POWER SYSTEMS WITH POWER7 AND AIX TECHNICAL SALES SKILLS V1

Number: 000-107Passing Score: 800Time Limit: 120 minFile Version: 1.0

http://www.gratisexam.com/

Page 2: POWER SYSTEMS WITH POWER7 AND AIX TECHNICAL · PDF fileB. System Builder Redbook ... plus DB2 pureScale running the database partition and Tivoli Systems Automation for the application

Exam A

QUESTION 1How many total processor threads are possible when a customer migrates a workload requiring AIX 5.3 froman 8-core Power 550 to an 8-core Power 750?

A. 8B. 16C. 32D. 64

Correct Answer: BSection: (none)Explanation

QUESTION 2A company is deploying several applications on IBM POWER6 and POWER7 Blade technology, and they wantto move into a Fibre Channel over Ethernet (FCoE) infrastructure. In addition to the required switches in theBladeCenter, which of the following is necessary to address the customer requirement?

A. Install a 10Gbps 2-port Converged Network Adapter.B. Install an 8Gbps 4-Port Converged Network Adapter card.C. Install an Ethernet and 4Gbps Fibre Channel Expansion CardD. Install Ethernet and fibre channel cards, connected into a converged switch

Correct Answer: ASection: (none)Explanation

QUESTION 3A customer has a large database server running online transactions where I/O performance has been thelimiting factor for running business-critical processes. Which statement correctly describes the use of SolidState Disks (SSDs) in this environment?

A. RAID-5 protection should be used on SSDs for best performance.B. SSDs should be placed where sequential write access is the primary type of I/O.C. Traditional hard disks can be concurrently replaced by SSDs, eliminating downtime.D. SSDs offer better response time than traditional hard disks, reducing total transaction processing time.

Correct Answer: DSection: (none)Explanation

QUESTION 4A customer has hundreds of AIX LPARs and wants to simplify the process of upgrading the operating systems.What will support the customer requirement?

A. mksysb.B. restore_vg.C. NIM environment.D. smit update_all.

Page 3: POWER SYSTEMS WITH POWER7 AND AIX TECHNICAL · PDF fileB. System Builder Redbook ... plus DB2 pureScale running the database partition and Tivoli Systems Automation for the application

Correct Answer: CSection: (none)Explanation

QUESTION 5A customer would like to consolidate multiple database workloads to a single server to reduce TCO. What isthe effect of PowerVM on TCO?

http://www.gratisexam.com/

A. Reduces SAN cost.B. Reduces network cost.C. Reduces administration costsD. Reduces software licensing cost.

Correct Answer: Section: (none)Explanation

Explanation/Reference:

QUESTION 6A customer would like to buy a new Power 750 and attach 2 PCIe I/O drawers. What is the minimumconfiguration which will support this?

A. One processor card and one GX+ expansion card.B. Two processor cards and one GX++ expansion card.C. One processor card, one GX+ expansion card, and one GX++ expansion card.D. Two processor cards, one GX+ expansion card, and one GX++ expansion card.

Correct Answer: CSection: (none)Explanation

QUESTION 7A customer has three 8-core servers at their office in a PowerHA cluster. Two of the servers actively supportthe database, and the third server is in a backup/standby mode. What is the minimum number of PowerHAlicenses required to support the environment?

A. 16B. 17C. 18D. 24

Correct Answer: BSection: (none)

Page 4: POWER SYSTEMS WITH POWER7 AND AIX TECHNICAL · PDF fileB. System Builder Redbook ... plus DB2 pureScale running the database partition and Tivoli Systems Automation for the application

Explanation

QUESTION 8A customer has a Power Systems 750 with PowerVM Standard Edition and Active MemoryExpansion (AME). They have these LPARs defined: In which LPARs is AME supported?

A. LPAR1B. LPAR2C. LPAR1 and LPAR3D. LPAR2 and LPAR4

Correct Answer: BSection: (none)Explanation

QUESTION 9A potential customer plans to deploy a new application on a RISC-based server. They are considering UNIXofferings from IBM and Sun. Which of the following statements are advantages of AIX over Solaris?

A. AIX supports journaled filesystems.B. AIX supports a graphical management tool.C. AIX has a suite of workload management and performance tools.D. AIX supports application mobility without requiring a shut down.

Correct Answer: DSection: (none)Explanation

QUESTION 10What is the most up-to-date resource a Power Systems seller can use to verify if an adapter is supported on aPOWER7 server?

A. Sales ManualB. System Builder RedbookC. Installation Planning ReferenceD. Customer Specified Placement Tool

Correct Answer: ASection: (none)Explanation

QUESTION 11A customer wants to implement Oracle RAC and is comparing the features and benefits of using either rawdevices or GPFS. What is a benefit of using GPFS in this solution?

A. GPFS is included with AIX Standard Edition for 2-node clusters.B. GPFS offers data protection by implementing a RAID-5-like storage allocation.C. GPFS allows for a cluster with nodes running heterogeneous operating systems.D. GPFS offers the performance capabilities of a raw device and the manageability of a file system.

Correct Answer: D

Page 5: POWER SYSTEMS WITH POWER7 AND AIX TECHNICAL · PDF fileB. System Builder Redbook ... plus DB2 pureScale running the database partition and Tivoli Systems Automation for the application

Section: (none)Explanation

QUESTION 12After purchasing the Active Memory Expansion (AME) Enablement Feature, what tasks must be completedbefore AME can be used?

A. Enable using active partition properties with DLPAR.B. Enter the activation key via the AIX 6.1 command line and reboot AIX.C. Enter the activation key via the HMC, power cycle the managed system and start the LPAR.D. Enter the activation key via the HMC, modify the partition profile, and restart the LPAR.

Correct Answer: BSection: (none)Explanation

QUESTION 13A customer has DB2 running on three POWER5 520s with AIX 5.2 and is planning to consolidate the systemson a new Power 740 with AIX 7.1. The customer is reviewing the RPE2 benchmark data to validate that theproposed solution will work. Why should rPerf be used instead of RPE2?

A. The rPerf benchmark is run on every server model to obtain performance data, while RPE2 frequently usesextrapolations.

B. rPerf includes the performance impact to AIX due to the introduction of new features, whileRPE2 does not focus on software versions

C. The rPerf metric considers the number of cores, memory utilization by the applications, I/Otransactions, and RPE2 only measures core performance.

D. rPerf is obtained by duplicating the production environment, representing the most accurate performance ofthe installed systems, and RPE2 uses analytical models.

Correct Answer: ASection: (none)Explanation

QUESTION 14What is one of the key benefits of Active Memory Sharing (AMS) to client LPARs?

A. Adds more memory using the On/Off Capacity on Demand featureB. Assigns memory using DLPAR capability according to workload priorityC. Adds additional memory using the Permanent Capacity on Demand featureD. Adjusts memory dynamically allocation depending on workload characteristics

Correct Answer: DSection: (none)Explanation

QUESTION 15System Software for the Power 770 is licensed at what tier?

A. HPCB. Small

Page 6: POWER SYSTEMS WITH POWER7 AND AIX TECHNICAL · PDF fileB. System Builder Redbook ... plus DB2 pureScale running the database partition and Tivoli Systems Automation for the application

C. LargeD. Medium

Correct Answer: DSection: (none)Explanation

QUESTION 16A customer is considering a highly available infrastructure for its SAP application. They have one 48-corePower 770 server running multiple AIX 6.1 partitions for database and application server functions. All thepartitions must recover with the same processing capacity. In addition to storage and networking at asecondary location, what must be added to provide for automatic recovery after a total failure at the primarysite?

A. Two Power 750 systems, plus DB2 pureScale for database and application partitions on both systems.B. One Power 770 system, plus PowerHA SystemMirror Enterprise Edition for database and application

partitions on both systems.C. One Power 750 for each of the database and application partitions, plus PowerHA SystemMirror Standard

Edition licenses for all systems.D. One Power 770 system, plus DB2 pureScale running the database partition and Tivoli

Systems Automation for the application partitions on both systems.

Correct Answer: BSection: (none)Explanation

QUESTION 17Which POWER7 internal storage option improves performance, reduces response time, and increases missioncritical OLTP application productivity?

A. 15K RPM SAS drivesB. Solid State drivesC. 15K RPM SATA drivesD. USB Removable drives

Correct Answer: BSection: (none)Explanation

QUESTION 18Which of the following PowerHA System Mirror for AIX Enterprise Edition statements is correct?

A. It can scale up to 1024 cluster nodes.B. It provides for application failover without downtime.C. It allows data replication via TCP/IP and host-based remote mirroring.D. It requires all partitions in a system to run the same AIX version and technology level.

Correct Answer: CSection: (none)Explanation

Page 7: POWER SYSTEMS WITH POWER7 AND AIX TECHNICAL · PDF fileB. System Builder Redbook ... plus DB2 pureScale running the database partition and Tivoli Systems Automation for the application

QUESTION 19When differentiating LPARs and WPARs, which statement is correct?

A. WPARs share only operating system resources.B. LPARs share only operating system resources.C. WPARs share operating system and hardware resources.D. LPARs share operating system and hardware resources.

Correct Answer: CSection: (none)Explanation

QUESTION 20Which of the following is enabled by using NPIV technology for fibre channel adapters?

A. Sharing SAN disks as vSCSI disksB. Multipathing and load balancing SAN trafficC. Combining SAN and LAN traffic on one adapterD. Virtualization and sharing of SAN adapters with client LPARs

Correct Answer: DSection: (none)Explanation

QUESTION 21An IT manager, new to Power Systems, wants guidance on AIX support strategy for planning purposes. Whichof the following statements about the AIX Roadmap address the customer request?

A. One TL update is released every twelve months.B. Two TL updates are released every twelve months. C. Four TL updates are released every twelve monthsD. Three TL updates are released every twelve months

Correct Answer: BSection: (none)Explanation

Explanation/Reference:

QUESTION 22A customer has purchased two servers which need several identical LPAR profiles defined. What resourceallows an administrator to create LPAR definitions and import them into the HMC?

A. SPTB. WLEC. NIMD. eConfig

Correct Answer: ASection: (none)Explanation

Page 8: POWER SYSTEMS WITH POWER7 AND AIX TECHNICAL · PDF fileB. System Builder Redbook ... plus DB2 pureScale running the database partition and Tivoli Systems Automation for the application

QUESTION 23A customer wants to know how to find the latest updates for their particular system. Which of the followingshould be recommended?

A. Use the System Planning Tool (SPT).B. Use the Fix Level Recommendation Tool (FLRT) website.C. Find the latest version of AIX from Strength to Strength on the IBM Website.D. Receive the latest updates via email with a Software Maintenance Agreement(SWMA).

Correct Answer: BSection: (none)Explanation

QUESTION 24A customer wants to run several application servers. They will deploy Web Sphere Application Server (WAS)on AIX 6.1 and Tomcat running on AIX 5.3. Which solution allows improved system utilization while minimizingmanagement efforts?

A. Create one micro-partition for each Tomcat server. Create one micro-partition for eachWAS instance.

B. Create a single micro-partition with an AIX 6.1 global area. Create separate AIX 5.3 andAIX 6.1 WPARs for Tomcat and WAS.

C. Create micro-partitions for each Tomcat server running on AIX 5.3. Create micro-partitions for each WASinstance running on AIX 6.1.

D. Create one micro-partition for each Tomcat server running on AIX 5.3. Create one micropartition with AIX6.1 and run all the WAS instances inside WPARs.

Correct Answer: DSection: (none)Explanation

QUESTION 25Which AIX edition is intended for price sensitive situations involving smaller workloads?

A. AIX Basic EditionB. AIX Entry EditionC. AIX Express EditionD. AIX Standard Edition

Correct Answer: CSection: (none)Explanation

QUESTION 26A customer is deploying highly critical Web applications with dynamic workload characteristics on multiplePower Systems servers. Which features of PowerVM can help the customer to deploy the applications?

A. Uncapped LPARs and WPARsB. Workload Manager and WPARsC. Uncapped LPARs and Live Partition MobilityD. Shared processor pool and Active Memory Expansion

Page 9: POWER SYSTEMS WITH POWER7 AND AIX TECHNICAL · PDF fileB. System Builder Redbook ... plus DB2 pureScale running the database partition and Tivoli Systems Automation for the application

Correct Answer: CSection: (none)Explanation

QUESTION 27A customer has 4 systems:Which of these systems is a candidate for Active Memory Expansion (AME)?

A. SystemAB. SystemBC. SystemCD. SystemD

Correct Answer: DSection: (none)Explanation

QUESTION 28A customer is concerned about the stability and availability of an application with a large number of kernelextensions. Which of the following can improve the application availability?

A. Security ExpertB. Application KeysC. Checkpoint RestartD. Storage Protection Keys

Correct Answer: DSection: (none)Explanation

QUESTION 29A customer is interested in PS700 Blade with 32GB of memory. The Blade will have 4 partitions sharingresources equally. They are looking for the least expensive operating system that supports Live PartitionMobility. Which of the following AIX Editions address their requirement?

A. BasicB. ExpressC. StandardD. Enterprise

Correct Answer: ASection: (none)Explanation

QUESTION 30A customer is planning to deploy several Web servers in a dedicated partition running AIX 6.1. What would bea benefit of using Workload Partitions (WPARs) in this environment?

A. WPARs offer better software isolation than traditional shared processor partitions.B. WPARs can share system files from the global environment, simplifying the installation of operating system

Page 10: POWER SYSTEMS WITH POWER7 AND AIX TECHNICAL · PDF fileB. System Builder Redbook ... plus DB2 pureScale running the database partition and Tivoli Systems Automation for the application

fixes.C. Software licensing can be reduced if the WPARs are limited to use a single core each, since only one

WPAR needs to have software licenses.D. Each Web server can have its own version of the operating system kernel, but still benefit from sharing the

system files from the global environment.

Correct Answer: BSection: (none)Explanation

QUESTION 31A customer has a Power Systems server with EMC disk attached at a Disaster Recovery site 30 miles away.The remote site has no operations staff. The customer would like to implement an automated failover solutionfor their production application environment. Which solution will satisfy the customer requirement?

A. DataGuard Enterprise EditionB. IBM Systems Director VMControlC. PowerHA SystemMirror Enterprise EditionD. PowerPath with Peer to Peer Remote Copy (PPRC)

Correct Answer: CSection: (none)Explanation

QUESTION 32A petroleum company is replacing their reservoir modeling High Performance Computing solution with a newer,faster solution. The software runs on AIX 6.1. The current environment is based on the same software runningon a cluster of Power 550 systems. They are planning to move to the Power 755 systems, adding 50% inperformance when compared to the existing solution. Which performance metric should be used to estimatethe number of machines and cores required?

A. SPECint2006B. SPECfp_rate2006C. SPECjAppServer2004D. SAP SD 2-Tier benchmark

Correct Answer: BSection: (none)Explanation

QUESTION 33A customer is implementing multiple partitions on a Power 780 system. They will use mksysb to back up AIXand want to minimize the number of tape cartridges used for the backup. Which solution addresses thecustomer concerns?

A. Configure NPIV on the Virtual I/O Server and use it to back AIX up to a SAN-attached tape library.B. Add one tape device in each CEC on the 780 and dynamically assign them to the AIX

partitions for backup.C. Create a NIM Master for network backups. Use NIM to back up the other partitions to internal disk, and copy

the images to a tape.D. Use VIO Server to configure a virtual tape device across partitions. Allocate the virtual tape device to one

partition at a time and perform the AIX backup to the tape.

Page 11: POWER SYSTEMS WITH POWER7 AND AIX TECHNICAL · PDF fileB. System Builder Redbook ... plus DB2 pureScale running the database partition and Tivoli Systems Automation for the application

Correct Answer: CSection: (none)Explanation

QUESTION 34A customer is running multiple business critical applications in a single LPAR with multiple WPARs. One of theapplications requires an AIX fix to be installed to improve the stability of the application. What will ensure theAIX fix does not affect other applications running in theLPAR?

A. Install the fix in the WPAR without committing.B. Use the eFix tool to install the fix to the WPAR only.C. Stop all the applications, install the fix and then start WPARs one by one.D. Move the application which needs the fix to another LPAR and apply the fix there.

Correct Answer: DSection: (none)Explanation

QUESTION 35A Power 750 customer will be deploying several Web servers. What benefit would be provided by WorkloadPartitions (WPARs) in this environment?

A. WPARs allow sharing of the Web server executables. B. WPARs are easily created from the HMC profile menu.C. WPARs allow the Web servers to have direct access to the system hardware.D. WPARs allow each of the Web servers' root user to control the global environment.

Correct Answer: ASection: (none)Explanation

Explanation/Reference:

QUESTION 36Which Edition of Systems Director should be recommended to an IT Director who wants performance analysisand capacity trend analysis reporting?

A. Systems Director Express EditionB. Systems Director Standard EditionC. Systems Director Enterprise EditionD. Systems Director Standard Edition with the Capacity Analysis Plug-In

Correct Answer: CSection: (none)Explanation

QUESTION 37A customer plans to consolidate two existing POWER6 processor-based servers to a Power 770.In what way will Live Partition Mobility benefit them?

Page 12: POWER SYSTEMS WITH POWER7 AND AIX TECHNICAL · PDF fileB. System Builder Redbook ... plus DB2 pureScale running the database partition and Tivoli Systems Automation for the application

A. It enables hot-swap of adapters from the old systems to the new system.B. The old and new systems can be run in parallel to test new system functionality.C. LPARs can be moved from the old systems to the new one while they are still runningD. The system serial number will remain the same after the upgrade for accounting purposes.

Correct Answer: CSection: (none)Explanation

QUESTION 38A customer has systems with AIX 6.1 and 5.3 distributed across two data centers located 8km apart. They wantto implement high availability with automated application restart and synchronous data replication between theIBM Systems Storage DS8700 systems which are installed in each datacenter. Which solution addresses thecustomer requirements?

A. Use the Geographic Logical Volume Manager (GLVM) for MetroMirror, and Live PartitionMobility to automate partition migration upon failure

B. Use MetroMirror for the AIX volumes and High Availability Disaster Recovery (HADR) to automate partitionmigration and restart upon failure.

C. Use the Geographic Logical Volume Manager (GLVM) for MetroMirror to replicate the data between the twosites and automate application recovery.

D. Use MetroMirror for the AIX volumes, and PowerHA SystemMirror Enterprise Edition to automate failover ofMetroMirror pairs and automate application recovery.

Correct Answer: DSection: (none)Explanation

QUESTION 39A customer would like to buy a new Power 750 and attach 2 PCIe I/O drawers. What is the minimumconfiguration which will support this?

A. One processor card and one GX+ expansion cardB. Two processor cards and one GX++ expansion cardC. One processor card, one GX+ expansion card, and one GX++ expansion cardD. Two processor cards, one GX+ expansion card, and one GX++ expansion card

Correct Answer: CSection: (none)Explanation

QUESTION 40Which of the following describes the advantage of using Fibre Channel over Ethernet (FCoE) in POWER6 andPOWER7 Blades?

A. The FCoE card provides both LAN and fibre channel function from a single card on the blade.B. The FCoE advanced technology removes the need for any BladeCenter switching to support this function.C. Component reliability on the fibre channel over Ethernet is higher than on regular Ethernet

And fibre channel adapters.D. The AIX device driver for FCoE has been completely rewritten for the current adapter, eliminating errors and

performance issues.

Page 13: POWER SYSTEMS WITH POWER7 AND AIX TECHNICAL · PDF fileB. System Builder Redbook ... plus DB2 pureScale running the database partition and Tivoli Systems Automation for the application

Correct Answer: ASection: (none)Explanation

QUESTION 41A customer needs to share large files across three Power Systems servers to create and validate complexautomotive designs. What IBM solution should be recommended?

A. PowerHA SystemMirrorB. Peer to Peer Remote CopyC. General Parallel File SystemsD. Parallel Operating Environment

Correct Answer: CSection: (none)Explanation

QUESTION 42In a scaleout environment, what is a benefit of running DB2 pureScale compared to other solutions?

A. Provides a highly available cluster of Power Systems enabling near linear scalability and disaster recoveryacross different sites.

B. Incorporates a hardware locking mechanism which resembles the Parallel Sysplex on the mainframe,delivering performance and scalability.

C. Enables near linear scalability by partitioning and clustering the database across multiple nodes, and addingnodes dynamically when needed.

D. Provides scalability by employing a highly available cluster of servers interconnected by anInfiniband network and a central locking mechanism.

Correct Answer: DSection: (none)Explanation

QUESTION 43A customer wants to run a Domino email application, a Business Intelligence database, and a batch processingapplication on Linux. The workloads have different behaviors and do not have peaks at the same time. What isa benefit of running these applications on a Power Systems server instead of running on separate x86 servers?

A. Each Linux application can run in a Workload Partition, reducing the management efforts.B. Total cost of Linux applications on Power Systems is more cost effective than on x86 because of platform

licensing.C. Memory cloning can be used on the Power Systems to have a single image of the Linux kernel shared by all

partitions.D. Using micropartitions on Power Systems allow the workloads to share the processing resources, increasing

the overall system utilization.

Correct Answer: DSection: (none)Explanation

QUESTION 44A small IT department is deploying Power 720 servers exploiting virtualization technologies. Each Power 720

Page 14: POWER SYSTEMS WITH POWER7 AND AIX TECHNICAL · PDF fileB. System Builder Redbook ... plus DB2 pureScale running the database partition and Tivoli Systems Automation for the application

will have two partitions, one with 6 cores and one with 2 cores, and both partitions having 32GB of memoryeach. Live Partition Mobility is being considered at some point in the future. What is the minimum AIX Editionrequired to support the customer?

A. AIX Basic EditionB. AIX Express EditionC. AIX Standard EditionD. AIX Enterprise Edition

Correct Answer: CSection: (none)Explanation

QUESTION 45A customer is interested in PS700 Blade with 32GB of memory. The Blade will have 4 partitions sharingresources equally. They want the least expensive operating system that supports Live Partition Mobility. Whichof the following AIX Editions address their requirement?

A. BasicB. ExpressC. StandardD. Enterprise

Correct Answer: ASection: (none)Explanation

QUESTION 46An IT director is eager to adopt POWER7 servers because of their relative performance ratings and energyefficiency, but is concerned about migrating applications which require AIX 5.3. Which of the following willaddress his concern?

A. POWER7 servers running AIX 5.3 operate in POWER5+ mode.B. POWER7 servers running AIX 5.3 operate in POWER6 and POWER6+ mode.C. POWER7 servers running AIX 5.3 operate in POWER5 and POWER6 modes.D. POWER7 servers running AIX 5.3 operate in POWER6 and POWER7 modes.

Correct Answer: BSection: (none)Explanation

QUESTION 47An IT manager needs to deploy multiple applications simultaneously. Which virtualization technology will reducethe number of operating system maintenance tasks?

A. Workload partitionsB. Dynamic logical partitionsC. Dedicated logical partitionsD. Virtualized logical partitions

Correct Answer: ASection: (none)

Page 15: POWER SYSTEMS WITH POWER7 AND AIX TECHNICAL · PDF fileB. System Builder Redbook ... plus DB2 pureScale running the database partition and Tivoli Systems Automation for the application

Explanation

QUESTION 48The system administrator at a university has many standalone machines and wants to consolidate them,minimizing the amount of time to upgrade all of the operating systems. Which of the following solutionssupports the requirement?

A. MicropartitionsB. Logical PartitionsC. Dynamic PartitionsD. Workload Partitions

Correct Answer: DSection: (none)Explanation

QUESTION 49System software for the Power 780 server is licensed at which tier?

A. LargeB. SmallC. MediumD. Enterprise

Correct Answer: ASection: (none)Explanation

QUESTION 50An IT director needs to deploy 3 partitions, each using dedicated internal boot disk. Which system will supportthe customer requirement using the least amount of rack space?

A. Power 770 serversB. Power 750 serversC. Power 755 serversD. Power 720 servers

Correct Answer: ASection: (none)Explanation

Explanation/Reference:

QUESTION 51A customer is evaluating using the PCIe SSD adapter for the system boot in their new Power 750. Redundancyand hotswap capability are required. What configuration supports the customer requirements?

A. Configure the PCIe SSD adapter and drive modules as a JBODB. Configure a pair of mirrored PCIe SSD adapters and drive modulesC. Configure the PCIe SSD adapter and drive modules in a RAID6 arrayD. Configure the PCIe SSD adapter and drive modules in a RAID5 array

Page 16: POWER SYSTEMS WITH POWER7 AND AIX TECHNICAL · PDF fileB. System Builder Redbook ... plus DB2 pureScale running the database partition and Tivoli Systems Automation for the application

Correct Answer: BSection: (none)Explanation

QUESTION 52A company runs very large database applications on multiple HPUX servers. They recently upgraded the devicedrivers for their fibre channel HBAs and have suffered numerous crashes on several systems. Which feature ofPower Systems running AIX would help eliminate this problem during prerelease Testing of a new devicedriver?

A. Redundant VIO serversB. Storage Protection KeysC. Electronic Service AgentD. NPIV support in the kernel

Correct Answer: BSection: (none)Explanation

Explanation/Reference:

QUESTION 53A customer wants to run DB2 on a Power 780 with uncapped partitions. They have licensed DB2 for 32 of the64 active cores, and will use it in multiple partitions. How can the customer ensure that the number of licensespurchased for DB2 is not exceeded?

A. Create a 32core shared processor pool for the DB2 partitions.B. Limit the number of virtual processors on each DB2 partition to 32.C. Use the IBM License Metric Tool to dynamically manage DB2 usage in the partitions.D. Set the 'Desired Processing Units' in each DB2 partition profile so that the sum of all partitions equals 32.

Correct Answer: ASection: (none)Explanation

QUESTION 54A customer has two Power 770 systems with 4 enclosures each. Thirty two cores and 1TB of memory areactivated on each system. Each system has 3 database partitions and each partition has 10 cores and 300GBof memory. Which solution will provide automated recovery of unplanned outages at least cost?

A. Purchase PowerVM Enterprise Edition. Use System Director to automate Live PartitionMobility to recover from partition failure.

B. Create additional shared processor partitions as standby nodes. Use PowerHA SystemMirror to activateand use CoD resources when a failover occurs.

C. Purchase an additional 32core Power 750 with PowerHA SystemMirror Standard Edition. Use the newsystem as standby node with the XD component of PowerHA.

D. Purchase an additional Power 770 system. Locate production and standby database partitions on eachsystem. Use DB2 pureScale to provide automated partition monitoring and failover.

Correct Answer: BSection: (none)Explanation

Page 17: POWER SYSTEMS WITH POWER7 AND AIX TECHNICAL · PDF fileB. System Builder Redbook ... plus DB2 pureScale running the database partition and Tivoli Systems Automation for the application

QUESTION 55A customer has ten RS/6000 Model M80, two pSeries 690 Model 681, five POWER5 510 and two POWER6560 machines installed and running commercial applications. They want to do a server consolidation study inorder to replace the existing systems with POWER7 systems. What performance metric is recommended whenevaluating the replacement system?

A. IBM CPWB. IBM rPerfC. SPECint_rate2006D. IDEAS International RPE2

Correct Answer: BSection: (none)Explanation

QUESTION 56`Which of the following is a correct statement about rPerf?

A. It can only be used on systems running without partitions.B. It is relevant for IBM systems running the AIX operating system.C. It is the main benchmark for sizing systems that will run HPC applications.D. It has a direct relationship with other benchmarks like TPCC and SpecjAppServer2004.

Correct Answer: BSection: (none)Explanation

QUESTION 57The systems administrator of a large manufacturer has POWER5 and POWER6 servers, each with LPARsrunning AIX 6.1. They are running several workloads including SAP, DNS, Oracle, DB2 and WebSphereApplication Server, and plan to consolidate onto one POWER7 server. How can the system administratordetermine how much benefit Active Memory Expansion (AME) could provide for the consolidated system?

A. Run amepat now on all of the existing LPARs.B. Run amepat after consolidation on all LPARs.C. Run amepat now on all existing LPARs running on the POWER6 servers.D. Run amepat now on all existing LPARs running database applications.

Correct Answer: ASection: (none)Explanation

QUESTION 58Which of the following virtualization options are unique to AIX and PowerVM compared to other UNIX basedofferings?

A. Software virtualization through PowerVM and hardware virtualization through IBM SystemsDirector.

B. Hardware virtualization through Workload Partitions (WPARS) and software virtualization through PowerVM.C. Software virtualization through Workload Partitions (WPARS) and hardware virtualization through PowerVM.

Page 18: POWER SYSTEMS WITH POWER7 AND AIX TECHNICAL · PDF fileB. System Builder Redbook ... plus DB2 pureScale running the database partition and Tivoli Systems Automation for the application

D. Hardware virtualization through Workload Partitions (WPARS) and software virtualization through IBMSystems Director.

Correct Answer: CSection: (none)Explanation

QUESTION 59A Power Systems customer would like to upgrade their HMC to the latest version of software to support a newhardware feature. What resource will help identify dependencies for firmware and system software for theirupgrade?

A. ITSO RedbooksB. Facts and FeaturesC. System Planning ToolD. Fix Level Recommendation Tool

Correct Answer: DSection: (none)Explanation

QUESTION 60An electrician needs to know what type of receptacle is required. What is the most uptodate resource to identifythe plug type for the feature code ordered?

A. InfocenterB. ITSO RedbooksC. Facts and FeaturesD. System Planning Tool

Correct Answer: ASection: (none)Explanation

QUESTION 61A Power 770 customer needs to add additional I/O adapters. There is no room for the cards, so an I/O drawermust be added. What resource will help identify supported I/O drawers and the maximum number of drawerspermitted per loop?

A. I/O Planning GuideB. Power Systems data sheetC. Power Systems Facts and FeaturesD. Run FLRT to recommend I/O features

Correct Answer: CSection: (none)Explanation

QUESTION 62After purchasing the Active Memory Expansion (AME) Enablement Feature, what tasks must be completedbefore AME can be used?

Page 19: POWER SYSTEMS WITH POWER7 AND AIX TECHNICAL · PDF fileB. System Builder Redbook ... plus DB2 pureScale running the database partition and Tivoli Systems Automation for the application

A. Enable using active partition properties with DLPAR.B. Enter the activation key via the AIX 6.1 command line and reboot AIX.C. Enter the activation key via the HMC, power cycle the managed system and start the LPAR.D. Enter the activation key via the HMC, modify the partition profile, and restart the LPAR.

Correct Answer: BSection: (none)Explanation

QUESTION 63What operating system is required to support Active Memory Expansion?

A. AIX 6.1B. AIX 5.3C. Red Hat 10D. SUSE LINUX 11

Correct Answer: ASection: (none)Explanation

QUESTION 64A proposed server architecture includes SAN LUNs being presented to client LPARs using shared HBAs toreduce infrastructure cost. The customer requires minimal management efforts for the dual VIO Servers. Whichtechnology is recommended for this proposal?

A. NPIVB. vSCSIC. Arbitrated loopD. Converged adapter

Correct Answer: ASection: (none)Explanation

QUESTION 65A customer has a requirement to eliminate single points of failure for an application. They have allocated oneEthernet adapter to each VIO server on the system. Which features ofPowerVM and AIX will support the customer requirement?

A. Etherchannel and trunkingB. Network Interface Backup and EtherchannelC. Shared Ethernet Adapter (SEA) Failover and EtherchannelD. Network Interface Backup and Shared Ethernet Adapter failover

Correct Answer: DSection: (none)Explanation

QUESTION 66A customer would like to consolidate multiple database workloads to a single server to reduce TCO. What is

Page 20: POWER SYSTEMS WITH POWER7 AND AIX TECHNICAL · PDF fileB. System Builder Redbook ... plus DB2 pureScale running the database partition and Tivoli Systems Automation for the application

the effect of PowerVM on TCO?

A. Reduces SAN costB. Reduces network costC. Reduces administration costsD. Reduces software licensing cost

Correct Answer: CSection: (none)Explanation

QUESTION 67A Power 720 has AIX 6.1 and Linux partitions. During normal workloads there is more than enough memoryavailable to the LPARs. During monthend processing one partition becomes memory constrained. What canhelp overcome this situation?

A. Active Memory Sharing (AMS)B. Active Memory Expansion AME)C. Integrated Virtual Memory (IVM)D. Memory Capacity on Demand CoD)

Correct Answer: ASection: (none)Explanation

QUESTION 68An AIX 5.3 customer has a Power 780 in a 2meter (T42) rack. This rack needs to be moved six inches (15cm)to allow underfloor access. What preparation for moving the rack will result in the least disruption to endusers?

A. Initiate LPAR fallover to backup systems.B. Use Live Partition Mobility to move the LPARs to other systems.C. Use Live Application Mobility to move critical applications to alternate systems.D. Back up all LPARS to a NIM server and restore them to other LPARs on other systems.

Correct Answer: BSection: (none)Explanation

Explanation/Reference:

QUESTION 69A customer has multiple application servers which create one process for each connected user. All users sharethe same AIX environment. What is a benefit of using WPARs in this environment?

A. WPARs give more controls for resource management than the traditional AIX operating system tools.B. WPARs support Live Application Mobility which can be used to balance user processes across systems.C. WPARs each have a copy of the AIX kernel, offering better availability than a system without WPARs.D. WPARs provide the ability to apply fixes specific for each environment, enabling the customer to create

specialized application servers.

Correct Answer: BSection: (none)

Page 21: POWER SYSTEMS WITH POWER7 AND AIX TECHNICAL · PDF fileB. System Builder Redbook ... plus DB2 pureScale running the database partition and Tivoli Systems Automation for the application

Explanation

QUESTION 70What advantages do WPARs have over LPARs?

A. Security is isolated by the HMCB. Support Live Partition MobilityC. Operating system faults are isolatedD. Reduced system management during upgrades

Correct Answer: DSection: (none)Explanation

QUESTION 71Which of the following is a correct statement about Workload Partitions (WPARs)?

A. WPARs use dedicated cores and shared memory.B. WPARs are restricted to using dedicated resources.C. WPARs share the resources of a single AIX instance.D. WPARs use shared cores, memory, and dedicated network adapters.

Correct Answer: CSection: (none)Explanation

Explanation/Reference:

QUESTION 72A financial company is auditing to ensure their systems are safe from external attack. They have just purchasednew Power 750 servers. Which features of AIX 6.1 will help in the auditing process?

A. IPSec and Kerberos AuthenticationB. Secure By Default and AIX Security ExpertC. Trusted Execution and Role Based Access ControlD. First Failure Data Capture and Storage Protection Keys

Correct Answer: BSection: (none)Explanation

Explanation/Reference:

http://www.gratisexam.com/

QUESTION 73

Page 22: POWER SYSTEMS WITH POWER7 AND AIX TECHNICAL · PDF fileB. System Builder Redbook ... plus DB2 pureScale running the database partition and Tivoli Systems Automation for the application

A customer is moving from an HPUX environment to an AIX environment. They will be producing a masterimage of the environment and will need to install it into hundreds of LPARs and WPARs. Which AIX tool will beof most use in this case?

A. NIMB. smitC. SUMAD. netboot

Correct Answer: ASection: (none)Explanation

QUESTION 74A customer has a new Power 720 with PowerVM Standard Edition. They plan to migrate their single partitionPOWER5 550 to the new Power 720. How can the customer migrate from the POWER5 550 to the Power 720with minimal effort and down time?

A. Perform Live Partition Mobility between the two systems.B. Move the boot disks from the old system to the new system.C. Use Tivoli Storage Manager to back up the POWER5 550 and restore on the Power 720.D. Upgrade AIX to the latest level on the POWER5 550 and clone using the mksysb command.

Correct Answer: DSection: (none)Explanation

Page 23: POWER SYSTEMS WITH POWER7 AND AIX TECHNICAL · PDF fileB. System Builder Redbook ... plus DB2 pureScale running the database partition and Tivoli Systems Automation for the application

Exam B

QUESTION 1How is Active Memory Expansion (AME) licensed

A. One license per systemB. One license per core used for AMEC. One license per each AIX licenseD. One license per active core in a system

Correct Answer: ASection: (none)Explanation

QUESTION 2What is the effect of PowerVM on TCO?

A. Lower network costs using FCoEB. Lower enviromental costs using ActivEnergy ManagerC. Lower software licensing cost using micro-partitioningD. Lowing administration costs using Active memory Expansion

Correct Answer: DSection: (none)Explanation

QUESTION 3What is a benefit of Live Partition mobility(LPM)?

A. It reduces unplanned down timeB. It automatically moves workloads to avaliable resourcesC. It moves processor activations from one system to anotherD. It aids in migration from POWER6 to POWER7 processor-based servers.

Correct Answer: DSection: (none)Explanation

QUESTION 4What is a benift of active memory sharing?

A. Active Memory Sharing can be used in parallel with Active Memory Expansion.B. The administrator can manuallyissue a dynamic memory reconfiguration command.C. The system automatically determines the optimal distribution of the physical memory.D. Active Memory Sharing can be exploited to decrease memory use on the system by increasing the global

memory.

Correct Answer: CSection: (none)Explanation

Page 24: POWER SYSTEMS WITH POWER7 AND AIX TECHNICAL · PDF fileB. System Builder Redbook ... plus DB2 pureScale running the database partition and Tivoli Systems Automation for the application

QUESTION 5What is the most up-to-date resource a Power System seller can use to verify if an adapter is supported on aPOWER7 server?

A. Sales ManualB. System Builder RedbookC. Installation Planning ReferenceD. Customer Specified Placement Tool

Correct Answer: ASection: (none)Explanation

QUESTION 6Which type of dump describes the Minidump Facility available with AIX 5.3?

A. A granular dump.B. A small compressed dumpC. An optimized compressed dumpD. A dump taken while the partition is restarting.

Correct Answer: BSection: (none)Explanation

QUESTION 7Ac ustomer wants to ru serveral appliacation servers. They will deploy WebSphere Application Server(WAS) onAIX 6.1 and Tomcat running on AIX 5.3.Which solution allows improved system utilization while minimizing management efforts?

A. Create one micro-partion for each Tomcat erver. Create one micro-partition for each WAS instance.B. Create a single micro-partition with an AIX 6.1 global area. Create seperate AIX5.3 and AIX 6.1 WPARs for

Tomcat and WASC. Create micro-partitions for each Tomcat server running on AIX 5.3. Create micro-partitions for each WAS

instance running on AIX 6.1.D. Create one micro-partition for each Tomcat server runing on AIX 5.3 Create one micro-partition with AIX 6.1

and run all the WAS instances inside WPARs.

Correct Answer: DSection: (none)Explanation

QUESTION 8Which solution provides a cost effective to tape backup?

A. AIX Backup managerB. IBM System DirectorC. IBM RDX Removable DiskD. Solid State Drive(SSD)

Correct Answer: CSection: (none)

Page 25: POWER SYSTEMS WITH POWER7 AND AIX TECHNICAL · PDF fileB. System Builder Redbook ... plus DB2 pureScale running the database partition and Tivoli Systems Automation for the application

Explanation

QUESTION 9How frequently are Technology Level updates released for AIX v6.1 and later?

A. Every 6 monthsB. Every 12 monthsC. Every 18 monthsD. Every 24 months

Correct Answer: BSection: (none)Explanation

QUESTION 10A customer needs to consolidate serveral applications. One of the applications has a large number of kernalextensions and is sensitive to any changes. Which partition type should the customer use to consolidate theapplications?

A. Logical PartitionsB. Worldload PartitionsC. Software PartitionsD. Application Partitions

Correct Answer: ASection: (none)Explanation

QUESTION 11When designing a high availability solution with PowerHA SystemMirror, how should the network adapters beconfiguredin order to provide redundant acces to the network?

A. One dual-port adapter can be used providing Etherchannel is configure for each port.B. Both a physical and a virtual adapter are required to provide redundant access to the network.C. A minmun of two distinct network adapters should be configured with IP address Takeover for these

adapters.D. PowerHA SystemMirror Enterprise Edition must be configurated in order to support IP address Takeover for

virtual network adapters.

Correct Answer: CSection: (none)Explanation

QUESTION 12A customer purchased towo Power system server to use as application servers and has finished installing theoperatin system and application on one. The customer wants to duplicate the first system on the secondsystem. Which command can be used for this porcess?

A. tarB. mksysbC. backup

Page 26: POWER SYSTEMS WITH POWER7 AND AIX TECHNICAL · PDF fileB. System Builder Redbook ... plus DB2 pureScale running the database partition and Tivoli Systems Automation for the application

D. savevg

Correct Answer: BSection: (none)Explanation

QUESTION 13A customer needs to connect a Power 750 server to the SAN and Ethernet enviroments using Fibre Channelover Ethernet(FCoE) adapters. What is required to support this envirment?

A. An Ethernetchannel-capable network switch.B. An Ethernet and Fibre channel converged switch.C. A fibre channel switch with an Ethernet interconnect.D. An Ethernet switch with a fibre channel bridging feature.

Correct Answer: BSection: (none)Explanation

QUESTION 14A customer has Power 710 with 8 active cores annd 64GB RAM. All of the internal disks are fully utilized. Overa period of a few months, the systems administrator has adjusted and optimized the amount of CPU andmemory allocated to each of the LPARs, all of which run database applications. All of the LPARs haveuncapped shared processord and are operating well within their CPU allocation but are becoming memoryconstrained. Which solution will relieve the memory constraint?

A. Configure AMSB. Install more memoryC. Create Sharerd Memory PoolsD. Purchase an AME activation key

Correct Answer: DSection: (none)Explanation

QUESTION 15Which servers will have the same per-core costs for AIX and PowerVM?

A. Power 770 and 795B. Power 750 and Power 770C. Power 755 and Power 770D. BladeCenter PS740 blade and Power 750

Correct Answer: DSection: (none)Explanation

QUESTION 16An electrician needs to know what type of receptacle is required. What is the most uptodate resource to identifythe plug type for the feature code ordered?

Page 27: POWER SYSTEMS WITH POWER7 AND AIX TECHNICAL · PDF fileB. System Builder Redbook ... plus DB2 pureScale running the database partition and Tivoli Systems Automation for the application

A. InfocenterB. ITSO RedbooksC. Facts and FeaturesD. System Planning Tool

Correct Answer: ASection: (none)Explanation

QUESTION 17A Power 770 customer needs to add additional I/O adapters. There is no room for the cards, so an I/O drawermust be added. What resource will help identify supported I/O drawers and the maximum number of drawerspermitted per loop?

A. I/O Planning GuideB. Power Systems data sheetC. Power Systems Facts and FeaturesD. Run FLRT to recommend I/O features

Correct Answer: CSection: (none)Explanation

QUESTION 18Which of the following is a correct statement about Workload Partitions (WPARs)?

A. WPARs use dedicated cores and shared memory.B. WPARs are restricted to using dedicated resources.C. WPARs share the resources of a single AIX instance.D. WPARs use shared cores, memory, and dedicated network adapters.

Correct Answer: CSection: (none)Explanation

QUESTION 19A financial company is auditing to ensure their systems are safe from external attack. They have just purchasednew Power 750 servers. Which features of AIX 6.1 will help in the auditing process?

A. IPSec and Kerberos AuthenticationB. Secure By Default and AIX Security ExpertC. Trusted Execution and Role Based Access ControlD. First Failure Data Capture and Storage Protection Keys

Correct Answer: BSection: (none)Explanation

QUESTION 20A Power Systems customer would like to upgrade their HMC to the latest version of software to support a newhardware feature. What resource will help identify dependencies for firmware and system software for their

Page 28: POWER SYSTEMS WITH POWER7 AND AIX TECHNICAL · PDF fileB. System Builder Redbook ... plus DB2 pureScale running the database partition and Tivoli Systems Automation for the application

upgrade?

A. ITSO RedbooksB. Facts and FeaturesC. System Planning ToolD. Fix Level Recommendation Tool

Correct Answer: DSection: (none)Explanation

Explanation/Reference:

Page 29: POWER SYSTEMS WITH POWER7 AND AIX TECHNICAL · PDF fileB. System Builder Redbook ... plus DB2 pureScale running the database partition and Tivoli Systems Automation for the application

Exam C

QUESTION 1A customer has applications that run on Power4 servers that require AIX 5.2 the customer wants to update thehardware. Which upgarde meets the customer's requirements?

A. POWER6 servers running AIX 5.2B. POWER6 server running AIX 6.1 with AIX 5.2 WAPARs.C. POWER7 server running AIX 6.1 with AIX 5.2 WAPARs.D. POWER7 server running AIX 7.1 with AIX 5.2 WAPARs.

Correct Answer: DSection: (none)Explanation

QUESTION 2A customer has an 8-core Power 720 with three partitions. the Power 720 is configured with an AIX 6.1 partitionusing 2.3 processors, an AIX 7.1 parition using 3.5 processors and a Linux partition using 1.8 processors. Thecustomer wants to purchase a duplicate Power 720 and create an active to passive PowerHA disaster recoversolution. How many licenses of PowerHA SystemMirror for AIX are required for this solution?

A.B.C.D.

Correct Answer: Section: (none)Explanation

QUESTION 3What is a benefit of consolidating environments using WPARs within micro-partitions?

A. Micro-partitions with different operating system verions can be creates from the command line and SMITinterface within a WPAR.

B. micro-partitions reduce the I/O requirements by sharing adapters and WPARs enable partitions to bemoved using Live Partition mobility.

C. WPARs offer isolation between operating system instances, and micro-partitions provide flexible operatingsystem tuning for better performance.

D. micro-partitions provide the ability to share processing resources, while WPARs offer the ability to reduceoperating system management efforts.

E. WPARs allow multiple enviroments to be consolidated onto single partitions, and micro-partitions enablepartitions to be moved using LivePartition mobility.

Correct Answer: DSection: (none)Explanation

QUESTION 4Which security capability of AIX allows for improved efficiency, reduced admistration costs and betteradherence to bussiness audit guidelines by allowing administrative tasks to be delegated to non-root users?

A. AIX Security Expert

Page 30: POWER SYSTEMS WITH POWER7 AND AIX TECHNICAL · PDF fileB. System Builder Redbook ... plus DB2 pureScale running the database partition and Tivoli Systems Automation for the application

B. Role Based Access controlC. Filesystem Permissions ToolD. Resource Access Control Facility

Correct Answer: BSection: (none)Explanation

QUESTION 5A financial company si auditing to sure their systems are safe from external attack. They have just purchasednew Power 750 server. Which features of AIX 6.1 will help in the auditing process?

A. IPSec and Kerberos AuthenticationB. Secure by Default and AIX Security ExpertC. Trusted Exceution and Role Based Access ControlD. First Failure Date capture and Storage Protection Keys

Correct Answer: BSection: (none)Explanation

QUESTION 6A customer si running an HR application with AIX 5.2 on a Power5 processor-based system. the systemis atmaximun capacity and there are performance problems. Due to application restrictions, the customer cannotrun the application on AIX 5.3 or 6.1. What should the customer do to solve the performance problem?

A. Migrate to a Power7 processor-based system with AIX 7 and run AIX 5.2 inside a WPARB. Upgrade AIX5.2 to AIX 7.1.1 amnd set the Compatibility Runtie flag in the partition profile.C. migrate to a power6 processor-based system with 5GHz processors and move AIX 5.2 to the new serverD. migate to a power7 processor-based system with 3GHz processors and upgrade AIX5.2 to the latest

technology level

Correct Answer: ASection: (none)Explanation

QUESTION 7A petroleum company si replaceing its reservoir modeling hihg Performance Computering solution with a newerfaster soluition. The software runs on AIX 6.1. The current enviroment is based on the sammesoftware runningon a cluster of Power 550 systems. the company is planning to move the Power 755 systems, adding 50% inperformance wwhen compared to the existing solution. Which performance metric should be used to estimatethe number of system and cores requird?

A. CPWB. rPerfC. SPECint_2006D. SPECfp_rate2006

Correct Answer: DSection: (none)Explanation

Page 31: POWER SYSTEMS WITH POWER7 AND AIX TECHNICAL · PDF fileB. System Builder Redbook ... plus DB2 pureScale running the database partition and Tivoli Systems Automation for the application

QUESTION 8Which AIX Edition includesall components nessary for Live Application mobility?

A. BasicB. ExpressC. StandardD. Enterprise

Correct Answer: DSection: (none)Explanation

QUESTION 9A customer has two Power System servers, each in a different data center, which the customer would like touse ato provide a highly available enviroment. The data centers are across the street from each other andshare TCP/IP and SAN enviroments. The customer recently purchased PowerHA SystemMirror to manageavailablilty. Both system are capable of running their mission-critical applications, but they have different typesof storage. one system has its data stored on a DS8800, while the other used an XIV. PowerHAcannot beimplemented because repliaction of data between systems was not taken into consideration. how can thecustomer solve this prblem?

A. Add TPC for ReplicationB. Upgarde to PowerHA SystemMirror Enterprise EditionC. Use Enhanced Concurrent logiccal volume Manager(CLVM)D. Deploy IBM System Storage data Center Fabric manager (DCFM)

Correct Answer: BSection: (none)Explanation

QUESTION 10A customer is running a production application in an LPAR on a Power 750. and nultiple development WorkloadPartitions(WPARs) in another partition on the same system. What is a benefit of WPARs in this scenariowhenrelated to unexperted processing demands?

A. Development WPARs do not interfere with the protection LPAR since they run in different aprtitions, isolatedfrom each other.

B. WPARS share a single operating system image, lowering the efforts requred to perform operating systemmaintenance, management and updates.

C. The development WPARs could be moved from one physical system to another application mobility, andresources reallocated to the production partition.

D. WPAPRs can have both shared and provate filesystems, allowing for specific application read/writerequirements to be satised, as well as keeping management efforts reduced.

Correct Answer: CSection: (none)Explanation

QUESTION 11An IT manager, new to Power Systems, wants guidance on AIX support strategy for planning purposes. Whichof the following statements about the AIX Roadmap address the customer request?

Page 32: POWER SYSTEMS WITH POWER7 AND AIX TECHNICAL · PDF fileB. System Builder Redbook ... plus DB2 pureScale running the database partition and Tivoli Systems Automation for the application

A. One TL update is released every twelve months.B. Two TL updates are released every twelve months.C. Four TL updates are released every twelve months.D. Three TL updates are released every twelve months.

Correct Answer: BSection: (none)Explanation

QUESTION 12A customer has purchased two servers which need several identical LPAR profiles defined. What resourceallows an administrator to create LPAR definitions and import them into the HMC?

A. SPTB. WLEC. NIMD. eConfig

Correct Answer: ASection: (none)Explanation

QUESTION 13A customer wants to know how to find the latest updates for their particular system. Which of the followingshould be recommended?

A. Use the System Planning Tool (SPT).B. Use the Fix Level Recommendation Tool (FLRT) website.C. Find the latest version of AIX from Strength to Strength on the IBM Website.D. Receive the latest updates via email with a Software Maintenance Agreement(SWMA).

Correct Answer: BSection: (none)Explanation

QUESTION 14A customer wants to run several application servers. They will deploy WebSphere Application Server (WAS) onAIX 6.1 and Tomcat running on AIX 5.3. Which solution allows improved system utilization while minimizingmanagement efforts?

A. Create one micro-partition for each Tomcat server. Create one micro-partition for each WAS instance.B. Create a single micro-partition with an AIX 6.1 global area. Create separate AIX 5.3 and AIX 6.1 WPARs for

Tomcat and WAS.C. Create micro-partitions for each Tomcat server running on AIX 5.3. Create micro-partitions for each WAS

instance running on AIX 6.1.D. Create one micro-partition for each Tomcat server running on AIX 5.3. Create one micro- partition with AIX

6.1 and run all the WAS instances inside WPARs.

Correct Answer: DSection: (none)Explanation

Page 33: POWER SYSTEMS WITH POWER7 AND AIX TECHNICAL · PDF fileB. System Builder Redbook ... plus DB2 pureScale running the database partition and Tivoli Systems Automation for the application

QUESTION 15Which AIX edition is intended for price sensitive situations involving smaller workloads?

A. AIX Basic EditionB. AIX Entry EditionC. AIX Express EditionD. AIX Standard Edition

Correct Answer: CSection: (none)Explanation

QUESTION 16A customer would like to buy a new Power 750 and attach 2 PCIe I/O drawers. What is the minimumconfiguration which will support this?

A. One processor card and one GX+ expansion cardB. Two processor cards and one GX++ expansion cardC. One processor card, one GX+ expansion card, and one GX++ expansion cardD. Two processor cards, one GX+ expansion card, and one GX++ expansion card

Correct Answer: CSection: (none)Explanation

QUESTION 17A customer has three 8-core servers at their office in a PowerHA cluster. Two of the servers actively supportthe database, and the third server is in a backup/standby mode. What is the minimum number of PowerHAlicenses required to support the environment?

A. 16B. 17C. 18D. 24

Correct Answer: BSection: (none)Explanation

Explanation/Reference:

QUESTION 18A customer has a Power Systems 750 with PowerVM Standard Edition and Active Memory Expansion (AME).They have these LPARs defined: In which LPARs is AME supported?

A. LPAR1B. LPAR2C. LPAR1 and LPAR3D. LPAR2 and LPAR4

Correct Answer: B

Page 34: POWER SYSTEMS WITH POWER7 AND AIX TECHNICAL · PDF fileB. System Builder Redbook ... plus DB2 pureScale running the database partition and Tivoli Systems Automation for the application

Section: (none)Explanation

QUESTION 19A potential customer plans to deploy a new application on a RISC-based server. They are considering UNIXofferings from IBM and Sun. Which of the following statements are advantages of AIX over Solaris?

A. AIX supports journaled filesystems.B. AIX supports a graphical management tool.C. AIX has a suite of workload management and performance tools.D. AIX supports application mobility without requiring a shut down.

Correct Answer: DSection: (none)Explanation

QUESTION 20What is the most up-to-date resource a Power Systems seller can use to verify if an adapter is supported on aPOWER7 server?

A. Sales ManualB. System Builder RedbookC. Installation Planning ReferenceD. Customer Specified Placement Tool

Correct Answer: ASection: (none)Explanation

Explanation/Reference:

Page 35: POWER SYSTEMS WITH POWER7 AND AIX TECHNICAL · PDF fileB. System Builder Redbook ... plus DB2 pureScale running the database partition and Tivoli Systems Automation for the application

Exam D

QUESTION 1A customer is deploying highly critical Web applications with dynamic workload characteristics on multiplePower Systems servers. Which features of PowerVM can help the customer to deploy the applications?

A. Uncapped LPARs and WPARsB. Workload Manager and WPARsC. Uncapped LPARs and Live Partition MobilityD. Shared processor pool and Active Memory Expansion

Correct Answer: CSection: (none)Explanation

QUESTION 2A customer has 4 systems:Which of these systems is a candidate for Active Memory Expansion (AME)?

A. SystemAB. SystemBC. SystemCD. SystemD

Correct Answer: DSection: (none)Explanation

QUESTION 3A customer is concerned about the stability and availability of an application with a large number of kernelextensions. Which of the following can improve the application availability?

A. Security ExpertB. Application KeysC. Checkpoint RestartD. Storage Protection Keys

Correct Answer: DSection: (none)Explanation

QUESTION 4A customer is interested in PS700 Blade with 32GB of memory. The Blade will have 4 partitions sharingresources equally. They are looking for the least expensive operating system that supports Live PartitionMobility. Which of the following AIX Editions address their requirement?

A. BasicB. ExpressC. StandardD. Enterprise

Correct Answer: ASection: (none)

Page 36: POWER SYSTEMS WITH POWER7 AND AIX TECHNICAL · PDF fileB. System Builder Redbook ... plus DB2 pureScale running the database partition and Tivoli Systems Automation for the application

Explanation

QUESTION 5A customer is planning to deploy several Web servers in a dedicated partition running AIX 6.1. What would bea benefit of using Workload Partitions (WPARs) in this environment?

A. WPARs offer better software isolation than traditional shared processor partitions.B. WPARs can share system files from the global environment, simplifying the installation of operating system

fixes.C. Software licensing can be reduced if the WPARs are limited to use a single core each, since only one

WPAR needs to have software licenses.D. Each Web server can have its own version of the operating system kernel, but still benefit from sharing the

system files from the global environment.

Correct Answer: BSection: (none)Explanation

QUESTION 6A customer has a Power Systems server with EMC disk attached at a Disaster Recovery site 30 miles away.The remote site has no operations staff. The customer would like to implement an automated failover solutionfor their production application environment. Which solution will satisfy the customer requirement?

A. DataGuard Enterprise EditionB. IBM Systems Director VMControlC. PowerHA SystemMirror Enterprise EditionD. PowerPath with Peer to Peer Remote Copy (PPRC)

Correct Answer: CSection: (none)Explanation

QUESTION 7A petroleum company is replacing their reservoir modeling High Performance Computing solution with a newer,faster solution. The software runs on AIX 6.1. The current environment is based on the same software runningon a cluster of Power 550 systems. They are planning to move to the Power 755 systems, adding 50% inperformance when compared to the existing solution. Which performance metric should be used to estimatethe number of machines and cores required?

A. SPECint2006B. SPECfp_rate2006C. SPECjAppServer2004D. SAP SD 2-Tier benchmark

Correct Answer: BSection: (none)Explanation

QUESTION 8A customer is implementing multiple partitions on a Power 780 system. They will use mksysb to back up AIXand want to minimize the number of tape cartridges used for the backup. Which solution addresses thecustomer concerns?

Page 37: POWER SYSTEMS WITH POWER7 AND AIX TECHNICAL · PDF fileB. System Builder Redbook ... plus DB2 pureScale running the database partition and Tivoli Systems Automation for the application

A. Configure NPIV on the Virtual I/O Server and use it to back AIX up to a SAN-attached tape library.B. Add one tape device in each CEC on the 780 and dynamically assign them to the AIX partitions for backup.C. Create a NIM Master for network backups. Use NIM to back up the other partitions to internal disk, and copy

the images to a tape.D. Use VIO Server to configure a virtual tape device across partitions. Allocate the virtual tape device to one

partition at a time and perform the AIX backup to the tape.

Correct Answer: CSection: (none)Explanation

QUESTION 9A customer is running multiple business critical applications in a single LPAR with multiple WPARs. One of theapplications requires an AIX fix to be installed to improve the stability of the application. What will ensure theAIX fix does not affect other applications running in the LPAR?

A. Install the fix in the WPAR without committing.B. Use the eFix tool to install the fix to the WPAR only.C. Stop all the applications, install the fix and then start WPARs one by one.D. Move the application which needs the fix to another LPAR and apply the fix there.

Correct Answer: DSection: (none)Explanation

Explanation/Reference:

http://www.gratisexam.com/

QUESTION 10A Power 750 customer will be deploying several Web servers. What benefit would be provided by WorkloadPartitions (WPARs) in this environment?

A. WPARs allow sharing of the Web server executables.B. WPARs are easily created from the HMC profile menu.C. WPARs allow the Web servers to have direct access to the system hardware.D. WPARs allow each of the Web servers' root user to control the global environment.

Correct Answer: ASection: (none)Explanation

QUESTION 11Which Edition of Systems Director should be recommended to an IT Director who wants performance analysisand capacity trend analysis reporting?

Page 38: POWER SYSTEMS WITH POWER7 AND AIX TECHNICAL · PDF fileB. System Builder Redbook ... plus DB2 pureScale running the database partition and Tivoli Systems Automation for the application

A. Systems Director Express EditionB. Systems Director Standard EditionC. Systems Director Enterprise EditionD. Systems Director Standard Edition with the Capacity Analysis Plug-In

Correct Answer: CSection: (none)Explanation

QUESTION 12A customer plans to consolidate two existing POWER6 processor-based servers to a Power 770. In what waywill Live Partition Mobility benefit them?

A. It enables hot-swap of adapters from the old systems to the new system.B. The old and new systems can be run in parallel to test new system functionality.C. LPARs can be moved from the old systems to the new one while they are still runningD. The system serial number will remain the same after the upgrade for accounting purposes.

Correct Answer: CSection: (none)Explanation

QUESTION 13A customer has systems with AIX 6.1 and 5.3 distributed across two data centers located 8km apart. They wantto implement high availability with automated application restart and synchronous data replication between theIBM Systems Storage DS8700 systems which are installed in each datacenter. Which solution addresses thecustomer requirements?

A. Use the Geographic Logical Volume Manager (GLVM) for MetroMirror, and Live Partition Mobility toautomate partition migration upon failure

B. Use MetroMirror for the AIX volumes and High Availability Disaster Recovery (HADR) to automate partitionmigration and restart upon failure.

C. Use the Geographic Logical Volume Manager (GLVM) for MetroMirror to replicate the data between the twosites and automate application recovery.

D. Use MetroMirror for the AIX volumes, and PowerHA SystemMirror Enterprise Edition to automate failover ofMetroMirror pairs and automate application recovery.

Correct Answer: DSection: (none)Explanation

QUESTION 14Which of the following describes the advantage of using Fibre Channel over Ethernet (FCoE) in POWER6 andPOWER7 Blades?

A. The FCoE card provides both LAN and fibre channel function from a single card on the blade.B. The FCoE advanced technology removes the need for any BladeCenter switching to support this function.C. Component reliability on the fibre channel over Ethernet is higher than on regular Ethernet and fibre channel

adapters.D. The AIX device driver for FCoE has been completely rewritten for the current adapter, eliminating errors and

performance issues.

Page 39: POWER SYSTEMS WITH POWER7 AND AIX TECHNICAL · PDF fileB. System Builder Redbook ... plus DB2 pureScale running the database partition and Tivoli Systems Automation for the application

Correct Answer: ASection: (none)Explanation

QUESTION 15A customer needs to share large files across three Power Systems servers to create and validate complexautomotive designs. What IBM solution should be recommended?

A. PowerHA SystemMirrorB. Peer to Peer Remote CopyC. General Parallel File SystemsD. Parallel Operating Environment

Correct Answer: CSection: (none)Explanation

QUESTION 16How many total processor threads are possible when a customer migrates a workload requiring AIX 5.3 froman 8-core Power 550 to an 8-core Power 750?

A. 8B. 16C. 32D. 64

Correct Answer: BSection: (none)Explanation

Explanation/Reference:

QUESTION 17A company is deploying several applications on IBM POWER6 and POWER7 Blade technology, and they wantto move into a Fibre Channel over Ethernet (FCoE) infrastructure. In addition to the required switches in theBladeCenter, which of the following is necessary to address the customer requirement?

A. Install a 10Gbps 2-port Converged Network Adapter.B. Install an 8Gbps 4-Port Converged Network Adapter card.C. Install an Ethernet and 4Gbps Fibre Channel Expansion CardD. Install Ethernet and fibre channel cards, connected into a converged switch

Correct Answer: ASection: (none)Explanation

QUESTION 18A customer has a large database server running online transactions where I/O performance has been thelimiting factor for running business-critical processes. Which statement correctly describes the use of SolidState Disks (SSDs) in this environment?

A. RAID-5 protection should be used on SSDs for best performance.

Page 40: POWER SYSTEMS WITH POWER7 AND AIX TECHNICAL · PDF fileB. System Builder Redbook ... plus DB2 pureScale running the database partition and Tivoli Systems Automation for the application

B. SSDs should be placed where sequential write access is the primary type of I/O.C. Traditional hard disks can be concurrently replaced by SSDs, eliminating downtime.D. SSDs offer better response time than traditional hard disks, reducing total transaction processing time.

Correct Answer: DSection: (none)Explanation

QUESTION 19A customer has hundreds of AIX LPARs and wants to simplify the process of upgrading the operating systems.What will support the customer requirement?

A. mksysbB. restore_vgC. NIM environmentD. smit update_all

Correct Answer: CSection: (none)Explanation

QUESTION 20A customer would like to consolidate multiple database workloads to a single server to reduce TCO. What isthe effect of PowerVM on TCO?

A. Reduces SAN costB. Reduces network costC. Reduces administration costsD. Reduces software licensing cost

Correct Answer: CSection: (none)Explanation

Explanation/Reference:

Page 41: POWER SYSTEMS WITH POWER7 AND AIX TECHNICAL · PDF fileB. System Builder Redbook ... plus DB2 pureScale running the database partition and Tivoli Systems Automation for the application

Exam E

QUESTION 1A customer wants to implement Oracle RAC and is comparing the features and benefits of using either rawdevices or GPFS. What is a benefit of using GPFS in this solution?

A. GPFS is included with AIX Standard Edition for 2-node clusters.B. GPFS offers data protection by implementing a RAID-5-like storage allocation.C. GPFS allows for a cluster with nodes running heterogeneous operating systems.D. GPFS offers the performance capabilities of a raw device and the manageability of a file system.

Correct Answer: DSection: (none)Explanation

QUESTION 2After purchasing the Active Memory Expansion (AME) Enablement Feature, what tasks must be completedbefore AME can be used?

A. Enable using active partition properties with DLPAR.B. Enter the activation key via the AIX 6.1 command line and reboot AIX.C. Enter the activation key via the HMC, power cycle the managed system and start the LPAR.D. Enter the activation key via the HMC, modify the partition profile, and restart the LPAR.

Correct Answer: BSection: (none)Explanation

QUESTION 3A customer has DB2 running on three POWER5 520s with AIX 5.2 and is planning to consolidate the systemson a new Power 740 with AIX 7.1. The customer is reviewing the RPE2 benchmark data to validate that theproposed solution will work. Why should rPerf be used instead of RPE2?

A. The rPerf benchmark is run on every server model to obtain performance data, while RPE2 frequently usesextrapolations.

B. rPerf includes the performance impact to AIX due to the introduction of new features, while RPE2 does notfocus on software versions

C. The rPerf metric considers the number of cores, memory utilization by the applications, I/O transactions,and RPE2 only measures core performance.

D. rPerf is obtained by duplicating the production environment, representing the most accurate performance ofthe installed systems, and RPE2 uses analytical models.

Correct Answer: ASection: (none)Explanation

QUESTION 4What is one of the key benefits of Active Memory Sharing (AMS) to client LPARs?

A. Adds more memory using the On/Off Capacity on Demand featureB. Assigns memory using DLPAR capability according to workload priorityC. Adds additional memory using the Permanent Capacity on Demand feature

Page 42: POWER SYSTEMS WITH POWER7 AND AIX TECHNICAL · PDF fileB. System Builder Redbook ... plus DB2 pureScale running the database partition and Tivoli Systems Automation for the application

D. Adjusts memory dynamically allocation depending on workload characteristics

Correct Answer: DSection: (none)Explanation

QUESTION 5System software for the Power 770 is licensed at what tier?

A. HPCB. SmallC. LargeD. Medium

Correct Answer: DSection: (none)Explanation

QUESTION 6A customer is considering a highly available infrastructure for its SAP application. They have one 48-corePower 770 server running multiple AIX 6.1 partitions for database and application server functions. All thepartitions must recover with the same processing capacity. In addition to storage and networking at asecondary location, what must be added to provide for automatic recovery after a total failure at the primarysite?

A. Two Power 750 systems, plus DB2 pureScale for database and application partitions on both systems.B. One Power 770 system, plus PowerHA SystemMirror Enterprise Edition for database and application

partitions on both systems.C. One Power 750 for each of the database and application partitions, plus PowerHA SystemMirror Standard

Edition licenses for all systems.D. One Power 770 system, plus DB2 pureScale running the database partition and Tivoli Systems Automation

for the application partitions on both systems.

Correct Answer: BSection: (none)Explanation

QUESTION 7Which POWER7 internal storage option improves performance, reduces response time, and increases missioncritical OLTP application productivity?

A. 15K RPM SAS drivesB. Solid State drivesC. 15K RPM SATA drivesD. USB Removable drives

Correct Answer: BSection: (none)Explanation

QUESTION 8Which of the following PowerHA SystemMirror for AIX Enterprise Edition statements is correct?

Page 43: POWER SYSTEMS WITH POWER7 AND AIX TECHNICAL · PDF fileB. System Builder Redbook ... plus DB2 pureScale running the database partition and Tivoli Systems Automation for the application

A. It can scale up to 1024 cluster nodes.B. It provides for application failover without downtime.C. It allows data replication via TCP/IP and host-based remote mirroring.D. It requires all partitions in a system to run the same AIX version and technology level.

Correct Answer: CSection: (none)Explanation

QUESTION 9When differentiating LPARs and WPARs, which statement is correct?

A. WPARs share only operating system resources.B. LPARs share only operating system resources.C. WPARs share operating system and hardware resources.D. LPARs share operating system and hardware resources.

Correct Answer: CSection: (none)Explanation

QUESTION 10Which of the following is enabled by using NPIV technology for fibre channel adapters?

A. Sharing SAN disks as vSCSI disksB. Multipathing and load balancing SAN trafficC. Combining SAN and LAN traffic on one adapterD. Virtualization and sharing of SAN adapters with client LPARs

Correct Answer: DSection: (none)Explanation

QUESTION 11A customer needs to deploy many LPARs on a large Power Server and needs to build and validate the LAPRdefinitions. Which tool should the customer use?

A. SPTB. NIMC. CSWD. eConfig

Correct Answer: ASection: (none)Explanation

QUESTION 12After purchasing the Active Memory Expansion (AME) Enablement Feature, what tasks must be completedbefore AME can be used?

Page 44: POWER SYSTEMS WITH POWER7 AND AIX TECHNICAL · PDF fileB. System Builder Redbook ... plus DB2 pureScale running the database partition and Tivoli Systems Automation for the application

A. Enable using active partition properties with DLPAR.B. Enter the activation key via the AIX 6.1 command line and reboot AIX.C. Enter the activation key via the HMC, power cycle the managed system and start the LPAR.D. Enter the activation key via the HMC, modify the partition profile, and restart the LPAR.

Correct Answer: BSection: (none)Explanation

QUESTION 13What operating system is required to support Active Memory Expansion?

A. AIX 6.1B. AIX 5.3C. Red Hat 10D. SUSE LINUX 11

Correct Answer: ASection: (none)Explanation

QUESTION 14A proposed server architecture includes SAN LUNs being presented to client LPARs using shared HBAs toreduce infrastructure cost. The customer requires minimal management efforts for the dual VIO Servers. Whichtechnology is recommended for this proposal?

A. NPIVB. vSCSIC. Arbitrated loopD. Converged adapter

Correct Answer: ASection: (none)Explanation

QUESTION 15A customer has a requirement to eliminate single points of failure for an application. They have allocated oneEthernet adapter to each VIO server on the system. Which features of PowerVM and AIX will support thecustomer requirement?

A. Etherchannel and trunkingB. Network Interface Backup and EtherchannelC. Shared Ethernet Adapter (SEA) Failover and EtherchannelD. Network Interface Backup and Shared Ethernet Adapter failover

Correct Answer: DSection: (none)Explanation

QUESTION 16A customer would like to consolidate multiple database workloads to a single server to reduce TCO. What is

Page 45: POWER SYSTEMS WITH POWER7 AND AIX TECHNICAL · PDF fileB. System Builder Redbook ... plus DB2 pureScale running the database partition and Tivoli Systems Automation for the application

the effect of PowerVM on TCO?

A. Reduces SAN costB. Reduces network costC. Reduces administration costsD. Reduces software licensing cost

Correct Answer: CSection: (none)Explanation

QUESTION 17A Power 720 has AIX 6.1 and Linux partitions. During normal workloads there is more than enough memoryavailable to the LPARs. During monthend processing one partition becomes memory constrained. What canhelp overcome this situation?

A. Active Memory Sharing (AMS)B. Active Memory Expansion (AME)C. Integrated Virtual Memory (IVM)D. Memory Capacity on Demand (CoD)

Correct Answer: ASection: (none)Explanation

QUESTION 18An AIX 5.3 customer has a Power 780 in a 2meter (T42) rack. This rack needs to be moved six inches (15cm)to allow underfloor access. What preparation for moving the rack will result in the least disruption to endusers?

A. Initiate LPAR fallover to backup systems.B. Use Live Partition Mobility to move the LPARs to other systems.C. Use Live Application Mobility to move critical applications to alternate systems.D. Back up all LPARS to a NIM server and restore them to other LPARs on other systems.

Correct Answer: BSection: (none)Explanation

QUESTION 19A customer has multiple application servers which create one process for each connected user. All users sharethe same AIX environment. What is a benefit of using WPARs in this environment?

A. WPARs give more controls for resource management than the traditional AIX operating system tools.B. WPARs support Live Application Mobility which can be used to balance user processes across systems.C. WPARs each have a copy of the AIX kernel, offering better availability than a system without WPARs.D. WPARs provide the ability to apply fixes specific for each environment, enabling the customer to create

specialized application servers.

Correct Answer: BSection: (none)Explanation

Page 46: POWER SYSTEMS WITH POWER7 AND AIX TECHNICAL · PDF fileB. System Builder Redbook ... plus DB2 pureScale running the database partition and Tivoli Systems Automation for the application

QUESTION 20What advantages do WPARs have over LPARs?

A. Security is isolated by the HMCB. Support Live Partition MobilityC. Operating system faults are isolatedD. Reduced system management during upgrades

Correct Answer: DSection: (none)Explanation

Explanation/Reference:

Page 47: POWER SYSTEMS WITH POWER7 AND AIX TECHNICAL · PDF fileB. System Builder Redbook ... plus DB2 pureScale running the database partition and Tivoli Systems Automation for the application

Exam F

QUESTION 1A customer is moving from an HPUX environment to an AIX environment. They will be producing a masterimage of the environment and will need to install it into hundreds of LPARs and WPARs.Which AIX tool will be of most use in this case?

A. NIMB. smitC. SUMAD. netboot

Correct Answer: ASection: (none)Explanation

QUESTION 2A customer has a new Power 720 with PowerVM Standard Edition. They plan to migrate their singlepartitionPOWER5 550 to the new Power 720. How can the customer migrate from the POWER5 550 to the Power 720with minimal effort and down time?

A. Perform Live Partition Mobility between the two systems.B. Move the boot disks from the old system to the new system.C. Use Tivoli Storage Manager to back up the POWER5 550 and restore on the Power 720.D. Upgrade AIX to the latest level on the POWER5 550 and clone using the mksysb command.

Correct Answer: DSection: (none)Explanation

QUESTION 3In a scaleout environment, what is a benefit of running DB2 pureScale compared to other solutions?

A. Provides a highly available cluster of Power Systems enabling near linear scalability and disaster recoveryacross different sites.

B. Incorporates a hardware locking mechanism which resembles the Parallel Sysplex on the mainframe,delivering performance and scalability.

C. Enables near linear scalability by partitioning and clustering the database across multiple nodes, and addingnodes dynamically when needed.

D. Provides scalability by employing a highly available cluster of servers interconnected by an Infinibandnetwork and a central locking mechanism.

Correct Answer: DSection: (none)Explanation

QUESTION 4A customer wants to run a Domino email application, a Business Intelligence database, and a batch processingapplication on Linux. The workloads have different behaviors and do not have peaks at the same time. What isa benefit of running these applications on a Power Systems server instead of running on separate x86 servers?

A. Each Linux application can run in a Workload Partition, reducing the management efforts.B. Total cost of Linux applications on Power Systems is more cost effective than on x86 because of platform

Page 48: POWER SYSTEMS WITH POWER7 AND AIX TECHNICAL · PDF fileB. System Builder Redbook ... plus DB2 pureScale running the database partition and Tivoli Systems Automation for the application

licensing.C. Memory cloning can be used on the Power Systems to have a single image of the Linux kernel shared by all

partitions.D. Using micropartitions on Power Systems allow the workloads to share the processing resources, increasing

the overall system utilization.

Correct Answer: DSection: (none)Explanation

QUESTION 5A small IT department is deploying Power 720 servers exploiting virtualization technologies. Each Power 720will have two partitions, one with 6 cores and one with 2 cores, and both partitions having 32GB of memoryeach. Live Partition Mobility is being considered at some point in the future. What is the minimum AIX Editionrequired to support the customer?

A. AIX Basic EditionB. AIX Express EditionC. AIX Standard EditionD. AIX Enterprise Edition

Correct Answer: CSection: (none)Explanation

QUESTION 6A customer is interested in PS700 Blade with 32GB of memory. The Blade will have 4 partitions sharingresources equally. They want the least expensive operating system that supports Live Partition Mobility. Whichof the following AIX Editions address their requirement?

A. BasicB. ExpressC. StandardD. Enterprise

Correct Answer: ASection: (none)Explanation

QUESTION 7An IT director is eager to adopt POWER7 servers because of their relative performance ratings and energyefficiency, but is concerned about migrating applications which require AIX 5.3. Which of the following willaddress his concern?

A. POWER7 servers running AIX 5.3 operate in POWER5+ mode.B. POWER7 servers running AIX 5.3 operate in POWER6 and POWER6+ mode.C. POWER7 servers running AIX 5.3 operate in POWER5 and POWER6 modes.D. POWER7 servers running AIX 5.3 operate in POWER6 and POWER7 modes.

Correct Answer: BSection: (none)Explanation

Page 49: POWER SYSTEMS WITH POWER7 AND AIX TECHNICAL · PDF fileB. System Builder Redbook ... plus DB2 pureScale running the database partition and Tivoli Systems Automation for the application

QUESTION 8An IT manager needs to deploy multiple applications simultaneously. Which virtualization technology will reducethe number of operating system maintenance tasks?

A. Workload partitionsB. Dynamic logical partitionsC. Dedicated logical partitionsD. Virtualized logical partitions

Correct Answer: ASection: (none)Explanation

QUESTION 9The system administrator at a university has many standalone machines and wants to consolidate them,minimizing the amount of time to upgrade all of the operating systems. Which of the following solutionssupports the requirement?

A. MicropartitionsB. Logical PartitionsC. Dynamic PartitionsD. Workload Partitions

Correct Answer: DSection: (none)Explanation

QUESTION 10System software for the Power 780 server is licensed at which tier?

A. LargeB. SmallC. MediumD. Enterprise

Correct Answer: ASection: (none)Explanation

QUESTION 11An IT director needs to deploy 3 partitions, each using dedicated internal boot disk. Which system will supportthe customer requirement using the least amount of rack space?

A. Power 770 serversB. Power 750 serversC. Power 755 serversD. Power 720 servers

Correct Answer: ASection: (none)

Page 50: POWER SYSTEMS WITH POWER7 AND AIX TECHNICAL · PDF fileB. System Builder Redbook ... plus DB2 pureScale running the database partition and Tivoli Systems Automation for the application

Explanation

QUESTION 12A customer is evaluating using the PCIe SSD adapter for the system boot in their new Power 750. Redundancyand hotswap capability are required. What configuration supports the customer requirements?

A. Configure the PCIe SSD adapter and drive modules as a JBODB. Configure a pair of mirrored PCIe SSD adapters and drive modulesC. Configure the PCIe SSD adapter and drive modules in a RAID6 arrayD. Configure the PCIe SSD adapter and drive modules in a RAID5 array

Correct Answer: BSection: (none)Explanation

QUESTION 13A company runs very large database applications on multiple HPUX servers. They recently upgraded the devicedrivers for their fibre channel HBAs and have suffered numerous crashes on several systems. Which feature ofPower Systems running AIX would help eliminate this problem during prerelease Testing of a new devicedriver?

A. Redundant VIO serversB. Storage Protection KeysC. Electronic Service AgentD. NPIV support in the kernel

Correct Answer: BSection: (none)Explanation

QUESTION 14A customer wants to run DB2 on a Power 780 with uncapped partitions. They have licensed DB2 for 32 of the64 active cores, and will use it in multiple partitions. How can the customer ensure that the number of licensespurchased for DB2 is not exceeded?

A. Create a 32core shared processor pool for the DB2 partitions.B. Limit the number of virtual processors on each DB2 partition to 32.C. Use the IBM License Metric Tool to dynamically manage DB2 usage in the partitions.D. Set the 'Desired Processing Units' in each DB2 partition profile so that the sum of all partitions equals 32.

Correct Answer: ASection: (none)Explanation

QUESTION 15A customer has two Power 770 systems with 4 enclosures each. Thirty two cores and 1TB of memory areactivated on each system. Each system has 3 database partitions and each partition has 10 cores and 300GBof memory. Which solution will provide automated recovery of unplanned outages at least cost?

A. Purchase PowerVM Enterprise Edition. Use System Director to automate Live Partition Mobility to recoverfrom partition failure.

B. Create additional shared processor partitions as standby nodes. Use PowerHA SystemMirror to activate

Page 51: POWER SYSTEMS WITH POWER7 AND AIX TECHNICAL · PDF fileB. System Builder Redbook ... plus DB2 pureScale running the database partition and Tivoli Systems Automation for the application

and use CoD resources when a failover occurs.C. Purchase an additional 32core Power 750 with PowerHA SystemMirror Standard Edition. Use the new

system as standby node with the XD component of PowerHA.D. Purchase an additional Power 770 system. Locate production and standby database partitions on each

system. Use DB2 pureScale to provide automated partition monitoring and failover.

Correct Answer: BSection: (none)Explanation

QUESTION 16A customer has ten RS/6000 Model M80, two pSeries 690 Model 681, five POWER5 510 and two POWER6560 machines installed and running commercial applications. They want to do a server consolidation study inorder to replace the existing systems with POWER7 systems. What performance metric is recommended whenevaluating the replacement system?

A. IBM CPWB. IBM rPerfC. SPECint_rate2006D. IDEAS International RPE2

Correct Answer: BSection: (none)Explanation

QUESTION 17Which of the following is a correct statement about rPerf?

A. It can only be used on systems running without partitions.B. It is relevant for IBM systems running the AIX operating system.C. It is the main benchmark for sizing systems that will run HPC applications.D. It has a direct relationship with other benchmarks like TPCC and SpecjAppServer2004.

Correct Answer: BSection: (none)Explanation

QUESTION 18The systems administrator of a large manufacturer has POWER5 and POWER6 servers, each with LPARsrunning AIX 6.1. They are running several workloads including SAP, DNS, Oracle, DB2 and WebSphereApplication Server, and plan to consolidate onto one POWER7 server. How can the system administratordetermine how much benefit Active Memory Expansion (AME) could provide for the consolidated system?

A. Run amepat now on all of the existing LPARs.B. Run amepat after consolidation on all LPARs.C. Run amepat now on all existing LPARs running on the POWER6 servers.D. Run amepat now on all existing LPARs running database applications.

Correct Answer: ASection: (none)Explanation

Page 52: POWER SYSTEMS WITH POWER7 AND AIX TECHNICAL · PDF fileB. System Builder Redbook ... plus DB2 pureScale running the database partition and Tivoli Systems Automation for the application

QUESTION 19Which of the following virtualization options are unique to AIX and PowerVM compared to other UNIX basedofferings?

A. Software virtualization through PowerVM and hardware virtualization through IBM Systems Director.B. Hardware virtualization through Workload Partitions (WPARS) and software virtualization through PowerVM.C. Software virtualization through Workload Partitions (WPARS) and hardware virtualization through PowerVM.D. Hardware virtualization through Workload Partitions (WPARS) and software virtualization through IBM

Systems Director.

Correct Answer: CSection: (none)Explanation

Explanation/Reference: