC, Gr.5 Black 7. 526-0814 1/2" x 1-3/4” Capscrew, NC, Gr.5, Pltd. 8. 526-7308 1/2" Stover Lock Nut, NC, Gr.8, Pltd. 9. 526-7610 5/8” Stover Lock Nut, NF, Gr.8, Pltd. 10. 530-0754 1/2" x 4” Capscrew, NC, Gr.8, Pltd. 11. 538-1018 5/8” x 2-1/4” Capscrew, NF, Gr.8, Pltd. 12. 540-0836 1/2" x 4-1/2” Socket Head Capscrew, NC, Gr.5, Pltd. 13. 550-5208 1/2” Flat Washer, Pltd. 14. 550-5617 5/8” SAE Flat Washer, Pltd. 15. 551-4905 5/16” Spring Lock Washer, Black 16. 551-5008 1/2" Spring Lock Washer, Pltd. 17. 805-7017 Spacer, 3” OD x .250w CDSM – 1/4” 18. 805-7018 Spacer, 3” OD x .250w CDSM – 3/8” 19. 805-7019 Spacer, 3” OD x .240w CDSM – 1/2" 20. 805-7041 Spacer, 3” OD x .240w CDSM – 1/8” 21. 805-8023 Drum Collar, Offset, 3-1/4” OD x .375w CDSM – 7/8 22. 827-0017r1 Drum Shaft, Ø2-7/16” x 14-3/4” Long 23. 835-1044 Half Section End Cap, Ø40-1/4, Painted * 805-8013 Back Bushing, Ø3-1/4” OD x .4375w CDSM – 1-3/4” long * 200-9002 Weld on Bushing, Ø3-7/8” x 1-5/16” Machined Steel Hub * 112-0590 Offset Drum Cross Wld. c/w coupling nuts & no Drum Shaft

Page 22: PRE-DELIVERY INSPECTION CHECK LIST - Riteway Mfg. · PDF filepre-delivery inspection check list . ... must be submitted on a properly completed claim form within 30 ... defective parts

RITE WAY MFG. CO. LTD. SLIDING TELESCOPIC HITCH ARM ASSEMBLY 4120 SWING HITCH LAND ROLLER

15

SLIDING TELSCOPIC HITCH ARM ASSEMBLY

Page 23: PRE-DELIVERY INSPECTION CHECK LIST - Riteway Mfg. · PDF filepre-delivery inspection check list . ... must be submitted on a properly completed claim form within 30 ... defective parts

RITE WAY MFG. CO. LTD. SLIDING TELESCOPIC HITCH ARM ASSEMBLY 4120 SWING HITCH LAND ROLLER

16

SLIDING TELESCOPIC HITCH ARM ASSEMBLY ITEM # PART # DESCRIPTION

1 030-5972 Cylinder, 20tx16-112, (Mon # 648683) ¾” ORB Port @ 90° 2 060-0034 Serial Number Plate 3 105-0193 Hitch Arm Weldment 4 105-0196 Sliding Hitch Weldment 5 310-5024 In-Line Lock Valve, 3/8” ORB 6 316-0316 3/8” ORB M x 3/8” JIC Sw. F – Straight Adapter 7 318-5707 3/8” JIC M (x2) x 3/8” JIC M Sw. F (Branch ) - Tee 8 319-5706 3/8” ORB M x 3/8” JIC M – 90° Elbow 9 319-5710 1/2” ORB M x 3/8” JIC M – 90° Elbow 10 320-5660 ½” ORB M Plug (Allen Socket Head) 11 407-0003 24” Shepherd Hook Hose Standoff 12 409-9050 Safety Chain 20,000 lbs. 13 413-0008 Black Plastic clamp 14 420-0145 20” Side Winder 3000 lbs. Parking Jack 15 422-0019 1” Hitch Pin c/w Chain 6-1/4” Useable 16 423-0001 PP1-301VH Perfect Hitch c/w PP1-301VH 17 426-0001 Storage Tube, Body Only 18 426-0002 Storage Tube, Cap only 19 510-0001 1/8” Rivet x 1/8” x 1/4” 20 526-0610 3/8” x 1-1/4” Capscrew, NC, Gr.5, Pltd. 21 526-0810 1/2” x 1-1/4” Capscrew, NC, Gr.5, Pltd. 22 526-1624 1” x 3” Capscrew, NC, Gr.5, Pltd. 23 526-1652 1” x 6-1/2” Capscrew, NC, Gr.5, Pltd. 24 526-2048 3/8” x 3” Capscrew, NC, Gr.5, Pltd., Scotch-Grip™ 25 526-6103 3/8” Stover Lock Nut, NC, Gr.5, Pltd. 26 526-6105 1/2” Stover Lock Nut, NC, Gr.5, Pltd. 27 526-6109 1” Stover Lock Nut, NC, Gr.5, Pltd. 28 550-5206 3/8” Flat Washer, Pltd. 29 550-5208 1/2” Flat Washer, Pltd. 30 550-5316 1” SAE Flat Washer, Pltd. 31 556-0906 3/16” x 1-3/4” Cotter Pin, Pltd. 32 560-1614 1” x 3-1/2” Cylinder Pin, Pltd. 33 835-1011 Tip and Chain Holder, Small, Painted

Page 24: PRE-DELIVERY INSPECTION CHECK LIST - Riteway Mfg. · PDF filepre-delivery inspection check list . ... must be submitted on a properly completed claim form within 30 ... defective parts

RITE WAY MFG. CO. LTD. SLIDING HITCH & MAIN FRAME ASSEMBLY 4120 SWING HITCH LAND ROLLER

17

SLIDING HITCH & MAIN FRAME ASSEMBLY

Field Position

Page 25: PRE-DELIVERY INSPECTION CHECK LIST - Riteway Mfg. · PDF filepre-delivery inspection check list . ... must be submitted on a properly completed claim form within 30 ... defective parts

RITE WAY MFG. CO. LTD. SLIDING HITCH & MAIN FRAME ASSEMBLY 4120 SWING HITCH LAND ROLLER

18

SLIDING HITCH & MAIN FRAME ASSEMBLY

ITEM # PART # DESCRIPTION 1 030-5982 3-1/2 x 24 x 1-3/4 Monarch Cylinder, 3/4 ORB In Line 2 105-0193 Hitch Arm Weldment 3 105-0195 Cross Member Weldment 4 105-0200 Hydraulic Hose Bracket Weldment 5 105-0204 Safety Handle Weldment 6 105-0238 Hydraulic Stroke Pin Weldment, Ø1” x 4-1/4” overall, Pltd. 7 105-0239r3 Main Frame Weldment 8 105-0241 Hitch Arm Pivot Axle Weldment 9 261-5100 Connex Steel Bushing, Ø2-3/4”OD x 2” long 10 310-5024 In-line Lock Valve, 3/8” ORB 11 318-5707 Tee, 3/8” JIC M (x2 run) x 3/8” JIC Sw. F ( branch) 12 319-5706 90° Elbow, 3/8” ORB M x 3/8” JIC M 13 319-5710 90° Elbow, 1/2” ORB M x 3/8” JIC M 14 413-0008 Small Plastic Clamp 15 419-0004 1/4” Grease Zerk, NF, Pltd. 16 422-0007 3/8” x 3” Hitch Pin, Pltd. 17 526-0516 5/16” x 2” Capscrew, NC, Gr.5, Pltd. 18 526-1016 5/8” x 2” Capscrew, NC, Gr.5, Pltd. 19 526-1216 3/4” x 2” Capscrew, NC, Gr.5, Pltd. 20 526-1624 1” x 3”Capscrew, NC, Gr.5, Pltd. 21 526-2048 3/8” x 3” Capscrew, NC, Gr.5, Pltd. Scotch-Grip™ 22 526-6106 5/8” Stover Lock Nut, NC, Gr.5, Pltd. 23 526-6107 3/4” Stover, NC, Gr.5, Pltd. 24 526-7105 5/16” Hex Flange Nut, NC, Gr.5, Pltd. 25 550-5206 5/16 Flat Washer, Pltd. 26 550-5206 3/8” Flat Washer, Pltd. 27 550-5210 5/8” Flat Washer, Pltd. 28 550-5212 3/4” Flat Washer, Pltd. 29 550-5216 1” Flat Washer, Pltd. 30 551-5016 1” Spring Lock Washer, Pltd. 31 556-0906 3/16 x 1-3/4” Cotter Pin, Pltd. 32 558-2057 #9 Hitch Pin Clip, Pltd. 33 304-0036 Bulk Head Nipple, 3/8” JIC M x 3/8” JIC M c/w Nut 34 825-0102 Hitch Arm Pivot Axle Spacer, Steel

Page 26: PRE-DELIVERY INSPECTION CHECK LIST - Riteway Mfg. · PDF filepre-delivery inspection check list . ... must be submitted on a properly completed claim form within 30 ... defective parts

RITE WAY MFG. CO. LTD. TRANSPORT FRAME & MAIN FRAME ASSEMBLY 4120 SWING HITCH LAND ROLLER

19

TRANSPORT FRAME & MAIN FRAME ASSEMBLY

Page 27: PRE-DELIVERY INSPECTION CHECK LIST - Riteway Mfg. · PDF filepre-delivery inspection check list . ... must be submitted on a properly completed claim form within 30 ... defective parts

RITE WAY MFG. CO. LTD. TRANSPORT FRAME & MAIN FRAME ASSEMBLY 4120 SWING HITCH LAND ROLLER

20

TRANSPORT FRAME & MAIN FRAME ASSEMBLY

ITEM # PART # DESCRIPTION 1 020-6014 CTD 812 Hub Assembly c/w Cones 2 030-5981 35THC14-175 Hydraulic Cylinder, 3/4 ORB Ports @ 90°, mon # 671626 3 105-0205 Transport Pin Weldment, Ø1-1/2 x 7-7/8” useable 4 105-0239r3 Main Frame Weldment 5 105-0256 Transport Frame Weldment, (Axle Legs) 6 105-0258r1 Axle Stub Mount Weldment 7 105-0281 Transport Cylinder Pin Wld., Ø1” x 5-1/2” Overall 8 160-0174 Swing Hitch Roller Stopper c/w Plastic Insert (Safety Cylinder Stop), painted 9 202-6013 CTD Dust Cap DC 17

10 203-6044 Ø2-1/2 – 812 Spindle – 11-3/4” long 11 204-5586 Wheel Rim 15 x 10 – 8 Bolt (offset minus 1-1/2”) 12 205-1193 12.5 x 15 Tire – Load range F (12 Ply) * 020-0108 Tire & Wheel Rim Assembly

13 295-6016 SE 17 Seal 14 316-0302 Adaptor, 1/2” ORB M x 3/8” JIC M 15 319-5710 90° Elbow, 1/2" ORB x 3/8” JIC M 16 419-0004 1/4” NF Grease Zerk, Pltd. 17 422-0007 3/8” x 3” Hitch Pin , Pltd. 18 526-0814 1/2" x 1-3/4” Capscrew, NC, Gr.5, Pltd. 19 526-0832 9/16” x 4” Capscrew, NC, Gr.5, Pltd. 20 526-1016 5/8” x 2” Capscrew, NC, Gr.5, Pltd. 21 526-6105 1/2" Stover Lock Nut, NC, Gr.5, Pltd. 22 526-6106 5/8” Stover Lock Nut, NC, Gr.5, Pltd. 23 526-6112 9/16” Stover Lock Nut, NC, Gr.5, Pltd. 24 534-7816 1” Castle Nut, NF, Gr.5, Pltd. 25 543-5563 9/16” Wheel Nut, NF, Gr.5, Pltd. 26 550-5208 9/16” Flat Washer, Pltd. 27 550-5208 1/2” Flat Washer, Pltd. 28 550-5210 5/8” Flat Washer, Pltd. 29 550-5216 1” Flat Washer, Pltd. 30 550-5316 1” ID SAE Flat Washer, Pltd. 31 556-0614 3/16 x 1-3/4” Cotter Pin, Black 32 556-0906 3/16” x 1-3/4” Cotter Pin, Pltd. 33 558-2057 #9 Hitch Pin Clip, Pltd. 34 560-1614 1” x 3-1/2” Cylinder Pin, Pltd.

Page 28: PRE-DELIVERY INSPECTION CHECK LIST - Riteway Mfg. · PDF filepre-delivery inspection check list . ... must be submitted on a properly completed claim form within 30 ... defective parts

RITE WAY MFG. CO. LTD. SLOW MOVING SIGN & LIGHT ASSEMBLY 4120 SWING HITCH LAND ROLLER

21

SLOW MOVING SIGN & LIGHT ASSEMBLY

Page 29: PRE-DELIVERY INSPECTION CHECK LIST - Riteway Mfg. · PDF filepre-delivery inspection check list . ... must be submitted on a properly completed claim form within 30 ... defective parts

RITE WAY MFG. CO. LTD. SLOW MOVING SIGN & LIGHT ASSEMBLY 4120 SWING HITCH LAND ROLLER

22

SLOW MOVING SIGN & LIGHT ASSEMBLY

ITEM # PART # DESCRIPTION

1 105-0239r3 Main Frame Weldment 2 417-0018 Amber Warning Light c/w Male 2 Pronged Plug 3 417-0019 Red Warning Light c/w Male 2 Pronged Plug 4 424-0001 Slow Moving Sign 5 424-0002 Slow Moving Sign Spade 6 526-0406 1/4” x 1” Capscrew, NC, Gr.5, Pltd. 7 526-0507 5/16” x 3/4” Capscrew, NC, Gr.5, Pltd. 8 526-0810 1/2" x 1-1/4” Capscrew, NC, Gr.5, Pltd. 9 526-6105 1/2" Stover Lock Nut, NC, Gr.5, Pltd. 10 526-6208 1/2" Hex Nut, NC, Gr.5, Pltd. 11 526-7104 1/4" Hex Flange Nut, NC, Gr.5, Pltd. 12 526-7105 5/16” Hex Flange Nut, NC, G.r5, Pltd. 13 550-5204 1/4" Flat Washer, Pltd. 14 550-5208 1/2" Flat Washer, Pltd. 15 839-0563 SMV Sign & Light Bracket, Painted * 040-0048 SHR (F1-20 HS) Light Harness Kit – All in one c/w Hitch Harness,

7 Point Plug, 18’ (216”) 4 Wire & 17’ (204”) Left (x2)& Right (x2) Leg 2 Wire all With Female 2 Pronged Plugs)

Page 30: PRE-DELIVERY INSPECTION CHECK LIST - Riteway Mfg. · PDF filepre-delivery inspection check list . ... must be submitted on a properly completed claim form within 30 ... defective parts

RITE WAY MFG. CO. LTD. HYDRAULIC ASSEMBLY 4120 SWING HITCH LAND ROLLER

23

HYDRAULIC ASSEMBLY

Page 31: PRE-DELIVERY INSPECTION CHECK LIST - Riteway Mfg. · PDF filepre-delivery inspection check list . ... must be submitted on a properly completed claim form within 30 ... defective parts

RITE WAY MFG. CO. LTD. HYDRAULIC ASSEMBLY 4120 SWING HITCH LAND ROLLER

24

HYDRAULIC ASSEMBLY

ITEM # PART # DESCRIPTION

1 030-5972 20TX16-112 Hydraulic Cylinder, 3/4 ORB @ 90° to Pin (Mon # 648683) 2 030-5981 35THC14-175 Hydraulic Cylinder, 3/4 ORB @ 90º to Pin (Mon # 671626) 3 030-5982 35TC24-175 Hydraulic Cylinder, 3/4 ORB @ 90º to Pin (Mon # 671642) 4 310-5024 In-Line Lock Valve (Superior # 710-6094, Sun # SXCB-LAN-GNN) 5 313-6774 3/8” Hose, 1/2” NPT M x 3/8” JIC Sw. F c/w Pioneer Tip (308-0001)-74” 6 313-6790 3/8” Hose, 1/2” NPT M x 3/8” JIC Sw. F c/w Pioneer Tip (308-0001)-90” 7 313-6704 3/8” Hose, 1/2” NPT M x 3/8” JIC Sw. F c/w Pioneer Tip (308-0001)-278” 8 313-6705 3/8” Hose, 1/2” NPT M x 3/8” JIC Sw. F c/w Pioneer Tip (308-0001)-306” 9 313-7952 3/8” Hose, 3/8” JIC Sw. F x 3/8” JIC Sw. F – 52” 10 313-7962 3/8” Hose, 3/8” JIC Sw. F x 3/8” JIC Sw. F – 62” 11 313-7968 3/8” Hose, 3/8” JIC Sw. F x 3/8” JIC Sw. F – 68” 12 313-7983 3/8” Hose, 3/8” JIC Sw. F x 3/8” JIC Sw. F – 83” 13 313-7907 3/8” Hose, 3/8” JIC Sw. F x 3/8” JIC Sw. F – 185” 14 330-0001 3/8” Hose, 3/8” JIC Sw. F x 3/8” JIC Sw. F – 200”

15 316-0302 Adaptor, 1/2" ORB M x 3/8” JIC M 16 316-0316 Adaptor, 3/8” ORB M x 3/8” JIC Sw. F

17 318-5701 Tee, 3/8” JIC M (x2 Run) x 3/8” JIC Sw. F (Branch)

18 317-5706 Elbow, 3/8” ORB M x 3/8” JIC M – 90° 19 319-5710 Elbow, 1/2” ORB M x 3/8” JIC M – 90° 20 319-5714 Elbow, 3/8” JIC Sw. F x 3/8” JIC M – 90° 21 319-5723 Elbow, 1/2” ORB M x 3/8” M – 90°, Restricted

22 324-0036 Nipple, 3/8” JIC M x 3/8” JIC M, Bulkhead

23 308-0001 Pioneer Tip, 1/2” NPT F

Page 32: PRE-DELIVERY INSPECTION CHECK LIST - Riteway Mfg. · PDF filepre-delivery inspection check list . ... must be submitted on a properly completed claim form within 30 ... defective parts

RITE WAY MFG. CO. LTD. HUB BREAKDOWN 4120 SWING HITCH LAND ROLLER

25

CTD 812 HUB BEAKDOWN

Drive In Stud & Wheel Nut

ITEM # PART# DESCRIPTION

1 203-6044 812 Spindle, Bolt-in Style Ø2-1/2” x 11-3/4” long 2. 200-6011 CTD-812-1 Hub (Takes SE-17 Seal) 3. 201-6016 Outer Cup, LM2720 4. 201-6017 Inner Cup, 3720 5. 202-6013 DC17 Dust Cap 6. 290-6013 Outer Bearing, 2790 7. 290-6014 Inner Bearing, 3780 8. 295-6016 SE-17 (For CTD-812 & CTD-812-1 Hub) 9. 534-7816 1” Castle Nut, NF, Pltd. 10. 543-5562 9/16” x 1-3/4” Wheel Bolt (Not Shown) 11. 554-5303 1” Spindle Washer, Plain 12. 556-0614 3/16” x 1-3/4” Cotter Pin, Plain 13. 020-6014 CTD-812-1 Hub Assembly 14. 543-5563 9/16” Wheel Nut (For CTD-812-1) 15. 543-5564 9/16” x 2-1/4” Wheel Stud (For CTD-812-1)

Page 33: PRE-DELIVERY INSPECTION CHECK LIST - Riteway Mfg. · PDF filepre-delivery inspection check list . ... must be submitted on a properly completed claim form within 30 ... defective parts

RITE WAY MFG. CO. LTD. CYLINDER BREAKDOWN 4120 SWING HITCH LAND ROLLER

26

MONARCH 3-1/2” X 24” CYLINDER

35TC24-175 (3/4” ORB Inline) Riteway Part # 030-5982 Monarch Part # 671642

Check with parts prior to ordering

ITEM # PART# DESCRIPTION

1 492676 Clevis Cap 3-1/2", 3/4” NF ORB 2 492381 Rod Cap 3-1/2", 3/4” ORB, 1-3/4" ID 3 292518 Piston 3-1/2 x 1- TL / TC 4 194897 Seal Hallite 605 Rod Ø1-3/4" 5 491814 Cylinder Tube, 3-1/2 x 24" - TL / TC 6 492354 Tie Rod, 5/8" x 24", NF, Gr.5 - TL / TC 7 134953 Cylinder Pin Ø1" x 3.37 for HP / COT 8 135995 Cotter Pin, 3/16” x 1-1/2” Hammer Lock, Pltd. 9 148000 Socket Set Screw, 3/8" x 5/16”, NF, Pltd. 10 493168 Rod Clevis 1-1/2” x 1" - TL / TC 11 128271 5/8” Hex Nut, NF, Gr.5, Black 12 130560 Piston Hex Nut, 1-1/4" ID, Gr.B 13 186562 Port Plug, 3/4", NF, Socket Head c/with O-Ring 14 649219 Seal Kit, RK 35L-175 Lion Hyd. Rep. Kit

Page 34: PRE-DELIVERY INSPECTION CHECK LIST - Riteway Mfg. · PDF filepre-delivery inspection check list . ... must be submitted on a properly completed claim form within 30 ... defective parts

RITE WAY MFG. CO. LTD. CYLINDER BREAKDOWN 4120 SWING HITCH LAND ROLLER

27

MONARCH 3-1/2” X 14” CYLINDER

35THC14-175 (3/4” ORB 90°) Riteway Part # 030-5981 Monarch Part # 671626

Check with parts man prior to ordering

ITEM # PART# DESCRIPTION

1 492676 Clevis Cap 3-1/2 - 3/4” NF ORB @ 90º 2 492381 Rod Cap 3-1/2 - 3/4” ORB, 1-3/43" ID 3 292518 Piston 3-1/2 x 1 - TL / TC 4 194897 Seal Hallite 605 Rod Ø1-3/4" x 5 491804 Cylinder Tube 3.5 - 14 6 492344 Tie Rod 5/8 - 14", NF, Gr.5, - TL / TC 7 134953 Cylinder Pin Ø1" x 3.37 for HP / COT 8 135995 Cotter Pin, 3/16” x 1-1/2” Hammer Lock, Pltd. 9 148390 Socket Set Screw, 3/8” UNC x ½” KNUR 10 492652 Rod Clevis 1-1/4” ID x 1" 11 128271 5/8” Hex Nut, NC, Gr.5, Black 12 130560 Piston Hex Nut 1-1/4” ID, Gr.B 13 186562 Port Plug 3/4”, NF Socket Head c/with O-Ring 14 649219 Seal Kit, RK 35L-175 Lion Hyd. Rep. Kit

Page 35: PRE-DELIVERY INSPECTION CHECK LIST - Riteway Mfg. · PDF filepre-delivery inspection check list . ... must be submitted on a properly completed claim form within 30 ... defective parts

RITE WAY MFG. CO. LTD. CYLINDER BREAKDOWN 4120 SWING HITCH LAND ROLLER

28

MONARCH 20” X 16” CYLINDER 20TX16-112 (3/4” ORB 90°)

Riteway Part # 030-5972 Monarch Part # 648683

DRAWING SHOWS PORTS IN LINE TO CYLINDER PINS

Check with parts prior to ordering

ITEM # PART# DESCRIPTION

1 293008 Clevis Cap 2.00 - 3/8 ORB- 1" 2 293016 Rod Cap 2.00 - 1.13 - 3/8" ORB - TX 3 293010 Piston 2.00 - TX 4 194893 Seal Hallite 605 Rod - 1-1/8"D 5 498511 Cylinder Tube - 2.00 x 16.00 - TX 6 494181 Tie Rod 5/16" - 16 - TX - Washed 7 134953 Cylinder Pin Ø1" X 3.37" HP / COT 8 135995 Cotter Pin, 3/16” x 1-1/2” Hammer Lock 9 148000 Socket Set Screw, 3/8” UNC x ½” KNUR 10 293009 Rod Clevis 1” ID x 1" - TX 11 128501 5/16” Hex Nut, NC, Gr.B, Black 12 186530 Plug 3/8 - 18 NPTF Dry Seal 13 639572 Seal Kit, RK 20L-112 Lion Hyd. Rep. Kit

Page 36: PRE-DELIVERY INSPECTION CHECK LIST - Riteway Mfg. · PDF filepre-delivery inspection check list . ... must be submitted on a properly completed claim form within 30 ... defective parts

RITE WAY MFG. CO. LTD. SIDE WIND PARKING JACK BREAKDOWN 4120 SWING HITCH LAND ROLLER

29

SIDE WIND PARKING JACK 20” 3000 lbs

RITE WAY PART NUMBER 420-0145.

Crank kit may not be available due to manufactures supplies

ITEM # PART# DESCRIPTION

1 420-0018 Side Wind Crank Kit 2 420-0019 Gear Set 3 420-0020 Hitch Pin c/w Chain 4 420-0021 Screw Replacement Kit 5 420-0146 Inner Ram Assembly 6 526-0424 Capscrew - 1/4" x 3" UNC 7 526-7004 Lock Nut - 1/4" UNC 8 420-0024 Cover 9 420-0025 Body

Page 37: PRE-DELIVERY INSPECTION CHECK LIST - Riteway Mfg. · PDF filepre-delivery inspection check list . ... must be submitted on a properly completed claim form within 30 ... defective parts

RITE WAY MFG. CO. LTD. ACRE METER LOCATION 4120 SWING HITCH LAND ROLLER

30

ACRE METER LOCATION

ITEM # PART# DESCRIPTION

1. 112-0258 4” ID Acre Meter Housing 2. 266-0013 Model 4120 Acre Meter, Forester 3. 518-0808 1/2” x 1/2” Set Screw, NC, Black 4. 526-0832 1/2” x 4” Capscrew, NC, Gr. 5, Pltd. 5. 526-7008 1/2” Nylon Lock Nut, NC, Pltd. 6. 525-6108 1/2” Jam Nut, NC, Pltd. 7. 550-5208 1/2” Plate Washer, NC, Pltd. 8. 827-0017r1 Replaceable Drum Shaft (Ø2-7/16" x 14-3/4") To purchase an acre meter please contact Forster Industries, Toll Free # 1-800-661-2994.

NOTE: Use Loc-Tite with jam nut when assembling to housing. DO NOT OVER TIGHTEN.

Page 38: PRE-DELIVERY INSPECTION CHECK LIST - Riteway Mfg. · PDF filepre-delivery inspection check list . ... must be submitted on a properly completed claim form within 30 ... defective parts

RITE WAY MFG. CO. LTD. GRADE CHART 4120 SWING HITCH LAND ROLLER

31

GRADE CHART

Page 39: PRE-DELIVERY INSPECTION CHECK LIST - Riteway Mfg. · PDF filepre-delivery inspection check list . ... must be submitted on a properly completed claim form within 30 ... defective parts

RITE WAY MFG. CO. LTD. TORQUE CHART 4120 SWING HITCH LAND ROLLER

32

TORQUE CHART

Page 40: PRE-DELIVERY INSPECTION CHECK LIST - Riteway Mfg. · PDF filepre-delivery inspection check list . ... must be submitted on a properly completed claim form within 30 ... defective parts

RITE WAY MFG. CO. LTD. NOTES 4120 SWING HITCH LAND ROLLER

33

NOTES