20
.QICl"l fcDs 3iflli E$Thlll ('m<i q;r ()WI) POWER GRID CORPORATION OF INDIA LIMITED (A Government of India Enterprise) 4'1'll<'l'l : '<'ITc <i. 2. 001. tfi'Fl : 2571700 - 719, ¢<ffi : 2571760, 2571761 C!R Corporate Office : "Saudamini" Plot No. 2, Sector-29, Gurgaon-122 001. Haryana . Tel.: 2571700 - 719, Fax: 2571760, 2571761 Gram: 'NATGRID' rn 'fffizn/R f Numbe e. r C/ENG/SEF/W/06/LTOA th 18 September, 2009 1. Member(PS) 2. Chairmann & Managing Director Central Electricity Authority MPPTCL, Block No. 3 Sewa Bhawan, R.K.Puram Shakti Bhawan, Rampur, New Delhi-11 O 066 Jabalpur-482 008 3. The Member Secretary 4. Executive Engineer (Projects) Western Regional Power Committee Electricity Department MIDC area, Marol, UT of Dadra & Nagar Havelli, Andheri (E) Post Naroli-396 235 Mumbai 400 093 Silvassa 5. Shri Ravinder 6. The Chief Engineer Chief Engineer(SP & PA) Electricity Department Central Electricity Authority The Government of Goa Sewa Bhawan, R.K.Puram Panaji New Delhi-110 066 ' 7. Managing Director 8. Shri M.L. Jadhav Gujarat Energy Transmission Corp. Ltd, Chief Engr(Transmission) Sardar Patel Vidyut Bhawan, Race Nuclear Power Corpn. of India Ltd. Course, 12th Floor, North wing, VS Bhawan Vadodra -390 007 Anushaktinagar, Mumbai-400 094 9. Executive Engineer , 10. Director (Operation) UT of Daman & Diu Administration, MSETCL. Electricity Department, 4th Floor, "Prakashganga" Moti Daman 396 220 Plot No. C-19, E-Block Sandra - Kurla Complex, Bandra(East), Mumbai- 400051 11. Managing Director 12. Executive Director (Engg.) Chhattisgarh State Transmision Co. Ltd. NTPC Ltd, Dangania EOC, Plot no. A-SA Raipur- 492 013 Sector-24, Post Box. 13 NOIDA 201 301 (U.Pl Sub :Minutes of the 11'" meeting of WR constituents regarding Long-term Open Access (L TOA) applications in WR held on 10.09.2009 at Ahmedabad Sir, The minutes of the 11th meeting of WR constituents regarding Long-term Open Access (LTOA) applications in WR held on 10.09.2009 at Ahmedabad is enclosed for your kind perusal and the needful. The minutes is also available at POWERGRID website (www.powerqridindia.com->Quick link-> Long-term Open Access). Encl: As above Yours faithfully, (Pankaj Kumar) General Manager(SEF) <l\-9, 'll'f'I lffem, 'ffif<!, 26560121 1l\<m: 011-26560039 <JR Registered Office : 8-9, Qutab Institutional Area, Katwaria Sarai, New Delhi-110016 Tel.: 26560121 Fax: 011-26560039 Gram : 'NATGRID' \n\ilf Save Energy for Benefit of Self and Nation

POWER GRID CORPORATION OF INDIA LIMITED Minutes/11t… · Mr.AM.Mishra Head-Electrical Korba West Power Co Ltd 2nd floor, Centrum Plaza, Sector-53, · Gurgaon-122002 Mr.G.P.Rao, Project-Head

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: POWER GRID CORPORATION OF INDIA LIMITED Minutes/11t… · Mr.AM.Mishra Head-Electrical Korba West Power Co Ltd 2nd floor, Centrum Plaza, Sector-53, · Gurgaon-122002 Mr.G.P.Rao, Project-Head

.QICl"l fcDs Cbl"lll)~~lOI 3iflli E$Thlll fc;t1Ji2~ ('m<i ~ q;r ()WI)

POWER GRID CORPORATION OF INDIA LIMITED (A Government of India Enterprise)

~ 4'1'll<'l'l : "'ifl<:lft!.,~" '<'ITc <i. 2. ~-29, ~-122 001. ~ tfi'Fl : 2571700 - 719, ¢<ffi : 2571760, 2571761 C!R ·~·

Corporate Office : "Saudamini" Plot No. 2, Sector-29, Gurgaon-122 001. Haryana . Tel.: 2571700 - 719, Fax: 2571760, 2571761 Gram: 'NATGRID'

rn 'fffizn/R f Numbe e. r C/ENG/SEF/W/06/L TOA th 18 September, 2009

1. Member(PS) 2. Chairmann & Managing Director Central Electricity Authority MPPTCL, Block No. 3 Sewa Bhawan, R.K.Puram Shakti Bhawan, Rampur, New Delhi-11 O 066 Jabalpur-482 008

3. The Member Secretary 4. Executive Engineer (Projects) Western Regional Power Committee Electricity Department MIDC area, Marol, UT of Dadra & Nagar Havelli, Andheri (E) Post Naroli-396 235 Mumbai 400 093 Silvassa

5. Shri Ravinder 6. The Chief Engineer Chief Engineer(SP & PA) Electricity Department Central Electricity Authority The Government of Goa Sewa Bhawan, R.K.Puram Panaji New Delhi-110 066 '

7. Managing Director 8. Shri M.L. Jadhav Gujarat Energy Transmission Corp. Ltd, Chief Engr(Transmission) Sardar Patel Vidyut Bhawan, Race Nuclear Power Corpn. of India Ltd. Course, 12th Floor, North wing, VS Bhawan Vadodra -390 007 Anushaktinagar, Mumbai-400 094

9. Executive Engineer , 10. Director (Operation) UT of Daman & Diu Administration, MSETCL. Electricity Department, 4th Floor, "Prakashganga" Moti Daman 396 220 Plot No. C-19, E-Block

Sandra - Kurla Complex, Bandra(East), Mumbai- 400051

11. Managing Director 12. Executive Director (Engg.) Chhattisgarh State Transmision Co. Ltd. NTPC Ltd, Dangania EOC, Plot no. A-SA Raipur- 492 013 Sector-24, Post Box. 13

NOIDA 201 301 (U.Pl

Sub :Minutes of the 11'" meeting of WR constituents regarding Long-term Open Access (L TOA) applications in WR held on 10.09.2009 at Ahmedabad

Sir,

The minutes of the 11th meeting of WR constituents regarding Long-term Open Access (L TOA) applications in WR held on 10.09.2009 at Ahmedabad is enclosed for your kind perusal and the needful. The minutes is also available at POWERGRID website (www.powerqridindia.com->Quick link-> Long-term Open Access).

Encl: As above

Yours faithfully, -~

~~v (Pankaj Kumar)

General Manager(SEF)

~ ~: <l\-9, 'll'f'I ~<tl<:<'J:'M"1 lffem, <!>cql~<U 'ffif<!, ~ ~-110016 ~: 26560121 1l\<m: 011-26560039 <JR ·~· Registered Office : 8-9, Qutab Institutional Area, Katwaria Sarai, New Delhi-110016 Tel.: 26560121 Fax: 011-26560039 Gram : 'NATGRID'

'«l~d ~ '!l"S:;~d ~ \n\ilf ~ Save Energy for Benefit of Self and Nation

Page 2: POWER GRID CORPORATION OF INDIA LIMITED Minutes/11t… · Mr.AM.Mishra Head-Electrical Korba West Power Co Ltd 2nd floor, Centrum Plaza, Sector-53, · Gurgaon-122002 Mr.G.P.Rao, Project-Head

Mr.T.M.Singaravel Director R.K.M. Powergen Ltd. 147, Gitanjali Nagar, Avanti Vihar, Sector-I, Raipur (C.G)-492004

Director Athena Chhattisgarh Power Ltd, 7-1-24 B Block, 5th floor," Roxana Towers" Greenlands, Begumpet, Hyderabad-500016

Mr.S.P.Anand, Sr. Vice President, Jindal Power Ltd, 2nd Floor, DCM Building Plot no-94, Sector-32 Gurgaon-122001

Mr.Ravindranath .Rathore Director SKS Power Generation (Chhattisgarh) Ltd 501 B, Elegant Business park, Andheri Kurla Road, J.B.Nagar, Andheri(E), Mumbai-400059

Mr.AM.Mishra Head-Electrical Korba West Power Co Ltd 2nd floor, Centrum Plaza, Sector-53, · Gurgaon-122002

Mr.G.P.Rao, Project-Head Wardha Power Company. Ltd, 8-2/293/82/A/431/A, Road No. 22, Jubilee Hills, Hyderbad-500033

Mr.Anil Kumar Jain Associate Vice President Bharat Aluminum Company Ltd Clo Administrative building, Balco Nagar, Korba-495684

Mr.Vinod Agrawal Director Vandana Vidyut Ltd Vandana Bhawan, M.G.Road, Raipur, Chhattisgarh

Mr. Girish Agarwaal Director DB Power Limited G-3A/4-6, Kamanwala Chambers, New Udyog Mandir-2, Mahim (West) Mumbai-400016

Mr.K.Raja Gopal Director & CEO Lanco Amarkantak Power Pvt Ltd., Plot No-397, Udyog Vihar, Phase-3 Gurgaon-122 016

Mr. Alok Choudhari Director Chhattisgarh Steel & Power Ltd 142, Saheed Smarak complex, G.E road, Raipur, Chhattisgarh

Mr. Ritesh Jindal Head - Corporate Relations Real lspat & Power Limited "Vrindavan", Opp Holy Hearts School, Civil lines, Raipur (C.G)

Mr. A.P.Shahi GM-Thermal Project M B Power (MP) Ltd. 43B, Okhla Industrial Estate, New Delhi-110020

Mr. D.P.Bhasin Sr. General Manager Pipavav Energy Private Ltd 121h Floor, Videocon Towers, Jhandewalan Extn., N.Delhi-110055

Mr. Suren Jain Director Bina Power Supply Company Limited Sector-128, Distt- Gautam Budh Nagar, Noida (U.P-201304)

Mr. Mukesh Singhal Sr. Vice President lndiabulls Power Ltd. lndiabulls House 448-451, Udyog Vihar, Phase-V, Gurgaon-122001

Page 3: POWER GRID CORPORATION OF INDIA LIMITED Minutes/11t… · Mr.AM.Mishra Head-Electrical Korba West Power Co Ltd 2nd floor, Centrum Plaza, Sector-53, · Gurgaon-122002 Mr.G.P.Rao, Project-Head

Minutes of 111h meeting of WR constituents regarding long-term open

access applications held on 10.09.2009 at Ahemdabad

The 11th meeting of WR Constituents regarding Long-term Open Access applications in WR was held on 10.09.2009 at Ahmedabad. The list of participants is enclosed at Annexure-1.

Director (Projects), POWERGRID welcomed the participants and informed that POWERGRID has received long-term open access applications from no. of IPPs in Western Region with target beneficiaries as WR/NR. However, IPPs who have shown substantial progress in terms of land acquisition, fuel tie-up, water supply tie-up & its management system, award of EPC contract, Financial closure as well as scheduled commissioning of the unit as informed by the applicants were considered for deliberation in the meeting. He emphasized that IPPs have indicated only target region/beneficiaries, however, they need to firm-up the beneficiaries at the earliest and inform to POWERGRIO. The proposals of long-term open access of the above applicants have been examined and suitable system strengthening as well as dedicated transmission system have been identified.

It was indicated that some of the L TOA applicants applied for open access for full capacity and some for net injection. In line with the discussion held during the 28th Standing Committee meeting of WR, since the sharing of pooled regional transmission charges was on the basis of gross generation capacity, therefore, the L TOA applicants would also share the transmission charges accordingly. Wherever, the applicant has applied for part capacity with balance to be supplied through STU system or own consumption, L TOA would be for capacity applied for. However, such applicants would need to account for their full generation capacity with respect to L TOA (STU) + L TOA(CTU) +own consumption.

Thereafter, the agenda items were taken up for discussion and the brief on the deliberations is as under:

1. New IPP projects in Chhattisgarh who have made definite progress as per CSPTCL/CSPGCL

POWEGRID informed that a large number of IPPs have proposed coal based generation projects in Chhattisgarh and applied for long-term open access in inter state transmission system proposing target beneficiaries to sell their power in WR/NR. The total generation capacity addition program is of the order of 58,000MW with L TOA sought for about 48,000MW. Out of the above, projects with 3500MW capacity have already been granted long-term open access. Most of the IPPs have indicated their commissioning schedule in XI plan/early XII plan.

A review of progress of IPPs in Chhattisgarh was done in various review meetings held on 18.07.09 at CSPTCL, Raipur, 04.08.09 at CEA, New Delhi wherein it emerged that only the following 12 IPPs with capacity of about 15000MW have shown progress for commissioning of their projects in the XI plan/ early XI I plan.

I

Page 4: POWER GRID CORPORATION OF INDIA LIMITED Minutes/11t… · Mr.AM.Mishra Head-Electrical Korba West Power Co Ltd 2nd floor, Centrum Plaza, Sector-53, · Gurgaon-122002 Mr.G.P.Rao, Project-Head

s Developer Capacity LTOA Unitwise comm Target Allocation-Region (MW) n (MWl (MWl schedule

RAIGARH COMPLEX WR** NR SR TOTAL 1 RKM Powergen Ltd.(4x360) 1440 1440 Mar'11,Jun'11,Sep'11, 840 300 300

Dec'11 2 Athena Chhattisgarh Power Ltd.(2x600) 1200 1200 Mar'12, Aug'12 823 377

3 Jindal Power Ltd.(4x600) 2400 2400 Mar'12,Jul'12,Nov'12, 1610 790 Mar'13

4 Jindal Power Ltd.(1x500) 500 500 Existing 500

5 SKS lspat & Power Ltd.(4x300) 1200 1200 Nov'11,Dec'11,Ma(12 800 400 ,Ma(12

6 Korba West Power Co. Ltd.(1x600) 600 600 Jul'12 600

7 DB Power Ltd.(2x600) 1200 1200 Nov'11,Feb'12 818 382

sub-total 8540 8540 5991 2249 300

JANJGIR-CHAMPA COMPLEX

1 Wardha Power Co. Ltd (6x600) 3600 3600 Feb'12,Jun'12,0ct'12, 3600 Feb'13, Jun'13,0ct'13

2 BALC0(4x300) 1200 900 Jun'10, Sep'10, 450 450 Dec'10, Mar'11

3 Vandana Vidyut Ltd.(2x135+1x270) 540 540 Apr'11,Dec'11,Mar'12 440 100

4 Lanco Amarkantak Power Pvt. 1320 1320 Mar'12,Jun'12 462 858 Ltd.(2x660l

5 Chhattisgarh Steel & Power 285 285 Existing, Dec'11 200 85 Ltd.(1x35+1x250)

sub-total 6945 6645 5152 1493 0

Total 15485 15185 11143 3742 300

- WR allocation also includes Chhattisgarh share @approx 35% on ale of first right of refusal

For transfer of power from above 12 nos. IPP projects in Chhattisgarh to target beneficiaries in NR and WR, it was proposed to pool power at 3 nos 765/400 kV pooling stations at Raigarh(Kotra), Raigarh(Tanmar) and Champa. These three pooling stations would be interconnected through Raigarh (Kotra)- Champa 765 kV S/c and Raigarh (Kotra)- Raigarh(Tamnar) 765kV D/c line. For onward transfer of power, it was proposed to further pool power at another intermediate Raipur pooling station. Raigarh Pooling station (Kotra) would be connected to Raipur pooling station through 765kV D/c line. Similarly Champa would be connected to Raipur through 765kV D/c lines. To provide an alternate path, Champa pooling station would also be connected to Dharamjaygarh where power from other IPP projects in Orrisa, Jharkhand and West Bengal would also be coming.

For transfer of power beyond Raipur within WR, Raipur-Wardha- Aurangabad 765kV 2xD/c lines are proposed. Beyond Aurangabad, power is proposed to be transferred through 765 kV Aurangabad-Padghe 765kV D/C and Aurangabad- Dhule-Vadodra 765 kV S/C line. For further dispersal of power at 400kV, Aurangabad-Khargar 400 kV D/C (quad), Vadodra-Asoj 400 kV D/C (quad) were proposed. Also interconnection at 400 kV level between the new proposed 765kV substations at Dhule, Padghe, Raipur Pooling Station & Raigarh pooling station(Kotra) to the existing substations was proposed.

For bulk power transfer from eastern part of WR to western part of WR, a :!: 600kV, 4000 MW HVDC bipole between Raigarh pooling station (Kotra) to Dhule(New) with 4000MW, 600kV HVDC terminals at Raigarh Pooling Station(Kotra) and Dhule(New) was proposed and for bulk transfer of power to NR, a :!: 800kV, 6000MW HVDC bipole between Champa pooling station and Kurushetra(NR) was proposed with 3000MW, 800kV HVDC terminals

· at Champa and Kurushetra with provision to upgrade the terminals to 6000 MW at a later date. After discussions the following transmission system was agreed

2

1440

1200

2400

500

1200

600

1200

8540

3600

900

540

1320

285

6645

15185

Page 5: POWER GRID CORPORATION OF INDIA LIMITED Minutes/11t… · Mr.AM.Mishra Head-Electrical Korba West Power Co Ltd 2nd floor, Centrum Plaza, Sector-53, · Gurgaon-122002 Mr.G.P.Rao, Project-Head

Transmission system associated with the 12 nos. IPPs in Chhattisgarh

a) Transmission System within WR (1) Establishment of 7651400 kV pooling stations at Raigarh (near Katra), Raigarh

(near Tamnar), Champa, and at Raipur (the pooling stations will be initially at 400 kV and later upgraded to 7651400 kV )

(2) Raigarh Pooling Station (Katra) - Raigarh existing 400 kV DIC (to be kept open at a later date).

(3) Raipur Pooling Station - Raipur existing 400 kV DIC (to be kept open at a later date).

(4) Raipur Pooling station- Wardha 765 kV 2x DIC (initially 1•1 Die line to be operated at400 kV)

(5) Wardha- Aurangabad(PG) 765 kV 2X DIC (initially 1•1 Die to l:ie operated at 400 kV)

(6) Aurangabad(PG)-Khargar 400 kV DIC (quad) (7) Aurangabad- Padge(PG) 765 kV DIC (8) Aurangabad- Dhule (New) (PG) 765 kV SIC ( Implementation through private

sector) (9) Dhule (New) - Vadodara (PG) 765 kV SIC ( Implementation through private

sector) . (10) Establishment of 7651400 kV 2x1500 MVA substation at Dhule (New) (

Implementation through private sector) (11) Dhule (New) - Dhule (MSETCL) 400 kV DIC (quad) (Implementation through

private sector) (12) Padghe(PG)- Padghe 400 kV DIC (Quad) (13) Establishment of 7651400 kV 2x1500 MVA substations at Aurangabad and

Padghe (14) ±600kV 4000 MW HVDC bipole between Raigarh pooling station (Kotra) -

Dhule(New) (15) 4000 MW, 600kV HVDC bipole terminal each at Raigarh pooling station (Kotra)

and Dhule (New) (16) Vadodra-Asoj 400 kV DIC (Quad) (17) D.hule (New) - Malegaon (MSETCL) 400 kV Die (Quad) (Implementation through

private sector) (18) Dhule(New) - Nasik(MSETCL) 400kV Dlc(Quad) (Implementation through

private sector)

b) Common transmission System for WR and NR (1) Raigarh Pooling Station (Katra)- Raipur Pooling station 765 kV DIC (intially to be

operated at 400 kV) (2) Raigarh Pooling Station (Katra)- Champa Pooling station 765 kV SIC (3) Champa Pooling station- Raipur Pooling station 765 kV DIC (initially to be operated

at 400 kV) (4) Raigarh Pooling station (Katra)- Raigarh Pooling station (Tamnar) 765 kV DIC

(initially to be operated at 400 kV ) (5) Champa Pooling station - Dharamjaygarh 765 kV SIC

3

Page 6: POWER GRID CORPORATION OF INDIA LIMITED Minutes/11t… · Mr.AM.Mishra Head-Electrical Korba West Power Co Ltd 2nd floor, Centrum Plaza, Sector-53, · Gurgaon-122002 Mr.G.P.Rao, Project-Head

c) Transmission System proposed for NR (1) ±800 kV 6000 MW HVDC bipole between Champa Pooling Station - Kurushetra

(NR) (initially to be operated at 3000 MW) (2) 3000 MW , 800 kV HVDC bipole terminal at Champa pooling station and

Kurushetra with provision to upgrade the terminals to 6000 MW (3) Kurushetra- Jallandhar 400 kV D/C (Quad) ( one ckt via Nakodar S/S) (4) LILO of Abdullapur- Sonepat 400 kV D/C (triple) at Kurushetra (5) Establishment of 400/220 kV, 2x500 MVA substation at Kurushetra

Broad Estimated Cost of the scheme [a to c]- Rs 23500 Crore

d) Generation specific Scheme for the IPPs- to be developed by respective /PPs

A. Raigarh Complex

RKM Powergen (i) RKM Powergen - Raigarh Pooling Station(near Kotra) Ltd.(4x360MW) 400kV D/c(Quad) Athena Chhattisgarh (i) Athena Chhattisgarh - Raigarh Pooling Station(near Power Ltd. Kotra) 400kV D/c(Quad) (2x600MW) Jindal Power (i) Jindal Power - Raigarh Pooling Station (near Tamnar) Ltd.(4x600MW + 400kV 2xD/c (Quad) along with 765/400kV 1x500MW) 3x1500MVA transformers at Raigarh Pooling station

<Tanmar) SKS lspat & Power (i) SKS lspat - Raigarh Pooling Station (near Kotra) Ltd. ( 4x300MW) 400kV D/c(Quad/Triple) Korba(West) Power (i) LILO of Athena Chhattisgarh - Raigarh Pooling Ltd.(1x600MW) Station 400kV D/c at Korba(W) DB Power (i) DB Power - Raigarh Pooling Station (near Kotra) Ltd.(2x600MW) 400kV D/c (Quad/Triple)

B. Champa Complex

Wardha Power (i) Wardha Power - Champa Pooling Station 400kV Ltd. (6x600MW) 2xD/c (Quad) along with 765/400kV 3x1500MVA

transformers at Champa Poolino Station. Balco Ltd.(4x300MW) (i) Balco - Champa Pooling Station 400kV D/c

(Quad/triple)

Vandana Vidyut Ltd. (i) Vandana Vidyut - Champa Pooling Station 400kV D/c (2x135 + 1 x270MW) Lanco Amarkantak (i) Lanco - Champa Pooling Station 400kV D/c (Quad) Power(2x660MW) Chhattisgarh Steel & (i) LILO of Vandana Vidyut- Champa Pooling Station Power Ltd. 400kV D/c at CSPL (1x35+1x250MW)

4

Page 7: POWER GRID CORPORATION OF INDIA LIMITED Minutes/11t… · Mr.AM.Mishra Head-Electrical Korba West Power Co Ltd 2nd floor, Centrum Plaza, Sector-53, · Gurgaon-122002 Mr.G.P.Rao, Project-Head

C. Interim arrangement for connectivity of projects coming prior to availability of above proposed transmission system

Balco Ltd. (i) LILO of Korba - BirsinQhpur 400kV Die at Balco (i) LILO of Rourkela- Raigarh 400kV Die at RKM

RKM Powergen Ltd. Powergen Vandana Vidyut Ltd (i) LILO of Korba - Birsingpur 400kV one ckt of Die at

Vandana Vidvut

The above interim arrangement is purely a temporary transmission arrangement to be carried out by the respective IPP and power transfer may take place on infirm basis depending upon the transmission capacity available in the network as determined by the concerned RLDC. However, the LILO shall be removed and the line shall be restored in its original configuration by the respective developer, after commissioning of the interconnection of generation project at the identified Pooling Station and onward system strengthening. In addition, the IPPs need to coordinate with POWERGRID for suitable system protection and metering arrangement.

Phasing of transmission works associated with above 12 nos. Chhattisgarh IPP projects

Stage - I (Tentatively by 36 months from the date of signing of BPTA by the IPPs)

1. Raigarh Pooling Station (Near Kotra) - Raigarh (existing) 400kV Die (temporary arrangement)

2. Raipur Pooling Station - Raipur (existing) 400kV Die (temporary arrangement) 3. Raigarh Pooling Station (Near Kotra) - Raipur Pooling Station 765kV Die

(initially to be operated at 400kV) 4. Champa Pooling Station - Raipur Pooling Station 765kV Dlc(initially to be

operated at 400kV) 5. Raigarh Pooling station(near Kotra) - Raigarh pooling station(near Tamnar)

765kV Dlc(initially to be operated at 400kV) 6. Raipur Pooling Station - Wardha 765kV Die (initially to be operated at 400kV). 7. Ward ha - Aurangabad (PG) 765kV Die (initially to be operated at 400kV) 8. Aurangabad(PG) - Khargar 400kV Die (Quad) 9. Establishment of 400kV Raigarh Pooling Station (near Kotra) [provision to

upgrade at 765kV level] 10. Establishment of 400kV Raipur Pooling Station (provision to upgrade at 765kV

level) 11. Establishment of 400kV Champa Pooling Station (provision to upgrade at

765kV level)

12. Establishment of 400kV Raigarh Pooling Station (near Tamnar) [provision to upgrade at 765kV level]

Stage - II (Tentatively by 42 months from the date of signing of BPTA by the IPPs)

5

Page 8: POWER GRID CORPORATION OF INDIA LIMITED Minutes/11t… · Mr.AM.Mishra Head-Electrical Korba West Power Co Ltd 2nd floor, Centrum Plaza, Sector-53, · Gurgaon-122002 Mr.G.P.Rao, Project-Head

1. Raipur Pooling Station - Wardha 765kV Dlc(2nd). 2. Ward ha - Aurangabad (PG) 765kV Dlc(2nd). 3. Padghe - Padghe(PG) 400kV Die (Quad) 4. Aurangabad (PG) - Padghe(PG) 765kV Die 5. Raigarh Pooling Station (near Katra) - Champa Pooling Station 765kV Sic 6. Champa Pooling Station - Dharamjaygarh 765kV Sic 7. Upgradation of 400kV Raigarh Pooling station (near Katra) to 7651400kV

4x1500MVA capacity, Raipur pooling station to 7651400kV 1x1500MVA capacity, Champa pooling station to 7651400kV 3x1500MVA capacity, Raigarh pooling station(near Tamnar) to 7651400kV 3x1500MVA capacity for charging of terminating 765kV lines at 765kV level

8. Establishment of 7651400kV 2x1500MVA Aurangabad (PG) Sis for charging of 765kV lines at 765kV level

9. Establishment of 7651400kV 2x1500MVA Padghe (PG) Sis 10. Aurangabad- Dhule (New) (PG) 765 kV SIC(lmplementation through private

sector). 11. Dhule (New) - Vadodara (PG) 765 kV SIC (Implementation through private

sector) 12. Vadodara -Asoj 400kV Die (Quad) 13. Establishment of 7651400 kV 2x1500 MVA substations at Dhule (New)

(Implementation through private sector) 14. Dhule (New) - Dhule (MSETCL) 400 kV DIC (quad) (Implementation through

private sector)

Stage - Ill (Tentatively by 52 months from the date of signing of BPTA by the IPPs)

1. ±600kV, 4000MW HVDC bipole between Raigarh Pooling Station (Katra) - Dhule(New)

2. Dhule(New) - Malegaon(MSETCL) 400kV Dlc(Quad) 3. Dhule (New) - Nasik(MSETCL) 400kV Dlc(Quad) 4. Establishment of 4000MW 600KV HVDC bipole terminal each at Raigarh Pooling

station (near Katra) and Dhule(New) respectively.

Stage - IV (Tentatively by 55 months from the date of signing of BPTA by the IPPs)

1. ±800kV, 6000MW HVDC bipole between Champa Pooling Station -Kurukshehtra (NR) [initially to be operated for 3000MW].

2. Establishment of 3000MW 800KV HVDC bipole terminal each at Champa Pooling station and Kurukshetra(NR) respectively (provision to upgrade the terminals at (6000 MW at a later date)

3. Kurukshetra(NR) - Jallandhar 400kV Dlc(Quad) one ckt. via 4001220kV Nakodar Sis.

4. LILO of Abdullapur - Sonepat 400kV Dlc(triple) at Kurukshetra 5. Establishment of 4001220kV 2x500 MVA Sis at Kurushetra

It was agreed that with the above system strengthening and generation specific (dedicated), the L TOA may be provided to the respective IPPs. The dedicated

6

Page 9: POWER GRID CORPORATION OF INDIA LIMITED Minutes/11t… · Mr.AM.Mishra Head-Electrical Korba West Power Co Ltd 2nd floor, Centrum Plaza, Sector-53, · Gurgaon-122002 Mr.G.P.Rao, Project-Head

transmission system shall be developed by the respective IPP. Further, IPPs need to sign BPTA with POWERGRID!Transmission licensee for sharing of the transmission charges for above scheme in proportion to their L TOA quantum in addition to sharing of respective regional transmission charges. It was also informed that IPPs need to firm up beneficiaries at the earliest and intimate the same to POWERGRID. Further, to take up the implementation the system strengthening scheme, it was informed that IPPs need to submit bank guarantee equivalent to 10% of the total transmission system project cost to be shared amongst the IPPs in proportion to their L TOA quantum along with signing of BPTA as construction phase bank guarantee. In addition, at the time of operationalisation of the transmission system, IPPs need to submit bank guarantee equivalent to 6 months transmission charges till finalization of the beneficiaries. The L TOA Applicants/IPPs agreed for the same.

2. Moser Baer Power & Infrastructure Ltd

2.1 M/s Moser Baer Power & Infrastructure Ltd. has submitted application to POWERGRID for grant of "Long term Open Access" for transfer of 1128MW power from their proposed generation project [2x600 MW] in Distt Anuppur, MP. Target beneficiaries indicated by the applicant as MP [416MW], Maharashtra[100 MW], Gujarat[100 MW], NCR (NR) [350 MW] and balance 162 MW to others. Expected date of commencement of open access is Dec' 2012 (commissioning schedule of 1•t unit). Point of injection and drawl details for the purpose of open access is as under:

s. Gen Capacity (MW) Point of injection Point /Quantum of drawal N [Quantum (MW) to be

transferred]

1. Moser Baer Power Nearest S/s in Anuppur Quantum: TPS- 2x600 MW Dist; M.P M.P Govt. to buy as per (1200MW) MOU-416MW Village- Belia & 1128 MW Jethari, Dist - Others - 162 MW Anuppur (M.P)

Ca12acitll for Sale to Other Generation step-up States - 550 MW voltage: 400kV WR:200MW

NR: 350 MW

Point of drawal: The State Utilities interface with POWERGRID system

The status of the generation project as informed by the developer is as given below:

7

Page 10: POWER GRID CORPORATION OF INDIA LIMITED Minutes/11t… · Mr.AM.Mishra Head-Electrical Korba West Power Co Ltd 2nd floor, Centrum Plaza, Sector-53, · Gurgaon-122002 Mr.G.P.Rao, Project-Head

Applicant Moser Baer Power & Infrastructure Ltd. (2x600MW)

o Land 50 acres of land under possession. Total land expected by Nov'09

o Fuel Ministry of Coal has recommended for coal linkage. Letter of Assurance from SECL received

o Water Water supply agreement (80 MCM) signed o Environment MOEF approved ToR. Public hearing scheduled

in Sep'09 o EPCIBTG Status - EPC contract expected to be awarded in Sept'09 o Financial Closure - Expected in Dec'09 o Commissioning Unit-I : December 2012

Unit-II : June 2013

2.2 POWERGRID informed that studies were carried out considering load generation scenario corresponding to 2012-13 time frame. It was also assumed that transmission system associated with Orissa IPPs would be available by that time frame. For injection of 1200MW [Gross capacity] power from Moser Baer TPS and transfer to target beneficiary, following dedicated interconnection into WR grid was proposed:

• Moser Baer TPS - Jabalpur Pooling Station 400kV Die (Quad) • 2 nos. 400kV line bays at Jabalpur Pooling station

In addition, following transmission system strengthening was identified along with the project:

• Jabalpur Pooling Station - Bina 765kV Sic along with associated bays at either end

• Jabalpur Pooling Station - Damoh 400kV Die (Quad) along with associated bays at either end

2.3 Mis Moser Baer Power & Infrastructure Ltd. informed that they do not have any proposal for further expansion of this generation complex. Further, location of the generation project is en-route to the 400kV Korba - Birsinghpur - Damoh Die line, which is already under implementation and suggested to explore the possibility of interconnection of this project at suitable location on the above lines. Moser Baer also informed that as per MOU signed with M.P, MPPTCL needs to draw their share from the generation switchyard for which suitable transmission arrangement may be established by MPPTCL. In view of the above, it was decided that connectivity of the generation project as well as strengthening requirement, if any, may be reviewed and proposal shall be circulated to the constituents for their concurrence.

8

Page 11: POWER GRID CORPORATION OF INDIA LIMITED Minutes/11t… · Mr.AM.Mishra Head-Electrical Korba West Power Co Ltd 2nd floor, Centrum Plaza, Sector-53, · Gurgaon-122002 Mr.G.P.Rao, Project-Head

3. Bina Power Supply Co. Ltd.

3.1 M/s Bina Power Supply Co. Ltd. has submitted application to POWERGRID for grant of "Long term Open Access" for transfer of 500MW power from their proposed generation project [2x250 MW) in Distt Sagar, MP to Madhya Pradesh [210 MW] and target region WR [145 MW] & NR [145 MW]. Expected date of commencement of above open access as informed by M/s Bina Power is Sep'2011.

Point of injection and drawl details for the purpose of open access is as under:

s. Gen Capacity (MW) Point of injection Point /Quantum of drawal N [Quantum (MW) to be

transferred]

1. Bina Power Supply 400kV Bina (PG) Quantum: TPS- 2x250 MW Long term Sale: (500MW) 500MW M.P-210 MW at MPSEB Village- Sirchopi, S/s Bina Tehsil - Bina, Dist-Sagar (M.P) Merchant Power - 290 MW

WR: 145 MW Generation step-up NR: 145MW voltage: 400kV

Point of drawal:

The State Utilities interface with POWERGRID svstem

The status of the generation project as informed by the developer is as given below:

Applicant o Land

o Fuel

o Water

o Environment

o EPC/BTG Status -

o Financial Closure -

o Commissioning

Bina Power Supply Co. Ltd. (2x250MW) Under Possession

Coal linkage available

GoMP given in principle approval for 100

cusec water

In process

BTG awarded to BHEL

Achieved

Unit-I : September 2011 Unit-II : December 2011

3.2 POWERGRID informed that based on the studies, for injection of 500MW [Gross capacity] power from Bina Power TPS and transfer to target beneficiary regions, following dedicated interconnection into the WR grid was considered.

9

Page 12: POWER GRID CORPORATION OF INDIA LIMITED Minutes/11t… · Mr.AM.Mishra Head-Electrical Korba West Power Co Ltd 2nd floor, Centrum Plaza, Sector-53, · Gurgaon-122002 Mr.G.P.Rao, Project-Head

• LILO of 400kV Bina(M.P) - Bina(PG) Die line at Bina TPS

3.3 Further, it emerged that possibility of direct interconnection at 400kV Bina(PG) with the project may be explored. POWERGRID informed that 400kV Bina(PG) has space constraints and therefore 2 nos. line bays for termination of the dedicated line from the generation project can't be accommodated. In view of the above, it was considered that generation project may be connected to WR grid through LILO of 400kV Bina (M.P) - Bina(PG) Die line at Bina TPS.

After detailed deliberations, following was agreed :

i) Long term Open access to Mis Bina Power for transfer of power from their 500 MW generation project at Dist. Sagar, MP to target beneficiaries in WR(145MW)INR(145MW) may be provided.

ii) LILO portion of 400kV Bina(M.P) - Bina(PG) Die line at Bina TPS shall be the dedicated transmission system for the generation project which shall be built, owned, operated and maintained by Mis Bina Power to interconnect the generation project with WR grid.

iii) Mis Bina Power shall sign BPTA with POWERGRID for sharing of WR regional transmission charges corresponding to 500MW, NR transmission charges corresponding to 145MW as per CERC norms as well as shall need to share the transmission charges towards following common transmission corridors beyond Bina(PG) in WRINR proposed for IPPs in OrissalBilaspur Pooling Station

Common Transmission system to shared by Maruti Clean Coal & Power Ltd.(300MW). PTC lndia(600MW). Dheeru Powergen(450MW), Jaiprakash Power Ventures Ltd(1320MW). Arvan Coal Benefications Pvt. Ltd.(1200MWl. Bina Power(500MW).Jndiabulls Power Ltd.(390MW) to be shared along with IPPs in Orissa(6080MW) in proportion to allocation to NR

a) Bina - Gwalior 765 kV Sic (3'd) b) Gwalior - Jaipur 765kV Sic (2nd) c) Jaipur - Bhiwani 765kV Sic

Common Transmission system to shared by Maruti Clean Coal & Power Ltd. (300MW). PTC lndia(600MW). Dheeru Powergen(450MW), Jaiprakash Power Ventures Ltd, (1320MW) and Arvan Coal Benefications Pvt. Ltd. (1200MW). Bina Power(500MW) in proportion to allocation to WR

a) Indore - Vadodara 765 kV Sic b) Vadodara - Pirana 400kV Dlc(Quad) c) Establishment of 7651400kV 2x1500MVA Pooling station at Vadodara

iv) Date of commencement of above open access is from the date of commissioning of above identified system strengthening scheme indicated at para (iii) and LILO portion of 400kV Bina(M.P) - Bina(PG) Die line at Bina TPS as dedicated line,

10

Page 13: POWER GRID CORPORATION OF INDIA LIMITED Minutes/11t… · Mr.AM.Mishra Head-Electrical Korba West Power Co Ltd 2nd floor, Centrum Plaza, Sector-53, · Gurgaon-122002 Mr.G.P.Rao, Project-Head

scheduled for implementation by that time frame. Further, Mis Bina Power shall take necessary action to fulfill the terms and conditions of open access application.

4. lndiabulls Power Ltd.

4.1 M/s lndiabulls Power Ltd. has submitted application to POWERGRID for grant of "Long term Open Access" for transfer of 1230MW power from their proposed Nandgaon peth generation project [2x660 MW) in Distt Amravati, Maharashtra to Maharashtra [930 MW] and target regions: WR [200 MW] & NR [100 MW]. Expected date of commencement of above open access as informed by M/s lndiabulls Power Ltd is Dec'2011. Point of injection and drawl details for the purpose of open access is as under:

s. Gen Capacity (MW) Point of injection Point /Quantum of drawal N [Quantum (MW) to be

transferred]

1. Amravati TPS - Nearest POWERGRID Quantum: 2x660 MW S/s in Maharashtra Maharashtra - 930 MW (1320MW) Nandgaon Pet, Dist - 1230 MW Ca12acitv for Sale to Other Amravati States - 300 MW (Maharashtra) WR:200MW

NR: 100MW Generation step-up voltage: 400kV Point of drawal:

Interconnection of CTU system with the STU system of taroet States

The status of the generation project as informed by the developer is as given below:

Applicant o Land

o Fuel

o Water

o Environment

lndiabulls Power Ltd.(2x660MW) Under possession

Coal linkage granted by the Standing Linkage

Committee. Source of linkage: WCUSECL

Allotted 240 MLD

MOEF prescribed ToR for EIA study. EAC

recommended the project for environmental

clearance.

o EPC/BTG Status Awarded

o Financial Closure - Achieved

o Commissioning Unit-I : December 2011 Unit-II : March 2012

11

Page 14: POWER GRID CORPORATION OF INDIA LIMITED Minutes/11t… · Mr.AM.Mishra Head-Electrical Korba West Power Co Ltd 2nd floor, Centrum Plaza, Sector-53, · Gurgaon-122002 Mr.G.P.Rao, Project-Head

4.2 POWERGRID informed that for injection of 1320MW [Gross capacity] power from lndiabulls TPS, MSTECL has already granted, connectivity with their network as under:

• Nandgaonpeth (lndiabulls) -Akola II (MSETCL) 400kV Dlc(Quad) • LILO of Akola-1 - Koradi I 400kV Sic at Nandgaonpeth (lndiabulls)

Further, transfer of 390MW through ISTS to other States in WR/NR, same may be effected through 400kV Akola - Aurangabad Die line (ISTS) as well as other identified transmission corridor towards NR. However, strengthening beyond Aurangabad is proposed to cater the power transfer requirement from various IPPs in Chhattisgarh including lndiabulls TPS for System strengthening comprising following elements shall be required.

• Aurangabad(PG) - Khargar 400kV Die (Quad)

Common Transmission system to shared by Maruti Clean Coal & Power Ltd.(300MW), PTC lndia(600MW), Dheeru Powergen(450MW), Jaiprakash Power Ventures Ltd(1320MW), Arvan Coal Benefications Pvt. Ltd.(1200MW), Bina Power(500MW), lndiabulls(390MW) to be shared along with IPPs in Orissa(6080MW) in proportion to allocation to NR

a) Bina - Gwalior 765 kV Sic (3'd) b) Gwalior - Jaipur 765kV Sic (2nd) c) Jaipur - Bhiwani 765kV Sic

After detailed deliberations, following was agreed:

a) Long term Open access to Mis lndiabulls Power for transfer of 390 MW power from their 1320 MW generation project at Dist. Amravati, Maharashtra to target beneficiaries in WR(260MW)INR(130MW) may be provided.

b) Following dedicated transmission system for the generation project shall be built, owned, operated and maintained by Mis lndiabulls Power to interconnect the generation project with MSTECL network:

• Nandgaonpeth (lndiabulls) - Akola II (MSETCL) 400kV Dlc(Quad) • LILO of Akola-1 - Koradi I 400kV Sic at Nandgaonpeth (lndiabulls)

c) Mis lndiabulls Power shall sign BPTA with POWERGRID for sharing of WR transmission charges corresponding to 390MW and NR transmission charges corresponding to 130MW as per CERC norms. In addition, transmission charges for the proposed strengthening scheme shall also need to be shared by Mis lndiabulls along with other IPPs in proportion to their quantum of L TOA.

i) Strengthening Scheme - Transmission charges to be shared along with other IPPs in Chhattisgarh [15185 MW] o Aurangabad(PG) - Khargar 400kV Die (Quad)

12

Page 15: POWER GRID CORPORATION OF INDIA LIMITED Minutes/11t… · Mr.AM.Mishra Head-Electrical Korba West Power Co Ltd 2nd floor, Centrum Plaza, Sector-53, · Gurgaon-122002 Mr.G.P.Rao, Project-Head

ii) Common Transmission system to shared by lndiabulls (390 MW), Maruti Clean Coal & Power Ltd.(300MW), PTC lndia(600MW), Dheeru Powergen(450MW), Jaiprakash Power Ventures Ltd(1320MW), Arvan Coal Benefications Pvt. Ltd.(1200MW), Bina Power(500MW) to be shared along with IPPs in Orissa(6080MW)

a) Bina - Gwalior 765 kV S/c (3'd) b) Gwalior - Jaipur 765kV S/c(2nd) c) Jaipur - Bhiwani 765kV S/c

It was informed that M/s lndiabulls needs to submit bank guarantee equivalent to 10% of the total transmission system strengthening project cost at (i) above to be shared along with IPPs in proportion to their L TOA quantum along with signing of BPTA as construction phase bank guarantee.

d) Date of commencement of above open access is from the date of commissioning of above identified system strengthening scheme indicated at para (c) and dedicated line, scheduled for implementation by that time frame. Further, M/s lndiabulls Power shall take necessary action to fulfill the terms and conditions of open access application.

5. Pipavav Energy Pvt Ltd.

5.1 Mis Pipavav Energy Ltd has submitted application to POWERGRID for grant of "Long term Open Access" for transfer of 555MW power from their proposed generation project [1x600 MW] in Distt Amreli, Gujarat. Subsequently, Pipavav Energy Ltd revised their generation capacity to 1200 MW (2x600 MW) and transfer requirement to 1110 MW (WR (555 MW] & NR (555 MW]). Expected ·date of commencement of above open access as informed by M/s Pipavav Energy Ltd is Mar'2013.

Point of injection and drawl details for the purpose of open access is as under:

s. Gen Capacity (MW) Point of injection Point /Quantum of drawal N [Quantum (MW) to be

transferred]

1. Pipavav Energy TPS Nearest POWERGRID Quantum: -2x600 MW S/s in Gujarat WR: 555MW (1200 MW) NR : 555 MW Pipavav port, Dist - 1110 MW Amreli (Gujarat) Point of drawal:

Interconnection of CTU Generation step-up system with the STU voltaQe: 400kV svstem of taroet States

The status of the generation project as informed by the developer is as given below:

13

Page 16: POWER GRID CORPORATION OF INDIA LIMITED Minutes/11t… · Mr.AM.Mishra Head-Electrical Korba West Power Co Ltd 2nd floor, Centrum Plaza, Sector-53, · Gurgaon-122002 Mr.G.P.Rao, Project-Head

Applicant o Land

o Fuel

Pipavav Energy Pvt. Ltd. (1x600MW)

320 acre under possesion, balance 210 acre in process Private coal mines[Videocon] in lndonesia(80%) and balance from Australia

o Water Sea water is being used o Environment Public hearing completed. MOEF clearance

expected in Sep'09. o EPCIBTG Status - Awarded to BHEL

o Financial Closure - Expected in Oct'09. o Commissioning Unit-I : March 2013

Unit-II : Sept, 2013

5.2 POWERGRID informed that for injection of 1200MW [Gross capacity] power from Pipavav TPS and transfer to target beneficiary, following dedicated interconnection into the WR grid was considered.

i) Pipavav TPS - Pirana(PG) 400kV Die ii) 2 nos. 400kV line bays at Pirana(PG) to terminate above line

Further, system strengthening comprising following elements shall also be required.

a) Bhachau - Versana(GETCO) 400kV Die

5.3 CEA informed that they earlier envisaged connectivity at 400kV AmrelilJetpur Sis in Saurashtra area due to proximity of location of generation project, however GETCO intimated that due to lack of space at 400kV AmrelilJetpur Sis and their future plans, connectivity wouldn't' be possible. GETCO informed that they would once again explore the possibility of connectivity at nearby Sis in Saurashtra region in a week's time and in case connectivity is not available, direct connection to 400kV Pirana may be provided.

After detailed deliberations, following was agreed:

a) Long term Open access to Mis Pipavav Energy Ltd for transfer of power from their 1200 MW generation project at Dist. Amreli, Gujarat to target beneficiaries in WR(600MW)INR(600MW) may be provided.

b) Following dedicated transmission system for the generation project shall be built, owned, operated and maintained by Mis Pipavav Energy Ltd to interconnect the generation project with WR grid, subject to response from GETCO regarding suitability of connectivity elsewhere:

i) Pipavav TPS - Pirana(PG) 400kV Die ii) 2 nos. 400kV line bays at Pirana(PG) to terminate above line

14

Page 17: POWER GRID CORPORATION OF INDIA LIMITED Minutes/11t… · Mr.AM.Mishra Head-Electrical Korba West Power Co Ltd 2nd floor, Centrum Plaza, Sector-53, · Gurgaon-122002 Mr.G.P.Rao, Project-Head

GETCO informed that they would explore the possibility of connectivity at nearby Sis in Saurashtra region in a week's time and in case connectivity is not available, direct connection to 400kV Pirana may be provided.

c) Mis Pipavav Energy Ltd shall sign BPTA with POWERGRID for sharing of WR regional transmission charges corresponding to 1200MW and NR transmission charges corresponding to 600MW as per CERC norms and as well as shall need to share the transmission charges towards following transmission system strengthening scheme. It was informed that Mis Pipavav Energy needs to submit bank guarantee equivalent to 10% of the total transmission system strengthening cost along with signing of BPTA as construction phase bank guarantee.

Strengthening Scheme

a) Bhachau - Versana(GETCO) 400kV Die

In case, generation project is interconnected at suitable location in Saurashtra area, above system strengthening would need to be reviewed.

d) Date of commencement of above open access is from the date of commissioning of above identified system strengthening scheme indicated at para (c) and dedicated line, scheduled for implementation by that time frame. Further, Mis Pipavav Energy Ltd shall take necessary action to fulfill the terms and conditions of open access application.

6. Real lspat & Power Ltd.(1x80 MW)

6.1 Mis Real lspat & Power Ltd has submitted application to POWERGRID for grant of "Long term Open Access" for transfer of 70MW power from their proposed generation project [1x80 MW] in Distt Bhatapara, Chhattisgarh to WR [42 MW] & NR [28 MW]). Expected date of commencement of above open access as informed by Mis Real lspat & Power Ltd is Dec'2010.

Point of injection and drawl details for the purpose of open access is as under:

s. Gen Capacity (MW) Point of injection Point /Quantum of drawal N [Quantum (MW) to be

transferred]

1. Real lspat & Power Ex-generator bus Quantum: Ltd. - 1x80 MW WR:42MW (80 MW) 70MW NR :28MW Dist - Bhatapara (Chhattisgarh) Point of drawal:

Interconnection of CTU Generation step-up system with the STU voltage: 400kV or system of target region 220kV

The status of the generation project as informed by the developer 1s as given below:

15

Page 18: POWER GRID CORPORATION OF INDIA LIMITED Minutes/11t… · Mr.AM.Mishra Head-Electrical Korba West Power Co Ltd 2nd floor, Centrum Plaza, Sector-53, · Gurgaon-122002 Mr.G.P.Rao, Project-Head

Applicant

o Land

o Fuel

o Water o Environment o EPC/BTG Status -o Financial Closure -o Commissioning

Real lspat & Power Ltd.(1x80MW)

100 acre required and total land under possession Dolachar and washery rejects/coal fines- all tied ups Allocation obtained ToR granted. EC is awaited within next 3 months Before 15th Sep'09

Expected in Oct'09. Unit-I : December 2010

6.2 POWERGRID informed that Considering the capacity of the project and its location, it is proposed to interconnect the Real lspat generation project(80MW) with the grid through LILO of 220kV Bhatapara(PG) - Bhatapara(CSPTCL) Die line at the generation switchyard

6.3 CSPTCL suggested that considering quantum of power transfer requirement, it is advisable to interconnect the project at suitable STU point, and adequacy of ISTS may be examined to effect desired quantum of power transfer through ISTS.

6.4 It was decided that M/s Real lspat may take up the matter with CSPTCL for interconnection of generation project with Chhattaigarh State network (CSPTCL) and inform to POWERGRID the same. Based on the interconnection at CSPTCL, adequacy of ISTS to effect desired inter-State transaction of power shall be examined and L TOA in ISTS shall be processed further.

16

Page 19: POWER GRID CORPORATION OF INDIA LIMITED Minutes/11t… · Mr.AM.Mishra Head-Electrical Korba West Power Co Ltd 2nd floor, Centrum Plaza, Sector-53, · Gurgaon-122002 Mr.G.P.Rao, Project-Head

Name (S/Sh)

V.Ramakrishna

P.K.Pahwa

A.K.Yadav

Manjit Singh

S.G.Tenpe

l.S.Jha

A.K.Datta

Y.K.Sehgal

M.G.Raoot

A.K.Sinha

S.K.Gupta

Prashant Sharma

1.N.Jha

P.Pentayya

SubirSen

Manju Gupta

K.K.Gupta

S.Jagdeesan

S. K. Negi

BB Mehta

S.G.Prasad

P.J.Jani

G.S.Limaye

S.D.Shrouty

N.R.Sonkavday

Vijay Singh

Shiv Raj Singh

ANNEXURE-1 11th Meeting of WR Constituents regarding L TOA Applications in WR

Date: 10-09-2009, Venue: Hotel Gateway Ummed, Ahmedabad

Designation Organisation Contact No Fax E-mail Member(PS) CEA

Director (SP &PA) CEA

EE CEA 011-26732308 [email protected]

Member Secretary WRPC 9819064946 022-28370193 [email protected]

SE (Comml) WRPC 9987513281 02228370193 sgtenpeeyahoo.com

Director, POWERGRID POWERGRID [email protected]

ED, WR-II POWERGRID

ED(SEF&CE) POWERGRID [email protected]

ED,WRLDC POWERGRID 0986945582 [email protected]

GM (Projects), WR-I POWERGRID 9422145369 ak [email protected]

GM (Projects), WR-II POWERGRID 9428504051 [email protected]

AGM (Comml.) POWERGRID 9910378002 [email protected]

AGM(Engg), WR-II POWERGRID 9428504054 02652480953 [email protected]

AGM, WRLDC POWERGRID 9869450206 02228314609 [email protected]

DGM POWERGRID [email protected]

COE POWERGRID [email protected]

CM (Engg), WR-II POWERGRID

Principal Secretary (Energy) Govt. Of Gujarat 022-28221636

MDGETCO GET CO 9879200622 02652338153 [email protected]

SE (STU) GET CO 9879200736 02652338152 [email protected]

EE (System) GET CO 9925208598 [email protected]

E.E.(Com.) GUVNL 9879618754 02652344543

Dir (Operation) MS ET CL 9820552242 02226592299 [email protected]

E.D. (STU) MS ET CL 9920456251 02226592298 [email protected]

SE (STU) MS ET CL 9987783924 02226592297 [email protected]

Chief Engr. (Trans.) CSPTCL 9406249987 07712574240 [email protected]

Advisor CSPTCL 9827216858 07712574015

Page 20: POWER GRID CORPORATION OF INDIA LIMITED Minutes/11t… · Mr.AM.Mishra Head-Electrical Korba West Power Co Ltd 2nd floor, Centrum Plaza, Sector-53, · Gurgaon-122002 Mr.G.P.Rao, Project-Head

11th Meeting of WR Constituents regarding LTOA Applications in WR Date: 10-09-2009, Venue: Hotel Gateway Ummed, Ahmedabad -

O.P.Jaiswal CE (P.S.) MPPTCL 9425804949 07612665593 [email protected]

M.M.Dhoke EE (T&P) MPPTCL 9425805237 07612665593 [email protected]

B.N.Mehta ACE (OIDC) SE (Power) Deptt. Of Elec.UT Of DD & DNH 9825400184 [email protected]

A.K.Gupta GM (PE-Elect & C&I) NTPC, Delhi 9868390251 01202410108 [email protected]

J.Balasubramanayam Sr. Advisor Athena Chattisgarh Power 9866516137 [email protected]

M.R.Krishna Rao GM (Comml.) Lanco Amarkantak Power Pvt. Ltd. 9650191968 [email protected]

Ritesh Jindal Head Corp. Relations Real lspat & Power Ltd. 9826014454 07712445510 [email protected]

Vined Agrawal Director Vandana Vidhyut Ltd. 9926050000 07714006001 [email protected]

RV.Mathe GM (Cont) Vandana Vidhyut Ltd. 9685090701 07714006001 [email protected]

M.P.Singh V.P.(Engg) JPVL (Jai Prakash ) 9910900380 01204516101 [email protected]

L.N.Agrawal Sr. V.P. (Trans.) lndiabulls Power Ltd. 9910032028 [email protected]

Ravi Arya GM (Contracts & Comml) Moserbaer 9910377978 01147624229 [email protected]

G.Srinivasarao DGM-Elec. Wardha Power 9908272223 [email protected]

C.Narasimha Manager - Elec Wardha Power 9959444903 04023559930 [email protected]

V.Lakshmipathi Wardha Power 9000011596 04023559930 [email protected]

Ramakrishna Rao Vice President SKS lspat And Power Ltd. 9967981551 02230807070 [email protected]

S S Mediratta GM D. B. Power Ltd. 9818638270 [email protected]

A.M.Misra Head-Electrical Korba West Power Co Ltd 9810553164 [email protected]

G.Kashinath Executive Director R.K.M. Powergen 9444915710 [email protected]

Bharat Rohra Sr.V.President Jindal Power 9818805228 [email protected]

lndranil Ditta Vice President Balco 9893379713 [email protected]

Devendra Patel Assoc.GM Bal co 9893122359 [email protected]

K.S.Arora ED Chattisgarh Steel & Power Ltd. 9425505122 [email protected]

D. P. Bhasin Sr GM PEPL 9958560005 [email protected]