2
PRE-ASSEMBLY Experience is the key to success Efficient preliminary work at the docks ALL NRG teams specialise in the full process of tur- bine, tower and foundation pre-assembly and can be based anywhere according to customer needs. We have carried out large pre-assembly jobs at several sites in Europe for many years and our highly qualified team has extensive experience. As one of the most experienced suppliers for pre-assembly solutions in the world, customers can rest assured that site QHSE rules are met and deadlines are kept. One supplier for complete setup Due to our extensive experience both within electrical and mechanical wind, we take full responsibility for the pre-assembly of cables, switchgear, transformers, towers and nacelles before shipment. Naturally, we also make certain that the team of electricians and technicians has the required skills and certificates. In this way we ensure a smooth and well-documented process from the incoming control of components during assembly, handling and load-out prior to offshore installation. Lyshøjen 4 | DK-8520 Lystrup | Tel.: +45 7010 1022 | www.allnrg.com PRE-ASSEMBLY EN

PRE-ASSEMBLY - ALL NRG · 2019-01-28 · PRE-ASSEMBLY Experience is the key to success Efficient preliminary work at the docks ALL NRG teams specialise in the full process of tur-bine,

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PRE-ASSEMBLY - ALL NRG · 2019-01-28 · PRE-ASSEMBLY Experience is the key to success Efficient preliminary work at the docks ALL NRG teams specialise in the full process of tur-bine,

PRE-ASSEMBLY Experience is the key to success

Efficient preliminary work at the docksALL NRG teams specialise in the full process of tur-bine, tower and foundation pre-assembly and can be based anywhere according to customer needs. We have carried out large pre-assembly jobs at several sites in Europe for many years and our highly qualified team has extensive experience. As one of the most experienced suppliers for pre-assembly solutions in the world, customers can rest assured that site QHSE rules are met and deadlines are kept.

One supplier for complete setupDue to our extensive experience both within electrical and mechanical wind, we take full responsibility for the pre-assembly of cables, switchgear, transformers, towers and nacelles before shipment. Naturally, we also make certain that the team of electricians and technicians has the required skills and certificates. In this way we ensure a smooth and well-documented process from the incoming control of components during assembly, handling and load-out prior to offshore installation.

Lyshøjen 4 | DK-8520 Lystrup | Tel.: +45 7010 1022 | www.allnrg.com

PRE-ASSEMBLY EN

Page 2: PRE-ASSEMBLY - ALL NRG · 2019-01-28 · PRE-ASSEMBLY Experience is the key to success Efficient preliminary work at the docks ALL NRG teams specialise in the full process of tur-bine,

PRE-ASSEMBLY Experience is the key to success

• Flexible and cost efficient

• Single supply source for the complete setup – electrical and mechanical

• Technicians hold all certifications and training according to customer rules

• Experienced managers and technicians

• Pre-assembly in time and on budget

ALL NRG Advantages

Individual technicians

Pre-assembly teams

Electrical and mechanical

Test of electrical systems

Loading/unloading and receiving

Handling and load-out

Site management

Quality control / Quality inspection

Health & safety management

ALL NRG pre-assembly solutions extend to:

Utilising the knowledge our technicians, team leads and back office on the pre-assembly site leads to reductions in the overall costs of offshore wind projects.

Why choose ALL NRG?

Lyshøjen 4 | DK-8520 Lystrup | Tel.: +45 7010 1022 | www.allnrg.com