    CONTENTS: - PAGE NO.

    1. HYDROLOGY 2

    2. RAIN FALL AND ITS MEASUREMENT 2-6

    3. RUN OFF AND ITS MEASUREMENT 7-9

    4. HYDRO GRAPHS 10-125. FLOW DURATION CURVE 13

    6. MASS DURATION CURVE 13

    7. SITE SELECTION FOR HYDRO-POWER PLANT 14-15

    2

  • 7/30/2019 power plant Assignment

    3/17

    POWER PLANT ENGINEERING

    HYDROLOGY

    Hydrology is the study of water in the environment. Hydrology has evolved as a science

    to try and understand the complex water systems of the Earth, to study and predict how

    water will behave under different circumstances as it moves through the land phase of the

    water cycle. Water is one of the most important natural resources and although plentiful,

    is not always in the right place at the right time or of the right quality. An overall aim of

    hydrologists is to apply scientific knowledge and mathematical principles to mitigate

    water-related problems in society and environmental protection. This may mean working

    out the best use of water supplies for cities or for irrigation, controlling river flooding or

    soil erosion, protecting or cleaning up pollution, planning long-term water storage

    reservoirs, flood risk assessment and flood/drought warning Domains of hydrology

    include Hydrometeorology, hydrology, hydrogeology, drainage basin management and

    water quality, where water plays the central role. Oceanography and meteorology are not

    included because water is only one of many important aspects within those fields.

    Hydrological research can inform environmental engineering, policy and planning.

    3

  • 7/30/2019 power plant Assignment

    4/17

    POWER PLANT ENGINEERING

    .

    Fig.1 Hydrological cycle

    Rainfall

    It is defined as the total condensation of moisture from the atmosphere that reaches the

    earth, including all forms of rains, ice and snow. Rain is liquid water in the form

    of droplets that have condensed from atmosphericwater vaporand then precipitated that

    is, become heavy enough to fall under gravity. The major cause of rain production is

    moisture moving along three-dimensional zones of temperature and moisture contrasts

    known as weather fronts. If enough moisture and upward motion is present, precipitation

    falls from convective clouds (those with strong upward vertical motion) such

    as cumulonimbus (thunder clouds) which can organize into narrow rain band. In

    mountainous areas, heavy precipitation is possible where upslope flow is maximized

    within windward sides of the terrain at elevation which forces moist air to condense and

    4

    http://en.wikipedia.org/wiki/Atmospherehttp://en.wikipedia.org/wiki/Water_vaporhttp://en.wikipedia.org/wiki/Water_vaporhttp://en.wikipedia.org/wiki/Water_vaporhttp://en.wikipedia.org/wiki/Atmosphere
  • 7/30/2019 power plant Assignment

    5/17

    POWER PLANT ENGINEERING

    fall out as rainfall along the sides of mountains. On the leeward side of mountains, desert

    climates can exist due to the dry air caused by down slope flow which causes heating and

    drying of the air mass.

    Fig.2 Rainfall cycle process

    5

    http://www.google.co.in/url?sa=i&source=imgres&cd=&cad=rja&docid=amrlxBLe6rZ2xM&tbnid=5qQNbGMi2atQQM:&ved=0CAwQjRwwAA&url=http%3A%2F%2Fubtrue2.net%2Ftiros50thanc%2FT5APrograms.htm&ei=lpJMUZVwjrSsB6OIgIgM&psig=AFQjCNHIpjvqLmQR8yjCZnAGqEiaM--H9Q&ust=1364059158051976
  • 7/30/2019 power plant Assignment

    6/17

    POWER PLANT ENGINEERING

    Fig.3 Average Annual Rainfall in India

    RAINFALL MEASUREMENTRain is measured using a rain gauge (also known as a udometer or a pluviometer which

    gathers and measures the amount of liquid precipitation over a set period of time.

    All rain gauges have their limitation .Attempting to collect rain data in high wind

    (hurricane conditions) can be nearly impossible and unreliable due to wind extremes

    preventing rain from entering the gauge .Rain gauges only indicate rainfall in a localized

    area. For virtually all gauges, drops will stick to the sides of the collecting device,

    resulting in slightly underestimated measurements .When the temperature is close to or

    below freezing, rain may fall on the funnel and freeze or snow may collect in the gauge

    and not permit any subsequent rain to pass through.

    6

  • 7/30/2019 power plant Assignment

    7/17

    POWER PLANT ENGINEERING

    Types of Rain GaugeTypes of rain gauges include graduated cylinders, weighing gauges, tipping bucket

    gauges, optical, and simple buried pit collectors. Each type has its advantages and

    disadvantages for collecting rain data.

    Fig.4 Rain Gauge

    Standard (Graduated Cylinder) Rain Gauge

    The standard rain gauge consists of a funnel attached to a graduated cylinder that fits into

    a larger container. If the water overflows from graduated cylinder the outside container

    will catch it. So when it is measured, the cylinder will be measured and then the excess

    will be put in another cylinder and measured. In most cases the cylinder is marked in mm.

    7

  • 7/30/2019 power plant Assignment

    8/17

    POWER PLANT ENGINEERING

    Tipping Bucket Rain GaugeThe tipping bucket gauge consists of a funnel that collects and channels the precipitation.

    The precipitation falls onto one of two small buckets or levers which are balanced in

    same manner as a balance scale. When the bucket fills sufficiently to "tip" the balance an

    electrical signal is sent to the recorder. Modern tipping rain gauges consist of a plastic

    collector balanced over a pivot. When it tips, it actuates a switch (such as a reed switch)

    which is then electronically recorded or transmitted to a remote collection station.

    The tipping bucket rain gauge is not as accurate as the standard rain gauge because the

    rainfall may stop before the lever has tipped. When the next period of rain begins it may

    take no more than one or two drops to tip the lever. Tipping buckets also tend to

    underestimate the amount of rainfall, particularly in snowfall and heavy rainfall events.

    Tipping buckets can be subject to vibration if not surely mounted causing the balance totip resulting in an over estimation of the rain measurement. The advantage of the tipping

    bucket rain gauge is that the rain rate (light, medium or heavy) may be easily obtained.

    Rainfall rate is decided by the total amount of rain that has fallen in a set period (usually

    1 hour) and by counting the number of 'clicks' in a 10 minute period the observer can

    decide the character of the rain. Tipping gauges can also incorporate weighing gauges. In

    these gauges, a strain gauge is fixed to the collection bucket so that the exact rainfall can

    be read at any moment. Each time the collector tips, the strain gauge (weight sensor) is

    re-zeroed to null out any drift. Weighing Precipitation Gauge. A weighing-type

    precipitation gauge consists of a storage container, which is weighed to record the mass.

    Certain models measure the mass using a pen on a rotating drum, or by using a vibrating

    wire attached to a data logger. The advantages of this type of gauge over tipping buckets

    are that it does not underestimate intense rain, and it can measure other forms of

    precipitation, including rain, hail and snow. These gauges are, however, more expensive

    and require more maintenance than tipping bucket gauges.

    Optical Rain GaugeThese have a row of collection funnels. In an enclosed space below each funnel are

    a laser diode and a phototransistor detector. When enough water has been collected to

    form a single drop it drips from the bottom of the funnel, falling into the laser beam's

    path. The detector is set at right angles to the path of the laser beam so that light scattered

    8

  • 7/30/2019 power plant Assignment

    9/17

    POWER PLANT ENGINEERING

    by the drop of water breaking the laser beam is detected as a sudden flash of light. The

    flashes from these photo detectors are then read and transmitted or recorded.

    RUNOFF

    Runoff is generated by rainstorms and its occurrence and quantity are dependent on the

    characteristics of the rainfall event, i.e. intensity, duration and distribution. There are, in

    addition, other important factors which influence the runoff generating process.

    R= P LWhere R= runoff,

    P= precipitation,

    & L= All losses.Run-off = Total precipitation Total evaporation

    Part of the precipitation is absorbed by the soil and seeps or percolates into ground and

    will ultimately reach the catchment area through the underground channels. Thus.

    Total run-off = Direct run off over the land surface T Run-off through seepage.

    The unit of run-off is m3/s or day-second meter.

    Day-second meter = Discharge collected in the catchment area at the rate of 1 in 3/S for

    one day

    = 1 24 3600 = 86400 m3/day.The flow of run-off can also be expressed in cm. of water on the drainage area feeding

    the river site for a stated period, or km, cm of water per unit of time. Surface

    Runoffoccurs when theintensity of precipitationexceeds the soil'sinfiltration rate.

    THE SURFACE RUNOFF PROCESS

    As the rain continues, water reaching the ground surface infiltrates into the soil until it

    reaches a stage where the rate of rainfall (intensity) exceeds the infiltration capacity ofthe soil. Thereafter, surface puddles, ditches, and other depressions are filled (depression

    storage), after which runoff is generated. The infiltration capacity of the soil depends on

    its texture and structure, as well as on the antecedent soil moisture content (previous

    rainfall or dry season). The initial capacity (of a dry soil) is high but, as the storm

    continues, it decreases until it reaches a steady value termed as final infiltration rate.

    9

  • 7/30/2019 power plant Assignment

    10/17

    POWER PLANT ENGINEERING

    The process of runoff generation continues as long as the rainfall intensity exceeds the

    actual infiltration capacity of the soil but it stops as soon as the rate of rainfall drops

    below the actual rate of infiltration.

    FACTORSAFFECTING RUN-OFFApart from rainfall characteristics such as intensity, duration and distribution, there are a

    number of site (or catchment) specific factors which have a direct bearing on the

    occurrence And Volume Of runoff.

    1. Nature of Precipitation.

    Short, hard showers may produce relatively little run-off. Rains lasting a longer time

    results in larger run-off. The soil tends to become saturated and the rate of seepage

    decreases. Also, the humid atmosphere lowers evaporation, resulting in increased run-off.

    2. Topography of Catchments Area.

    Steep, impervious areas will produce large percentage of total run-off. The water will

    flow quickly and absorption and evaporation losses will be small.

    3. Geology of Area.

    The run-off is very much affected by the types of surface soil and sub-soil, type of rocks

    etc. Rocky areas will give more run-offs while pervious soil and sub-soil and soft and

    sandy area will give lesser run-off.

    4. Meteorology.

    Evaporation varies with temperature, wind velocity and relative humidity. Runoff

    increases with low temperature, low wind velocity and high relative humidity and vice

    versa.

    5. Vegetation.

    Evaporation and seepage are increased by cultivation. Cultivation opens and roughens

    the hard, smooth surface and promotes seepage. Thick vegetation like forests consumes

    A portion of the rain fall and also acts as obstruction for run-off.

    6. Size and Shape of Area.

    Large areas will give more run-offs. A wide area like a fan will give greater run-off,

    whereas, a narrow area likes a leaf will give lesser run-off. In an area whose length is

    more than its width, the flow along its width will give more run-off than if the flow is

    along its length, since in the former case, seepage and evaporation will be less.

    10

  • 7/30/2019 power plant Assignment

    11/17

    POWER PLANT ENGINEERING

    MEASUREMENT OF RUNOFF

    Runoff can be measured by delineating a certain area of a field and collecting and

    measuring the volume of water passing the down slope border of that area. In view of the

    dynamic character of the process, the runoff rate willgive the most useful information.

    From Rain-Fall Records

    The run-off can be estimated from rain-fall records by multiplying

    The rain fall with run-off coefficient for the drainage area. The run-off coefficient takes

    into account the various losses and will depend upon the nature of the catchment area, asgiven below: in Table 1.1

    Table 1.1

    Drainage Area Run-off-Coefficient

    Commercial and industrial 0.90

    Asphalt or concrete pavement 0.85

    Forests 0.05 to 0.30

    Parks, farmland and pastures 0.05 to 0.30

    Then, Run-off = Rain fall run-off co-efficient

    This is not an accurate method of measuring run-off since the estimation of run-off co-

    efficientCan not be very accurate.

    2. Empirical Formulas.

    Empirical relations to determine the stream flow relate only to a particular site and

    cannot be relied upon for general use.

    3. Actual Measurement. Direct measurement by stream gauging at a given site for a

    long period is the only precise method of evaluation of stream flow. The flow is

    measured by selecting a channel of fixed cross-section and measuring the water velocity

    at regular intervals, at enough points in the cross-section for different water levels. The

    velocity of flow can

    11

  • 7/30/2019 power plant Assignment

    12/17

    POWER PLANT ENGINEERING

    Fig.5 Stream gauging records

    Be measured with the help of current meter or float method. By integrating the velocities

    over the cross-section for each stage, the total flow for each stage can be calculated.

    HYDROGRAPH

    A hydrograph is a graph showing the rate of flow (discharge) versus time past a specific

    point in a river, or other channel or conduit carrying flow. The rate of flow is typically

    expressed in cubic meters or cubic feet per second (cams or cuffs).

    It can also refer to a graph showing the volume of water reaching a particular outfall, or

    location in a sewerage network, graphs are commonly used in the design ofsewerage,

    more specifically, the design ofsurface watersewerage systems and combined sewers.

    12

    http://en.wikipedia.org/wiki/Outfallhttp://en.wikipedia.org/wiki/Outfallhttp://en.wikipedia.org/wiki/Seweragehttp://en.wikipedia.org/wiki/Seweragehttp://en.wikipedia.org/wiki/Surface_waterhttp://en.wikipedia.org/wiki/Combined_sewerhttp://en.wikipedia.org/wiki/Outfallhttp://en.wikipedia.org/wiki/Seweragehttp://en.wikipedia.org/wiki/Surface_waterhttp://en.wikipedia.org/wiki/Combined_sewer
  • 7/30/2019 power plant Assignment

    13/17

    POWER PLANT ENGINEERING

    Fig.6 Hydrograph

    Types of hydrograph can include:

    1. Storm hydrographs

    2. Flood hydrographs3. Annual hydrographs aka regimes

    4. Direct Runoff Hydrograph

    5. Effective Runoff Hydrograph6. Raster Hydrograph

    7. Storage opportunities in the drainage network (e.g., lakes, reservoirs, wetlands, channel

    and bank storage capacity)

    UNIT HYDROGRAPHAunit hydrograph(UH) is the hypothetical unit response of a watershed (in terms of

    runoff volume and timing) to a unit input of rainfall. It can be defined as the direct runoff

    hydrograph(DRH) resulting from one unit (e.g., one cm or one inch) ofeffective

    rainfalloccurring uniformly over that watershed at a uniform rate over a unit period of

    13

  • 7/30/2019 power plant Assignment

    14/17

    POWER PLANT ENGINEERING

    time. As a UH is applicable only to the direct runoff component of a hydrograph (i.e.,

    surface runoff), a separate determination of the base flow component is required.

    A UH is specific to particular watershed, and specific to a particular length of time

    corresponding to the duration of the effective rainfall. That is, the UH is specified as

    being the 1-hour, 6-hour, or 24-hour UH, or any other length of time up to thetime of

    concentrationof direct runoff at the watershed outlet. Thus, for a given watershed, there

    can be many unit hydrographs, each one corresponding to a different duration of effective

    rainfall.

    The UH technique provides a practical and relatively easy-to-apply tool for quantifying

    the effect of a unit of rainfall on the corresponding runoff from a particular drainage

    basin. UH theory assumes that a watershed's runoff response is linear and time-invariant,

    and that the effective rainfall occurs uniformly over the watershed. In the real world,

    none of these assumptions are strictly true. Nevertheless, application of UH methods

    typically yields a reasonable approximation of the flood response of natural watersheds.

    The linear assumptions underlying UH theory allows for the variation in storm intensity

    over time (i.e., the stormhyetograph) to be simulated by applying the principles of

    superposition and proportionality to separate storm components to determine the resulting

    cumulative hydrograph. This allows for a relatively straightforward calculation of the

    hydrograph response to any arbitrary rain event.

    Aninstantaneous unit hydrographis a further refinement of the concept; for an IUH, the

    input rainfall is assumed to all take place at a discrete point in time (obviously, this isn't

    the case for actual rainstorms). Making this assumption can greatly simplify the analysis

    involved in constructing a unit hydrograph, and it is necessary for the creation of

    a geomorphologic instantaneous unit hydrograph.

    The creation of a GIUH is possible given nothing more than topologic data for a

    particular drainage basin. In fact, only the number of streams of a given order, the mean

    length of streams of a given order, and the mean land area draining directly to streams of

    a given order are absolutely required (and can be estimated rather than explicitly

    calculated if necessary). It is therefore possible to calculate a GIUH for a basin without

    any data about stream height or flow, which may not always be available.

    14

  • 7/30/2019 power plant Assignment

    15/17

    POWER PLANT ENGINEERING

    FLOW DURATION CURVE

    a flow duration curve shows the relation between flows and lengths of time during which

    they are available. The flows are plotted as the ordinates and lengths of time as abscissas.

    The flow duration curve can be plotted from a hydrograph.

    MASS-CURVE

    The use of the mass curve is to compute the capacity of the reservoir for a hydro site. The

    mass curve indicates the total volume of run-off in second meter-months or other

    convenient units, during a given period. The mass curve is obtained by plotting

    cumulative volume of flow as ordinate and time (days, weeks by months) as abscissa. A

    mass curve for a typical river for which flow data is given in Table 1.2.

    The monthly flow is only the mean flow and is correct only at the beginning and end of

    the months. The variation of flow during each month is not considered. Cumulative daily

    flows, instead of monthly flows, will give a more accurate mass curve, but this involves

    an excessive amount of work. The slope of the curve at any point gives the flow rate in

    15

  • 7/30/2019 power plant Assignment

    16/17

    POWER PLANT ENGINEERING

    second-meter. Let us join two pointsXand Yon the curve. The slope of this line gives the

    average rate of flow during the period betweenXand Y. This will be = (Flow at Y-Flow at

    X)/Time Span.

    SITE SELECTION FOR HYDRO-POWER PLANT

    While selecting a suitable site, if a good system of natural storage lakes at high altitudes

    and with large catchment areas can be located, the plant will be comparatively

    economical. Anyhow the essential characteristics of a good site are: large catchment

    areas, high average rainfall and a favorable place for constructing the storage or reservoir.

    For this purpose, the geological, geographical and meteorological conditions of a site

    need careful investigation. The following factors should be given careful consideration

    while selecting a site for a hydro-electric power plant.

    1. Water Available.

    To know the available energy from a given stream or river, the discharge flowing and its

    variation with time over a number of years must be known. Preferably, the estimates of

    the average quantity of water available should be prepared on the basis of actual

    measurements of stream or river flow. The recorded observation should be taken over a

    number of years to know within reasonable, limits the maximum and minimum variations

    from the average discharge. The river flow data should be based on daily, weekly,

    monthly and yearly flow ever a number of years. Then the curves or graphs can be

    plotted between tile river flow and time. These are known as hygrographs and flow

    duration curves. The plant capacity and the estimated output as well as the need for

    storage will be governed by the average flow. The primary or dependable power which is

    available at all times when energy is needed will depend upon the minimum flow. Such

    conditions may also fix the capacity of the standby plant. The, maximum of flood flow

    governs the size of the headwords and dam to be built with adequate spillway.

    2. Water-Storage.

    As already discussed, the output of a hydropower plant is not uniform due to wide

    variations of rain fall. To have a uniform power output, water storage is needed so that

    excess flow at certain times may be stored to make it available at the times of low flow.

    16

  • 7/30/2019 power plant Assignment

    17/17

    POWER PLANT ENGINEERING

    To select the site of the dam ; careful study should be made of the geology and

    topography of the catchment area to see if the natural foundations could be found and put

    to the best use.

    3. Head of Water.

    The level of water in the reservoir for a proposed plant should always be within limits

    throughout the year.

    4. Distance from Load Center.

    Most of the time the electric power generated in a hydro-electric power plant has to be

    used some considerable distance from the site of plant. For this reason, to be economical

    on transmission of electric power, the routes and the distances should be carefully

    considered since the cost of erection of transmission lines and their maintenance will

    depend upon the route selected.

    5. Access to Site.

    It is always a desirable factor to have a good access to the site of the plant. This factor is

    very important if the electric power generated is to be utilized at or near the plant site.

    The transport facilities must also be given due consideration.

    17