Cranes and Crane Safety Awareness
2
The purpose of this class is to provide you with an overall foundation of knowledge pertaining to Cranes and Crane Safety.
Upon completion of this course, students will be able to identify types of cranes and their basic components, recognize hazards associated with cranes and understand safe operating practices based on guidelines established by OSHA.
3
• Describe maintenance, inspection and certification requirements of cranes• Understand load capacities, limits and lifting principles• Describe safe assembly/disassembly activities• Understand hand signals• Describe hazards and most common causes of crane accidents• Recognize types of cranes, basic components as well as rigging equipment• Summarize OSHA standards pertaining to cranes• Understand the roles and responsibilities of lifting personnel
Objectives
4
Types of Cranes• Mobile Telescopic• Crawler Lattice• Side Lift• All Terrain• Truck Mounted• Articulating • Barge/Floating/Ship• Railroad• Aerial/Helicopter
• Overhead Traveling• Wall• Gantry• Semi-Gantry• Cantilever• Straddle/Mobile Gantry• Tower/Derrick Hammer Head • Stiff-leg Derrick
5
Most Common Types of Cranes in Construction
6 6
Crawler Lattice
7 7
Wheel-Mounted Telescoping
8 8
Tower Crane
9
Construction - Cranes & Rigging • 1926.1400-1442 - Cranes Subpart CC• 1926.251 - Rigging equipment for material handlingMarine Terminals - Cargo Handling Gear and Equipment• 1917.45 - Cranes and derricks (see also 1917.50)• 1917.50 - Certification of marine terminal material handling devicesGeneral Industry - 1910 Subpart N - Materials Handling and Storage• 1910.179 - Overhead and gantry cranes• 1910.180 - Crawler locomotive and truck cranes• 1910.181 - Derricks• 1910.183 - Helicopters• 1910.184 - Slings
OSHA Crane Standards
10
Wind Speed Incorporated by DOE Reference?
DOE STANDARD, HOISTING AND RIGGING(Formerly Hoisting and Rigging Manual)
DOE-STD-1090-999.5.1 Conduct of Operatorv. In the absence of crane manufacturer’s instructions regarding maximum wind speeds for operation, operations undertaken at wind speeds in excess of 25 mph should be evaluated by a qualified person to determine if the size, shape and weight of the load can be safely lifted.15.5.2 Mobile Cranes/Boom Trucks7. In the absence of crane manufacturer’s instructions regarding maximum wind speeds for operation, operations undertaken at wind speeds in excess of 25 mph should be evaluated by a qualified person to determine if the size, shape and weight of the load can be safely lifted.4.1 General22. Personnel platforms should not be used in winds greater than 15 mph (25 km/h), electric storms, snow, ice, sleet, or other adverse weather conditions that could affect the safety of personnel.
10
11 11
Option Description Portable Valid
1 Certification by an accredited crane operator testing organization
Y 5
2 Qualification by an audited employer programDeveloped by an accredited crane operator testing organization or Approved by an auditor in accordance with CFR.
N 5
3 Qualification by the U.S. military N Infinity
4 Licensing by a government entity N 5 or less
Operator Qualification Certification 1427 & 1428Should have taken effect November 10, 2014 but will now go into effect November 10, 2017.
12
Feb. 7, 2014Contact: Office of CommunicationsPhone: 202-693-1999
OSHA issues proposed rule to extend compliance date for crane operatorcertification requirements
WASHINGTON – The Occupational Safety and Health Administration today issued a proposed rule to extend the compliance date for the crane operator certification requirement by three years to Nov. 10, 2017. The proposal would also extend to the same date the existing phase-in requirement that employers ensure that their operators are qualified to operate the equipment.
OSHA issued a final standard on requirements for cranes and derricks in construction work on Aug. 9, 2010. The standard requires crane operators on construction sites to meet one of four qualification/certification options by Nov. 10, 2014. After OSHA issued the standard, a number of parties raised concerns about the qualification/certification requirements. After conducting several public meetings, OSHA decided to extend the enforcement date so that the certification requirements do not take effect during potential rulemaking or cause disruption to the construction industry.
Comments may submitted electronically at http://www.regulations.gov, the Federal e-Rulemaking Portal or by facsimile or mail. See the Federal Register notice for submission details and additional information about this proposed rule. Comments must be submitted by March 12, 2014.
OSHA held three stakeholder meetings on operator certification/qualification issues in April 2013 and posted detailed notes of the meetings at http://www.osha.gov/cranes-derricks/stakeholders.html, a Web page devoted to the stakeholder meeting. A list of frequently asked questions are also posted on OSHA's Cranes and Derricks in Construction Web page to provide additional clarification and address some comments and concerns raised by stakeholders.
Under the Occupational Safety and Health Act of 1970, employers are responsible for providing safe and healthful workplaces for their employees. OSHA's role is to ensure these conditions for America's working men and women by setting and enforcing standards, and providing training, education and assistance. For more information, visit http://www.osha.gov.
12
13 13
Definitions• Crane – Consists of a rotating structure for lifting and lowering
horizontally on rubber tires or crawler treads• Hoist – Used to lift and lower load• Boom – An inclined spar, strut, or other long member supporting the
hoisting tackle• Boom stops – A device used to limit the angle of the boom at its highest
position• Brake – To slow or stop motion by friction or power • Block – Sheaves or grooved pulleys in a frame with hook, eye and strap• Jib – Extension attached to the boom point to provide added boom
length for lifting specified loads
14 14
Crane Parts
15
OSHA Competent Person vs. Qualified Person• This is in response to your memorandum of January 28, on the above subject.• 29 CFR 1926.32(f) states: "Competent person" means on who is capable of identifying existing and predictable
hazards in the surroundings or working conditions, which are unsanitary, hazardous, or dangerous to employees, and who has authorization to take prompt corrective measures to eliminate them.
• 29 CFR 1926.32(l) states: "Qualified" means one who, by possession of a recognized degree, certificate, or profess- ional standing, or who by extensive knowledge, training and experience, has successfully demonstrated his ability to solve or resolve problems relating to the subject matter, the work, or the project.
• These definitions provide that a competent person must have authority to take prompt measures to eliminate hazards at the work site and have the experience to be capable of identifying these hazards. This is the reason a competent person is required under inspection requirements in 29 CFR 1926.650 and 29 CFR 1926.651.
• The definitions provide that a qualified person must have a recognized degree, certificate, etc., or extensive experience and ability to solve the subject problems, at the worksite. This is the reason why 29 CFR 1926.651(f) requires that supporting systems design shall be by a qualified person. There may be a requirement for more technical or engineering knowledge here.
• Each excavation job as in any other case, must be evaluated as to the facts relating to the needs of a competent person, and qualified person.
• The professional judgment of OSHA must come into play by using our construction regulations where they apply• Please advise if we can be of further assistance.
15
16
Qualified Operator
Any person engaged in a construction activity who is operating a crane covered by the new cranes and derricks rule, except: • Sideboom cranes• Derricks• Equipment with a rated hoisting/lifting capacity of 2,000 pounds or less
Operators of listed equipment must meet the criteria for minimum expertise described in the applicable section in subpart CC 1926.1427
* A Certified Operator is currently recommended and expected to be required on November 10, 2017.
Who needs to be certified or qualified?
17
When is a qualified rigger required?
Employers must use qualified riggers during hoisting activities for assembly and disassembly work (1926.1404(r)(1)). Additionally, qualified riggers are required whenever workers are within the fall zone and hooking, unhooking, or guiding a load, or doing the initial connection of a load to a component or structure (1926.1425(c)).
Qualified Operator
18
Qualified Signal PersonWhen is a signal person required?
A signal person is required when: The point of operation is not in full view of the operator (1926.1419(a)), the operator’s view is obstructed in the direction the equipment is traveling, or either the operator or the person handling the load determines that a signal person is needed because of site-specific safety concerns.
19
Subpart CC – Cranes and Derricks inConstruction: Assembly/Disassembly
Employers must comply with all manufacturer prohibitions regarding assembly and disassembly. The OSHA standard generally allows employers to choose between the manufacturer’s procedures or their own, any the most stringent must be followed.Employer procedures must be developed by a “qualified person” and must satisfy a number of specified requirements, such as providing adequate support and stability for all parts of the equipment, and positioning employees involved to minimize exposure to any unintended movement or collapse.
20
Assembly/Disassembly Responsibilities• The rule requires the work to be directed by an Assembly/Disassembly
(A/D) director. The A/D director must meet the criteria for both a “competent person” and a “qualified person,” which are terms defined in this rule, or must be a “competent person” assisted by a “qualified person.”
• The A/D director must understand the applicable procedures.• The A/D director must review the procedures immediately prior to
beginning work unless he or she understands the procedures and has used them before for that equipment type and configuration.
• The A/D director must ensure that each member of the crew understands his or her tasks, the hazards of the tasks, and any hazardous positions or locations to avoid.
21
• The A/D director must verify all capacities of any equipment used, including rigging, lifting lugs, etc.
• The A/D director must also address hazards associated with the operation, including 12 specified areas of concern:
Assembly/Disassembly Responsibilities (cont.)
• Site and ground conditions• Blocking material• Proper location of blocking• Verifying assist crane loads• Boom & jib pick points• Center of gravity• Stability upon pin removal
• Stability upon pin removal• Snagging• Struck by counterweights• Boom hoist brake failure• Loss of backward stability• Wind speed and weather
22
A/D General Requirements
• A crew member who moves out of the operator’s view to a location where the crew member could be injured by movement of the equipment (or load) MUST inform the operator before going to that location. The operator must not move the equipment until that crew member informs the operator that he or she has relocated to a safe position.
• Employees must never be under the boom or jib when pins (or similar devices) are being removed, unless it is required by site constraints and the A/D director has implemented procedures that minimize the risk of unintended movement and the duration and extent of exposure under the boom.
23
• Component weights must be readily available for all components to be assembled.
• All rigging must be done by a “qualified rigger.”• Pins may not be removed during disassembly when the pendants
are in tension.• Booms supported only by cantilevering must not exceed
manufacturer limitations or RPE (Registered Professional Engineer) limitations, as applicable.
• Component selection and equipment configuration that affects the capacity or safe operation of the equipment must be in accordance with manufacturer requirements and limits or RPE requirements and limits, as applicable.
A/D General Requirements (cont.)
24
A/D Outriggers and StabilizersWhen outriggers or stabilizers are used or are necessary in light of the load to be handled and the operating radius:
• Outriggers and stabilizers must be fully extended or, if permitted by manufacturer procedures, deployed is specified in the load chart.
• Outriggers must be set to remove equipment weight from the wheels, except for locomotive cranes.
• Outrigger floats, if used, must be attached to the outriggers; stabilizer floats, if used, must be attached to the stabilizers.
• Each outrigger or stabilizer must be visible to the operator or to a signal person during extension and setting.
• Outrigger and stabilizer blocking must be placed under the float/pad of the jack or, if there is no jack, under the outer bearing surface of the outrigger or stabilizer beam. Blocking must also be sufficient to sustain the loads and maintain stability and must be properly placed.
25 25
• Contact with power lines• Overturns• Falls• Mechanical failures• Moving parts• Improper load rating• Excessive speeds• No hand signals• Inadequate inspection and maintenance
Crane Hazards
26 26
• Unguarded parts• Unguarded swing radius• Working too close to power lines• Improper exhaust system• Shattered windows• No steps/guardrails walkways• No boom angle indicator• Not using outriggers
Crane Hazards (cont.)
27
OSHA-Identified Crane HazardsOSHA's analysis identified the major causes of crane accidents to include:• Boom or crane contact with energized power lines (nearly 45% of the cases)• Under the hook lifting device• Overturned cranes• Dropped loads• Boom collapse• Crushing by the counter weight• Outrigger use• Falls• Rigging failures
28 28
Who is at Risk?
• Operators• Persons at Crane Site
29 29
Power LinesThe greatest risk for cranes is contacting power lines.
30 30
Stay clear from power lines at least 10 feet under 50kv.If the voltage of the power lines is unknown, stay at least 20 feet away or more and immediately contact your employer so that they may contact the utility provider to determine voltage of the power lines. Warning: Power lines can carry 50kv, 250kv, 350kv, 500kv or more. The higher the kv the greater the risk of arcing and employee injury and property damage.
Power Lines
31 31
Improper Load
Improper loads or speeds can result in the tipping of the crane.
32 32
Improper Load
33 33
Improper Load
34 34
Guard Moving Parts
Unguarded Chain Drive
Guard moving parts such as gears or belts.
35 35
Swing Radius
Stay out of the swing radius of the crane –make sure there are barrier guards showing swing radius.
36 36
Operator Visibility
Broken Window
Make sure broken windows or other
obstructions do not prevent the operator
from seeing.
37 37
Ladders
Ladder
Use ladders to get to the upper portion of the cab.
38 38
Guardrails
Runways and steps need to have
guardrails, handholds and slip resistant surfaces.
39 39
Planning Before Start-Up
• Level the crane and ensure support surface is firm and able to support the load.• Contact power line owners and determine precautions. Know the location and
voltage of overhead power lines. • Know the basic crane capacities, limitations, and job site restrictions, such as the
location of power lines, unstable soil, or high winds. • Make other personnel aware of hoisting activities.• Barricade areas within swing radius.• Ensure proper maintenance and inspections.• Determine safe areas to store materials and place machinery.
40 40
Suspended Loads
Don’t stand under suspended loads.
41 41
• Instability – unsecured load, load capacity exceeded, or ground not level or too soft
• Lack of communication – the point of operation is a distance from the crane operator or not in full view of the operator
• Lack of training – inadequate maintenance or inspection
Common Reasons Accidents Occur
42 42
Competent Person
The competent person must inspect all machinery and equipment prior to each use, and during use, to make sure it is in safe operating condition.If it needs fixing, take it out of service and don’t use it until it is fixed.
Broken Track
43 43
Load Capacity - Speed - Warnings
• Make sure the crane operator can see the:• Rated Load Capacities• Operating Speeds• Special Hazard
Warning or Instruction
Load Rating Chart
44 44
Boom Angle Indicator
A boom angle indicator must be on the crane
45 45
Know the Weight of the Load
• Refer to shipping ticket or other documentation• Ensure lift calculations are correct• Ensure load is within load chart rating for boom length and
load radius of crane• Crane is rated by the maximum weight it will lift at a
minimum radius and minimum boom length – the further from its centerpoint, the less it will lift
46 46
Load-Limiting Factors
• Not level • Wind• Side loads• On its wheels• Lifting over the side• Use of extensions, jibs and other attachments• Limits of wire rope, slings and lifting devices
47 47
Mobile Cranes – Lifting Principles
• Center of gravity• Leverage• Stability• Structural integrity
48 48
Load Example – 30 Ton Crane
• Will lift 60,000 pounds at 10 feet from the center pin of the crane
• Based on level surface, no wind, and outriggers fully extended
• At 25 feet from the center pin with an 80 foot boom, the capacity is only 14,950 pounds
• At 74 feet from the center pin, the capacity is only 4,800 pounds
49
Communication is Key
50
Hand Signals
51
Standard and Alternative Signals
Hand signal charts must be either posted on the equipment or conspicuously posted in the vicinity of the hoisting operations.When using non-standard hand signals, the signal person, operator, and lift director (where there is one) must contact each other prior to the operation and agree on the non-standard hand signals that will be used. Hand signal charts must be either posted on the equipment or conspicuously posted in the vicinity of the hoisting operation.
52
Maintenance, Inspection and Crane Certification
53
A competent person must begin a visual inspection prior to each shift the equipment will be used.
The inspection must consist of observation for apparent deficiencies. Taking apart equipment components and booming down is not required as part of this inspection unless the results of the visual inspection or trial operation indicate that further investigation is necessary. Determinations made in the inspection must be reassessed in light of observations made during operation. At a minimum the inspection must include all of the following:
Inspections - Each Shift
54
• Control mechanisms for maladjustments interfering with proper operation. Control and drive mechanisms for apparent excessive wear of components and contamination by lubricants, water or other foreign matter.
• Air, hydraulic, and other pressurized lines for deterioration or leakage, particularly those which flex in normal operation.
• Hydraulic system for proper fluid level.• Hooks and latches for deformation, cracks, excessive wear, or damage
such as from chemicals or heat.• Wire rope reeving for compliance with the manufacturer's specifications.• Wire rope, in accordance with §1926.1413(a).• Electrical apparatus for malfunctioning, signs of apparent excessive
deterioration, dirt or moisture accumulation.
55
• Tires (when in use) for proper inflation and condition.• Ground conditions around the equipment for proper support, including
ground settling under and around outriggers/stabilizers and supporting foundations, ground water accumulation, or similar conditions.
• The equipment for level position within the tolerances specified by the equipment manufacturer's recommendations, both before each shift and after each move and setup.
• Operator cab windows for significant cracks, breaks, or other deficiencies that would hamper the operator's view.
• Rails, rail stops, rail clamps and supporting surfaces when the equipment has rail traveling.
• Safety devices and operational aids for proper operation.
56
Monthly InspectionsEach month the equipment is in service it must be inspected and records must be kept for at least 3 months.
Annual/Comprehensive InspectionsAt least every 12 months the equipment must be inspected by a qualified person in accordance with 1926.1412(f).
57
Review• Is anyone allowed to operate a crane?
• MUST a crew member inform the operator before going to that location behind a crane or blind spot?
• Is the greatest risk for cranes coming into contacting power lines?
• When should crane be inspected?
58
Review• Is anyone allowed to operate a crane?
No, only qualified operators.
• MUST a crew member inform the operator before going to that location behind a crane or blind spot?Yes, always.
• Is the greatest risk for cranes coming into contacting power lines?Yes, and being struck by a crane or falling load are also great risks.
• When should crane be inspected?At the beginning of every shift, monthly and annually.