Arch Davis (GS*69) Davis Systems Engineering
Poor light-socket coordination
Parallel Computing Architectures
• 1. (not parallel) Fastest Possible serial– a. Make it complex– b. Limits
• 2. Old superscalar, vector Crays, etc.• 3. Silicon graphics shared memory (<64 CPUs)
• 4. Intel shared memory: 2-32 processor servers
• 5. Distributed memory: “Beowulf” clusters
• 6. Biggest D.m.: NEC SS6 “Earth Simulator”
+ glue → Cluster ?
Building a Beowulf cluster
Some Design Considerations
• 1. Processor type and speed
• 2. Single or Dual
• 3. Type of memory
• 4. Disk topology
• 5. Interconnection technology
• 6. Physical packaging
• 7. Reliability
“Just a bunch of ordinary PCs”
• But to be reliable, more must be watched.– Power supplies– Fans– Motherboard components– Packaging layout– Heat dissipation– Power quality
• To be cost effective, configure carefully.– Easy to overspecify and cost >2x what is necessary– Don’t overdo the connections, they cost a lot.– The old woman swallowed a fly. Be careful your budget doesn’t
die.
1. Processor type & speed
• A. Pentium 4 Inexpensive if not leading edge speed
• B. Xeon =dual processor P4. Shares a motherboard.
• C. AMD Opteron 64-bit Needed for >2GB mem.
• D. (future) Intel 64-bit Will be AMD compatible!
• E. IBM 970 (G5) True 64-bit design Apple is using
• F. Intel Itanium “Ititanic” 64-bit long instruction word
Disk Topology
• 1. Disk per board
• 2. Diskless + RAID
Interconnect Options
• Always a desire for way more speed than possible• Latency is ultimately an issue of light speed
• Existing options:• 1. Ethernet, including Gigabit Switched
• Very Robust, by Dave Boggs EECS’72• Affordable, even at Gigabit
• 2. Infiniband Switched• 3. Proprietary: Myrinet, Quadrics, Dolphin
• Various topologies, including 2&3-D meshes• Remote DMA may be transfer method• Assumes noise-free channel, may have CRC
Physical Packaging
• It’s not “rocket science,” but it takes care.
• A few equations now and then never hurt when you are doing heat transfer design.
• How convenient is it to service?
• How compact is the cluster?• What about the little things? Lights & buttons?
• “Take care of yourself, you never know how long you will live.”
Reliability
• Quality is designed-in, not an accident.• Many factors affect reliability.• Truism: “All PCs are the same. Buy the cheapest and
save.”• Mil-spec spirit can be followed without gold plate.• Many components and procedures affect the result.• Early philosophy: triage of failing modules• Later philosophy: Entire cluster uptime• Consequence of long uptime: user confidence, greatly
accelerated research
Benchmarks● Not a synthetic
● 100 timesteps of Terra code (John R. Baumgardner, LANL)● Computational fluid dynamics application
● Navier-Stokes equation with ∞ Prandtl number● 3D spherical shell multi-grid solver
● Global elliptic problem with 174,000 elements● Inverting and solving at each timestep
Results are with Portland Group pf90 Fortran compiler on –fastsse option
And with Intel release 8 Fortran:
CompilerMachine Intel Portlandbaseline P4 2.0 319s 362 seclowpower P4M 1.6 342s 358 secRouter2 Xeon 2.4 264s 305 secepiphany Xeon 2.2 264s 312 secpntium28 P4 2.8 /800 172s 209 secopteron146 AMD 2.0 160s 164 secCray design NEC SX-6 ~50 sec
Software
• Usually is Linux with MPI for communication.
• Could be Windows, but not many.
• Compilers optimize.
• Management and monitoring software
• Scheduling software
Linux 32-bit/64-bit WindowsPentium 4 Athlon Xeon Opteron
PGI® Workstation – 1 to 4 CPU Systems
Compiler Language Command
PGF77® FORTRAN 77 pgf77
PGF90™ Fortran 90 pgf90
PGHPF® High Performance Fortran pghpf
PGCC® ANSI and K&R C pgcc
PGC++™ ANSI C++ with cfront compatibility features
pgCC
PGDBG® Source code debugger pgdbg
PGPROF® Source code performance profiler
pgprof
Workstation Clusters
PGI CDK ™ = PGI Compilers + Open Source Clustering Software
A turn-key package for configuration of an HPC cluster from a group of networked Linux workstations or dedicated blades
What about the future?
• Always go Beowulf if you can.
• Work on source code to minimize communication.
• Compilers may never be smart enough to automatically parallelize or second-guess the programmer or the investigator.
• Components will get faster, but interconnects will always lag processors.
Future Hardware
• No existing boards are made for clustering.
• Better management firmware is needed.• Blade designs may be proprietary.• They may require common components to
operate at all.• Hard disks need more affordable reliability.• Large, affordable Ethernet switches are
needed.
General advice?
• Think of clusters as “personal supercomputers.”
• They are simplest if used as a departmental or small-group resource.
• Clusters too large may cost too much:– Overconfigured– Massive interconnect switches– Users can only exploit so many processors at once– Multiple runs may beat one massively parallel run.– Think “lean and mean.”
Opportunities
• 1. Test these machines with your code.
• 2. Get a consultation on configuration
More are Coming
• Peter Bunge sends his greetingsIn anticipation of a Deutsche Geowulf
256 Processors…
And many more clusters here and there.