8/13/2019 Powerpoint: The University of Vermont STEM Initiative
1/18
The University of Vermont
STEM Initiative
1
A Presentation to the Committee of the Whole
February 7, 2014
By
David V. Rosowsky, Provost and Senior Vice President
Supported by
John N. Evans, Interim Vice President for Research
O. Richard Bundy III, President and Chief Executive Officer, The UVM Foundation
Robert B. Vaughan, Director, Capital Planning and Management
8/13/2019 Powerpoint: The University of Vermont STEM Initiative
2/18
2
8/13/2019 Powerpoint: The University of Vermont STEM Initiative
3/18
3
8/13/2019 Powerpoint: The University of Vermont STEM Initiative
4/18
8/13/2019 Powerpoint: The University of Vermont STEM Initiative
5/18
5
8/13/2019 Powerpoint: The University of Vermont STEM Initiative
6/18
6
STEM ComplexEast View
8/13/2019 Powerpoint: The University of Vermont STEM Initiative
7/187
Programming Phase Schedule
Sep
w eek starting 30 7 14 21 28 4 11 18 25 2 9 16 23 30 6 13 20 10 17
2 18 30 13 26 11 23 8 22
l l l l l l l l l l
Programming
23
Visioning Meeting l
Facility Tours
User Meetings (multi-day) l l l l
Draft Program u
Final Draft Program u
Existing Conditions Analysis
Existing Conditions Report u
Facility Tours : l College of the Holy Crossl University of New Hampshirel Worcester Polytechnic Institute
STEM Steering Committee Meetings
3
FebruaryOctober November December January
27
8/13/2019 Powerpoint: The University of Vermont STEM Initiative
8/188
Program Development Process
Project Vision and Goals
Project Tours
Benchmarking
Faculty Interviews
Departmental
Shared researchshared core labs
Shared teachingshared teaching labs
Utilization analysis (teaching spaces)
Growth Projections Plan layouts and 3-D Views
Space program
8/13/2019 Powerpoint: The University of Vermont STEM Initiative
9/18
Projected Chemistry Teaching Lab Utilization
9
8/13/2019 Powerpoint: The University of Vermont STEM Initiative
10/18
10
Introductory Chemistry Teaching Lab24 Person capacity
A shared lab with Environmental Engineering Course CE254
Programming Process: Plan Layouts and 3D views
Confirm room requirements
Determine potential for space sharing
8/13/2019 Powerpoint: The University of Vermont STEM Initiative
11/18
Physics - Active Learning Lab/Classroom - 96 person capacity
Programming Process: Plan Layouts and 3D views
Explore new pedagogies
8/13/2019 Powerpoint: The University of Vermont STEM Initiative
12/18
Programming Process: Plan Layouts and 3D views
Explore flexible layouts and space sharing, Modular design
Organic Chemistry Research Lab - Open Plan
8/13/2019 Powerpoint: The University of Vermont STEM Initiative
13/1813
Site Visits: University of New Hampshire vs. UVM Teaching Spaces
UNH Engineering Advanced Electronics and
Instrumentation Lab
UVM Votey Hall Engineering Structures Lab
8/13/2019 Powerpoint: The University of Vermont STEM Initiative
14/1814
Site Visits: College of the Holy Cross vs. UVM Teaching Spaces
College of the Holy Cross
GeneralChemistry Teaching Lab
UVM Cook Building Chemistry
Teaching lab
8/13/2019 Powerpoint: The University of Vermont STEM Initiative
15/18
Cook Building - Existing Conditions Evaluation
15
Obsolete Building & Life Safety Systems Inadequate mechanical systems
Deficient fume hood air supply and exhaust
Inadequate temperature and humidity control
Inadequate chilled water system
No energy recovery
Plumbing and Fire Protection and Detection Systemsnot code compliant
Building envelope deficiencies
Substandard building management system
Substandard electrical systems
Votey Hall - Existing Conditions Evaluation
Deferred Maintenance and Interior Configuration Issues Roof membrane
Mechanical systems
Exterior entrance
Corridor flooring and lighting
Undergraduate student laboratory space
Research laboratory space
8/13/2019 Powerpoint: The University of Vermont STEM Initiative
16/18
16
Project Schedule (3 phases)
RFP for Professional Services ... 17 June 2013
Architectural Team Selected .. 23 September 2013
Program and Preliminary Concept ... 15 February 2014
New STEM Research and Teaching Lab Building (Phase 1)
Design and Documentation Complete . 1 February 2015
Bid and Award .. 1 April 2015
Construction Completion . 1 December 2016
New STEM Classroom and Office Building (Phase 2)
Design and Documentation Complete .. 1 May 2016
Bid and Award ... 1 September 2016Construction Completion 1 June 2018
Votey Hall Selective Renovations (Phase 3)
Design and Documentation .. March 2015 - May 2016
Construction in Multiple Phases June 2014 - June 2018
8/13/2019 Powerpoint: The University of Vermont STEM Initiative
17/18
17
Discussion
8/13/2019 Powerpoint: The University of Vermont STEM Initiative
18/18