19

PPT Solar-E-Cycles General use

Embed Size (px)

Citation preview

Page 1: PPT Solar-E-Cycles General use
Page 2: PPT Solar-E-Cycles General use

NEED FOR LOW COST ACCESSIBLE SOLUTIONS

•Half the population in Africa earn less than $2 a day.•This project can have an impact

Page 3: PPT Solar-E-Cycles General use

•Food•Water•Health•Education•Electricity•Jobs

BASIC NEEDS

WE ARE A FOR-PROFIT COMPANY WITH A SOCIAL MISSION-WE CAN DO THIS!-(DADAAB REFUGEE CAMP)

Page 4: PPT Solar-E-Cycles General use
Page 5: PPT Solar-E-Cycles General use
Page 6: PPT Solar-E-Cycles General use

Mostly by women and girls that should be in school

Page 7: PPT Solar-E-Cycles General use

ACCESS TO ELECTRICITY

AFRICA•622 million in off-grid rural areas •70 million families•100,000 villages

16% of world population = >will never be connected even if we spend $45 000 000 000/yr for 20 year.

Page 8: PPT Solar-E-Cycles General use

OUR 3-in-1 SOLUTION : Leased Electricity &

Mobility - Low Cost – Low Maintenance – Environmentally friendly

• Solar powered – CO2 & noise free

• Off-the-shelf mature mountain e-bike and PV technology

• 50kph - 50 km daily range• 3000 Wh power (=2 refrigerators)

• Mobile Generator 220V• 300kg capacity – 3pax• GPS GSM GPRS • Functional proof-of-concept prototypes being tested

Page 9: PPT Solar-E-Cycles General use

OPeRATIONAL COVERAGE- Sunny/flat land

80% of AFRICA

Page 10: PPT Solar-E-Cycles General use

Proof of conceptMorocco Solar challenge Morocco solar Festival

Page 11: PPT Solar-E-Cycles General use

Unique Business Model• Low capital and low cost – use Asian manufacturing capability

• Leasing as low as $0,50 per day – • Low access barrier - GPS secured • Sustainable business - privately operated – we lease or we die

• Light outsourced and experienced account management - Microfinance

• Transparent governance - performance data uploaded via GPS GSM GPRS to website

• Private financing within 5 years• Fully scalable - ramping-up in 50/100 vehicle project sizes

Page 12: PPT Solar-E-Cycles General use

Start-up strategy• Initial financing with donor funds through Start-up competitions, incubation accelerators, RE and off-grid financed projects in developing countries. (Presently implementing 309,000 euro project in Kenya, negotiating 3,000,000Dh project in Morocco).

• 2 pilot projects 70 vehicles Kenya Morocco to measure impacts – data uploaded for good governance. Tourism cash cow with 1 yr payback.

• Institutional Donors : USAID (up to $15,000,000), ACUMEN (up to $3,000,000), WORLD BANK…

Page 13: PPT Solar-E-Cycles General use

Impact projections• 3 years to break-even (2500 vehicles )

• 5 years to private financing (13,000 vehicles)

• 10 years : 70,000 vehicles (1% of market share) • 100MW generation capacity• 100,000 tons CO2 avoided• 330 thousand jobs• 1 million people empowered

(conservative estimates)

Page 14: PPT Solar-E-Cycles General use

Attractive to donors Startups – economic development –

environment – renewable energy – education off-grid power – poverty reduction – health

• EEP – Kenya – 70 vehicles – €309,000 • IRESEN - INNOPROJECTS 2015 – 10 vehicles - 3,000,000Dh negociating

• Trans-Morocco solar – M’hamid to Agadir & back – INDH• Won best social project ENCG KENITRA• Passed to second phase in VERIZON BRAVE ANSWERS – MAGHRENOV - GLOBAL ENTREPRENEURSHIP FORUM PRINCE ABDULAZZIZ – ROLEX 2016 – 1776 – Mass Challenge ….

• DARE INC. – UNREASONABLE LABS – incubation• SOME POTENTIAL :

• USAID DIV PROGRAM PHASE 1 – 3 $150K - $3m $15m • ACUMEN : $3m investor…. Many many more

Page 15: PPT Solar-E-Cycles General use

KENYA PROJECT• Environment Energy Partnership – East Africa (EEP)– Finland, Austria, UK -216,000 euro grant for 70 vehicles

• MOU with Kisumu regional government for 10 vehicle project

• Project sites identified, Daadab refugee camp, Masai Mara, Handicapped

• Partnership between OFGEN ltd a PV energy installer and Moroccan start-up STENRICH CYCLES

• July 2015 to march 2017• Presently components procurement phase

Page 16: PPT Solar-E-Cycles General use

IRESEN Project • IRESEN (Solar energy Research Institute) financing - in negotiations

• Academia and Industry partnership• Settat Univ. Renewables lab• CE3M industrial cluster• A2ME mech’l eng’g and mfg• ADETEL electronic eng’g and mfg• CETIEV vehicle testing• IFMIA automotive mfg ed facility

• 3 000 000 Dh budget• Design city solar car• 2016 -2017

Page 17: PPT Solar-E-Cycles General use

ZAGORA – M’HAMIDNext Morocco project

• Tourism Dept support• Initiated via TRANS-MOROCCO solar drive March 2016• Zagora- Ouarzazate – Agadir – Tifnit – M’Hamid Izghane

• 30 days 3 vehicles + Press• Collect requests for leasing• Submit to INDH

• 20 vehicle pilot with help of Kenya Project vehicles

• First operational business unit – 3 jobs

• Cashflow to buy 1 new vehicle every 2 months.

Page 18: PPT Solar-E-Cycles General use

Team• STENRICH CYCLES sarl

• Roger Christen, B.Sc. MBA 40 years experience, 25 in Africa

• Hélène Dupuis, Monitoring and eval’n, Gov’t of Canada

• OFGEN ltd• Geoffrey Ronoh electrical engineer/RE expert

• JIbril Mohamed, marketer/legal experT

• University Hassan Ier • Prof Hamid El Omari

• CE3M Cluster • Nourdine Bouyaakoub

Advisors: •Pierre Telep – GIZ•Yvan Rossignal – World Bank Trade and Competitiveness•Hajarivony Andriamarofara – World Bank Governance•Pierre Breton - Marketing•Minah El Haj – Peace corps•Driss Messaho – IAV

Page 19: PPT Solar-E-Cycles General use

FIRST MASS PRODUCED SOLAR

[email protected]