Time Step Simulation

Caroline Marzinzik [email protected]

Page 2: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 2

Time Step Simulation

• It is often useful to assess how power system quantities vary hour by hour (or smaller time steps) due to changes in load, generation, transmission line status, etc.

• The Time Step Simulation (TSS) allows you to obtain power flow, OPF, and SCOPF solutions for a list of time points for which input (scenario) data has been specified.

• It also allows you to model actions that occur at specific times, as well as periodic actions.

Page 3: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 3

History

• Originally designed for studying optimal power flow results on an hour-by-hour basis (2001?) – Specifically for TVA

• Released for general use with Simulator Version 11 (April 2005) – Power flow as well as OPF – Specify time points with a resolution of minutes – Patch release April 2006 – specify time points with a resolution of

seconds

• BPA Quasi-Steady State Analysis (May 2010) – Time delays for switched shunts and transformers – Time Step Actions – Injection Groups time point input – CSV file output

Page 4: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 4

BPA Changes

• Sequence power flow studies (quasi-steady state) • Model variable MW output of a large number of wind

power plants over several hours to verify proper voltage profiles can be maintained under all operating conditions

• Plan secondary voltage resources and controls by implementing the order of slower system characteristics (few seconds to minutes/hours) – Load characteristic changes – LTC – Switched shunts – Remedial action schemes – Equipment status changes

Page 5: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 5

Switched Shunt Time Delay

• Must specify that a switched shunt be allowed to use a time delay during the time step simulation run

• Primary and optional secondary regulation ranges with time delays for switching

• All parameters stored with switched shunt objects in PWB and not in TSB – Switched Shunt dialog – Switched Shunt Records case information display

• Only evaluated and implemented if doing a complete time step simulation run – Must click Do Run button

Page 6: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 6

Switched Shunt Time Delay

• Switched shunts not using time delays operate as usual during a Time Step Simulation study with one exception – Switched shunts not using time delays are fixed in

the step where the shunts that are using time delays are processed

• Switched shunts using time delays are fixed at the beginning of the time step run – Processed after all other time point inputs are

applied – Only allowed to switch after time delay is met

while regulated value is outside regulation range

Page 7: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 7

Switched Shunt Time Delay

Primary Regulation Range

Regulated Bus

Control mode for one shunt at a bus must NOT be set to Fixed

Case and area shunt control must be enabled

Blocks must be defined to specify how much shunt can move at each time step

Page 8: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 8

Switched Shunt Time Delay

Must be checked to model time delay

Determines maximum Mvar change per time step

Optional Secondary Regulation Range

Delay used once regulated value first falls outside regulation range

Delay used once shunt starts switching but has not met regulation range

Page 9: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 9

Switched Shunt Time Delay

Time delay-specific fields

Page 10: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 10

Using Secondary Regulation Range

• Expectation is that secondary regulation range is larger and time delays are shorter for controls to act more quickly to larger deviation

• One range must be completely contained within the other to prevent conflicting control actions

• Secondary regulation range is always checked first – Primary timer is only started if the time delay for

secondary range is not met or the regulated value is within secondary regulation range

Page 11: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 11

Switched Shunt Time Delay

Time Bus 3 pu Volt

Shunt 3 #1 Nominal Mvar

Comments

12:00:00 AM 0.9942 50.0

12:00:01 AM 0.9942 50.0

12:00:02 AM 0.9942 50.0

12:00:03 AM 0.9711 50.0 Start Secondary and Primary Timers, First Move Delay applicable

12:00:04 AM 0.9711 50.0

12:00:05 AM 0.9768 60.0 Secondary Move (2 sec. delay), Reset Timers, Next Move Delay applicable

12:00:06 AM 0.9768 60.0 Start Secondary and Primary Timers

12:00:07 AM 0.9824 70.0 Secondary Move (1 sec. delay), Reset Timers

12:00:08 AM 0.9824 70.0 Start Primary Timer

12:00:09 AM 0.9824 70.0

12:00:10 AM 0.9882 80.0 Primary Move (2 sec. delay), Reset Timers

12:00:11 AM 0.9882 80.0 Start Primary Timer

12:00:12 AM 0.9882 80.0

12:00:13 AM 0.9939 90.0 Primary Move (2 sec. delay), Reset Timers, First Move Delay applicable

Page 12: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 12

Processing Switched Shunts

• Any switched shunt meeting time delay and regulated value is outside regulation range will be processed to determine switching

• Each shunt meeting this condition is processed one-by-one in the order of ascending bus number

– If any adjustments are made to a shunt, an estimate is made of any impact on system voltages and voltages are updated before the next switched shunt in the list is processed

Page 13: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 13

Processing Switched Shunts

– Only one switched shunt at a bus allowed to be on control at a time

– Multiple switched shunts at the same bus processed one-by-one in iterative steps

– Process is repeated until all shunts that are allowed to be on control for the time step have been processed

Page 14: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 14

Multiple Switched Shunts on Control at Same Bus

• Multiple switched shunts at the same bus are allowed to be on control when using the Time Step Simulation tool

– Not currently allowed during standard power flow solution

– One shunt at a bus must be specified as not fixed and this dictates the Control Mode for the others using time delays at that bus

Page 15: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 15

Iterative Process for Switched Shunts Example

Iteration Bus 1 Shunt A

Bus 2 Shunt B

Bus 2 Shunt C

Bus 3 Shunt D

Bus 3 Shunt E

Bus 3 Shunt F

1 Discrete Discrete Fixed Discrete Fixed Fixed

2 Fixed Fixed Discrete Fixed Discrete Fixed

3 Fixed Fixed Fixed Fixed Fixed Discrete

• At a given time step, 6 switched shunts meet time delay and outside regulation range

• Process these shunts while all other shunts are fixed

• At each iteration shunts are processed one-by-one in the order of Bus 1, Bus 2, Bus 3 – Any switching is done and then voltage estimates are used to

update the voltages before the next shunt is processed

• Only one shunt at a given bus can be on control during an iteration

Page 16: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 16

Transformer Time Delay

• Must specify that a transformer be allowed to use a time delay during the time step simulation run

• Primary and optional secondary regulation ranges with time delays for tap switching

• All parameters stored with transformer objects in PWB and not in TSB – Branch Information Dialog

– Transformer Control Records case information display

• Only evaluated and implemented if doing a complete time step simulation run – Must click Do Run button

Page 17: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 17

Transformer Time Delay

• Transformers not using time delays operate as usual during a Time Step Simulation study with one exception – Transformers not using time delays are fixed in the

step where the transformers that are using time delays are processed

• Transformers using time delays are fixed at the beginning of the time step run – Processed after all other time point inputs are

applied – Only allowed to change tap/phase positions after

time delay is met while regulated value is outside regulation range

Page 18: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 18

Transformer Time Delay

Control must be enabled for transformer or phase shifter

Area transformer control must be enabled along with case transformer and phase shifter control

Page 19: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 19

Transformer Time Delay

Primary Regulation Range (pu Voltage, Mvar, or MW)

Determines how much tap or phase can move at each time step

Page 20: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 20

Transformer Time Delay

Optional Secondary Regulation Range (pu Voltage, Mvar, or MW)

Must be checked to model time delay

Determines maximum tap/phase change per time step

Delay used once regulated value first falls outside regulation range

Delay used once transformer starts switching but has not met regulation range

Page 21: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 21

Transformer Time Delay

Time delay-specific fields. Can also be found on the Line and Transformer Records display.

Page 22: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 22

Processing Transformers

• Any transformer meeting time delay and regulated value is outside regulation range will be processed to determine tap/phase switching

• Transformers meeting this condition will be processed in the same manner that transformers on control are processed in the regular power flow solution – Balancing parallel LTC taps – Transformer Stepping Methodology – Min. Sensitivity for LTC Control – Model Phase Shifters as Discrete Controls

Page 23: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 23

Time Step Actions

• Conditional actions that can be implemented following a time delay

• Based off contingency elements with addition of time delay and requirement that Model Criteria be defined

• Can be defined from – Time Step Actions page of Time Step Simulation dialog – Model Explorer under Solution Detail\Time Step

Actions

• Saved with PWB and not in TSB • Only evaluated and implemented if doing a

complete time step simulation run – Must click Do Run button

Page 24: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 24

Creating/Modifying Time Step Actions

Right-click and choose Insert to create new action Right-click on existing action and choose Show Dialog to modify Can also create/modify from Model Explorer: Solution Detail\Time Step Actions

Page 25: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 25

Time Step Action Dialog

Model Criteria (Model Filter or Model Condition) must be specified for action to be considered

Minimum Time Delay is 1 second

Specified in the same manner as Contingency Elements

CHECK or NEVER

Page 26: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 26

Time Step Actions Example

• Adjust generator voltage setpoint and open switched shunt based on Model Criteria

Action implemented

Time Delay = 1 sec. Conditions met one time step (10 seconds between time steps) prior to the implementation time step.

Page 27: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 27

Time Step Actions Example

Action implemented

Time Delay = 56 sec. Conditions met 6 time steps (10 seconds between time steps) prior to the implementation time step.

Page 28: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 28

Time Step Actions Example

JONES_CANYON_LEANJ2 2 34.5 kV C1 open Met for Shunt 95003 #C1 Status = Open

JONES_CANYON_LEANJ2 2 34.5 kV L1 closed Met for Shunt 95003 #L1 Status = Closed

Model Criteria: JONES_CANYON_LEANJ2 2 switch out L1 and L2 Contains 4 Model Conditions

Page 29: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 29

Time Step Actions Example

JONES_CANYON_VAR_CONTR_ENABLE Met for Bus 47814 227.7< kV Voltage <246

JONES_CANYON_LEANJ2W2_switch_out_L1_and_L2 Met for Generator 95005 #W3 Mvar Output > 2 Mvar

Page 30: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 30

Processing Time Step Actions

• Any time step action meeting time delay and Model Criteria will be implemented

• All actions are evaluated to determine which should be implemented without actually implementing

• Prevent one action from influencing another in the same time step

Page 31: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 31

Flow of Time Step Run

1) Start the time step simulation by clicking the Do Run button on Time Step Simulation dialog

2) Initialize time delay objects and check for data errors

• If any errors result, provide user option to continue with Simulator fixing the errors or abort the run so that user can fix the errors – Transformers and switched shunts that are modeling

switching delays are turned off automatic control

Page 32: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 32

Flow of Time Step Run

3) Process a time point • If applying pre-script command before

applying input data, run pre-script command

• If Apply Input Data – Update loads, MW and Mvar – Update generators, MW and Max MW – Update line statuses – Update area loads, MW and Mvar – Update zone loads, MW and Mvar – Update injection group injections – Apply custom inputs

Page 33: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 33

Flow of Time Step Run

• If Apply Schedule Data – Apply schedule actions

• If Input Data and Schedule Data can be applied with no errors or not applying these at all – If applying pre-script command after

applying input data, run pre-script command

– If choosing to Apply and Solve • Solve power flow

• If successful power flow solution

Page 34: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 34

Flow of Time Step Run

– If any objects modeling time delay, check for time delay implementation

» Switched Shunts

» Transformers

» Time Step Actions

» If any system changes, solve power flow

– If still successful power flow solution (time delay actions implemented and power flow solves or no time delay actions implemented)

» If Solution Type <> Single Solution, run unconstrained OPF, OPF, or SCOPF

» If Run Contingencies = YES, run contingency analysis

Page 35: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 35

Flow of Time Step Run

• If applying post-script command before storing results, run post-script command

• Store results • If applying post-script command after

storing results, run post-script command 4) Continue processing time points

until all completed – go back to step 3 5) Restore time delay objects to original control

modes

Page 36: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 36

Injection Groups Input

• Allows easy scaling of groups of generators (such as wind farms)

• Loads and generators can be scaled together or separately as part of injection groups

• The same loads and generators should not be placed in multiple injection groups that are used in the time step scaling

Page 37: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 37

Specifying Injection Groups Input

Page 38: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 38

Specifying Injection Groups Input

• Specifies the net MW injection for loads and generators in the injection group

• Generator MW limits are enforced • Generators scaled regardless of AGC

status • No Mvar adjustments • Positive load is not enforced

Check this to prevent generator changes from being modified due to AGC

Page 39: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 39

CSV File Output

• Avoid filling up computer memory by writing results to file

• Separate file created for each type of object

– Areas, Buses, Generators, InjectionGroups, Interfaces, Lines, Owners, SuperAreas, Zones, Transformers, Loads, and Shunts

• Optionally save to memory only, CSV file only, or both

– When not saving to memory, Results tables will contain zeros

Page 40: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 40

CSV File Output

Select where the results should be stored

Key field to use for identifying objects within the file

File prefix - file will be named CSV File Identifier_objectname.CSV

Location where files should be written

CSV file options contained on the Options page of the Time Step Simulation dialog

Page 41: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 41

CSV File Output

Date,Time,[3] PU Volt

10/4/2010,12:00:00 AM,0.99421638250351

10/4/2010,12:00:01 AM,0.99421638250351

10/4/2010,12:00:02 AM,0.99421638250351

10/4/2010,12:00:03 AM,0.971107363700867

10/4/2010,12:00:04 AM,0.971107363700867

10/4/2010,12:00:05 AM,0.976763546466827

10/4/2010,12:00:06 AM,0.976763546466827

10/4/2010,12:00:07 AM,0.982440531253815

10/4/2010,12:00:08 AM,0.982440531253815

10/4/2010,12:00:09 AM,0.982440531253815

10/4/2010,12:00:10 AM,0.988180339336395

10/4/2010,12:00:11 AM,0.988180339336395

10/4/2010,12:00:12 AM,0.988153159618378

10/4/2010,12:00:13 AM,0.993943929672241

10/4/2010,12:00:14 AM,0.993943929672241

...

Time point identification Object identifier based on key field selection

Field identifier

Page 42: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 42

Time Step Simulation

• In this section we’ll learn how to:

– Set up and maintain a list of time points

– Specify time point input data

– Specify scheduled input data

– Customize the results we want to store from the solution

– Run continuous and timed simulations

• Open the B7flat.PWB case. To access the Time Step Simulation dialog, in Run Mode, go to the Tools ribbon tab and select Time Step

Simulation.

Page 43: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 43

Inserting New Time Points

• The first step in setting up a Time Step Simulation is to define a list of time points.

– This is a list of points in time for which Simulator will obtain solutions.

• In the Time Step Simulation dialog, right-click on the grid and select Insert New Timepoint(s), or press the Insert Time Points button.

Page 44: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 44

Inserting New Time Points

Click to select the date from a calendar component

Number of time points that will be inserted

Specify the interval between time points. Maximum resolution is 1 second.

As an example, assume we want to simulate 24 hours, starting on May 18, 2006 at 1:00 AM

Page 45: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 45

Inserting New Time Points

• After Inserting the Time Points, the Time Step Simulation dialog looks like this:

By default dialog shows

the Summary

page

Page 46: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 46

Time Step Simulation Dialog

Simulation control buttons

Summary page

contains list of

time points just inserted

Solution Type

Can specify the simulation starting and ending date and time

Simulation progress

Page 47: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 47

Summary Page: Controlling Solution

• The Time Point Solution Type can be: – Single Solution: Same as hitting the single solution button, but

would act on the corresponding time point.

– Unconstrained OPF

– Optimal Power Flow (OPF)

– Security Constrained Optimal Power Flow (SCOPF)

• Different time points can have different solution types

During the simulation you can skip a Time Point or you can pause at a Time Point

Page 48: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 48

.TSB file Control

Time Step Simulation Dialog

The input data and the results of the Time Step Simulation can be saved in a Time Series Binary (*.TSB) file. (Time Step Actions saved in .PWB)

Deletes results, input and scheduled input data,

and the list of time points

Page 49: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 49

Summary Page: Script Commands

• You can specify pre- and post script commands for each time point.

• This allows you to perform almost every possible Simulator action before and after a time point is solved.

• Typical actions are running contingency analysis or saving particular set of results.

Page 50: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 50

Summary Page: Script Command Tips

• It is a good idea to first test the script commands in script mode, to avoid potential syntax errors.

• To edit the script command cell, double-click on the cell. – You can copy/paste from the cells as usual

– You can also copy/paste from excel or the clipboard.

• To delete a script command, double-click and hit the Delete or Backspace buttons.

• To clear all the scripts commands in a column, right-click on the grid and select Set/Toggle/Columns Set All Values To. Then just press OK without typing anything in the dialog.

Page 51: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 51

Setting up Input Data

• Input data for each time point is specified in the Input pages for: – Load MW/Mvar – Generation MW/Max MW – Line Status – Area MW Load – Zone MW Load – Injection Group MW

• All these Input pages are matrix grids. This means that each row corresponds to a time point, and each column corresponds to the specific object for which data will be specified.

• Very detailed time-varying inputs may be specified on the Custom Inputs pages

Page 52: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 52

Setting up Input Data

• Thus we need to explicitly tell Simulator which generators, loads, etc. will have input data.

– The objects that do not have input data (or scheduled input data) will keep the values from the case.

• The matrix grids will have one column for the input data of each object.

• In the B7flat.pwb case, suppose that we want to specify Load MW data for Loads 2 and 3.

– In the Input page MW Loads page, right-click and select Time Point records Insert/Scale Load Column(s)

Page 53: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 53

Setting up Input Data

By default, we just want to insert new columns

Use the selector component to select Loads 2 and 3 at the same time.

We just need active load

Page 54: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 54

Setting up Input Data

In order to specify time point values, we can: 1. Enter the values manually (as shown in the Figure) 2. Read load values from Excel using the corresponding button. 3. Paste values from Excel (Copy the headers to Excel first). 4. Derive the values from another column. 5. Scale the column values.

The columns will contain zeros by default. Those will need to be filled with correct data.

Page 55: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 55

Setting up Input Data

Example: • We have specified some values for Loads 2 and 3 (as

shown in the previous slide). • Suppose we also need to specify input data for Loads

4 and 5, and know that those vary as Load 3, but are 90% of it. – We can derive the values for Loads 4 and 5 from Load 3.

• Right-click on column for Load 3 and select Time Point records Insert/Scale Load Column(s). – Column 3 will now be the Current Column

Page 56: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 56

Setting up Input Data

Column 3 becomes the current column

Use the selector component to select Loads 4 and 5, whose values will be derived from Load 3.

Loads 4 and 5 will be 90% of Load 3

Page 57: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 57

Setting up Input Data

• The Input Load MW page now looks like this:

Columns derived as 90% of Load 3

Page 58: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 58

Setting up Input Data

• We can use the column plot to check our input data. • The plot column function of Case Information Displays

becomes a plot versus date time when used from Time Step Simulation matrix grids.

To plot a column, right-click on the column and select Set/Toggle/Columns Plot Column from the Local Menu. You can also drag the mouse across several columns to plot multiple columns. The Load MW for Loads 2-5 looks like this.

Page 59: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 59

Setting up Input Data

• Since we have spent some time defining our input data, it is probably good to save the input data in the .TSB file.

• Press the Save TSB File button, and save the data as B7TSS.TSB

Page 60: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 60

Setting up Input Data

• In the same manner as we did for load MW, hourly data for other quantities would be specified in the corresponding pages: – Mvar Loads – Gen Actual MW – Gen Max MW – Line Status – Area Loads – Zone Loads – Injection Groups

• Recall that you can use the selector to create multiple columns at a time, and you can copy/ paste the input data from Excel.

Page 61: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 61

Setting Up Results

• During the time step simulation, Simulator obtains a PF/OPF/SCOPF solution for each time point.

• The amount of information that is generated may be significant since each time point can potentially contain the information of a solved PF, OPF, or SCOPF case. – For large systems, storing all these information may be

limited by memory.

• Typically, you don’t need to examine all the system quantities. The Time Step Simulation requires you to explicitly define which quantities you want to explore.

Page 62: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 62

Setting Up Results

• Select the Results page: Modify the Results Definitions

Result pages By default no objects are shown

Results Display Options

Page 63: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 63

Setting Up Results

• Press the View/Modify Result Definitions button to tell Simulator the quantities you want to store.

• You will need to specify:

– The type of object for which results must be saved (buses, generators, etc.)

– The individual objects whose fields will be saved (Bus 1, Bus 2, etc.)

– The fields that will be saved for each type of objects (Bus pu volt, etc.)

Page 64: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 64

Setting Up Results

Click Add/Remove Fields… to modify list of fields to store

Set to YES the buses for which you want to store the fields (By default all are set to NO)

For our example, assume we want to explore per unit voltage and angle for all the buses.

Save and Close the Result Definitions

Select the Buses page

Result Definitions are also saved in the .TSB file.

Page 65: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 65

Running the Simulation

• Now that we have set input data and specified which results we need to store, we can run the simulation.

• Simulator will obtain a solution for each time point depending on the solution type.

• In order to start the simulation, press the Do Run button.

• During the simulation, you will see how the Last Result box and the Progress Bar are updated.

Page 66: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 66

Running the Simulation

• Simulator will do the following at each time point: – Look at the time point skip/pause flag and act

accordingly

– Run a pre-script command if it was specified

– Apply time point and scheduled input data. • We’ll learn how to set scheduled input data later on.

– Obtain the PF/OPF/SCOPF solution

– Set the Processed flag in the Summary page

– Update the Last Result and Progress Bar indicating the status of the solution.

– Write the results to the Result pages

– Run a post-script command if it was specified

Page 67: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 67

Exploring Results

BUS 1 BUS 2

• For our example, the Buses page of the Results shows bus voltages and angles.

• The results can be grouped by objects or by fields.

Page 68: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 68

Exploring Results

• We can also explore the results by obtaining a column plot. This is how the bus angles look in our example.

Page 69: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 69

Specifying Scheduled Input Data

• Besides time point input data, the Time Step Simulation allows you to specify scheduled data.

• Scheduled data is used for data that more naturally spans multiple time points rather than being defined at each time point

– Line statuses

– Generator, load, capacitor and reactor statuses

– MW levels of scheduled transactions

– Number of capacitor/reactor blocks

– Generator voltage set points

– etc.

Page 70: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 70

Specifying Scheduled Input Data

• Schedule input data requires a schedule and a schedule subscription.

• The schedule defines how a quantity varies in time (just a shape). It is a list of time points together with Numeric or Yes/No values.

• By subscribing an object field (Line status, Gen MW, Transaction MW level, etc.) to a schedule, we can make this object field vary according to the shape of the schedule.

• Schedules are implemented as sets of actions that are applied to the power flow case at the next available time point.

Page 71: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 71

Specifying Scheduled Input Data

Schedule

t

Value

Object Field

Subscription

t

Gen MW

Time Point List

t

Page 72: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 72

Defining a Schedule

• Schedules:

– Are Numeric, Yes/No, or Text

– Can be made periodic by specifying them to repeat the shape with a certain period.

– Can have start and end validity dates (used normally for periodic schedules).

• To define a schedule go to the Input page Schedules page, right-click on the grid, and select Insert New Schedule.

Page 73: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 73

Defining a Schedule

Date time and numeric values define the shape of the schedule

Settings for periodic Schedules

Date times don’t need to coincide with the date times of the list of time points (Summary page)

Shortcut buttons allow easy definition of the schedule date times

Schedule name must be unique Identifies main characteristics of schedule

Page 74: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 74

Defining a Schedule Subscription

• Most enterable fields from the following object types can subscribe to schedules: Generators, Loads, Line/transformers, Shunts, Areas, Transactions, and Zones

• Numeric fields subscribe to Numeric Schedules, Boolean fields subscribe to Yes/No schedules, and Custom Strings and Memo fields subscribe to Text schedules.

• To define a schedule subscription, go to the Input page Sched Subscriptions page, right-click on the grid, and select Insert New Subscription.

Page 75: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 75

Defining a Schedule Subscription

1. Select the object type: Gen, Load, Line/Xfrmr, Shunt, Area, Transaction or Zone.

2. Select the particular object from the power flow case.

3. Select the field that will subscribe to the schedule

4. Select the schedule the field will subscribe to.

Press to select multiple objects that subscribe to the same schedule

When you select a field, this label changes telling whether the field is Numeric or Yes/No For instance, this means

that the Gen MW output of Generator 1 at bus 1 will follow the shape of Schedule 1.

Page 76: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 76

Defining a Schedule Subscription

Subscriptions to numeric schedules can modify the schedule values: Actual Value = Multiplier *Sched Value + Value Shift

Schedule actions are applied with the specified delay

Page 77: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 77

Example: Scheduled Input Data

• In the B7Flat.pwb case, the following input data is known for Gen 1 and line 2 to 3. The generator values occur every day.

• We want to create the schedules and schedules subscriptions needed to model these varying quantities.

Hour Gen 1MW Hour Line 2-3 Status

1:00 AM 60 MW 4:00 AM Open

7:00 AM 80 MW 2:00 PM Closed

1:00 PM 120 MW

7:00 PM 100 MW

Page 78: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 78

Example: Schedules

• For the generator, we create a periodic schedule with period = 1 day.

• The schedule is numeric.

• The schedule has 4 time points.

Page 79: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 79

Example: Schedule Subscriptions

• Then we subscribe the Gen MW output filed of generator 1, ID 1 to Sched1.

• There is no delay

• The field takes the exact values of the numeric schedule.

Note: Gen1 needs to be Off-AGC in order to keep the scheduled MW output. Manually set or use option

Page 80: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 80

Example: Schedules

• For the transmission line, we create a non-periodic schedule

• The schedule type is Yes/No.

• The schedule has 2 time points. Line will open at 4 AM and will close at 2 PM.

Page 81: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 81

Example: Schedule Subscriptions

• Then we subscribe the Status of Transmission Line 2 to 3, circuit 1 to Sched2.

• There is no delay

• Let us go ahead and rerun the Time Step Simulation.

Page 82: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 82

Example: Schedule Subscriptions

• By exploring the results, we can see how bus angles changed due to load variations, the generator schedule and the outage of the transmission line.

Bus Timepoint Custom Results Variables

1 Angle (Deg) 2 Angle (Deg) 3 Angle (Deg) 4 Angle (Deg) 5 Angle (Deg)

6 Angle (Deg)

DateTime

12:00 AM6:00 PM12:00 PM6:00 AM

Valu

es

5

4

3

2

1

0

Page 83: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 83

Schedule Subscriptions

• The advantage of schedules and schedule subscriptions is that power systems tend to have many quantities that follow a similar time pattern: – Bus loads of the same type

– Different units of a power plant that are identically scheduled

– A group of devices that are disconnected/reconnected at the same time. For instance, groups of capacitor or reactors.

• Using schedules, one avoids having to specify time point data for each field, which would be tedious and would require large quantities of memory.

Page 84: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 84

Time Step Actions

• Special conditional actions may be modeled with time delays

• These are typically useful only for very detailed simulations with time steps on the order of several seconds or less, where the objective is to analyze switching behavior and resulting time-domain voltage profiles (e.g. wind farm operation)

• Time Step Actions are only considered for complete Time Step Runs (those started using Do Run button)

• Actions can be applied again, following the appropriate time delay, if model criteria is met

• Switched shunts and transformers may also incorporate switching delays (specified with individual shunt and transformer records)

Page 85: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 85

Time Step Actions

• Example: Open a transmission line if it has been overloaded for at least 5 minutes

Page 86: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 86

Time Step Actions

• Time Step Options for AVR transformer

• Typical application would be detailed time-domain voltage modeling of wind farm

Page 87: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 87

Custom Inputs

• Custom inputs allow specification of more detailed parameters in the time domain for several object types

• Example: generator voltage setpoint

Page 88: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 88

What is Saved in the .TSB File?

• Because the amount of time information generated in the Time Step Simulation may be significant, a binary file is used to store it. This is called the Time Series Binary (.TSB) file.

• This file will save: – Input Data

– Scheduled Input Data

– Custom Inputs

– Result Definitions

– Results

– Time Simulation Options (defined in the Options page)

Page 89: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 89

Continuous and Timed Simulations

• By default, when you hit the Do Run button, each time step is solved immediately after the previous one. This is called a Continuous Simulation.

• On the other hand, the Time Step Simulation can mimic a solution in actual time by specifying a time scale. This is called a Timed Simulation.

• The Timed Simulation allows you to visualize the solutions on oneline diagrams as a movie. – You can see how time point and scheduled input data

are applied and their effect on the system.

– You can also contour and animate.

Page 90: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 90

Continuous and Timed Simulations

• To set up a Timed Simulation go to the Options page and select Timed, in the Time Step Simulation Options under Step Control.

• Set the Time Scale. A time scale of 60 means that the ACTUAL time delay between the solutions of two time points with date times 1:00 AM and 2:00 AM will be 60 seconds. Thus, if the 1:00 AM point is solved now, the 2:00 AM point will be solved 60 seconds later.

Page 91: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 91

Continuous and Timed Simulations

Example • Let us set the simulation to be Step Control = Timed,

and set a Time Scale of 5 (1 hour runs in 5 seconds of actual time).

• Move the Time Step Simulation dialog so you can see the oneline, but still have access to the control buttons.

• Run the simulation by clicking Do Run

Page 92: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 92

Continuous and Timed Simulations

Top Area Cost

Left Area CostRight Area Cost

60 MW

100 MW

-40 MW 200 MW

38 MW

0 Mvar 34 MW

0 Mvar

34 MW

0 Mvar

40 MW

0 Mvar

1.00 pu

1.03 pu

1.04 pu1.04 pu

1.04 pu

1.00 pu

1.05 pu

A

MVA

A

MVA

A

MVA

A

MVA

A

MVA

A

MVA

A

MVA

A

MVA

A

MVA

35 MW

35 MW

25 MW 25 MW

13 MW 13 MW

0 MW

0 MW

29 MW 29 MW

19 MW

20 MW

1 MW

6 MW

6 MW 3 MW 3 MW

46 MW

46 MW

28 MW

0 MW

0 Mvar

200 MW

0 Mvar

A

MVA

3 MW 3 MW

AGC ON

AGC ON

OFF AGC

AGC ON

AGC ON

6265 $/hr

4701 $/hr 188 $/hr

Case Hourly Cost

11155 $/hr

OneThree

Four

Two

Five

Six Seven

0 MW

10.8 Mvar

Top Area Cost

Left Area CostRight Area Cost

120 MW

160 MW

-40 MW 201 MW

70 MW

0 Mvar 63 MW

0 Mvar

63 MW

0 Mvar

80 MW

0 Mvar

1.00 pu

1.03 pu

1.04 pu1.04 pu

1.04 pu

1.01 pu

1.05 pu

A

MVA

A

MVA

A

MVA

A

MVA

A

MVAA

MVA

A

MVA

A

MVA

79 MW

78 MW

41 MW 40 MW

2 MW 2 MW

28 MW

28 MW

47 MW 46 MW

27 MW

28 MW

2 MW

15 MW

15 MW 7 MW 7 MW

55 MW

55 MW

40 MW

0 MW

0 Mvar

200 MW

0 Mvar

A

MVA

7 MW 7 MW

AGC ON

AGC ON

OFF AGC

AGC ON

AGC ON

9841 $/hr

4716 $/hr 188 $/hr

Case Hourly Cost

14745 $/hr

OneThree

Four

Two

Five

Six Seven

2 MW

10.8 Mvar

100%A

MVA

103%A

MVA

System at 5 AM System at 2 PM

Note the status of transmission line 2-3, the values of generator 1 MW output and how loads change at each time point. See how the line flows and angle contouring change (Note: Contouring should be set to continuously refresh).

Page 93: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 93

Time Step Simulation Toolbar

• The time step simulation toolbar is visible when the dialog is open and time points have been defined.

• It allows you to control the simulation (continuous or timed), without using the time step simulation dialog.

Simulation Control Buttons

Last Result Status Progress Bar

Timed/Continuous Simulation

Time Scale used

in Timed Simulation

Present Time for Timed

Simulation

Page 94: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 94

Time Step Simulation Toolbar

Solve the next Time Point

Play the Time Step Simulation

in either continuous or timed mode.

Reset the Simulation

Pause a continuous or

timed simulation

Solve the previous Time

Point

Page 95: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 95

Summary Page Local Menu

• Deletes the time point together with all the input data of that time point

• Applies the input data of the selected time point to the power system case (makes data available on the case information displays, oneline diagram, etc.). It does not apply scheduled input data.

• Brings up a dialog to change the date/time of a time point. It sorts the list afterwards.

• Solves the selected time point, by first applying both time point and schedule input data.

• Paste (under Copy/Paste/Send) becomes enabled when the clipboard contains time step data in the correct format.

Page 96: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 96

Time Step Simulation Options

When there is time point input data for area MW load and for individual load MW, always set to individual MW load value first. Then, if set to Areas, only areas are scaled. If set to Zones, only zones are scaled.

OPF Pricing options

Saves binding constraint results in specific results matrix grid.

Important when changing Gen Actual MW and Injection Groups

Page 97: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 97

Time Step Simulation Options

Time Step Simulation allows you to either Apply and Solve or just Apply Data without solving. Sometimes you want to test only time point or schedule data

Loads the TSB automatically when the case is opened.

When saving the TSB, set automatically the Default tsb to be the current tsb.

Page 98: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 98

Time Step Simulation Options

The Time Step Simulation can contour oneline diagrams as the simulation takes place. It can also save a list of the resulting images as Bitmaps or JPGs.

Options Page

Page 99: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 99

Time Step Simulation Options

The Time Step Simulation can save data directly to a CSV file. This is meant to enable the time step to store data from very long runs without running out of memory.

Options Page

The file identifier is used to identify the run. Individual objects have files created for them. For example, Year2010_areas.csv.

Page 100: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 100

OPF and SCOPF Time Step Simulations

• Users of OPF and the SCOPF add-ons can obtain time point optimal power flow and security-constrained optimal solutions by specifying these solution types for one or more time points in the Summary page.

– Make sure you become familiar with Simulator OPF and SCOPF before running a Time Step Simulation with these options.

Page 101: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 101

OPF and SCOPF Time Step Simulations

Unconstrained OPF • The Time Step Simulation will remove all the constraints

that would normally act in the OPF and will optimize the system to find the minimum operating cost.

• Simulator will change the set points of the specified controls (generators and phase shifters) to minimize the cost of all Areas and Super Areas set to OPF AGC control.

• Besides the power flow solution options, the Unconstrained OPF simulation will take all the options that have been defined for a regular OPF solution. Most of these options are defined in OPF Options and Results Dialog under the Add Ons ribbon tab.

Page 102: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 102

OPF and SCOPF Time Step Simulations

OPF

• The Time Step Simulation applies the time point and schedule input data and optimizes the control areas set to OPF to minimize cost while enforcing normal operation constraints. – This includes: transmission line thermal limits, interface limits,

generator control limits, and load control limits.

• The OPF algorithm detects the controls that need to be moved, the constraints that are binding at the solution point, and the unenforceable constraints, i.e., constraints that cannot be enforced with the available controls.

Page 103: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 103

OPF and SCOPF Time Step Simulations

OPF • Some of the quantities that are of interest in the solution

of the OPF algorithm, are displayed in the Result: Constraints Pages: – Unconstrained Generator MW Output

– Final generator MW Output

– Change in Generator MW

– Locational Marginal Prices: These are displayed in the Hourly Final Bus LMP Page. Average LMP prices and other LMP metrics are also available in the Results Page for Areas, Injection Groups, Super Areas, and Zones.

– Binding Constraints as well as Marginal Cost of Limit Enforcement for lines and interfaces.

Page 104: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 104

OPF and SCOPF Time Step Simulations

SCOPF • The SCOPF combines Simulator’s OPF with

Contingency Analysis to optimize a system for minimum cost while enforcing both normal operation and contingency constraints.

• The solution of an SCOPF Time Step Simulation depends on the options that have been set up for the following tools: – Power Flow – Optimal Power Flow – Contingency Analysis – Security Constrained Optimal Power Flow – Time Domain OPF Options

Page 105: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 105

OPF and SCOPF Time Step Simulations

SCOPF

• At each time point, the SCOPF Time Step Simulation does the following: – Applies the input data and scheduled actions

– Solves a power flow

– If specified, it solves an unconstrained OPF

– Initializes the base case for the SCOPF by solving a power flow or an OPF

– Solves the contingencies for the initialized system state

– Solves the SCOPF optimization problem

– Displays the results in the matrix grids

Page 106: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 106

OPF and SCOPF Time Step Simulations

SCOPF • The SCOPF often requires significant computer resources

mostly because of the need to solve a large number of contingencies and to calculate their sensitivities.

• The size of the problem also depends on the size of the system, number of constraints (monitored elements), and number of time points considered.

• A mechanism to speed up the computation of the PF/OPF/SCOPF Time Step Simulation is to use DC solutions in some of the internal routines: – AC or DC power flow – AC or DC contingency analysis. This one will produce the larger

time savings. – AC or DC SCOPF

Page 107: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 107

OPF Pricing Options

• Different applications of the OPF/SCOPF require special pricing options.

• A method for congestion pricing consist of solving first the unconstrained case to determine unconstrained LMPs, and then solve the OPF or SCOPF. The difference between these two solutions correspond to the congestion cost or congestion component of the LMP for a given hour.

Check this option to solve an unconstrained OPF (equivalent to economic dispatch) before solving the OPF or SCOPF for each time point.

Page 108: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 108

OPF Pricing Options

• It is also customary in LMP markets to price hydro generation at a cost equal to the unconstrained LMP.

• Simulator will internally modify the cost curve of the hydro generation to match the unconstrained LMP obtained during the initial unconstrained simulation. It will then solve the constrained optimization problem using this cost for the hydro units.

• Check this option to reset the cost curve of hydro generation to the original cost after each time step.

• Uncheck this option to explore how Simulator changes the hydro cost to the unconstrained marginal price.

Page 109: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 109

OPF Pricing Options

• OPF and SCOPF solutions with pricing options do the following for each time step:

– Apply time point and schedule input data

– if unconstrained then begin

• Solve Unconstrained OPF

• if price hydro then Hydro Cost = LMP

– end

– Solve OPF or SCOPF

– if unconstrained and price hydro and reset then Reset Price

– if Save then Save Binding Constraints

Page 110: PowerWorld Time Step Simulation Tool

©2010 PowerWorld Corporation 110

Time Step Simulation and Contingency Analysis

• Contingency analysis will take place as part of the SCOPF. – Binding constraints will be saved in the Results: Constraints page.

• Sometimes summary information of contingency analysis is required without the SCOPF – For instance, the custom results for transmission lines allows saving the

Aggregate MVA Overload and Max% Loading Contingency for each transmission element.

• In order to run contingency analysis for a time point, set the corresponding field to YES in the Summary page.