2
PP PP PP STAY POLE PP PP PP PP PP/LP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP STAY POLE PP PP PP PP PP/LP PP/LP PP/LP PP/LP PP PP/LP PP PIT Issue Description Date 100mm on Original Project Title Client Project No. Issue Drawing No. Grid Checked Designed Drawn Height A1 Datum Approved Status Scales PERMISSION OF AT&L THIS DRAWING CANNOT BE COPIED OR REPRODUCED IN OTHER PURPOSE OTHER THAN WITHOUT THE WRITTEN THAT ORIGINALLY INTENDED ANY FORM OR USED FOR ANY Bar Scales Civil Engineers and Project Managers 02 9923 1055 02 9439 1777 Level 7, 153 Walker Street North Sydney NSW 2060 Tel: Fax: ABN 96 130 882 405 www.atl.net.au [email protected] F:\17-494 Garfield Road\Drgs\Civil\Final\0000_DA Demolition Stage 1 Package\C0011.dwg C0011 DEMOLITION PLAN SHEET 1 FOR APPROVAL NOT TO BE USED FOR CONSTRUCTION TH TH DS NTS AHD MGA 17-494 DEMOLITION DA VILLA ROSA 280 GARFIELD ROAD EAST AND 259 RIVERSTONE ROAD P2

STAY PP - Blacktown City Council · PP/LP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP STAY POLE PP PP PP PP/LP PP/LP PPPP/LP

  • Upload
    others

  • View
    49

  • Download
    0

Embed Size (px)

Citation preview

Page 1: STAY PP - Blacktown City Council · PP/LP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP STAY POLE PP PP PP PP/LP PP/LP PPPP/LP

PP

PP

PP

STAYPOLE

PPPP

PPPP

PP/LP PP

PP

PP

PP

PP

PP

PP

PP

PP

PP

PP

PP

PP

PP

PP

PP

PP

PP

PP

PP

PP

PP

PP

PP

PP PP

PP

PP PP

PPPP

PP

PPPP

STAYPOLEPP

PPPPPP

PP/LPPP/LP

PP/LPPP/LPPPPP/LPPP

PIT

Issue

Description

Date

100mm on Original

Project

Title

Client

Project No. IssueDrawing No.

Grid

Checked

Designed

Drawn

Height

A1

Datum

Approved

Status

Scales

PERMISSION OF AT&L

THIS DRAWING CANNOT BE

COPIED OR REPRODUCED IN

OTHER PURPOSE OTHER THAN

WITHOUT THE WRITTEN

THAT ORIGINALLY INTENDED

ANY FORM OR USED FOR ANY

Bar Scales

Civil Engineers and Project Managers

02 9923 1055

02 9439 1777

Level 7, 153 Walker Street

North Sydney NSW 2060

Tel:

Fax:

ABN 96 130 882 405

www.atl.net.au

[email protected]

F:\17-494 Garfield Road\Drgs\Civil\Final\0000_DA Demolition Stage 1 Package\C0011.dwg

C0011

DEMOLITION PLAN

SHEET 1

FOR APPROVAL

NOT TO BE USED FOR CONSTRUCTION

TH

TH

DS

NTS

AHD

MGA

17-494

DEMOLITION DA

VILLA ROSA

280 GARFIELD ROAD EAST

AND 259 RIVERSTONE ROAD

P2

AutoCAD SHX Text
27
AutoCAD SHX Text
27
AutoCAD SHX Text
27.5
AutoCAD SHX Text
27.5
AutoCAD SHX Text
27.5
AutoCAD SHX Text
28
AutoCAD SHX Text
28
AutoCAD SHX Text
28
AutoCAD SHX Text
28.5
AutoCAD SHX Text
28.5
AutoCAD SHX Text
28.5
AutoCAD SHX Text
28.5
AutoCAD SHX Text
28.5
AutoCAD SHX Text
28.5
AutoCAD SHX Text
28.5
AutoCAD SHX Text
29
AutoCAD SHX Text
29
AutoCAD SHX Text
29
AutoCAD SHX Text
29
AutoCAD SHX Text
29
AutoCAD SHX Text
29
AutoCAD SHX Text
29
AutoCAD SHX Text
29.5
AutoCAD SHX Text
29.5
AutoCAD SHX Text
29.5
AutoCAD SHX Text
29.5
AutoCAD SHX Text
29.5
AutoCAD SHX Text
29.5
AutoCAD SHX Text
29.5
AutoCAD SHX Text
29.5
AutoCAD SHX Text
29.5
AutoCAD SHX Text
30
AutoCAD SHX Text
30
AutoCAD SHX Text
30
AutoCAD SHX Text
30
AutoCAD SHX Text
30
AutoCAD SHX Text
30.5
AutoCAD SHX Text
30.5
AutoCAD SHX Text
30.5
AutoCAD SHX Text
31
AutoCAD SHX Text
31
AutoCAD SHX Text
31.5
AutoCAD SHX Text
31.5
AutoCAD SHX Text
32
AutoCAD SHX Text
32
AutoCAD SHX Text
32.5
AutoCAD SHX Text
32.5
AutoCAD SHX Text
32.5
AutoCAD SHX Text
32.5
AutoCAD SHX Text
32.5
AutoCAD SHX Text
32.5
AutoCAD SHX Text
32.5
AutoCAD SHX Text
32.5
AutoCAD SHX Text
32.5
AutoCAD SHX Text
32.5
AutoCAD SHX Text
33
AutoCAD SHX Text
33
AutoCAD SHX Text
33
AutoCAD SHX Text
33
AutoCAD SHX Text
33
AutoCAD SHX Text
33
AutoCAD SHX Text
33.5
AutoCAD SHX Text
33.5
AutoCAD SHX Text
33.5
AutoCAD SHX Text
33.5
AutoCAD SHX Text
33.5
AutoCAD SHX Text
33.5
AutoCAD SHX Text
34
AutoCAD SHX Text
34
AutoCAD SHX Text
34
AutoCAD SHX Text
34
AutoCAD SHX Text
34.5
AutoCAD SHX Text
34.5
AutoCAD SHX Text
34.5
AutoCAD SHX Text
34.5
AutoCAD SHX Text
34.5
AutoCAD SHX Text
34.5
AutoCAD SHX Text
34.5
AutoCAD SHX Text
34.5
AutoCAD SHX Text
34.5
AutoCAD SHX Text
34.5
AutoCAD SHX Text
34.5
AutoCAD SHX Text
34.5
AutoCAD SHX Text
35
AutoCAD SHX Text
35
AutoCAD SHX Text
35
AutoCAD SHX Text
35
AutoCAD SHX Text
35.5
AutoCAD SHX Text
35.5
AutoCAD SHX Text
35.5
AutoCAD SHX Text
36
AutoCAD SHX Text
36
AutoCAD SHX Text
36
AutoCAD SHX Text
36.5
AutoCAD SHX Text
36.5
AutoCAD SHX Text
37
AutoCAD SHX Text
37
AutoCAD SHX Text
37.5
AutoCAD SHX Text
38
AutoCAD SHX Text
38
AutoCAD SHX Text
38.5
AutoCAD SHX Text
38.5
AutoCAD SHX Text
38.5
AutoCAD SHX Text
38.5
AutoCAD SHX Text
38.5
AutoCAD SHX Text
39
AutoCAD SHX Text
39
AutoCAD SHX Text
39
AutoCAD SHX Text
39.5
AutoCAD SHX Text
39.5
AutoCAD SHX Text
39.5
AutoCAD SHX Text
40
AutoCAD SHX Text
40
AutoCAD SHX Text
40.5
AutoCAD SHX Text
40.5
AutoCAD SHX Text
41
AutoCAD SHX Text
41
AutoCAD SHX Text
41.5
AutoCAD SHX Text
41.5
AutoCAD SHX Text
42
AutoCAD SHX Text
42
AutoCAD SHX Text
42
AutoCAD SHX Text
42
AutoCAD SHX Text
42.5
AutoCAD SHX Text
42.5
AutoCAD SHX Text
43
AutoCAD SHX Text
43
AutoCAD SHX Text
43.5
AutoCAD SHX Text
44
AutoCAD SHX Text
44.5
AutoCAD SHX Text
45
AutoCAD SHX Text
EXISTING WAREHOUSE AND HARDSTAND AREA TO BE DEMOLISHED
AutoCAD SHX Text
DE-WATER, REMEDIATE AND DEMOLISH EXISTING BASIN (REMEDIATION UNDER SEPARATE APPROVAL)
AutoCAD SHX Text
DEMOLISH AND REMEDIATE EXISTING AREA ADJOINING WAREHOUSE (REMEDIATION UNDER SEPARATE APPROVAL)
AutoCAD SHX Text
EXISTING DAM TO REMAIN
AutoCAD SHX Text
DEWATER AND DEMOLISH EXISTING DAM
AutoCAD SHX Text
DEWATER AND DEMOLISH EXISTING DAM
AutoCAD SHX Text
EXISTING AWNING TO BE DEMOLISHED
AutoCAD SHX Text
EXISTING OVERHEAD SERVICES TO BE DEMOLISHED
AutoCAD SHX Text
EXISTING HV LINE TO REMAIN
AutoCAD SHX Text
EXISTING OVERHEAD SERVICES TO BE DEMOLISHED
AutoCAD SHX Text
EXISTING OVERHEAD SERVICES TO BE DEMOLISHED
AutoCAD SHX Text
DEMOLISH AND REMEDIATE EXISTING AREA ADJOINING WAREHOUSE
AutoCAD SHX Text
EXISTING HARDSTAND TO BE DEMOLISHED
AutoCAD SHX Text
EXISTING HARDSTAND AREA TO BE DEMOLISHED
AutoCAD SHX Text
EXISTING HARDSTAND AREA TO BE DEMOLISHED
AutoCAD SHX Text
0
AutoCAD SHX Text
1 : 1000 @ A1 1 : 2000 @ A3
AutoCAD SHX Text
20
AutoCAD SHX Text
40
AutoCAD SHX Text
60
AutoCAD SHX Text
80
AutoCAD SHX Text
100m
AutoCAD SHX Text
P1
AutoCAD SHX Text
ISSUE FOR DEVELOPMENT APPLICATION
AutoCAD SHX Text
10-11-17
AutoCAD SHX Text
P2
AutoCAD SHX Text
RE-ISSUED FOR DEVELOPMENT APPLICATION
AutoCAD SHX Text
13-11-17
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
EXISTING BUILDING TO BE DEMOLISHED
AutoCAD SHX Text
EXISTING STRUCTURE/DAM TO REMAIN
AutoCAD SHX Text
EXISTING DAM TO BE DE-WATERED AND DEMOLISHED
AutoCAD SHX Text
EXISTING HARDSTAND/DRIVEWAY TO BE DEMOLISHED
AutoCAD SHX Text
EXISTING LANDSCAPED AREA TO BE DEMOLISHED AND REMEDIATED (REMEDIATION UNDER SEPARATE APPROVAL)
AutoCAD SHX Text
EXISTING OVERHEAD POWER LINES TO REMAIN
AutoCAD SHX Text
EXISTING TELECOMMUNICATIONS LINE TO REMAIN
AutoCAD SHX Text
EXISTING WATER SERVICE TO REMAIN
AutoCAD SHX Text
EXISTING BASIN TO BE DE-WATERED, REMEDIATED AND DEMOLISHED (REMEDIATION UNDER SEPARATE APPROVAL)
AutoCAD SHX Text
EXISTING OVERHEAD POWER LINES TO BE DEMOLISHED
AutoCAD SHX Text
EXISTING TELECOMMUNICATIONS LINE TO DEMOLISHED
AutoCAD SHX Text
NOTES::
AutoCAD SHX Text
1. ALL DAMS TO BE DE-WATERED/DEMOLISHED/REMEDIATED TO BE IN ACCORDANCE WITH THE DAM ALL DAMS TO BE DE-WATERED/DEMOLISHED/REMEDIATED TO BE IN ACCORDANCE WITH THE DAM DE-WATERING PLAN AND DAM FAUNA STUDY BY ECOLOGICAL. 2. ALL BUILDING DEMOLITION TO BE IN COMPLETED IN ACCORDANCE WITH THE HAZARDOUS BUILDING ALL BUILDING DEMOLITION TO BE IN COMPLETED IN ACCORDANCE WITH THE HAZARDOUS BUILDING MATERIALS ASSESSMENT BY ADE. 3. ALL REMEDIATION WORKS TO BE COMPLETED IN ACCORDANCE WITH THE REMEDIATION ACTION ALL REMEDIATION WORKS TO BE COMPLETED IN ACCORDANCE WITH THE REMEDIATION ACTION PLAN BY ADE AND THE NON-STATUTORY AUDITOR RAP REVIEW BY ZOIC (REMEDIATION UNDER SEPARATE APPROVAL). 4. ANY ANCILLARY BUILDING STRUCTURES, FENCES, HARDSTAND, FOOTINGS ETC. TO BE DEMOLISHED ANY ANCILLARY BUILDING STRUCTURES, FENCES, HARDSTAND, FOOTINGS ETC. TO BE DEMOLISHED AS PART OF THE ABOVE DEMOLITION AND REMEDIATION WORKS. 5. ALL VEGETATION AND TREES TO BE CLEARED FROM 'ZONED' LAND. VEGETATION AND TREE ALL VEGETATION AND TREES TO BE CLEARED FROM 'ZONED' LAND. VEGETATION AND TREE REMOVAL ON 'UNZONED' LAND TO BE LIMITED TO THOSE AREAS WHERE DEMOLITION IS TO OCCUR. 6. ALL SURPLUS DEMOLITION MATERIAL TO BE REMOVED FROM SITE. ALL SURPLUS DEMOLITION MATERIAL TO BE REMOVED FROM SITE. 7. SEDIMENTATION AND EROSION CONTROL MEASURES TO BE IMPLEMENTED PRIOR TO SEDIMENTATION AND EROSION CONTROL MEASURES TO BE IMPLEMENTED PRIOR TO COMMENCEMENT OF WORKS IN ACCORDANCE WITH THE "BLUE BOOK". 8. ALL REMEDIATION WORKS ARE NOT INCLUDED AS PART OF THIS DEVELOPMENT APPLICATION AND ALL REMEDIATION WORKS ARE NOT INCLUDED AS PART OF THIS DEVELOPMENT APPLICATION AND SHOWN/REFERRED TO FOR INFORMATION ONLY.
Page 2: STAY PP - Blacktown City Council · PP/LP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP STAY POLE PP PP PP PP/LP PP/LP PPPP/LP

PP

PP

PP

PP

PP

PP PPPP

PP/LP

PP

PP

PP PP

PP

PP

PP

PP

PP

PP

PPPP

LP

LP

LP

LP

LP

LP

PPPP

PPPP

PPPP

SWP

SWP

WATER

TANKS

PP

PP

Issue

Description

Date

100mm on Original

Project

Title

Client

Project No. IssueDrawing No.

Grid

Checked

Designed

Drawn

Height

A1

Datum

Approved

Status

Scales

PERMISSION OF AT&L

THIS DRAWING CANNOT BE

COPIED OR REPRODUCED IN

OTHER PURPOSE OTHER THAN

WITHOUT THE WRITTEN

THAT ORIGINALLY INTENDED

ANY FORM OR USED FOR ANY

Bar Scales

Civil Engineers and Project Managers

02 9923 1055

02 9439 1777

Level 7, 153 Walker Street

North Sydney NSW 2060

Tel:

Fax:

ABN 96 130 882 405

www.atl.net.au

[email protected]

F:\17-494 Garfield Road\Drgs\Civil\Final\0000_DA Demolition Stage 1 Package\C0012.dwg

C0012

DEMOLITION PLAN

SHEET 2

FOR APPROVAL

NOT TO BE USED FOR CONSTRUCTION

TH

TH

DS

NTS

AHD

MGA

17-494

DEMOLITION DA

VILLA ROSA

280 GARFIELD ROAD EAST

AND 259 RIVERSTONE ROAD

P2

AutoCAD SHX Text
31.5
AutoCAD SHX Text
32
AutoCAD SHX Text
32.5
AutoCAD SHX Text
32.5
AutoCAD SHX Text
32.5
AutoCAD SHX Text
32.5
AutoCAD SHX Text
32.5
AutoCAD SHX Text
32.5
AutoCAD SHX Text
32.5
AutoCAD SHX Text
32.5
AutoCAD SHX Text
33
AutoCAD SHX Text
33
AutoCAD SHX Text
33
AutoCAD SHX Text
33
AutoCAD SHX Text
33
AutoCAD SHX Text
33
AutoCAD SHX Text
33
AutoCAD SHX Text
33.5
AutoCAD SHX Text
33.5
AutoCAD SHX Text
33.5
AutoCAD SHX Text
33.5
AutoCAD SHX Text
33.5
AutoCAD SHX Text
33.5
AutoCAD SHX Text
33.5
AutoCAD SHX Text
33.5
AutoCAD SHX Text
33.5
AutoCAD SHX Text
33.5
AutoCAD SHX Text
33.5
AutoCAD SHX Text
34
AutoCAD SHX Text
34
AutoCAD SHX Text
34
AutoCAD SHX Text
34
AutoCAD SHX Text
34
AutoCAD SHX Text
34
AutoCAD SHX Text
34
AutoCAD SHX Text
34
AutoCAD SHX Text
34
AutoCAD SHX Text
34.5
AutoCAD SHX Text
35
AutoCAD SHX Text
35
AutoCAD SHX Text
35
AutoCAD SHX Text
35
AutoCAD SHX Text
35
AutoCAD SHX Text
35
AutoCAD SHX Text
35
AutoCAD SHX Text
35
AutoCAD SHX Text
35
AutoCAD SHX Text
35
AutoCAD SHX Text
35.5
AutoCAD SHX Text
35.5
AutoCAD SHX Text
35.5
AutoCAD SHX Text
35.5
AutoCAD SHX Text
36
AutoCAD SHX Text
36.5
AutoCAD SHX Text
36.5
AutoCAD SHX Text
36.5
AutoCAD SHX Text
36.5
AutoCAD SHX Text
37
AutoCAD SHX Text
37
AutoCAD SHX Text
37
AutoCAD SHX Text
37.5
AutoCAD SHX Text
37.5
AutoCAD SHX Text
37.5
AutoCAD SHX Text
37.5
AutoCAD SHX Text
37.5
AutoCAD SHX Text
37.5
AutoCAD SHX Text
37.5
AutoCAD SHX Text
37.5
AutoCAD SHX Text
38
AutoCAD SHX Text
38
AutoCAD SHX Text
38
AutoCAD SHX Text
38
AutoCAD SHX Text
38
AutoCAD SHX Text
38
AutoCAD SHX Text
38
AutoCAD SHX Text
38
AutoCAD SHX Text
38
AutoCAD SHX Text
38.5
AutoCAD SHX Text
38.5
AutoCAD SHX Text
38.5
AutoCAD SHX Text
38.5
AutoCAD SHX Text
38.5
AutoCAD SHX Text
38.5
AutoCAD SHX Text
38.5
AutoCAD SHX Text
38.5
AutoCAD SHX Text
38.5
AutoCAD SHX Text
38.5
AutoCAD SHX Text
38.5
AutoCAD SHX Text
39
AutoCAD SHX Text
39
AutoCAD SHX Text
39
AutoCAD SHX Text
39
AutoCAD SHX Text
39
AutoCAD SHX Text
39
AutoCAD SHX Text
39
AutoCAD SHX Text
39
AutoCAD SHX Text
39
AutoCAD SHX Text
39
AutoCAD SHX Text
39
AutoCAD SHX Text
39.5
AutoCAD SHX Text
39.5
AutoCAD SHX Text
39.5
AutoCAD SHX Text
40
AutoCAD SHX Text
40
AutoCAD SHX Text
40
AutoCAD SHX Text
40
AutoCAD SHX Text
40
AutoCAD SHX Text
40
AutoCAD SHX Text
40
AutoCAD SHX Text
40
AutoCAD SHX Text
40
AutoCAD SHX Text
40
AutoCAD SHX Text
40
AutoCAD SHX Text
40
AutoCAD SHX Text
40.5
AutoCAD SHX Text
40.5
AutoCAD SHX Text
40.5
AutoCAD SHX Text
40.5
AutoCAD SHX Text
40.5
AutoCAD SHX Text
40.5
AutoCAD SHX Text
40.5
AutoCAD SHX Text
40.5
AutoCAD SHX Text
40.5
AutoCAD SHX Text
40.5
AutoCAD SHX Text
41
AutoCAD SHX Text
41
AutoCAD SHX Text
41
AutoCAD SHX Text
41
AutoCAD SHX Text
41
AutoCAD SHX Text
41
AutoCAD SHX Text
41.5
AutoCAD SHX Text
41.5
AutoCAD SHX Text
41.5
AutoCAD SHX Text
41.5
AutoCAD SHX Text
41.5
AutoCAD SHX Text
42
AutoCAD SHX Text
42
AutoCAD SHX Text
42
AutoCAD SHX Text
42.5
AutoCAD SHX Text
42.5
AutoCAD SHX Text
42.5
AutoCAD SHX Text
42.5
AutoCAD SHX Text
43
AutoCAD SHX Text
43.5
AutoCAD SHX Text
44
AutoCAD SHX Text
44
AutoCAD SHX Text
44
AutoCAD SHX Text
44.5
AutoCAD SHX Text
44.5
AutoCAD SHX Text
44.5
AutoCAD SHX Text
45
AutoCAD SHX Text
45
AutoCAD SHX Text
45.5
AutoCAD SHX Text
45.5
AutoCAD SHX Text
46
AutoCAD SHX Text
46
AutoCAD SHX Text
46.5
AutoCAD SHX Text
46.5
AutoCAD SHX Text
46.5
AutoCAD SHX Text
46.5
AutoCAD SHX Text
47
AutoCAD SHX Text
47
AutoCAD SHX Text
47.5
AutoCAD SHX Text
47.5
AutoCAD SHX Text
48
AutoCAD SHX Text
48
AutoCAD SHX Text
48
AutoCAD SHX Text
48.5
AutoCAD SHX Text
48.5
AutoCAD SHX Text
48.5
AutoCAD SHX Text
48.5
AutoCAD SHX Text
48.5
AutoCAD SHX Text
48.5
AutoCAD SHX Text
49
AutoCAD SHX Text
49
AutoCAD SHX Text
49
AutoCAD SHX Text
49
AutoCAD SHX Text
49.5
AutoCAD SHX Text
49.5
AutoCAD SHX Text
49.5
AutoCAD SHX Text
50
AutoCAD SHX Text
50
AutoCAD SHX Text
50
AutoCAD SHX Text
50.5
AutoCAD SHX Text
50.5
AutoCAD SHX Text
50.5
AutoCAD SHX Text
51
AutoCAD SHX Text
51.5
AutoCAD SHX Text
52
AutoCAD SHX Text
52
AutoCAD SHX Text
52.5
AutoCAD SHX Text
EXISTING CHICKEN SHED AND CATTLE GRID TO BE DEMOLISHED
AutoCAD SHX Text
EXISTING GLASSHOUSE TO BE DEMOLISHED
AutoCAD SHX Text
EXISTING RESIDENCE "VILLA ROSA" TO REMAIN
AutoCAD SHX Text
EXISTING SHED TO BE REMOVED BY OWNER. EXISITNG SLAB AND CELLAR TO BE DEMOLISED
AutoCAD SHX Text
EXISTING DAM TO REMAIN
AutoCAD SHX Text
OUTDOOR PLANTER BED TO BE DEMOLISHED
AutoCAD SHX Text
EXISTING WATER TANK TO BE DEMOLISHED
AutoCAD SHX Text
EXISTING SEPTIC TANK TO BE DEMOLISHED
AutoCAD SHX Text
SHED/DWELLING AND ASSOCIATED FOOTINGS TO BE DEMOLISHED
AutoCAD SHX Text
LIVESTOCK FENCE TO BE DEMOLISHED
AutoCAD SHX Text
EXISTING HV LINE TO REMAIN
AutoCAD SHX Text
DEWATER AND DEMOLISH EXISTING DAM
AutoCAD SHX Text
DEWATER AND DEMOLISH EXISTING DAM
AutoCAD SHX Text
DEWATER AND DEMOLISH EXISTING DAM
AutoCAD SHX Text
DEWATER AND DEMOLISH EXISTING DAM
AutoCAD SHX Text
OVERHEAD POWER AND COMMS THAT SERVICE "VILLA ROSA" TO REMAIN. OTHERWISE, DEMOLISH OVERHEAD POWER AND COMMS.
AutoCAD SHX Text
0
AutoCAD SHX Text
1 : 1000 @ A1 1 : 2000 @ A3
AutoCAD SHX Text
20
AutoCAD SHX Text
40
AutoCAD SHX Text
60
AutoCAD SHX Text
80
AutoCAD SHX Text
100m
AutoCAD SHX Text
P1
AutoCAD SHX Text
ISSUE FOR DEVELOPMENT APPLICATION
AutoCAD SHX Text
10-11-17
AutoCAD SHX Text
P2
AutoCAD SHX Text
RE-ISSUED FOR DEVELOPMENT APPLICATION
AutoCAD SHX Text
13-11-17
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
NOTES::
AutoCAD SHX Text
EXISTING BUILDING TO BE DEMOLISHED
AutoCAD SHX Text
EXISTING STRUCTURE/DAM TO REMAIN
AutoCAD SHX Text
EXISTING DAM TO BE DE-WATERED AND DEMOLISHED
AutoCAD SHX Text
EXISTING HARDSTAND/DRIVEWAY TO BE DEMOLISHED
AutoCAD SHX Text
EXISTING LANDSCAPED AREA TO BE DEMOLISHED AND REMEDIATED (REMEDIATION UNDER SEPARATE APPROVAL)
AutoCAD SHX Text
EXISTING OVERHEAD POWER LINES TO REMAIN
AutoCAD SHX Text
EXISTING TELECOMMUNICATIONS LINE TO REMAIN
AutoCAD SHX Text
EXISTING WATER SERVICE TO REMAIN
AutoCAD SHX Text
EXISTING BASIN TO BE DE-WATERED, REMEDIATED AND DEMOLISHED (REMEDIATION UNDER SEPARATE APPROVAL)
AutoCAD SHX Text
EXISTING OVERHEAD POWER LINES TO BE DEMOLISHED
AutoCAD SHX Text
EXISTING TELECOMMUNICATIONS LINE TO DEMOLISHED
AutoCAD SHX Text
1. ALL DAMS TO BE DE-WATERED/DEMOLISHED/REMEDIATED TO BE IN ACCORDANCE WITH THE DAM ALL DAMS TO BE DE-WATERED/DEMOLISHED/REMEDIATED TO BE IN ACCORDANCE WITH THE DAM DE-WATERING PLAN AND DAM FAUNA STUDY BY ECOLOGICAL. 2. ALL BUILDING DEMOLITION TO BE IN COMPLETED IN ACCORDANCE WITH THE HAZARDOUS BUILDING ALL BUILDING DEMOLITION TO BE IN COMPLETED IN ACCORDANCE WITH THE HAZARDOUS BUILDING MATERIALS ASSESSMENT BY ADE. 3. ALL REMEDIATION WORKS TO BE COMPLETED IN ACCORDANCE WITH THE REMEDIATION ACTION ALL REMEDIATION WORKS TO BE COMPLETED IN ACCORDANCE WITH THE REMEDIATION ACTION PLAN BY ADE AND THE NON-STATUTORY AUDITOR RAP REVIEW BY ZOIC (REMEDIATION UNDER SEPARATE APPROVAL). 4. ANY ANCILLARY BUILDING STRUCTURES, FENCES, HARDSTAND, FOOTINGS ETC. TO BE DEMOLISHED ANY ANCILLARY BUILDING STRUCTURES, FENCES, HARDSTAND, FOOTINGS ETC. TO BE DEMOLISHED AS PART OF THE ABOVE DEMOLITION AND REMEDIATION WORKS. 5. ALL VEGETATION AND TREES TO BE CLEARED FROM 'ZONED' LAND. VEGETATION AND TREE ALL VEGETATION AND TREES TO BE CLEARED FROM 'ZONED' LAND. VEGETATION AND TREE REMOVAL ON 'UNZONED' LAND TO BE LIMITED TO THOSE AREAS WHERE DEMOLITION IS TO OCCUR. 6. ALL SURPLUS DEMOLITION MATERIAL TO BE REMOVED FROM SITE. ALL SURPLUS DEMOLITION MATERIAL TO BE REMOVED FROM SITE. 7. SEDIMENTATION AND EROSION CONTROL MEASURES TO BE IMPLEMENTED PRIOR TO SEDIMENTATION AND EROSION CONTROL MEASURES TO BE IMPLEMENTED PRIOR TO COMMENCEMENT OF WORKS IN ACCORDANCE WITH THE "BLUE BOOK". 8. ALL REMEDIATION WORKS ARE NOT INCLUDED AS PART OF THIS DEVELOPMENT APPLICATION AND ALL REMEDIATION WORKS ARE NOT INCLUDED AS PART OF THIS DEVELOPMENT APPLICATION AND SHOWN/REFERRED TO FOR INFORMATION ONLY.