U.S. Army Corps of Engineers 28 August 2019 PORTLAND METRO LEVEE SYSTEM FLOOD RISK MANAGEMENT FEASIBILITY STUDY 1

PORTLAND METRO LEVEE SYSTEM FLOOD RISK MANAGEMENT … · 2019. 8. 28. · PORTLAND METRO LEVEE SYSTEM ... Assessment released for public review, comment • Agency endorsement for

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PORTLAND METRO LEVEE SYSTEM FLOOD RISK MANAGEMENT … · 2019. 8. 28. · PORTLAND METRO LEVEE SYSTEM ... Assessment released for public review, comment • Agency endorsement for

U.S. Army Corps of Engineers28 August 2019

PORTLAND METRO LEVEE SYSTEMFLOOD RISK MANAGEMENT FEASIBILITY STUDY

1

Page 2: PORTLAND METRO LEVEE SYSTEM FLOOD RISK MANAGEMENT … · 2019. 8. 28. · PORTLAND METRO LEVEE SYSTEM ... Assessment released for public review, comment • Agency endorsement for

2PURPOSE OF MEETING–Update on Corps’ planning process for the Portland Metro

Levee System Feasibility Study since the December open houses

–Explain next steps, including when the draft report is scheduled for release to the public for comment

Page 3: PORTLAND METRO LEVEE SYSTEM FLOOD RISK MANAGEMENT … · 2019. 8. 28. · PORTLAND METRO LEVEE SYSTEM ... Assessment released for public review, comment • Agency endorsement for

STUDY AREA

3

Page 4: PORTLAND METRO LEVEE SYSTEM FLOOD RISK MANAGEMENT … · 2019. 8. 28. · PORTLAND METRO LEVEE SYSTEM ... Assessment released for public review, comment • Agency endorsement for

4STUDY AUTHORITY AND SPONSOR–Authority: Section 216 of the Flood Control Act of 1970

(33 U.S.C. § 549a)

–SMART Planning status: 3x3x3 compliantTitle IV, Division B of the Bipartisan Budget Act of 2018, Public Law 115-123, enacted February 9, 2018 authorizes the Government to conduct the study at full Federal expense.

–Non-Federal Sponsor: Columbia Corridor Drainage Districts

Page 5: PORTLAND METRO LEVEE SYSTEM FLOOD RISK MANAGEMENT … · 2019. 8. 28. · PORTLAND METRO LEVEE SYSTEM ... Assessment released for public review, comment • Agency endorsement for

5

<3 months <9 months ~ 12 months ~ 6 months~ 6 months

Alternative Evaluation& Analysis

Feasibility Analysis of Selected Plan

Washington-level Review

Alternatives Milestone9 Jan 2019

Tentatively SelectedPlan Milestone3 Oct 2019

Agency Decision Milestone3 Apr 2020

Chief’s Report Signed

3 Oct 2021

Draft Report Released for

Concurrent Review3 Dec 2019

District FinalReport Package

Transmittal2 Apr 2021

Scoping & Alt. Formulation

Draft Chief’s Report

Released

Section 1002 letter to NFS (<90 days after FCSA executed)

KEY MILESTONES IN A 3x3 STUDY

KeyDecision Milestone

Product Milestone

Includes Final Biological Opinion

<-------------------------- $800k --------------------------->

Page 6: PORTLAND METRO LEVEE SYSTEM FLOOD RISK MANAGEMENT … · 2019. 8. 28. · PORTLAND METRO LEVEE SYSTEM ... Assessment released for public review, comment • Agency endorsement for

6

CORPS FEASIBILITY STUDY PROCESS

ScopingAlternatives Formulation & Analysis

Feasibility-Level Design

Chief’s Report

Completed April 2020 – April 2021 April 2021 – Oct 2021

• Public input addressed• Data gathering• Environmental

coordination began

• Formulate, evaluate alternatives

• Draft Feasibility Report & Environmental Assessment released for public review, comment

• Agency endorsement for further design of recommended plan

• Further refine recommended plan; develop ~35% designs and cost estimate

• Final Feasibility Report & Environmental Assessment released

• Report to Congress to seek authorization for Construction

• Environmental compliance complete

Present

Page 7: PORTLAND METRO LEVEE SYSTEM FLOOD RISK MANAGEMENT … · 2019. 8. 28. · PORTLAND METRO LEVEE SYSTEM ... Assessment released for public review, comment • Agency endorsement for

7WHAT IS FLOOD RISK?

Risk = Hazard + Performance + Exposure + Vulnerability + Consequences

Flood Risk (simplified) = Flood Probability x Flood Consequences

Page 8: PORTLAND METRO LEVEE SYSTEM FLOOD RISK MANAGEMENT … · 2019. 8. 28. · PORTLAND METRO LEVEE SYSTEM ... Assessment released for public review, comment • Agency endorsement for

8FEDERAL INTERESTLevee System–All 4 drainage districts were authorized

and constructed in either or both the 1936 and 1950 Flood Control Acts.

–Additional work has occurred on the flood control system in all 4 drainage districts in subsequent years

SignificanceThe study area is a cornerstone to the regional, statewide, and national economy with over $16 billion in annual economic activity generated from businesses and over $7.3 billion in property values within the levee protection area.–Population At Risk estimated at approximately 60k–Thousands of businesses–12% of Multnomah County’s jobs–Drinking water supply to 966,600 customers–Natural gas pipeline that serves two states –2 airports:

• Portland International Airport (50k passengers/day, 18.4 M/year) • US Air National Guard Base

–3 Interstate highways: I-5, I-205, I-84–2 Transit and a Class I freight rail lines

Page 9: PORTLAND METRO LEVEE SYSTEM FLOOD RISK MANAGEMENT … · 2019. 8. 28. · PORTLAND METRO LEVEE SYSTEM ... Assessment released for public review, comment • Agency endorsement for

9PROBLEMSConsequences of flood risk– Life Safety: large population at risk; difficult to evacuate– NED Economic Losses: critical infrastructure, structures, contents, vehicles,

hazardous materials inundation

Weaknesses in existing system– Overtopping of existing levees– Weak points (e.g. Railroad embankment)– Aging infrastructure– Pump stations lack of adequate pumps

Page 10: PORTLAND METRO LEVEE SYSTEM FLOOD RISK MANAGEMENT … · 2019. 8. 28. · PORTLAND METRO LEVEE SYSTEM ... Assessment released for public review, comment • Agency endorsement for

10OBJECTIVES & CONSTRAINTSObjectives (within the PMLS, over the period of analysis)– Reduce flood damages, in particular to critical infrastructure– Reduce threats to life safety from flooding, and increase awareness of flood risk – Increase resiliency of the flood management system– Increase reliability of the flood management system – Improve operability of the flood management system – To the extent practicable, provide opportunities for recreation, natural resources,

and cultural resources.

Constraints– Cross-levees must stay in place – Railroad embankment will not be considered a levee in the same alignment.– Existing road infrastructure remains unchanged.

Page 11: PORTLAND METRO LEVEE SYSTEM FLOOD RISK MANAGEMENT … · 2019. 8. 28. · PORTLAND METRO LEVEE SYSTEM ... Assessment released for public review, comment • Agency endorsement for

11INITIAL MEASURES1. Elevate structures2. Flood proof buildings3. Buy outs4. Relocation of residences/ businesses/

critical infrastructure5. Widen levees6. Early warning/flood evacuation

systems7. Increase levee heights (this includes

cross levees, mainstem, slough)8. Maximize/increase flood storage capacity

in the Willamette Basin Projects9. Bigger facility: buy real estate to expand

horizontal10.Add pump capacity11.Add gates12.Add ring levees13.Riprap14. Improve Flood Fight: access roads,

mobility of flood fighters, remove restrictions for equipment

15.Automate operations in the systems16. Improve permeability: paved parking lot

replaced with grid & grass17. Increase wetlands/retention ponds18.Complete Seismic retrofits19. Install Portable pumps similar to Brazil20.Add redundancy for pump system21. Install Submersible pump stations22. Improve/Increase Debris control23.Relocate MCDD Headquarters out of

floodplain (COOP plan)24.Reroute water/floodwater25.Construct levee next to railway/ highway

to act as drainage seep26.Aquatic invasive plants control/eradication27.Recreation trails on top of levees28.Operate tide gates to increase flow29. Improve/Increase seepage berms30.Build additional levees/floodwalls31.Remove existing levee (Pen 1)

32.Rehab or replace mechanical/structural features: gates, valves, pumps

33.Adjust/ensure levee slopes meet current standards

34.Relocate transportation corridors35.Utilize setback levees36.Education on flood risk37. Install/Improve Signs for evacuation38.Removal of Levee Vegetation39.Address existing erosion/control future

erosion on levees40.Reduce Area of Protection41.Establish "safe zones" for evacuation

Stem wall42.Add relief or overflow areas43.Zoning44.Secure floating homes

Page 12: PORTLAND METRO LEVEE SYSTEM FLOOD RISK MANAGEMENT … · 2019. 8. 28. · PORTLAND METRO LEVEE SYSTEM ... Assessment released for public review, comment • Agency endorsement for

12RECONNECTING PEN 1Minimal flood risk benefits: If Pen 1 levees didn’t exist during February 1996 flood, decrease in flood levels would have been negligible. (0.02’)– Capacity– Conveyance

Page 13: PORTLAND METRO LEVEE SYSTEM FLOOD RISK MANAGEMENT … · 2019. 8. 28. · PORTLAND METRO LEVEE SYSTEM ... Assessment released for public review, comment • Agency endorsement for

13

FUTURE WITHOUT PROJECT CONDITION

Increase Levee Height Between Pen 2 and MCDD

Page 14: PORTLAND METRO LEVEE SYSTEM FLOOD RISK MANAGEMENT … · 2019. 8. 28. · PORTLAND METRO LEVEE SYSTEM ... Assessment released for public review, comment • Agency endorsement for

14MEASURES RETAINEDStructural5. Improve levee performance7. Increase levee heights

10. Add pump capacity20. Add redundancy for pump system22. Improve/Increase Debris control30. Build additional levees/floodwalls32. Rehab or replace mechanical/

structural features: gates, valves, pumps

Non-Structural6. Early warning system/flood

evacuation system14. Improve Flood Fight15. Automate operations in the systems36. Education on flood risk37. Install/improve signs for evacuation41. Establish "safe zones" for

evacuation life/safety

Page 15: PORTLAND METRO LEVEE SYSTEM FLOOD RISK MANAGEMENT … · 2019. 8. 28. · PORTLAND METRO LEVEE SYSTEM ... Assessment released for public review, comment • Agency endorsement for

15

Page 16: PORTLAND METRO LEVEE SYSTEM FLOOD RISK MANAGEMENT … · 2019. 8. 28. · PORTLAND METRO LEVEE SYSTEM ... Assessment released for public review, comment • Agency endorsement for

16

Page 17: PORTLAND METRO LEVEE SYSTEM FLOOD RISK MANAGEMENT … · 2019. 8. 28. · PORTLAND METRO LEVEE SYSTEM ... Assessment released for public review, comment • Agency endorsement for

17

Page 18: PORTLAND METRO LEVEE SYSTEM FLOOD RISK MANAGEMENT … · 2019. 8. 28. · PORTLAND METRO LEVEE SYSTEM ... Assessment released for public review, comment • Agency endorsement for

18

HOW CAN THE SYSTEM FAIL?

Page 19: PORTLAND METRO LEVEE SYSTEM FLOOD RISK MANAGEMENT … · 2019. 8. 28. · PORTLAND METRO LEVEE SYSTEM ... Assessment released for public review, comment • Agency endorsement for

19PROBABILITY OF LEVEE FAILURE?

Probability of breach

0 1

Riv

er e

lev.

Less fragileMore reliable

More fragileLess reliable

Page 20: PORTLAND METRO LEVEE SYSTEM FLOOD RISK MANAGEMENT … · 2019. 8. 28. · PORTLAND METRO LEVEE SYSTEM ... Assessment released for public review, comment • Agency endorsement for

20RAILROAD SEGMENT–Site of levee breach during 1948 flood–Unknown condition currently–Currently assuming no cooperation is

possible with railroad, though discussions continue

Page 21: PORTLAND METRO LEVEE SYSTEM FLOOD RISK MANAGEMENT … · 2019. 8. 28. · PORTLAND METRO LEVEE SYSTEM ... Assessment released for public review, comment • Agency endorsement for

21

MODEL RESULTS: FUTURE WITHOUT PROJECT

Page 22: PORTLAND METRO LEVEE SYSTEM FLOOD RISK MANAGEMENT … · 2019. 8. 28. · PORTLAND METRO LEVEE SYSTEM ... Assessment released for public review, comment • Agency endorsement for

22INTERIOR DRAINAGE

Flooding caused from stormwater runoff that cannot be controlled by pump stations.

Page 23: PORTLAND METRO LEVEE SYSTEM FLOOD RISK MANAGEMENT … · 2019. 8. 28. · PORTLAND METRO LEVEE SYSTEM ... Assessment released for public review, comment • Agency endorsement for

23INTERIOR DRAINAGE

Sandy Pump Station was swamped in February 1996 storm

Page 24: PORTLAND METRO LEVEE SYSTEM FLOOD RISK MANAGEMENT … · 2019. 8. 28. · PORTLAND METRO LEVEE SYSTEM ... Assessment released for public review, comment • Agency endorsement for

24LEVEE BREACH SCENARIOS

DEPTH ARRIVAL TIME

Page 25: PORTLAND METRO LEVEE SYSTEM FLOOD RISK MANAGEMENT … · 2019. 8. 28. · PORTLAND METRO LEVEE SYSTEM ... Assessment released for public review, comment • Agency endorsement for

25CONSIDERATION OF ENVIRONMENTAL & CULTURAL RESOURCES

Obtain early feedback from stakeholders• Open houses• Early coordination and pre-consultation with agencies and

federally recognized tribes

Evaluation of alternatives• Describe affected environment• Describe impacts of alternatives: avoid, minimize, mitigate• Evaluate environmental consequences

Agency & Public Review• Consultation with agencies and federally recognized tribes• Circulation of Draft Integrated Feasibility Report and

Environmental Assessment 3 December 2019

NEPA

Clean Water Act

Endangered Species Act

Fish and Wildlife Coordination Act

Migratory Bird Treaty Act & Eagle

Protection Act

National Historic Preservation Act

Page 26: PORTLAND METRO LEVEE SYSTEM FLOOD RISK MANAGEMENT … · 2019. 8. 28. · PORTLAND METRO LEVEE SYSTEM ... Assessment released for public review, comment • Agency endorsement for

26LOCAL SPONSORSThe four individual drainage districts serve

as the local sponsors of federally-authorized levee system. Working closely with the US

Army Corps of Engineers on feasibility study. Also, members of Levee Ready Columbia

Page 27: PORTLAND METRO LEVEE SYSTEM FLOOD RISK MANAGEMENT … · 2019. 8. 28. · PORTLAND METRO LEVEE SYSTEM ... Assessment released for public review, comment • Agency endorsement for

27

20+ member coalition committed to: a) ensuring the levee system meets federal safety standards b) modernizing the infrastructure and the way it is managedc) making the most of opportunities to improve the environmental and

recreational value of the area

LEVEE READY COLUMBIA

Page 28: PORTLAND METRO LEVEE SYSTEM FLOOD RISK MANAGEMENT … · 2019. 8. 28. · PORTLAND METRO LEVEE SYSTEM ... Assessment released for public review, comment • Agency endorsement for

DISCOVERY PHASE: 2013-2018

Levee Engineering Assessment

Flood Risk Assessment

Encroachment Evaluation Climate Change Study

Community Asset Inventory Economic Inventory Environmental

InventoryGovernance &

Revenue Analysis

Page 29: PORTLAND METRO LEVEE SYSTEM FLOOD RISK MANAGEMENT … · 2019. 8. 28. · PORTLAND METRO LEVEE SYSTEM ... Assessment released for public review, comment • Agency endorsement for

CERTIFICATION NEEDS

Page 30: PORTLAND METRO LEVEE SYSTEM FLOOD RISK MANAGEMENT … · 2019. 8. 28. · PORTLAND METRO LEVEE SYSTEM ... Assessment released for public review, comment • Agency endorsement for

PLANNING & IMPLEMENTATION PHASE2019 2020

Recertifying the levees

• Technical Advisory Committee Scoping Project Alternatives for minimum certification requirements + additional benefits

• LRC partners begin discussing responsibility and funding of certification projects + enhancements

• LRC partners review project alternatives and okay for public review.

• Community conversation about certification projects and added benefits

• Project partners consider feedback, make decisions about projects that can move forward.

Governance Reform

• Request of legislature to create new governance structure to take over management of levees

• New district’s initial board is appointed and oriented.

Page 31: PORTLAND METRO LEVEE SYSTEM FLOOD RISK MANAGEMENT … · 2019. 8. 28. · PORTLAND METRO LEVEE SYSTEM ... Assessment released for public review, comment • Agency endorsement for

THANK YOU FOR TIME AND INTEREST