27

Post Fire Stability Hans Gerlich for Winstone Wallboards Ltd

Embed Size (px)

Citation preview

Page 1: Post Fire Stability Hans Gerlich for Winstone Wallboards Ltd
Page 5: Post Fire Stability Hans Gerlich for Winstone Wallboards Ltd

‘Structural Adequacy’

Ability of a specimen to resist vertical loads, applied

in a standard furnace test

e.g.,30/30/30

Page 7: Post Fire Stability Hans Gerlich for Winstone Wallboards Ltd

Designing for Stability

in accordance with

NZBC B1/VM1

During and After fire

Page 8: Post Fire Stability Hans Gerlich for Winstone Wallboards Ltd

Designing for Stability

Of boundary fire walls

Page 11: Post Fire Stability Hans Gerlich for Winstone Wallboards Ltd

Post-Fire

NZBC B1/VM1

‘After the fire until the building is either repaired or

demolished’

??

Page 13: Post Fire Stability Hans Gerlich for Winstone Wallboards Ltd

MEFE Thesis – Daniel JessopFire Performance of a Laterally Loaded LTF Structure

Page 14: Post Fire Stability Hans Gerlich for Winstone Wallboards Ltd
Page 15: Post Fire Stability Hans Gerlich for Winstone Wallboards Ltd

Horizontal furnace testISO 834 standard time-temperature curve

Page 16: Post Fire Stability Hans Gerlich for Winstone Wallboards Ltd
Page 17: Post Fire Stability Hans Gerlich for Winstone Wallboards Ltd
Page 18: Post Fire Stability Hans Gerlich for Winstone Wallboards Ltd
Page 19: Post Fire Stability Hans Gerlich for Winstone Wallboards Ltd
Page 20: Post Fire Stability Hans Gerlich for Winstone Wallboards Ltd
Page 21: Post Fire Stability Hans Gerlich for Winstone Wallboards Ltd

30.5 mins – Run-away deflection in fire-rated wall, furnace shut-off

Page 22: Post Fire Stability Hans Gerlich for Winstone Wallboards Ltd
Page 23: Post Fire Stability Hans Gerlich for Winstone Wallboards Ltd
Page 24: Post Fire Stability Hans Gerlich for Winstone Wallboards Ltd

30.5 minutes Run-away deflection in fire-rated wallfurnace shut-down

Page 26: Post Fire Stability Hans Gerlich for Winstone Wallboards Ltd

C/AS1NZS3604

NZBC Compliance

B1 – Structure C 1-6 Protection from Fire

Page 27: Post Fire Stability Hans Gerlich for Winstone Wallboards Ltd

Thanks for Listening !

In short;

• ‘Stability’ vs ‘Structural Adequacy’• ‘Post-Fire’• B1/VM1 provisions• Required FRRs for Boundary Walls• Testing LTF structure (MEFE Project - Daniel Jessop)