    Select the line item and click the button and then refresh

    PI sheet sent status will be obtained as follows,

  • 7/27/2019 PP Q&A

    3/47

    Now select the line item, go to Edit and then click Delete options

    The PI sheet gets deleted from the list

  • 7/27/2019 PP Q&A

    4/47

    Shift Note in SAP

    By U.Nagarajan, HLL Lifecare Ltd

    1. To create comments about a Person, Machine, an Event or other special points occurs within a

    shift or happened while executing the process orders that cannot be entered elsewhere in thesystem. (i.e., in a confirmation or maintenance notification, for instance).

    2. Can be created with reference to a Process order, Work center, a hierarchy, or a resource

    PURPOSE(a) To document all important information and events that is occurring within a shift or while executing

    the Process order(b) Sending the informations to other recipients

    SEQUENTIAL STEPS INVOLVED

    Notification type for the Shift note-Creation Assigning Shift Notification type to the required resources

    Shift Note creation

    Sending Shift note to other recipients

    STEPS IN DETAILS

    STEP 1

    Notification type for the Shift note-Creation

    IMG

    Menupath

    Logistics General Make Settings for Shift Notes Make Settings for Shift Note Type

    Step 2

    Assigning Shift Notification type to the required resources

    SAPMenuPath

    LogisticsProduction Process Master Data Resources ResourceCreate/Change

    T. Code CRC1/CRC2

  • 7/27/2019 PP Q&A

    5/47

    STEP 3

    Shift Note Creation using SHN1 & sending to different recipients

    Go To SHN1 ,enter the Resource / Work center

    After entering the Resource, press enter or click button, the following screenappears

  • 7/27/2019 PP Q&A

    6/47

    Enter the required details in the Comment Area

    Click button , the following message appears

  • 7/27/2019 PP Q&A

    7/47

    Click and then save ,the following screen appears:

    Click the Recipient column, the following screen appears

  • 7/27/2019 PP Q&A

    8/47

    Segregation of Valuable Components (ROHs/VERPs/SFGs) forreuse after Process order confirmation & after GR

    By U.Nagarajan, HLL Lifecare Ltd

    Purpose:

    Segregation of valuable components (ROHs/VERPs/SFGs) for reuse (with the same batch number)

    after Process order Confirmation & after GR against the process order

    Procedural steps to be followed:

    (1) Entry of the rejection quantity in the Scrap column and the GI and GR to be done as per the

    procedure during the confirmation in transaction COR6N

    (2) GR for the scrap materials to be done in transaction MB1C.

    Steps in details:

    Step 1:-

    Let us consider the following BOM in which the valuable component (I101011007) is in level 3, so that

    it will recover after the Level 1 GR:

    Entry of the rejection quantity in the Scrap column after GI and GR done for the process

    order

  • 7/27/2019 PP Q&A

    9/47

    261 details:

    101 details:

    Entry of the rejected quantities mentioned as 10 NO(mentioned in Orange color box ) ,the GI

    done for 100 NOs(Mentioned in green color Box)&GR 90 Nos done for the order

    Step 2:

    GR for the rejected material

    For recovering the component I101011007 10 Nos , the following steps to be carried out

    After confirmation, the stock of the component is shown as below:

  • 7/27/2019 PP Q&A

    10/47

  • 7/27/2019 PP Q&A

    11/47

    Process Instruction (PI) Sheet

    By U.Nagarajan, HLL Lifecare Ltd

    Process Instruction (PI) Sheet:

    Sheets to exchange data between the partially or completely manually operated production level

    Features of PI sheet

    PI sheet can display Control information such as instructions for the Process operator in theShop-floor on how to carryout the production step in effective manner

    Critical Machine parameters like Operating temperature, Die & Mould settings which are notcaptured in any form in SAP can be recorded with the help of PI Sheet

    Sequential steps:

    Creation of PI sheet/Control recipe destination

    Creation of Process Message category

    Creation of Process Instruction Category

    Assigning Process message & Process Instruction Category to the Phase of the Master recipe

    C202

    Generating Control Recipe-COR2

    Sent Control Recipe-CO53XT

    PI sheet details entry-CO60XT

    Steps in details:

    Step 1

    Creation of PI sheet/Control recipe destination

    Step 2

    Creation of Process Message Category

    Step 3

    Creation of Process Instruction Category

    Step 4

    Assigning Process message & Process Instruction Category to the Phase of the Master

    recipe

  • 7/27/2019 PP Q&A

    12/47

    Go to C202-Change Master recipe

    Enter the Material code/Recipe group to which the assignment needed

    Select the phase and click

    Enter the Process Instructions, Process Instructions category as follows and click any one Process

    instructions category

    Enter the required Characteristic and the characteristic value as follows,

  • 7/27/2019 PP Q&A

    13/47

    Save the recipe group

    Step 5

    Generating control recipe-COR2:

    Go to T. code COR2-Change Process Order

    Enter the Process order number

    Menu path for Generating Control Recipe:

  • 7/27/2019 PP Q&A

    14/47

    Save the process order

  • 7/27/2019 PP Q&A

    15/47

    Process Order Confirmation with Auto Goods Movement (Both GI &GR)

    By U.Nagarajan, HLL Lifecare Ltd

    Purpose:

    To perform the Auto GI by using Back flush technique and Auto GR by using Control key during the

    Process orderconfirmation in COR6N

    Steps involved:

    Backflush indicator is to be made active for all the GI materials(ROHs/VERPs/SFGs)

    Creation of Control keys

    Assigning the Control keys to the Phase in Master recipe for which the Auto GR is required

    Material assignment to the corresponding phases in Master recipe

    Auto GI & GR during Process order Confirmation through the T.Code COR6N

    Definitions:

    Back flushing -A technique through which automatic accounting of GI materials with 261

    movement can be performed, at the time of process order confirmation

    Control Key- specifies the business functions to carry out with an operation. In the control key

    one can specify whether an operation has to be scheduled, whether capacity calculations should

    happen, whether the operation needs to be costed and whether auto goods receipt with 101

    movements has to be carried out.

    Steps in details:

    I. Activation of Back flush indicator for the GI material:-

    Menu

    PathLogistics -> Materials Management -> Material Master ->

    Material Create(general) -> MM01 Immediately -> MRP 2 -

    > Procurement OR

    Logistics -> Materials Management -> Material Master -> Material -

    > Change -> MM02 Immediately -> MRP 2 -> Procurement

    T. Code MM01/MM02

  • 7/27/2019 PP Q&A

    16/47

    II. Creation of Control Keys :-

    IMGMenu Production Planning for Process Industries -> Master Data -> Master recipedata -> Define Control Key

    T. Code OP00

    III. Assigning Control Key to the phase :-

    IV. Material assignment to the phases :-

  • 7/27/2019 PP Q&A

    17/47

    V. Auto GI & GR :-

    o In COR6N , enter the Process order number, select the Phase & Confirmation type and click on

    Goods Movements button

    101-Goods Receipt for the order

    261-Goods Issue to the order

    Save the Confirmation

  • 7/27/2019 PP Q&A

    18/47

    Note:

    If the material is not activated by Backflush indicator and not assigned by the control key, then the

    GI & GR to be done separately through MB1A-261 movement& MB31-101 movement respectively.

  • 7/27/2019 PP Q&A

    19/47

    Automatic batch determination for raw materials/packagingmaterials/semi finished goods during Process Order Confirmation

    By U.Nagarajan, HLL Lifecare Ltd

    Purpose:

    To determine the Batches automatically based on FIFO while doing the 261 movement through Autogoods movement in COR6N by using Batch Search Strategy Technique.

    Sequential steps:

    Batch search Strategy creation through COB1 transactionPre-requisites:-

    Strategy type:a. Order Type/Plant/Materialb. Order Type/Plant

    Search strategies ( will be created by MM)

    Selection criteria ( will be created by MM) Sorting rules ( will be created by MM)

    Creating the Classification view for SFGs in MM02 transaction

    Assigning the batches automatically during Process order creation (COR1) or in COR6Nthrough auto goods movement

    Steps in detailI. Batch search Strategy creation through COB1 transaction

    Strategy Type & Strategies

    SAP Menu Path:

    SAP

    MENU

    Logistics Production Shop Floor Control Goods Movements Batch Search

    Strategy Create

    T.Code COB1

    Go to the Transaction COB1 ,enter the Strategy type:

  • 7/27/2019 PP Q&A

    20/47

    After entering the strategy type, enter the Order Type , Plant &Material codes:

    Note:

    Before the Creation of the Batch strategy, the Selection &Sort sequences columns are in

    deactivate condition (mentioned in Green colour box)

    Selection Criteria

    After entering the material codes, select all the materials by clicking and then click the selection

    criteria button ,

    Click Class &Select the Required options

  • 7/27/2019 PP Q&A

    21/47

    And click on button, then the following screen will display with the default selection with the tickmark for the particular material.

    Similarly the selection criteria procedure has to be repeated for all the remaining materials

    Sorting Rules

    Now select the material by clicking and then click the Sort button ,

  • 7/27/2019 PP Q&A

    22/47

    Select the sort rule

    Click Sort rule & select the required options

  • 7/27/2019 PP Q&A

    23/47

    MRP Run in background for all Network Plants

    By Divakar Rane, Suzlon Energy Limited

    Purpose:

    To understand how to take MRP Run in Background for All Network Plants, using Transaction Code:-

    MDBT.

    Scope: To view Background MRP List.

    Method:

    Please follow the procedure as given below:

    Transaction code MDBT

    Menu Path SAP menu Logistics Production MRP Planning Total

    Planning MDBT--Background MRP

  • 7/27/2019 PP Q&A

    24/47

  • 7/27/2019 PP Q&A

    25/47

    After filling information please click on Attributes. Here you need to do configuration for Scope of

    Planning (TCode: OM0E) or you can select single plant also. In Scope of planning you take multiple

    plants.

  • 7/27/2019 PP Q&A

    26/47

    Here you

    select different option as per your requirement like protect variant.

    After Saving Variant you will get Variant SCM VB Saved.

  • 7/27/2019 PP Q&A

    27/47

    Typical Production cycle in Process Industry

    By R.Balaji, Infosys Technologies

    The below production cycle explains the basic business flow in Process Industry. The flow is

    generally focusing only on Production and Quality Management

    Simple Production Cycle:

    Consider all Raw materials are available in plant and production process yet to start, the following

    stages are to be followed

    1. Create Process Order

    Here we are creating a process order based on the capacity of the equipments and resourceavailability

    2. Release the Process order

    Once Process order created, it has to be released for production, means system will check thescheduling, material availability, capacity planning, etc., and then release process takes place

    3. Goods issue from the Stores

    Once PO got released, goods issue against the process order will takes place

    4. Start processing

    Product process against the PO will start

    5. Confirmation Process

    After production, the final out put confirmation from the process will be entered

    6. Goods Receipt Process

    Goods receipt process plays a major role in any business here we have to do 101 movement typeand do the postings. In goods issue process they will issue the goods against PO in 261 movementtype.

    7. Quality Approval and Release

    Once GR from the production was made, the material will come to Quality control for approval. HereQC person will check the material and they will do the result recording and usage decision

    8. Stock will appear in Unrestricted use for SALE / Further Process

    Once usage decision was made the material will automatically moved into unrestricted use. The FG isready for sale

    By keeping above all points in mind, the following masters and transactions are required to

    proceed

  • 7/27/2019 PP Q&A

    28/47

    S.

    No

    Master Trans-

    action

    T-code Description Where has to be used

    1 MM01 Create Material Used for creating Recipe and further

    tracking

    2 CRC1 Create Resource Machine / set of Machines used for

    making the product

    3 C201 Create Recipe Here we are calling resource and

    materials required to make the

    finished product

    4 QS21 Create MIC List of specifications to be checked for

    that concerned finished goods

    5 QP01 Create Quality Plan Creating Quality Plan

    6 COR1 Create Process

    Order

    Initiating Production Process by

    creating Process Order

    7 MIGO with

    261

    movement

    Goods Issue Process Goods issue to Manufacturing unit

    8 CORK Confirmation

    Process

    Production Output confirmation

    Process

    9 QA32 Quality Approvaland Usage Decision

    QC will approve and release for furtherprocess

    Step by Step Execution Process:

    Scenario Explanation:

    REQUIREMENTS:

    For a leading Process Manufacturing Company ABC, they are selling the product FG 1, the raw

    materials and resource requirements are listed below

    Raw Materials required for making 50kg ofFinished Product, FG 1 are

    S.No Material Code /

    Material Type

    Material Description Quantity required Unit of Measurement

    1 RM l 1 / ROH Raw Material 1 80 Kg

    2 RM 2 /ROH Raw Material 2 20 Kg

    3 BP 1 / FERT Byproduct 60 L

  • 7/27/2019 PP Q&A

    29/47

    Resources required for making 50kg of Finished Product FG1

    S.No Resource Code Resource Description Capacity

    1 CRC-001 Reactor 2KL

    2 CRC-002 Vessel 4KL

    List of MASTERS required for addressing the above scenario

    1. Create Materials using MM01 transactions in the following way:

    In this screen select select views button and extend the following fields

  • 7/27/2019 PP Q&A

    30/47

    We have selected basic information entries field. Fill the information and finally select the General

    plant / storage data and give plant as 1100 and storage as 0001 in case of Raw material.

    The same procedure has to be repeated for finished goods and Co-Products, in plant storage data we

    have to give Plant 1100 and storage 0004.

    2. Create Resource master using CRC 1 Transactio

  • 7/27/2019 PP Q&A

    31/47

    Repetitive Manufacturing Cycle

    By Umesh R Shinde, KPIT Info-systems

    1. Create REM Profile using SPRO

    SPROProductionRep ManufacturingControl Data Create REM Profile Using Wizard.

  • 7/27/2019 PP Q&A

    32/47

  • 7/27/2019 PP Q&A

    33/47

  • 7/27/2019 PP Q&A

    34/47

  • 7/27/2019 PP Q&A

    35/47

  • 7/27/2019 PP Q&A

    36/47

  • 7/27/2019 PP Q&A

    37/47

  • 7/27/2019 PP Q&A

    38/47

  • 7/27/2019 PP Q&A

    39/47

    Production Order Splitting

    Production Order could be split due to following reasons:

    1. When partial lot of order is to be handled from the rest due to quality reasons.

    2. If capacity bottle necks exists.3. Material is committed for part of order qty.

    Features:

    1. The split operations and the material assigned are copied into the child order.2. The structure of the parent order does not changes while the split off operations are copied

    into the child order

    Status for parent order : SPLTStatus for the child order: SPLEFor operation : SPLT

    Restrictions:

    1. The parent order and the child order must be settled to same cost collector2. Read PP Master data is not possible3. Confirmations at header level is not possible

    Steps to perform split:

    1. In OPL8 Set the indicator cost collector2. Default Rule -Periodic settlement(PP2)3. CK11N do standard cost estimate4. KKF6N Create cost collector5. Create production order with op10,20,30,406. Go to op overview7. Select the op from which you want to split (exop20)8. Go to functions ----> Split order9. Enter the qty ,if necessary a different order type for the child order10. Execute11. Order will be splitted .12. The order can be splitted even from op10 itself13. Goto MD0414. Two orders will be created15. Go to op overview of each order and there you can see the splitting.

  • 7/27/2019 PP Q&A

    40/47

    Routing Vs Task list Vs Work Procedure

    By Mahesh

    Task list means the task which has to carry out on the shop floor and these are six types as you have

    mention.

    Routing is one of task list and this consists the series of operations requires for the production of anassembly at shop floor.

    Regarding the work procedure, you can define this in the work center default tab for the detailsabout the work center and how to operate. this will be copied in operations while creating routings.

  • 7/27/2019 PP Q&A

    41/47

    Convert Planned Orders to Purchase requisitions and PurchaseOrders

    By Mahesh

    We can create planned orders & convert them into purchase requisition or into production order.

    In the material master ,MRP2 view give the procurement type as 'X', for both internal & externalprocurement.

    Also include purchasing view for this material.

    When you run MRP using md02, a planned order will be created for the requirement (Eg: say 100 no'sgiven using transaction code MD61).

    Use transaction code MD04 to view the stock/requirement list.

    Here double click the planned order, you can see tabs such as convert into purchase requisition, intoproduction order, into process order.

    Click convert into Purchase Requisition & enter 50 Nos. Then a Purchase Requisition will be createdwhich can be further converted into Purchase Order.

    Again come to md04 screen.

    You can see a planned order & Purchase Requisition for 50 no's.This planned order can be converted into production order & 50 no's can be produced internally.

  • 7/27/2019 PP Q&A

    42/47

  • 7/27/2019 PP Q&A

    43/47

    Types of Subcontracting

    By Chandra

    There are two types of subcontracting relevant for PP module:

    1. Operation subcontracting2. Assembly subcontracting.

    Operation subcontracting: Within in-house production if some capacity bottlenecks exists in anyoperations then you can this job to some vendors to carryout this job at his premises and supply usthe semi-finished part. This can be done via control key example PP02 (external processing).

    Assembly subcontracting: Total product can be given for subcontracting. We have to give the rawmaterials to vendors and they would supply the assembly. This can be done with specialprocurement type 30 with procurement type F.

  • 7/27/2019 PP Q&A

    44/47

    Process Order Confirmation with Auto Goods Movement (Both GI &GR)

    By U.Nagarajan, HLL Lifecare Ltd

    Purpose:

    To perform the Auto GI by using Back flush technique and Auto GR by using Control key during the

    Process order confirmation in COR6N

    Steps involved:

    Backflush indicator is to be made active for all the GI materials(ROHs/VERPs/SFGs)

    Creation of Control keys

    Assigning the Control keys to the Phase in Master recipe for which the Auto GR is required

    Material assignment to the corresponding phases in Master recipe

    Auto GI & GR during Process order Confirmation through the T.Code COR6N

    Definitions:

    Back flushing -A technique through which automatic accounting of GI materials with 261

    movement can be performed, at the time of process order confirmation

    Control Key- specifies the business functions to carry out with an operation. In the control key

    one can specify whether an operation has to be scheduled, whether capacity calculations should

    happen, whether the operation needs to be costed and whether auto goods receipt with 101

    movements has to be carried out.

    Steps in details:

    I. Activation of Back flush indicator for the GI material:-

    Menu

    PathLogistics -> Materials Management -> Material Master ->

    Material Create(general) -> MM01 Immediately -> MRP 2 -

    > Procurement OR

    Logistics -> Materials Management -> Material Master -> Material -

    > Change -> MM02 Immediately -> MRP 2 -> Procurement

    T. Code MM01/MM02

  • 7/27/2019 PP Q&A

    45/47

    II. Creation of Control Keys :-

    IMGMenu Production Planning for Process Industries -> Master Data -> Master recipedata -> Define Control Key

    T. Code OP00

    III. Assigning Control Key to the phase :-

    IV. Material assignment to the phases :-

  • 7/27/2019 PP Q&A