33
Ponds along Project Stretch Sl No. From To 1 Chainage (Km) Chainage (Km) No of Ponds Location Present Use To be Reclaimed / Affected 2 22.2 22.3 open well LHS To be Reclaimed 3 25.3 25.4 open well LHS To be Reclaimed 4 42.6 42.7 open well LHS To be Reclaimed 5 61.6 61.7 open well LHS To be Reclaimed 6 59.30 59.40 open well RHS To be Reclaimed 7 60.00 60.10 open well RHS To be Reclaimed 8 71.00 71.10 open well LHS To be Reclaimed 9 71.10 71.20 open well RHS To be Reclaimed 10 71.70 71.80 open well RHS To be Reclaimed 11 76.30 79.40 open well LHS To be Reclaimed 12 78.70 78.80 Pond dry RHS To be Reclaimed 13 79.10 79.20 Pond dry LHS To be Reclaimed 14 81.50 81.60 open well LHS To be Reclaimed 15 84.30 84.40 open well LHS To be Reclaimed 16 86.70 86.80 open well LHS&RHS Also 17 90.50 90.60 open well LHS To be Reclaimed 18 95.10 95.20 pond filled RHS To be Reclaimed 19 95.30 95.40 open well LHS To be Reclaimed 20 96.70 96.80 lake dry LHS To be Reclaimed 21 99.00 99.10 Pond filled LHS To be Reclaimed 22 99.90 100.00 open well filled LHS To be Reclaimed 23 103.10 103.20 open well RHS To be Reclaimed 24 109.90 110.00 lake filled RHS To be Reclaimed 25 109.80 109.90 pond RHS To be Reclaimed 26 134.60 134.70 open well RHS To be Reclaimed 27 137.00 137.10 pond LHS To be Reclaimed Source: Tehsil Office & Primary Reconnaissance Survey Economic Value of Species Ponds

Ponds along Project Stretchenvironmentclearance.nic.in/writereaddata/Online/... · Ponds along Project Stretch Sl No. From To 1 Chainage (Km) Chainage ... Social Facilities along

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Ponds along Project Stretchenvironmentclearance.nic.in/writereaddata/Online/... · Ponds along Project Stretch Sl No. From To 1 Chainage (Km) Chainage ... Social Facilities along

Ponds along Project StretchSl No. From To

1 Chainage

(Km)

Chainage

(Km)

No of Ponds Location Present Use To be Reclaimed / Affected

2 22.2 22.3 open well LHS To be Reclaimed

3 25.3 25.4 open well LHS To be Reclaimed

4 42.6 42.7 open well LHS To be Reclaimed

5 61.6 61.7 open well LHS To be Reclaimed

6 59.30 59.40 open well RHS To be Reclaimed

7 60.00 60.10 open well RHS To be Reclaimed

8 71.00 71.10 open well LHS To be Reclaimed

9 71.10 71.20 open well RHS To be Reclaimed

10 71.70 71.80 open well RHS To be Reclaimed

11 76.30 79.40 open well LHS To be Reclaimed

12 78.70 78.80 Pond dry RHS To be Reclaimed

13 79.10 79.20 Pond dry LHS To be Reclaimed

14 81.50 81.60 open well LHS To be Reclaimed

15 84.30 84.40 open well LHS To be Reclaimed

16 86.70 86.80 open well LHS&RHS Also

17 90.50 90.60 open well LHS To be Reclaimed

18 95.10 95.20 pond filled RHS To be Reclaimed

19 95.30 95.40 open well LHS To be Reclaimed

20 96.70 96.80 lake dry LHS To be Reclaimed

21 99.00 99.10 Pond filled LHS To be Reclaimed

22 99.90 100.00 open well filled LHS To be Reclaimed

23 103.10 103.20 open well RHS To be Reclaimed

24 109.90 110.00 lake filled RHS To be Reclaimed

25 109.80 109.90 pond RHS To be Reclaimed

26 134.60 134.70 open well RHS To be Reclaimed

27 137.00 137.10 pond LHS To be Reclaimed

Source: Tehsil Office & Primary Reconnaissance Survey

Economic Value of Species

Ponds

Page 2: Ponds along Project Stretchenvironmentclearance.nic.in/writereaddata/Online/... · Ponds along Project Stretch Sl No. From To 1 Chainage (Km) Chainage ... Social Facilities along

Social Facilities along Project RoadFrom To

Chainage (Km) Chainage (Km) Name To be Reclaimed/ Affected

1 62.30 62.40 bus shelter(RHS) & petrol bunk(LHS)

2 62.60 62.70 Electricity sub station

3 62.80 62.90 Temple(LHS)

4 62.90 63.00 petrol bunk(LHS)

5 63.20 63.30 bus depo(RHS) afzalpur

6 67.20 67.30 bus shelter(RHS)

7 68.80 68.90 Govt school (LHS)

8 69.90 70.00 Pragati daba (RHS)

9 73.80 73.90 Bus shelter (RHS)

10 74.20 74.30 OHT (LHS)

11 74.30 74.40 Govt school ballurgi (LHS)

12 75.70 75.80 Temple (RHS) @ border

13 81.20 81.30 Bus shelter (LHS) dudani

14 82.40 82.50 Petrol bunk (LHS)

15 82.60 82.70 OHT (RHS)

16 82.80 82.90 Electricity sub station dudani

17 83.00 83.10 railway crossing

18 85.10 85.20 toll gate near sugar factroy

19 85.60 85.70 sugar factroy enterence

20 86.20 86.30 matoshri primary school

21 89.00 89.10 OHT (LHS)

22 92.10 92.20 Durga (RHS)

23 96.00 96.10 Electricity sub station maindargi

24 97.00 97.10 Temple & OHT (LHS)

25 97.90 98.00 Petrol bunk (LHS)

26 99.60 99.70 Petrol bunk (RHS)

27 102.50 102.60 Bus shelter (LHS)

28 105.40 105.50 Hotel (LHS)

29 105.50 105.60 Hotel (RHS)

30 106.30 106.40 Petrol bunk (RHS)

31 107.00 107.10 Ashrama(LHS)

32 107.10 107.20 Bar & Restaurant (LHS)

33 109.80 109.90 Muslim prayer hall (LHS) Affected so bypass proposd

34 109.90 110.00 Lake (RHS) Affected so bypass proposd

35 111.40 111.50 Electricity sub station (LHS) Akkalkot

36 112.20 112.30 Petrol bunk (RHS)

37 112.50 112.60 Garbage dumping yard (RHS) Akkalkot

38 112.60 112.70 Garbage dumping yard (RHS) Akkalkot

39 113.00 113.10 Petrol bunk (LHS)

40 116.60 116.70 Electricity sub station (LHS) Akkalkot

41 117.40 117.50 Petrol bunk (RHS)

42 117.70 117.80 Garbage dumping yard (RHS) Akkalkot

43 117.80 117.90 Garbage dumping yard (RHS) Akkalkot

44 118.20 118.30 Petrol bunk (LHS)

45 118.50 118.60 KLE's socity belgaum

46 119.60 119.70 School building

47 120.10 120.20 Bus shelter (LHS)

48 122.50 122.60 OHT (LHS)

49 122.60 122.70 High school (RHS) karjol

50 123.00 123.10 OHT & Bus shelter (LHS)

51 124.90 125.00 Cotton factory (LHS)

52 126.20 126.30 Natya mandir (LHS)

53 127.10 127.20 Bus shelter (LHS)

54 127.30 127.40 Network tower (LHS) & BSNL office (RHS)

55 127.80 127.90 Muslim structure

56 129.50 129.60 Fun Food Restoraunt (RHS)

57 131.30 131.40 OHT (RHS)

58 131.60 131.70 Temple (RHS)

Sl No. Institutions/ Social facilities/ amenities

Page 3: Ponds along Project Stretchenvironmentclearance.nic.in/writereaddata/Online/... · Ponds along Project Stretch Sl No. From To 1 Chainage (Km) Chainage ... Social Facilities along

59 132.00 132.10Power grid corporation sollapur (RHS)

765/400/200 KW, OHT & Idga ground (LHS)

60 132.40 132.50 Hotel new shivapark (LHS)

61 135.10 135.20 Shrishail resart

62 138.60 138.70 Cotton Industry

63 140.10 140.20 Ashwine degree collage (LHS)

64 140.20 140.30 Temple (LHS)

65 140.80 140.90 Petrol bunk (RHS)

66 140.90 141.00 2 nos OHT (LHS)

67 141.40 141.50 Toll gate sollapur

68 144.00 144.10 Chavan tata motars (RHS)

69 144.50 144.60 Network tower (RHS)

70 146.50 146.60 Hero showroom

71 146.60 146.70 Temple (LHS)

72 147.50 147.60 Bus shelter (LHS)

73 148.30 148.40 ESSAR Petrol bunk (RHS)

74 148.60 148.70 Over head water tank

Page 4: Ponds along Project Stretchenvironmentclearance.nic.in/writereaddata/Online/... · Ponds along Project Stretch Sl No. From To 1 Chainage (Km) Chainage ... Social Facilities along

Chainage (Km.) Type Side Leading to (LHS) Leading to (RHS) Location Feature

01 00+000 X-Junction BHS Gulbarga City HumnabaadHumnabaad Ring

roadBuilt up Area

02 00+585 X-Junction BHS Shivaji Nagar Ram Nagar Gulbarga City Built up Area

03 01+100 X-Junction BHS Bhavani Nagar Samipur Gulbarga City Built up Area

04 02+060 X-Junction BHS Gulbarga City Sultanpur Gulbarga City Built up Area

05 02+490 X-Junction BHS Gulbarga City Syed Chincholi Gulbarga City Built up Area

06 02+660 T-Junction LHSMahatma Gandhi Truck

Terminal- Gulbarga City Built up Area

07 03+882 X-Junction BHS Gulbarga City Aland City Aland Crossing Built up Area

08 05+300 X-Junction BHS Chadri Chowk (Gulbarga) DabarabadhDabarabadh

CrossingBuilt up Area

09 06+350 X-Junction BHS Gulbarga City MSK Mill MSK Square Built up Area

10 07+355 X-Junction BHS Gulbarga Bus Stand Hirapur Hirapur Circle Built up Area

11 08+800 Y-Junction LHS Sedam (Jewargi) - Afzalpur Square

12 12+760 T-Junction LHS Kalavi Village -

13 17+350 X-Junction BHS Kanni VillageHadagi Haruti Tanda

Village

14 19+660 T-Junction RHS - Kollur Village Kollur Crossing

15 21+574 T-Junction LHS Havanoor Village - Havanoor Crossing Bus Stand

16 22+415 X-Junction BHS Gobbur Village Mali Village Gobbur Village

17 26+407 T-Junction RHS - Machanal Tanda Village

18 28+775 Y-Junction RHS - Bhair Madagi village Built Up Area

19 31+865 T-Junction RHS - Wadali Village Wadali Crossing Bus Stand

20 32+893 X-Junction BHS Field Wadali Village Wadali Crossing Bus Stand

21 37+235 Y-Junction LHS Chinmali Village -

22 37+520 Y-Junction LHS Gangapur -Chowdapur

CrossingBuilt up Area

23 37+877 T-Junction RHS - Chowdapur VillageChowdapur

VillageBuilt up Area

24 38+400 Y-Junction RHS - Gangapur Railway Station

25 40+345 T-Junction RHS - Goudgaon Village Bus Stand

26 42+150 T-Junction LHS Lkedki Village - Bus Stand

27 44+535 T-Junction RHS - Boknali Village Bus Stand

28 46+730 T-Junction LHS Atanur Village - Atanur village Built up Area

29 52+295 T-Junction RHS - Raiyur Village Built up Area

30 52+920 T-Junction RHS - Matholi Village Bus Stand

31 59+955 X-Junction BHS Kalur Village Bijapur Village Built up Area

32 64+730 Y-Junction RHS - Eladda Village Bus Stand

33 70+540 Y-Junction LHS Belurgi Masjid - Belurgi Village Built up Area

34 70+925 Y-Junction RHS - Badadal Village Belurgi Village Built up Area

35 77+530 Y-Junction RHS - Revur Village Dudhani Village

GULBARGA - SOLAPUR PROJECT

Details of Major and Minor Junction list

Sl. No.Road Junction Road Side Features

Page 5: Ponds along Project Stretchenvironmentclearance.nic.in/writereaddata/Online/... · Ponds along Project Stretch Sl No. From To 1 Chainage (Km) Chainage ... Social Facilities along

Chainage (Km.) Type Side Leading to (LHS) Leading to (RHS) Location Feature

GULBARGA - SOLAPUR PROJECT

Details of Major and Minor Junction list

Sl. No.Road Junction Road Side Features

36 77+785 T-Junction RHS - Dudhani City Dudhani City Built up Area

37 79+410 Y-Junction LHS Baroti Village -

38 80+220 T-Junction RHS - Aland City

39 83+100 T-Junction RHS - Mugali Village

40 83+555 T-Junction LHS Rudhdewadi -

41 85+225 T-Junction LHS Thallewada -

42 85+640 X-Junction BHS Sangoli Baswal Mougadi Village Built up Area

43 85+975 T-Junction RHS - Kadaka Devi

44 87+795 T-Junction LHS Binjigarh -

45 90+990 T-Junction RHS - Naghur Village

46 91+630 Y-Junction LHS Maindargi Village

47 92+515 X-Junction BHS Maindargi Village Aland City

48 93+800 T-Junction RHS - Sangodi Village Maindargi Village Built up Area

49 93+965 T-Junction LHS Maindargi Village - Maindargi Village Built up Area

50 98+510 T-Junction LHS Mirajigi Village - Mirajigi Village Built up Area

51 98+595 Y-Junction RHS - Hadi Hadumos Village Mirajigi Village Built up Area

52 100+870 T-Junction RHS - Goudagaon VillageBorimpargi

VillageBuilt up Area

53 101+708 T-Junction RHS - Rapur Village

54 104+895 T-Junction LHSSVS MD's Polytechnic

College

55 105+560 Y-Junction RHS - Akalkot City Akalkot City Built up Area

56 106+612 X-Junction BHS Nagansur / Hajgi Akalkot CityAkalkot Bypass

SquareBuilt up Area

57 107+525 T-Junction RHS - Akalkot City Akalkot City Built up Area

58 112+375 Staggered Junction BHS Banagahati Village Temple

59 114+525 T-Junction RHS - Dahitanewadi

60 114+590 T-Junction LHS Konhali Village

61 117+405 Staggered Junction BHS Singjodi Village Halhali village Karjal Village Built up Area

62 124+795 X-Junction BHS Revansi Temple Dindur Village

63 128+385 X-Junction BHS Hungaon Village Rampur VillageThougapadi

Village

64 132+740 T-Junction RHS - Khaduthakhadi Village

65 133+070 T-Junction LHS Hanmgaon Togarali Village

66 134+180 Staggered Junction BHS Sidheshwar Sakhara Mill Dhodi Village Kumbhari Village Built up Area

67 137+775 X-Junction BHS Krishna Temple Ali Mahara Ashram

68 139+450 T-Junction RHS - Rebba Nagar Wamik Square

69 140+190 T-Junction LHSMaharashtra Industrial

Development Corporation

Page 6: Ponds along Project Stretchenvironmentclearance.nic.in/writereaddata/Online/... · Ponds along Project Stretch Sl No. From To 1 Chainage (Km) Chainage ... Social Facilities along

Chainage (Km.) Type Side Leading to (LHS) Leading to (RHS) Location Feature

GULBARGA - SOLAPUR PROJECT

Details of Major and Minor Junction list

Sl. No.Road Junction Road Side Features

70 141+685 X-Junction BHS Solapur Bus Stand Sakhare Wada Solapur City Built up Area

71 142+197 X-Junction BHS Solapur City Rajendra Square Solapur City Built up Area

Chainage (Km.) Type Side Leading to (LHS) Leading to (RHS) Location Feature

01 35+900 Y-Junction RHS -- Chowdapur Bypass Start

02 38+700 X-Junction BHS -- Chowdapur Bypass End

03 58+250 Y-Junction RHS -- Afzalpur Bypass Start

04 61+775 Y-Junction RHS -- Afzalpur Bypass End

05 69+400 Y-Junction RHS -- Belurgi Bypass Start

06 72+700 Y-Junction RHS -- Belurgi Bypass End

07 76+700 Y-Junction LHS Dudhani Bypass Start --

08 80+525 Y-Junction LHS Dudhani Bypass End --

09 91+200 Y-Junction LHS Maindargi Bypass Start --

10 95+250 Y-Junction LHS Maindargi Bypass End --

11 104+600 Y-Junction RHS -- Akalkot Bypass Start

12 108+700 Y-Junction RHS -- Akalkot Bypass End

ADDITIONAL MAJOR JUNCTIONS LIST (BY-PASS)

Sl. No.

Road Junction Road Side Features

Chowdapur

VillageBuilt up Area

Maindargi Village Built up Area

Akalkot Village Built up Area

Afzalpur Village Built up Area

Belurgi Village Built up Area

Dudhani Village Built up Area

Page 7: Ponds along Project Stretchenvironmentclearance.nic.in/writereaddata/Online/... · Ponds along Project Stretch Sl No. From To 1 Chainage (Km) Chainage ... Social Facilities along

Chainage Sides State Taluka Village

Location

Chainage Residential Commercial Insutional Community Utility Total

0 to100 LHS Karnataka Gulbarga 03.000 to

4.000 RHS 3.28 Shop 16.000 to

7.000 RHS 6.35 Shop 17.000 to

8.000 RHS 7.65

Partialliy

(3/4th part) 1

7.95

Raiway

gurard room

(not affected

as ROB is

under

Construction 1

13.000

to14.000 RHS 14.05

Residential

outer wall 1

19.000

to20.000 LHS 19.65

Shops (Half

parts) 2

19.000

to20.000 RHS 19.62

Shop ( 1/3

part initial) 1

24.000to25.0

00 LHS 24.85 Tube well 1

28.000to29.0

00 LHS 29.05 Shop 28.480 Tub 1

28.000to29.0

00 RHS 28.7 Shop 28.480 Tub 1

37.000 to

38.000 LHS 37.9 well 1

41.000 to

42.000 RHS 41.8 sump 0

46.000 to

47.000 LHS 46.7 shops 2

46.000 to

47.000 RHS 46.38 shops 1

47.000 to

48.000 LHS 47.1 sheds 1

51.000 to

52.000 LHS 51.1 pit 1

51.000 to

52.000 RHS 51.9 house shop tank 3

52.000 to

53.000 LHS 52.3 shop 3

52.000 to

53.000 RHS

52.35 &

52.900 shop 2

53.000 to

54.000 LHS 53.8 Pump house 2

53.000 to

54.000 RHS 53.1 house wall 1

59.000 to

60.000 LHS 50.25 well 1

59.05 Pit 1

59.85 shops Bus stand 8

60.000 to

61.000 LHS 60.05 shops 3

60.000 to

61.000 RHS 60.05 shops 4

62.000 to

63.000 RHS 62.2 houses 20

68.000 to

69.000 RHS 68.5 Well & shed 2

70.000 to

71.000 LHS 70.5 to 71 houses 26

70.000 to

71.000 RHS 70.5 to 72 houses 38

71.000 to

72.000 LHS 71.1 -71.3 houses 0

72.000 to

73.000 RHS Maharasthra Akalkot 0

73.000 to

74.000 LHS 73.7 house 8

73.000 to

74.000 RHS 73.9 house 5

77.000 to

78.000 LHS 77.1 1 1

77.78 2 2

78 1 1

77.000 to

78.000 RHS 77.85 2 2

78.000 to

79.000 LHS 78.09 1 1

Affected Structures

59.000 to

60.000 RHS

Page 8: Ponds along Project Stretchenvironmentclearance.nic.in/writereaddata/Online/... · Ponds along Project Stretch Sl No. From To 1 Chainage (Km) Chainage ... Social Facilities along

78.000 to

79.000 RHS 78.09 1 1

79.000 to

80.000 LHS 79.9

1 Fence &

Railway

Track 1

85.000 to

86.000 LHS 85.658 1 1

93.000 to

94.000 LHS 93.5 5 5

105.000 to

106.000 LHS 105.6 4 2 1 Mosque 7

105.000 to

106.000 RHS 4 4

125.000 to

126.000 RHS 125.5 1 1

Page 9: Ponds along Project Stretchenvironmentclearance.nic.in/writereaddata/Online/... · Ponds along Project Stretch Sl No. From To 1 Chainage (Km) Chainage ... Social Facilities along

From To

1 0.00 0.10 EP(b/s) / Street poles

2 0.10 0.20 EP(b/s) / Street poles

3 0.20 0.30 EP(b/s) / Street poles

4 0.30 0.40 EP(b/s) / Street poles

5 0.40 0.50 EP(b/s) / Street poles

6 0.50 0.60 EP(b/s) / transformer (RHS) / Street poles

7 0.60 0.70 EP(RHS) / HT crossing / Street poles

8 0.70 0.80 EP(b/s) / Street poles

9 0.80 0.90 EP(b/s) / Street poles

10 0.90 1.00 EP(b/s) / Street poles

11 1.00 1.10 EP(b/s) / Street poles

12 1.10 1.20 EP(LHS) / Street poles

13 1.20 1.30 EP(LHS) / Street poles

14 1.30 1.40 EP(LHS) / Street poles

15 1.40 1.50 EP(LHS) / Street poles / transformer (RHS)

16 1.50 1.60 EP(LHS) / Street poles

17 1.60 1.70 EP(LHS) / Street poles / transformer (RHS)

18 1.70 1.80 EP(b/s) / Street poles / EP(crossing)

19 1.80 1.90 EP(b/s) / Street poles / EP(crossing)

20 1.90 2.00 EP(b/s) / Street poles / EP(crossing)

21 2.20 2.30 EP(LHS) / Street poles

22 2.30 2.40 EP(LHS) / Street poles

23 2.40 2.50 EP(LHS) / Street poles / transformer (RHS)

24 2.50 2.60 EP(LHS) / Street poles

25 2.60 2.70 EP(RHS) / Street poles

26 2.70 2.80 EP(RHS) / Street poles

27 2.80 2.90 EP(RHS) / Street poles

28 2.90 3.00 EP(RHS) / Street poles

29 3.00 3.10 EP(RHS) / Street poles

30 3.10 3.20 EP(RHS) / Street poles / EP(crossing)

31 3.20 3.30 EP(b/s) / Street poles

32 3.30 3.40 EP(RHS) / EP(crossing) / Street poles

33 3.40 3.50 EP(RHS) / EP(crossing) / Street poles

34 3.50 3.60 EP(RHS) / Street poles

35 3.60 3.70 EP(RHS) / Street poles

36 3.70 3.80 EP(b/s) / Street poles

37 3.80 3.90 EP(b/s) / Street poles / transformer (RHS)

38 3.90 4.00 EP(b/s) / Street poles / transformer (RHS)

39 4.00 4.10 EP(b/s) / Street poles

40 4.10 4.20 EP(RHS) / Street poles

41 4.20 4.30 EP(RHS) / Street poles

42 4.30 4.40 EP(b/s) / Street poles / transformer (LHS)

43 4.40 4.50 transformer (RHS)

44 4.50 4.60 transformer (RHS)

45 4.60 4.70 EP(b/s) / Street poles

46 4.70 4.80 EP(b/s) / Street poles

47 4.80 4.90 EP(b/s) / Street poles

48 4.90 5.00 EP(b/s) / Street poles / EP(crossing)

49 5.00 5.10 EP(b/s) / Street poles

50 5.10 5.20 EP(b/s) / Street poles

51 5.20 5.30 EP(b/s) / Street poles / EP(crossing)

Sl No.

Annexure III. C Land Utilsation Checklist

Chainage

(Km)

Chainage

(Km)

Utilities

Water Pipe line/ Sewer Line/ Electrcity poles/ Others Location Present Use To be Reclaimed/ Affected

Page 10: Ponds along Project Stretchenvironmentclearance.nic.in/writereaddata/Online/... · Ponds along Project Stretch Sl No. From To 1 Chainage (Km) Chainage ... Social Facilities along

52 5.30 5.40 EP(b/s) / Street poles / EP(crossing)

53 5.40 5.50 EP(b/s) / Street poles / EP(crossing)

54 5.50 5.60 EP(b/s) / Street poles

55 5.60 5.70 EP(b/s) / Street poles

56 5.70 5.80 EP(b/s) / Street poles

57 5.80 5.90 EP(b/s) / Street poles

58 5.90 6.00 EP(b/s) / Street poles

59 6.00 6.10 EP(b/s) / Street poles

60 6.10 6.20 EP(b/s) / Street poles

61 6.20 6.30 EP(b/s) / Street poles

62 6.30 6.40 EP(b/s) / Street poles

63 6.40 6.50 EP(b/s) / Street poles

64 6.50 6.60 EP(b/s) / Street poles

65 6.60 6.70 EP(RHS) / Street poles

66 6.70 6.80 EP(b/s) / Street poles

67 6.80 6.90 EP(b/s) / Street poles

68 6.90 7.00 EP(b/s) / Street poles

69 7.00 7.10 EP(RHS) / Street poles

70 7.10 7.20 EP(RHS) / Street poles

71 7.20 7.30 EP(RHS) / Street poles

72 7.30 7.40 EP(RHS) / Street poles

73 7.40 7.50 EP(b/s) / Street poles

74 7.50 7.60 EP(b/s) / Street poles

75 7.60 7.70 EP(b/s) / Street poles

76 7.70 7.80 EP(b/s) / Street poles

77 7.80 7.90 EP(b/s) / Street poles

78 7.90 8.00 EP(b/s) / Street poles

79 8.00 8.10 EP(b/s) / Street poles

80 8.10 8.20 EP(b/s) / Street poles

81 8.20 8.30 EP(b/s) / Street poles

82 8.30 8.40 EP(b/s) / Street poles

83 8.40 8.50 EP(b/s) / Street poles

84 8.50 8.60 EP(b/s) / Street poles

85 8.60 8.70 EP(b/s) / Street poles

86 8.70 8.80 EP(b/s) / Street poles

87 8.80 8.90 EP(b/s) / Street poles

88 8.90 9.00 EP(b/s)

89 9.00 9.10 EP(b/s)

90 9.10 9.20 EP(b/s)

91 9.20 9.30 EP(b/s)

92 9.30 9.40 EP(b/s)

93 9.40 9.50 EP(b/s)

94 9.50 9.60 EP(b/s) / EP(crossing)

95 9.60 9.70 EP(b/s)

96 9.70 9.80 EP(b/s)

97 9.80 9.90 EP(b/s)

98 9.90 10.00 EP(b/s)

99 10.00 10.10 EP(b/s)

100 10.10 10.20 EP(b/s) / EP(crossing)

101 10.20 10.30 EP(b/s) / EP(crossing)

102 10.30 10.40 EP(b/s) / EP(crossing) / network tower

103 10.40 10.50 EP(b/s)

104 10.50 10.60 EP(b/s)

105 10.60 10.70 EP(b/s) / EP(crossing)

106 10.70 10.80 EP(b/s) / EP(crossing)

107 10.80 10.90 EP(b/s)

Page 11: Ponds along Project Stretchenvironmentclearance.nic.in/writereaddata/Online/... · Ponds along Project Stretch Sl No. From To 1 Chainage (Km) Chainage ... Social Facilities along

108 10.90 11.00 EP(b/s)

109 11.00 11.10 EP(b/s)

110 11.10 11.20 EP(b/s) / EP(crossing)

111 11.20 11.30 EP(b/s) / EP(crossing)

112 11.30 11.40 EP(b/s) / EP(crossing)

113 11.40 11.50 EP(b/s)

114 11.50 11.60 EP(b/s)

115 11.60 11.70 EP(b/s) / EP(crossing)

116 11.70 11.80 EP(b/s)

117 11.80 11.90 EP(b/s) / EP(crossing)

118 11.90 12.00 EP(b/s) / EP(crossing)

119 12.00 12.10 EP(b/s) / EP(crossing)

120 12.10 12.20 EP(b/s)

121 12.20 12.30 EP(b/s)

122 12.30 12.40 EP(b/s)

123 12.40 12.50 EP(b/s)

124 12.50 12.60 EP(b/s)

125 12.60 12.70 EP(b/s)

126 12.70 12.80 EP(b/s)

127 12.80 12.90 EP(b/s)

128 12.90 13.00 EP(b/s) / EP(crossing) 6 nos

129 13.30 13.40 EP(crossing)

130 13.50 13.60 EP(RHS) / EP(crossing)

131 13.60 13.70 EP(RHS)

132 13.70 13.80 EP(RHS)

133 13.80 13.90 EP(RHS) / EP(crossing)

134 13.90 14.00 EP(b/s)

135 14.00 14.10 EP(b/s)

136 14.10 14.20 EP(b/s) / HT crossing

137 14.20 14.30 EP(b/s)

138 14.30 14.40 EP(b/s)

139 14.40 14.50 EP(b/s) / EP(crossing)

140 14.50 14.60 EP(b/s)

141 14.60 14.70 EP(b/s) / EP(crossing)

142 14.70 14.80 EP(b/s)

143 14.80 14.90 EP(b/s) / EP(crossing) 2 nos

144 14.90 15.00 EP(b/s)

145 15.00 15.10 EP(b/s)

146 15.10 15.20 EP(b/s)

147 15.20 15.30 EP(b/s) / EP(crossing)

148 15.30 15.40 EP(RHS) / EP(crossing)

149 15.40 15.50 EP(RHS)

150 15.50 15.60 EP(RHS)

151 15.60 15.70 EP(RHS) / EP(crossing)

152 15.70 15.80 EP(RHS)

153 15.80 15.90 EP(RHS)

154 15.90 16.00 EP(RHS) / EP(crossing)

155 16.00 16.10 EP (LHS)

156 16.10 16.20 EP (LHS)

157 16.20 16.30 EP (LHS)

158 16.30 16.40 EP (LHS) / EP(crossing)

159 16.40 16.50 EP (LHS) / EP(crossing)

160 16.50 16.60 EP (LHS)

161 16.60 16.70 EP (LHS)

162 16.70 16.80 EP (LHS)

163 16.80 16.90 EP (LHS) / EP(crossing)

Page 12: Ponds along Project Stretchenvironmentclearance.nic.in/writereaddata/Online/... · Ponds along Project Stretch Sl No. From To 1 Chainage (Km) Chainage ... Social Facilities along

164 16.90 17.00 EP (LHS) / EP(crossing)

165 17.00 17.10 EP(b/s)

166 17.10 17.20 EP(b/s)

167 17.20 17.30 EP(b/s)

168 17.30 17.40 EP(b/s)

169 17.40 17.50 EP(b/s)

170 17.50 17.60 EP(b/s) / EP(crossing)

171 17.60 17.70 EP(b/s) / EP(crossing)

172 17.70 17.80 EP(b/s)

173 17.80 17.90 EP(b/s) / EP(crossing)

174 17.90 18.00 EP (RHS)

175 18.00 18.10 EP (RHS)

176 18.10 18.20 EP (RHS)

177 18.20 18.30 EP (RHS)

178 18.30 18.40 EP (RHS)

179 18.40 18.50 EP (RHS)

180 18.50 18.60 EP (RHS)

181 18.60 18.70 EP (RHS)

182 18.70 18.80 EP (RHS)

183 18.80 18.90 EP (RHS)

184 18.90 19.00 EP (RHS) / EP(crossing)

185 19.00 19.10 EP (RHS)

186 19.10 19.20 EP (RHS)

187 19.20 19.30 EP (RHS) / EP(crossing)

188 19.30 19.40 EP (RHS)

189 19.40 19.50 EP (RHS) / EP(crossing)

190 19.50 19.60 EP (RHS) / EP(crossing)

191 19.60 19.70 EP (RHS)

192 19.70 19.80 EP(b/s)

193 19.80 19.90 EP(b/s)

194 19.90 20.00 EP(b/s) / EP(crossing

195 20.00 20.10 EP(b/s)

196 20.10 20.20 EP(b/s) / EP(crossing

197 20.20 20.30 EP(b/s) / EP(crossing

198 20.30 20.40 EP(b/s)

199 20.40 20.50 EP(b/s) / EP(crossing)

200 20.50 20.60 EP(b/s) / EP(crossing)

201 20.60 20.70 EP(RHS)

202 20.70 20.80 EP(RHS)

203 20.80 20.90 EP(RHS)

204 20.90 21.00 EP(RHS)

205 21.20 21.30 EP (LHS) / EP(crossing)

206 21.80 21.90 EP (RHS)

207 21.90 22.00 EP (RHS)

208 22.00 22.10 EP (RHS)

209 22.10 22.20 EP (RHS)

210 22.50 22.60 EP (LHS)

211 22.60 22.70 EP (LHS)

212 22.70 22.80 EP (RHS)

213 22.80 22.90 EP (RHS)

214 22.90 23.00 EP (RHS) / EP(crossing)

215 23.00 23.10 EP (RHS) / EP(crossing)

216 23.10 23.20 EP (RHS) / EP(crossing)

217 23.20 23.30 EP (RHS)

218 23.30 23.40 EP (RHS) / EP(crossing)

219 23.40 23.50 EP (RHS)

Page 13: Ponds along Project Stretchenvironmentclearance.nic.in/writereaddata/Online/... · Ponds along Project Stretch Sl No. From To 1 Chainage (Km) Chainage ... Social Facilities along

220 23.50 23.60 EP (RHS)

221 23.60 23.70 EP (RHS)

222 23.70 23.80 EP (RHS) / EP(crossing)

223 25.40 25.50 EP(crossing)

224 25.50 25.60 EP(crossing)

225 25.60 25.70 EP(b/s) / EP(crossing)

226 27.20 27.30 EP (RHS)

227 27.30 27.40 EP (RHS)

228 27.40 27.50 EP (RHS)

229 27.50 27.60 EP (RHS) / EP(crossing)

230 27.60 27.70 EP (RHS) / EP(crossing)

231 28.10 28.20 EP (RHS) / EP(crossing)

232 28.20 28.30 EP (RHS)

233 28.30 28.40 EP (RHS)

234 28.40 28.50 EP (RHS)

235 28.50 28.60 EP (b/s)

236 28.60 28.70 EP (b/s) / EP(crossing)

237 28.70 28.80 EP (b/s) / EP(crossing)

238 28.80 28.90 EP (b/s) / EP(crossing)

239 28.90 29.00 EP (b/s) / network tower (LHS)

240 29.00 29.10 EP (b/s)

241 29.10 29.20 EP (b/s)

242 29.20 29.30 EP (b/s) / EP(crossing)

243 29.30 29.40 EP (b/s)

244 29.40 29.50 EP (b/s)

245 29.50 29.60 EP (b/s)

246 29.60 29.70 EP (b/s)

247 29.70 29.80 EP (b/s) / EP(crossing)

248 29.80 29.90 EP (b/s)

249 29.90 30.00 EP (b/s) / EP(crossing)

250 30.00 30.10 EP (b/s) / EP(crossing)

251 30.10 30.20 EP (b/s) / EP(crossing)

252 30.20 30.30 EP (b/s)

253 30.30 30.40 EP (b/s)

254 30.40 30.50 EP (b/s)

255 30.50 30.60 EP (b/s)

256 30.60 30.70 EP(b/s)

257 30.70 30.80 EP(b/s)

258 30.80 30.90 EP(b/s)

259 30.90 31.00 EP(b/s)

260 31.00 31.10 EP(b/s)

261 31.10 31.20 EP(b/s) / EP (crossing)

262 31.20 31.30 EP(b/s)

263 31.30 31.40 EP(b/s)

264 31.40 31.50 EP(b/s) / EP (crossing)

265 31.50 31.60 EP (LHS)

266 31.60 31.70 EP (LHS)

267 31.70 31.80 EP (LHS)

268 31.80 31.90 EP (LHS)

269 31.90 32.00 EP (LHS)

270 32.00 32.10 EP (LHS)

271 32.60 32.70 EP (crossing)

272 32.80 32.90 EP (RHS)

273 32.90 33.00 EP (RHS)

274 33.00 33.10 EP (RHS)

275 33.10 33.20 EP (RHS)

Page 14: Ponds along Project Stretchenvironmentclearance.nic.in/writereaddata/Online/... · Ponds along Project Stretch Sl No. From To 1 Chainage (Km) Chainage ... Social Facilities along

276 33.20 33.30 EP (RHS)

277 33.30 33.40 EP (RHS)

278 33.40 33.50 EP (RHS)

279 33.50 33.60 EP (RHS)

280 33.60 33.70 EP (RHS)

281 33.70 33.80 EP (RHS)

282 33.80 33.90 EP (RHS)

283 33.90 34.00 EP (RHS) / EP(crossing)

284 34.00 34.10 EP (RHS)

285 34.10 34.20 EP (RHS) / EP(crossing)

286 34.50 34.60 EP(crossing)

287 35.10 35.20 EP (LHS) / EP(crossing)

288 35.20 35.30 EP (LHS) / EP(crossing)

289 35.30 35.40 EP (LHS)

290 35.40 35.50 EP (LHS)

291 35.50 35.60 EP (LHS)

292 35.60 35.70 EP (LHS)

293 35.80 35.90 EP (LHS)

294 35.90 36.00 EP (LHS)

295 36.00 36.10 EP (LHS)

296 36.10 36.20 EP (LHS)

297 36.20 36.30 EP (LHS)

298 36.30 36.40 EP (LHS)

299 36.40 36.50 EP (LHS) / EP (crossing)

300 36.50 36.60 EP (LHS)

301 36.60 36.70 EP (LHS)

302 36.70 36.80 EP (LHS)

303 36.80 36.90 EP (LHS)

304 36.90 37.00 EP (LHS)

305 37.00 37.10 EP (LHS)

306 37.10 37.20 EP (LHS) / EP (crossing)

307 37.20 37.30 EP (crossing)

308 37.90 38.00 EP (b/s)

309 38.00 38.10 EP (b/s) / EP (crossing)

310 38.10 38.20 EP (LHS)

311 38.20 38.30 EP (LHS)

312 38.30 38.40 EP (LHS)

313 38.40 38.50 EP (LHS)

314 38.50 38.60 EP (LHS)

315 38.60 38.70 EP (LHS)

316 38.70 38.80 Chowdapur city

317 38.80 38.90 Chowdapur city

318 38.90 39.00 Chowdapur city

319 39.00 39.10 Chowdapur city

320 39.10 39.20 Chowdapur city

321 39.20 39.30 Chowdapur city

322 39.30 39.40 Chowdapur city

323 39.40 39.50 Chowdapur city

324 39.50 39.60 Chowdapur city

325 39.60 39.70 Chowdapur city

326 39.70 39.80 EP (b/s)

327 39.80 39.90 EP (b/s)

328 39.90 40.00 EP (b/s)

329 40.00 40.10 EP (b/s)

330 40.10 40.20 EP (b/s)

331 40.20 40.30 EP (b/s)

Page 15: Ponds along Project Stretchenvironmentclearance.nic.in/writereaddata/Online/... · Ponds along Project Stretch Sl No. From To 1 Chainage (Km) Chainage ... Social Facilities along

332 40.30 40.40 EP (b/s)

333 40.40 40.50 EP (b/s)

334 40.50 40.60 EP (b/s)

335 40.60 40.70 EP (b/s) / EP (crossing)

336 40.70 40.80 EP (b/s)

337 40.80 40.90 EP (b/s)

338 40.90 41.00 EP (crossing)

339 41.00 41.10 EP (crossing)

340 41.10 41.20 EP (RHS)

341 41.20 41.30 EP (RHS)

342 41.30 41.40 EP (RHS)

343 41.40 41.50 EP (RHS)

344 41.50 41.60 EP (RHS)

345 41.60 41.70 EP (RHS)

346 41.70 41.80 EP (RHS) / EP (crossing)

347 41.80 41.90 EP (RHS)

348 41.90 42.00 EP (RHS) / EP (crossing)

349 42.00 42.10 EP (RHS)

350 42.10 42.20 EP (RHS)

351 42.20 42.30 EP (RHS)

352 42.30 42.40 EP (RHS)

353 42.40 42.50 EP (b/s) / EP (crossing)

354 43.70 43.80 EP (crossing)

355 43.80 43.90 HT crossing

356 44.40 44.50 EP (crossing)

357 44.60 44.70 EP (RHS)

358 44.70 44.80 EP (RHS) / EP (crossing)

359 44.80 44.90 EP (RHS)

360 46.20 46.30 EP (RHS) / EP (crossing)

361 46.30 46.40 EP (RHS)

362 46.40 46.50 EP (RHS)

363 46.50 46.60 EP (RHS)

364 46.60 46.70 EP (RHS)

365 46.70 46.80 EP (RHS)

366 46.80 46.90 EP (RHS)

367 46.90 47.00 EP (RHS)

368 47.00 47.10 EP (RHS)

369 47.10 47.20 EP (RHS)

370 47.20 47.30 EP (RHS)

371 47.30 47.40 EP (RHS)

372 47.40 47.50 EP (RHS)

373 47.50 47.60 EP (RHS)

374 47.60 47.70 EP (RHS) / EP (crossing) 2 nos

375 47.70 47.80 EP (RHS)

376 47.80 47.90 EP (RHS) / EP (crossing)

377 47.90 48.00 EP (RHS) / EP (crossing)

378 48.00 48.10 EP (RHS) / EP (crossing)

379 48.10 48.20 EP (b/s)

380 48.20 48.30 EP (b/s)

381 48.30 48.40 EP (b/s)

382 48.70 48.80 EP (b/s) / EP (crossing)

383 48.80 48.90 EP (b/s)

384 48.90 49.00 EP (b/s)

385 49.00 49.10 EP (b/s)

386 49.10 49.20 EP (b/s) / EP (crossing)

387 49.20 49.30 EP (b/s)

Page 16: Ponds along Project Stretchenvironmentclearance.nic.in/writereaddata/Online/... · Ponds along Project Stretch Sl No. From To 1 Chainage (Km) Chainage ... Social Facilities along

388 49.30 49.40 EP (b/s)

389 49.40 49.50 EP (b/s)

390 49.50 49.60 EP (b/s)

391 49.60 49.70 EP (b/s)

392 49.70 49.80 EP (b/s)

393 49.80 49.90 EP (b/s)

394 49.90 50.00 EP (b/s)

395 50.00 50.10 EP (b/s)

396 50.10 50.20 EP (b/s)

397 50.20 50.30 EP (b/s)

398 50.30 50.40 EP (b/s)

399 50.40 50.50 EP (b/s) / EP (crossing)

400 50.50 50.60 EP (b/s)

401 50.60 50.70 EP (b/s)

402 50.70 50.80 EP (b/s)

403 50.80 50.90 EP (b/s) / EP (crossing)

404 50.90 51.00 EP (b/s)

405 51.00 51.10 EP (b/s)

406 51.10 51.20 EP (b/s)

407 51.20 51.30 EP (b/s)

408 51.30 51.40 EP (b/s)

409 51.40 51.50 EP (b/s)

410 51.50 51.60 EP (b/s)

411 51.60 51.70 EP (b/s)

412 51.70 51.80 EP (b/s)

413 51.80 51.90 EP (b/s)

414 51.90 52.00 EP (b/s)

415 52.00 52.10 EP (b/s)

416 52.10 52.20 EP (b/s)

417 52.20 52.30 EP (b/s)

418 52.30 52.40 EP (b/s)

419 52.40 52.50 EP (b/s)

420 52.50 52.60 EP (b/s)

421 52.60 52.70 EP (b/s)

422 52.70 52.80 EP (b/s)

423 52.80 52.90 EP (b/s) / EP (crossing)

424 52.90 53.00 EP (b/s)

425 53.00 53.10 EP (b/s)

426 53.10 53.20 EP (b/s)

427 53.20 53.30 EP (b/s)

428 53.30 53.40 EP (b/s)

429 53.40 53.50 EP (b/s) / EP (crossing)

430 53.50 53.60 EP (b/s)

431 53.60 53.70 EP (b/s)

432 53.70 53.80 EP (b/s)

433 53.80 53.90 EP (RHS) / EP (crossing)

434 53.90 54.00 EP (RHS) / EP (crossing)

435 54.00 54.10 EP (RHS) / EP (crossing)

436 54.10 54.20 EP (RHS)

437 54.20 54.30 EP (RHS)

438 54.30 54.40 EP (RHS) / EP (crossing)

439 54.40 54.50 EP (RHS)

440 54.50 54.60 EP (RHS)

441 54.60 54.70 EP (RHS) / EP (crossing)

442 54.70 54.80 EP (RHS)

443 54.80 54.90 EP (RHS) / EP (crossing)

Page 17: Ponds along Project Stretchenvironmentclearance.nic.in/writereaddata/Online/... · Ponds along Project Stretch Sl No. From To 1 Chainage (Km) Chainage ... Social Facilities along

444 54.90 55.00 EP (RHS)

445 55.00 55.10 EP (RHS) / EP (crossing)

446 55.10 55.20 EP (RHS)

447 55.20 55.30 EP (RHS)

448 55.30 55.40 EP (RHS)

449 55.40 55.50 EP (RHS)

450 55.50 55.60 EP (RHS)

451 55.60 55.70 EP (RHS)

452 55.70 55.80 EP (RHS) / EP (crossing)

453 55.80 55.90 EP (b/s)

454 55.90 56.00 EP (RHS)

455 56.00 56.10 EP (RHS)

456 56.10 56.20 EP (RHS)

457 56.20 56.30 EP (RHS)

458 56.30 56.40 EP (RHS)

459 56.40 56.50 EP (RHS)

460 56.50 56.60 EP (RHS)

461 56.60 56.70 EP (RHS)

462 56.70 56.80 EP (RHS)

463 56.80 56.90 EP (RHS)

464 56.90 57.00 EP (RHS)

465 57.00 57.10 EP (RHS)

466 57.10 57.20 EP (RHS)

467 57.20 57.30 EP (RHS)

468 57.30 57.40 EP (RHS) / EP (crossing)

469 57.40 57.50 EP (RHS)

470 57.50 57.60 EP (RHS)

471 57.60 57.70 EP (RHS)

472 57.70 57.80 EP (RHS)

473 57.80 57.90 EP (RHS) /HT (crossing)

474 57.90 58.00 EP (RHS)

475 58.00 58.10 EP (RHS) / EP (crossing)

476 58.10 58.20 EP (RHS) /HT (crossing)

477 58.20 58.30 EP (RHS)

478 58.30 58.40 EP (RHS)

479 58.40 58.50 EP (RHS) / EP (crossing)

480 58.50 58.60 EP (RHS)

481 58.60 58.70 EP (RHS) / EP (crossing)

482 58.70 58.80 EP (RHS)

483 58.80 58.90 EP (RHS)

484 58.90 59.00 EP (RHS)

485 59.00 59.10 EP (RHS)

486 59.30 59.40 EP(crossing) affected

487 59.40 59.50 EP(crossing) affected

488 60.00 60.10 EP(crossing) affected

489 60.50 60.60 EP(RHS)

490 60.60 60.70 EP(RHS)

491 60.70 60.80 EP(RHS)

492 60.90 61.00 EP(crossing)

493 61.00 61.10 EP(crossing)/ EP(b/s) affected

494 61.10 61.20 EP(crossing)/ EP(b/s) affected

495 61.40 61.50 EP(crossing) / HT(crossing) /EP

496 61.50 61.60 EP(RHS)

497 61.60 61.70 EP(crossing) / transformer (RHS)

498 61.70 61.80 EP(crossing)

499 61.80 61.90 EP(crossing)

Page 18: Ponds along Project Stretchenvironmentclearance.nic.in/writereaddata/Online/... · Ponds along Project Stretch Sl No. From To 1 Chainage (Km) Chainage ... Social Facilities along

500 61.90 62.00 EP

501 62.00 62.10 EP(crossing) / transformer (RHS)

502 62.10 62.20 EP(crossing)/ EP(b/s) affected

503 62.20 62.30 EP(crossing)/ EP(b/s) / transformer (RHS) affected

504 62.30 62.40 EP(crossing)/ EP(b/s) affected

505 62.40 62.50 transformer (RHS)

506 62.70 62.80 EP(crossing)/ EP(b/s)

507 63.10 63.20 EP(crossing)

508 63.20 63.30 transformer (RHS)

509 63.50 63.60 EP(crossing)

510 63.60 63.70 EP(RHS)

511 63.70 63.80 EP(RHS)

512 63.80 63.90 EP(RHS)

513 63.90 64.00 EP(RHS)

514 64.00 64.10 EP(RHS)

515 64.10 64.20 EP(RHS)

516 64.20 64.30 EP(RHS)

517 64.30 64.40 EP(RHS)

518 64.40 64.50 EP(RHS) / EP(crossing)

519 64.50 64.60 EP (RHS) / transformer (RHS)

520 64.60 64.70 EP (RHS) / transformer (RHS)

521 64.70 64.80 EP (RHS)

522 64.80 64.90 EP (RHS)

523 64.90 65.00 EP (RHS)

524 65.00 65.10 EP (RHS)

525 65.10 65.20 EP (RHS)

526 65.20 65.30 EP (RHS)

527 65.30 65.40 EP (RHS)

528 65.40 65.50 EP(RHS) / EP(crossing)

529 65.50 65.60 EP (RHS)

530 65.60 65.70 EP (RHS)

531 65.70 65.80 EP (RHS)

532 65.80 65.90 EP (RHS)

533 65.90 66.00 EP (b/s) / transformer (LHS)

534 66.00 66.10 EP (b/s) / transformer (RHS)

535 66.10 66.20 EP (RHS)

536 66.20 66.30 EP (RHS) / transformer (LHS)

537 66.30 66.40 EP (RHS)

538 66.40 66.50 EP (RHS)

539 66.50 66.60 EP (b/s)

540 66.60 66.70 EP (b/s)

541 66.70 66.80 EP (b/s) / transformer (LHS)

542 66.80 66.90 EP (b/s)

543 66.90 67.00 EP (b/s)

544 67.00 67.10 EP (b/s)

545 67.10 67.20 EP (b/s)

546 67.20 67.30 EP (b/s)

547 67.30 67.40 EP (b/s)

548 67.40 67.50 EP (b/s)

549 67.50 67.60 EP (b/s) / HT (crossing)

550 67.60 67.70 EP (b/s)

551 67.70 67.80 EP (b/s) / HT (crossing)

552 67.80 67.90 EP (b/s)

553 67.90 68.00 EP (b/s)

554 68.00 68.10 EP (b/s)

555 68.10 68.20 EP (b/s)

Page 19: Ponds along Project Stretchenvironmentclearance.nic.in/writereaddata/Online/... · Ponds along Project Stretch Sl No. From To 1 Chainage (Km) Chainage ... Social Facilities along

556 68.20 68.30 EP (RHS)

557 68.30 68.40 EP (b/s) RHS affected

558 68.40 68.50 EP (b/s) RHS affected

559 68.50 68.60 EP (b/s) RHS affected

560 68.60 68.70 EP (b/s) RHS affected

561 68.70 68.80 EP (b/s) RHS affected

562 68.80 68.90 EP (b/s) RHS affected

563 68.90 69.00 EP (b/s) RHS affected

564 69.00 69.10 EP (b/s) RHS affected

565 69.10 69.20 EP (b/s) RHS affected

566 69.20 69.30 EP (b/s) RHS affected

567 69.30 69.40 EP (RHS)

568 69.40 69.50 EP (RHS)

569 69.50 69.60 EP (RHS)

570 69.60 69.70 EP (RHS)

571 69.70 69.80 EP (RHS)

572 69.80 69.90 EP (RHS)

573 69.90 70.00 EP (RHS) / transformer (RHS)

574 70.00 70.10 EP (RHS)

575 70.10 70.20 EP (RHS)

576 70.20 70.30 EP (RHS)

577 70.30 70.40 EP (RHS)

578 70.40 70.50 EP (RHS)

579 70.50 70.60 EP (RHS)

580 70.60 70.70 EP (RHS)

581 70.70 70.80 EP (RHS)

582 70.80 70.90 EP (RHS)

583 70.90 71.00 EP (RHS)

584 71.00 71.10 EP (RHS)

585 71.10 71.20 EP (RHS) / transformer (RHS&LHS)

586 71.20 71.30 EP (RHS)

587 71.30 71.40 EP (RHS)

588 71.40 71.50 EP (RHS)

589 71.50 71.60 EP (RHS)

590 71.60 71.70 EP (RHS)

591 71.70 71.80 EP (RHS)

592 71.80 71.90 EP (RHS)

593 71.90 72.00 EP (RHS)

594 72.00 72.10 EP (RHS)

595 72.10 72.20 EP (b/s)

596 72.20 72.30 EP (b/s)

597 72.30 72.40 EP (b/s)

598 72.40 72.50 EP (b/s)

599 72.50 72.60 EP (b/s)

600 72.60 72.70 EP (b/s)

601 72.70 72.80 EP (RHS)

602 72.80 72.90 EP (RHS)

603 72.90 73.00 EP (RHS)

604 73.00 73.10 EP (RHS)

605 73.10 73.20 EP (RHS)

606 73.20 73.30 EP (RHS)

607 73.30 73.40 EP (RHS)

608 73.40 73.50 EP (RHS) / transformer (RHS)

609 73.50 73.60 EP (b/s)

610 73.60 73.70 EP (b/s) / transformer (RHS)

611 73.70 73.80 EP (b/s) / transformer (LHS)

Page 20: Ponds along Project Stretchenvironmentclearance.nic.in/writereaddata/Online/... · Ponds along Project Stretch Sl No. From To 1 Chainage (Km) Chainage ... Social Facilities along

612 73.80 73.90 EP (b/s)

613 75.70 75.80 EP (LHS)

614 75.80 75.90 EP (LHS)

615 75.90 76.00 EP (LHS)

616 76.00 76.10 EP (LHS)

617 76.10 76.20 EP (LHS)

618 76.20 76.30 EP (LHS)

619 76.30 76.40 EP (LHS) / transformer (LHS)

620 76.40 76.50 EP (b/s) / transformer (RHS)

621 76.50 76.60 EP (b/s)

622 76.60 76.70 EP (b/s)

623 76.70 76.80 EP (b/s)

624 76.80 76.90 EP (b/s) / transformer (LHS) / network tower

625 77.20 77.30 EP (LHS)

626 77.30 77.40 EP (LHS)

627 77.40 77.50 EP (LHS)

628 77.50 77.60 EP (LHS)

629 77.60 77.70 EP (LHS)

630 77.70 77.80 EP (LHS)

631 77.80 77.90 EP (LHS)

632 77.90 78.00 EP (LHS)

633 78.00 78.10 EP (LHS)

634 78.10 78.20 EP (LHS)

635 78.20 78.30 EP (LHS)

636 78.30 78.40 EP (LHS)

637 78.40 78.50 EP (LHS)

638 78.50 78.60 EP (LHS)

639 78.60 78.70 EP (LHS)

640 78.70 78.80 EP (LHS)

641 78.80 78.90 EP (LHS)

642 78.90 79.00 EP (LHS)

643 79.00 79.10 EP (LHS)

644 79.10 79.20 EP (LHS)

645 79.20 79.30 EP (LHS)

646 79.30 79.40 EP (LHS)

647 79.40 79.50 EP (LHS)

648 79.50 79.60 EP (LHS)

649 79.60 79.70 EP (LHS)

650 79.70 79.80 EP (LHS)

651 79.80 79.90 EP (LHS)

652 79.90 80.00 EP (LHS) / steet poles

653 80.00 80.10 street poles

654 80.10 80.20 street poles

655 80.20 80.30 EP (b/s) / steet poles

656 80.30 80.40 EP (b/s) / steet poles

657 80.40 80.50 EP (b/s) / steet poles

658 80.50 80.60 EP (b/s) / steet poles / transformer (RHS)

659 80.60 80.70 EP (b/s) / steet poles

660 80.70 80.80 EP (b/s) / steet poles

661 80.80 80.90 EP (LHS) / steet poles

662 80.90 81.00 EP (LHS) / steet poles

663 81.00 81.10 steet poles / transformer (LHS)

664 81.10 81.20 steet poles

665 81.20 81.30 EP (b/s) / steet poles / transformer (RHS)

666 81.30 81.40 EP (b/s) / steet poles

667 81.40 81.50 EP (b/s) / steet poles

Page 21: Ponds along Project Stretchenvironmentclearance.nic.in/writereaddata/Online/... · Ponds along Project Stretch Sl No. From To 1 Chainage (Km) Chainage ... Social Facilities along

668 81.50 81.60 EP (b/s) / steet poles

669 81.60 81.70 EP (b/s) / steet poles / transformer (LHS)

670 81.70 81.80 EP (b/s) / steet poles

671 81.80 81.90 EP (b/s) / steet poles

672 81.90 82.00 EP (RHS) / steet poles / transformer (LHS)

673 82.00 82.10 EP (RHS) / steet poles

674 82.10 82.20 EP (RHS) / steet poles

675 82.20 82.30 EP (RHS) / steet poles

676 82.30 82.40 EP (RHS) / steet poles

677 82.40 82.50 EP (RHS) / steet poles

678 82.50 82.60 EP (b/s)

679 82.60 82.70 EP (b/s)

680 82.70 82.80 EP (b/s)

681 83.10 83.20 EP (RHS)

682 83.20 83.30 EP (RHS)

683 83.30 83.40 EP (RHS)

684 83.40 83.50 EP (RHS)

685 83.50 83.60 EP (RHS)

686 83.60 83.70 EP (RHS)

687 83.70 83.80 EP (RHS)

688 83.80 83.90 EP (RHS)

689 83.90 84.00 EP (RHS)

690 84.00 84.10 EP (RHS)

691 84.10 84.20 EP (RHS)

692 84.20 84.30 EP (RHS)

693 84.30 84.40 EP (RHS) / transformer (RHS)

694 84.40 84.50 EP (RHS)

695 84.50 84.60 EP (RHS)

696 84.60 84.70 EP (RHS)

697 84.70 84.80 EP (RHS)

698 84.80 84.90 EP (RHS)

699 84.90 85.00 EP (RHS)

700 85.00 85.10 EP (RHS)

701 85.10 85.20 EP (RHS)

702 85.20 85.30 EP (RHS)

703 85.30 85.40 EP (RHS)

704 85.40 85.50 EP (RHS)

705 85.50 85.60 EP (RHS)

706 85.60 85.70 EP (RHS)

707 85.70 85.80 EP (RHS)

708 85.80 85.90 EP (RHS)

709 85.90 86.00 EP (RHS)

710 86.00 86.10 EP (RHS)

711 86.10 86.20 EP (RHS)

712 86.20 86.30 EP (RHS)

713 86.30 86.40 EP (RHS)

714 86.40 86.50 EP (RHS)

715 86.50 86.60 EP (RHS)

716 86.60 86.70 EP (RHS)

717 86.70 86.80 EP (RHS)

718 86.80 86.90 EP (RHS)

719 86.90 87.00 EP (RHS)

720 87.00 87.10 EP (RHS)

721 87.10 87.20 EP (RHS)

722 87.20 87.30 EP (b/s)

723 87.30 87.40 EP (b/s)

Page 22: Ponds along Project Stretchenvironmentclearance.nic.in/writereaddata/Online/... · Ponds along Project Stretch Sl No. From To 1 Chainage (Km) Chainage ... Social Facilities along

724 87.40 87.50 EP (b/s)

725 87.50 87.60 EP (b/s)

726 87.60 87.70 EP (b/s)

727 87.70 87.80 EP (b/s)

728 87.80 87.90 EP (b/s)

729 87.90 88.00 EP (b/s)

730 88.00 88.10 EP (b/s)

731 88.10 88.20 EP (b/s)

732 88.20 88.30 EP (b/s)

733 88.30 88.40 EP (b/s)

734 88.40 88.50 EP (b/s)

735 88.50 88.60 EP (b/s)

736 88.60 88.70 EP (b/s)

737 88.70 88.80 EP (LHS)

738 88.80 88.90 EP (LHS)

739 88.90 89.00 EP (LHS)

740 89.00 89.10 EP (b/s)

741 89.10 89.20 EP (b/s)

742 89.20 89.30 EP (b/s) / transformer (RHS)

743 89.30 89.40 EP (LHS)

744 89.40 89.50 EP (LHS)

745 89.50 89.60 EP (LHS)

746 89.60 89.70 EP (LHS)

747 89.70 89.80 EP (LHS)

748 89.80 89.90 EP (b/s) / transformer (RHS)

749 89.90 90.00 EP (b/s)

750 90.00 90.10 EP (b/s)

751 90.10 90.20 EP (b/s)

752 90.20 90.30 EP (b/s)

753 90.30 90.40 EP (b/s)

754 90.70 90.80 EP (RHS) affected

755 90.80 90.90 EP (RHS) affected

756 90.90 91.00 EP (RHS) affected

757 91.00 91.10 EP (RHS) affected

758 91.10 91.20 EP (RHS) affected

759 91.20 91.30 EP (RHS) affected

760 91.30 91.40 EP (RHS) affected

761 91.40 91.50 EP (RHS) affected

762 91.50 91.60 EP (RHS) affected

763 91.60 91.70 EP (RHS) affected

764 91.70 91.80 EP (RHS) affected

765 91.80 91.90 EP (b/s) affected

766 91.90 92.00 EP (b/s) affected

767 92.00 92.10 EP (b/s) affected

768 92.10 92.20 EP (b/s) affected

769 92.20 92.30 EP (b/s) affected

770 92.30 92.40 EP (b/s) affected

771 92.40 92.50 EP (b/s) affected

772 92.50 92.60 EP (b/s) affected

773 92.60 92.70 EP (b/s) affected

774 92.70 92.80 EP (b/s) affected

775 92.80 92.90 EP (b/s) affected

776 92.90 93.00 EP (b/s) affected

777 93.00 93.10 EP (b/s) affected

778 93.10 93.20 EP (b/s) affected

779 93.20 93.30 EP (b/s) / transformer (LHS) affected

Page 23: Ponds along Project Stretchenvironmentclearance.nic.in/writereaddata/Online/... · Ponds along Project Stretch Sl No. From To 1 Chainage (Km) Chainage ... Social Facilities along

780 93.30 93.40 EP (b/s) affected

781 93.40 93.50 EP (b/s) affected

782 93.50 93.60 EP (b/s) affected

783 93.60 93.70 EP (b/s) affected

784 93.70 93.80 EP (b/s) affected

785 93.80 93.90 EP (b/s) affected

786 93.90 94.00 EP (b/s) affected

787 94.00 94.10 EP (b/s) affected

788 94.10 94.20 EP (b/s) affected

789 94.20 94.30 EP (b/s) affected

790 94.30 94.40 EP (b/s) affected

791 94.40 94.50 EP (RHS) affected

792 94.50 94.60 EP (RHS) affected

793 94.60 94.70 EP (RHS) affected

794 94.70 94.80 EP (RHS) affected

795 94.80 94.90 EP (RHS) affected

796 94.90 95.00 EP (RHS) affected

797 95.00 95.10 EP (RHS) affected

798 95.10 95.20 EP (RHS) affected

799 95.20 95.30 EP (RHS) affected

800 95.30 95.40 EP (RHS) affected

801 95.40 95.50 EP (RHS) affected

802 95.50 95.60 EP (RHS) affected

803 95.60 95.70 EP (b/s)

804 95.70 95.80 EP (b/s) / transformer (LHS)

805 95.90 96.00 EP (b/s)

806 96.00 96.10 EP (b/s)

807 96.10 96.20 EP (b/s)

808 96.20 96.30 EP (b/s)

809 96.30 96.40 EP (b/s)

810 96.40 96.50 EP (b/s)

811 96.50 96.60 EP (b/s)

812 96.60 96.70 EP (b/s)

813 96.70 96.80 EP (b/s)

814 96.80 96.90 EP (b/s)

815 96.90 97.00 EP (b/s)

816 97.00 97.10 EP (b/s)

817 97.10 97.20 EP (b/s)

818 97.20 97.30 EP (b/s)

819 97.30 97.40 EP (b/s)

820 97.40 97.50 EP (b/s)

821 97.50 97.60 EP (LHS) / transformer (LHS)

822 97.60 97.70 EP (LHS)

823 97.70 97.80 EP (LHS)

824 97.80 97.90 EP (RHS)

825 97.90 98.00 EP (RHS)

826 98.00 98.10 EP (RHS)

827 98.10 98.20 EP (RHS)

828 98.20 98.30 EP (RHS)

829 98.30 98.40 EP (RHS)

830 98.40 98.50 EP (RHS)

831 98.50 98.60 EP (RHS)

832 98.60 98.70 EP (b/s)

833 98.70 98.80 EP (b/s)

834 98.80 98.90 EP (b/s)

835 98.90 99.00 EP (b/s)

Page 24: Ponds along Project Stretchenvironmentclearance.nic.in/writereaddata/Online/... · Ponds along Project Stretch Sl No. From To 1 Chainage (Km) Chainage ... Social Facilities along

836 99.00 99.10 EP (b/s)

837 99.10 99.20 EP (b/s)

838 99.20 99.30 EP (b/s)

839 99.30 99.40 EP (b/s)

840 99.40 99.50 EP (b/s)

841 99.50 99.60 EP (b/s)

842 99.60 99.70 EP (b/s) / transformer (RHS)

843 99.70 99.80 EP (b/s)

844 99.80 99.90 EP (b/s)

845 99.90 100.00 EP (b/s) / transformer (LHS)

846 100.00 100.10 EP (b/s)

847 100.10 100.20 EP (b/s)

848 100.20 100.30 EP (b/s)

849 100.30 100.40 EP (b/s)

850 100.40 100.50 EP (b/s)

851 100.50 100.60 EP (b/s)

852 100.60 100.70 EP (b/s)

853 100.70 100.80 EP (b/s)

854 100.80 100.90 EP (b/s)

855 100.90 101.00 EP (b/s)

856 101.00 101.10 EP (b/s)

857 101.10 101.20 EP (b/s)

858 101.20 101.30 EP (b/s)

859 101.30 101.40 EP (b/s)

860 101.40 101.50 EP (b/s)

861 101.50 101.60 EP (b/s)

862 101.60 101.70 EP (b/s)

863 101.70 101.80 EP (b/s)

864 101.80 101.90 EP (b/s)

865 101.90 102.00 EP (b/s)

866 102.00 102.10 EP (b/s)

867 102.10 102.20 EP (b/s)

868 102.20 102.30 EP (b/s)

869 102.30 102.40 EP (b/s)

870 102.40 102.50 EP (b/s)

871 102.50 102.60 EP (b/s)

872 102.60 102.70 EP (b/s)

873 102.70 102.80 EP (b/s)

874 102.80 102.90 EP (b/s)

875 102.90 103.00 EP (b/s)

876 103.00 103.10 EP (b/s)

877 103.10 103.20 EP (b/s)

878 103.20 103.30 EP (b/s)

879 103.30 103.40 EP (b/s)

880 103.40 103.50 EP (b/s)

881 103.50 103.60 EP (b/s)

882 103.60 103.70 EP (b/s)

883 103.70 103.80 EP (b/s)

884 103.80 103.90 EP (b/s)

885 103.90 104.00 EP (b/s)

886 104.00 104.10 EP (b/s)

887 104.10 104.20 EP (b/s)

888 104.20 104.30 EP (b/s)

889 104.30 104.40 EP (b/s)

890 104.40 104.50 EP (b/s)

891 104.50 104.60 EP (RHS)

Page 25: Ponds along Project Stretchenvironmentclearance.nic.in/writereaddata/Online/... · Ponds along Project Stretch Sl No. From To 1 Chainage (Km) Chainage ... Social Facilities along

892 104.60 104.70 EP (RHS)

893 104.70 104.80 EP (RHS)

894 104.80 104.90 EP (RHS)

895 104.90 105.00 EP (RHS)

896 105.00 105.10 EP (RHS)

897 105.10 105.20 EP (RHS)

898 105.20 105.30 EP (RHS)

899 105.30 105.40 EP (RHS)

900 105.40 105.50 EP (b/s)

901 105.50 105.60 EP (b/s)

902 105.60 105.70 EP (RHS)

903 105.70 105.80 EP (RHS)

904 105.80 105.90 EP (RHS) / transformer (RHS)

905 105.90 106.00 EP (b/s)

906 106.00 106.10 EP (b/s)

907 106.10 106.20 EP (b/s)

908 106.20 106.30 EP (b/s)

909 106.30 106.40 EP (RHS)

910 106.40 106.50 EP (RHS)

911 106.50 106.60 EP (RHS)

912 106.60 106.70 EP (RHS)

913 106.70 106.80 EP (RHS)

914 106.80 106.90 EP (RHS)

915 106.90 107.00 EP (RHS)

916 107.00 107.10 EP (RHS)

917 107.10 107.20 EP (RHS)

918 107.20 107.30 EP (RHS)

919 107.30 107.40 EP (RHS)

920 107.80 107.90 EP (LHS)

921 107.90 108.00 EP (LHS)

922 108.00 108.10 EP (b/s)

923 108.10 108.20 EP (b/s)

924 108.20 108.30 EP (RHS)

925 108.30 108.40 EP (RHS)

926 108.40 108.50 EP (RHS)

927 108.50 108.60 EP (RHS)

928 108.60 108.70 EP (RHS)

929 108.70 108.80 EP (RHS)

930 108.80 108.90 EP (RHS)

931 108.90 109.00 EP (RHS)

932 109.00 109.10 EP (RHS)

933 109.10 109.20 EP (RHS) / transformer (LHS)

934 109.20 109.30 EP (RHS)

935 109.30 109.40 EP (RHS)

936 109.40 109.50 EP (RHS)

937 109.50 109.60 EP (RHS)

938 109.60 109.70 EP (RHS)

939 109.70 109.80 EP (RHS)

940 109.80 109.90 EP (LHS) / transformer (LHS)

941 109.90 110.00 EP (LHS)

942 110.00 110.10 EP (LHS)

943 110.10 110.20 EP (LHS)

944 110.20 110.30 EP (LHS)

945 110.30 110.40 EP (LHS)

946 110.40 110.50 EP (LHS)

947 110.50 110.60 EP (LHS)

Page 26: Ponds along Project Stretchenvironmentclearance.nic.in/writereaddata/Online/... · Ponds along Project Stretch Sl No. From To 1 Chainage (Km) Chainage ... Social Facilities along

948 110.60 110.70 EP (LHS)

949 110.70 110.80 EP (LHS)

950 110.80 110.90 EP (b/s) / transformer (LHS)

951 110.90 111.00 EP (b/s)

952 111.00 111.10 EP (b/s)

953 111.10 111.20 EP (b/s)

954 111.20 111.30 EP (b/s)

955 111.30 111.40 EP (b/s)

956 111.40 111.50 EP (b/s)

957 111.50 111.60 EP (b/s)

958 111.60 111.70 EP (b/s)

959 111.70 111.80 EP (b/s)

960 111.80 111.90 EP (LHS)

961 111.90 112.00 EP (LHS)

962 112.00 112.10 EP (LHS)

963 112.10 112.20 EP (LHS)

964 112.20 112.30 EP (LHS)

965 112.30 112.40 EP (LHS)

966 112.40 112.50 EP (LHS)

967 112.50 112.60 EP (LHS)

968 112.60 112.70 EP (LHS)

969 112.70 112.80 EP (RHS)

970 112.80 112.90 EP (RHS)

971 112.90 113.00 EP (RHS)

972 113.00 113.10 EP (RHS)

973 113.10 113.20 EP (RHS) / HT crossing

974 113.20 113.30 EP (RHS)

975 113.30 113.40 EP (RHS)

976 113.40 113.50 EP (RHS)

977 113.50 113.60 EP (RHS)

978 113.60 113.70 EP (RHS)

979 113.70 113.80 EP (RHS)

980 113.80 113.90 EP (RHS)

981 113.90 114.00 EP (RHS)

982 114.00 114.10 EP (RHS)

983 114.10 114.20 EP (RHS)

984 114.20 114.30 EP (RHS)

985 114.30 114.40 EP (RHS)

986 114.40 114.50 EP (RHS)

987 114.50 114.60 EP (RHS)

988 114.60 114.70 EP (RHS)

989 114.70 114.80 EP (RHS)

990 114.80 114.90 EP (b/s)

991 114.90 115.00 EP (LHS)

992 115.00 115.10 EP (LHS)

993 115.10 115.20 EP (LHS)

994 115.20 115.30 EP (LHS)

995 115.30 115.40 EP (LHS)

996 115.40 115.50 EP (LHS) / 3 nos transformer (RHS)

997 115.50 115.60 EP (LHS)

998 115.60 115.70 EP (LHS)

999 115.70 115.80 EP (LHS) / transformer (RHS)

1000 115.80 115.90 EP (LHS)

1001 115.90 116.00 EP (b/s)

1002 116.00 116.10 EP (b/s)

1003 116.10 116.20 EP (b/s)

Page 27: Ponds along Project Stretchenvironmentclearance.nic.in/writereaddata/Online/... · Ponds along Project Stretch Sl No. From To 1 Chainage (Km) Chainage ... Social Facilities along

1004 116.20 116.30 EP (b/s)

1005 116.30 116.40 EP (b/s)

1006 116.40 116.50 EP (b/s)

1007 116.50 116.60 EP (b/s)

1008 116.60 116.70 EP (b/s)

1009 116.70 116.80 EP (b/s)

1010 116.80 116.90 EP (b/s)

1011 116.90 117.00 EP (b/s)

1012 117.00 117.10 EP (b/s)

1013 117.10 117.20 EP (b/s)

1014 117.20 117.30 EP (b/s)

1015 117.30 117.40 EP (b/s)

1016 117.40 117.50 EP (b/s)

1017 117.50 117.60 EP (b/s)

1018 117.60 117.70 EP (RHS)

1019 117.70 117.80 EP (RHS)

1020 117.80 117.90 EP (RHS)

1021 117.90 118.00 EP (RHS)

1022 118.00 118.10 EP (RHS)

1023 118.10 118.20 EP (RHS)

1024 118.20 118.30 EP (RHS)

1025 118.30 118.40 EP (RHS)

1026 118.40 118.50 EP (b/s)

1027 118.50 118.60 EP (b/s)

1028 118.60 118.70 transformer (LHS)

1029 119.20 119.30 EP (b/s)

1030 119.30 119.40 EP (b/s)

1031 119.40 119.50 EP (b/s)

1032 119.50 119.60 EP (b/s)

1033 119.80 119.90 EP (RHS)

1034 119.90 120.00 EP (RHS)

1035 120.00 120.10 EP (RHS)

1036 120.10 120.20 EP (RHS)

1037 120.20 120.30 EP (RHS)

1038 120.30 120.40 EP (RHS)

1039 120.40 120.50 EP (RHS)

1040 120.50 120.60 EP (RHS)

1041 120.60 120.70 EP (RHS)

1042 120.70 120.80 EP (RHS)

1043 120.80 120.90 EP (RHS)

1044 120.90 121.00 EP (RHS)

1045 121.00 121.10 EP (RHS)

1046 121.10 121.20 EP (RHS)

1047 121.20 121.30 EP (RHS) / EP crossing

1048 121.30 121.40 EP (RHS)

1049 121.40 121.50 EP (RHS)

1050 121.50 121.60 EP (LHS)

1051 121.60 121.70 EP (LHS)

1052 121.70 121.80 EP (LHS)

1053 121.80 121.90 EP (LHS)

1054 121.90 122.00 EP (LHS)

1055 122.00 122.10 EP (LHS)

1056 122.10 122.20 EP (LHS)

1057 122.20 122.30 EP (LHS)

1058 122.30 122.40 EP (LHS)

1059 122.40 122.50 EP (b/s)

Page 28: Ponds along Project Stretchenvironmentclearance.nic.in/writereaddata/Online/... · Ponds along Project Stretch Sl No. From To 1 Chainage (Km) Chainage ... Social Facilities along

1060 122.50 122.60 EP (b/s)

1061 122.60 122.70 EP (LHS)

1062 122.70 122.80 EP (LHS)

1063 122.80 122.90 EP (b/s)

1064 122.90 123.00 EP (b/s)

1065 123.00 123.10 EP (RHS) / transformer(RHS)

1066 123.10 123.20 EP (RHS)

1067 123.20 123.30 EP (RHS)

1068 123.50 123.60 transformer(RHS)

1069 124.20 124.30 HT&EP crossing

1070 124.50 124.60 HT crossing

1071 124.80 124.90 EP (RHS) / EP crossing

1072 124.90 125.00 EP (RHS)

1073 125.00 125.10 EP (RHS) /EP crossing

1074 125.20 125.30 EP (b/s)

1075 125.30 125.40 EP (b/s)

1076 125.50 125.60 EP crossing

1077 125.70 125.80 EP (LHS) / EP crossing

1078 125.80 125.90 EP (LHS)

1079 125.90 126.00 EP (LHS)

1080 126.00 126.10 EP (LHS)

1081 126.10 126.20 EP (LHS)

1082 126.20 126.30 EP (LHS)

1083 126.30 126.40 EP (LHS) / EP crossing

1084 126.40 126.50 EP (LHS)

1085 126.50 126.60 EP (LHS)

1086 126.60 126.70 EP (LHS)

1087 126.70 126.80 EP (LHS)

1088 126.80 126.90 EP crossing / transformer

1089 126.90 127.00 EP (RHS)

1090 127.00 127.10 EP (RHS)

1091 127.10 127.20 EP (RHS)

1092 127.20 127.30 EP (RHS)

1093 127.30 127.40 EP crossing / network tower

1094 127.40 127.50 EP crossing

1095 127.50 127.60 EP (LHS) / EP crossing

1096 127.60 127.70 EP (LHS) / EP crossing

1097 127.70 127.80 EP (LHS)

1098 128.20 128.30 EP (b/s)

1099 128.30 128.40 EP (b/s)

1100 128.40 128.50 EP (b/s)

1101 128.50 128.60 EP (b/s)

1102 128.60 128.70 EP (b/s)

1103 128.70 128.80 EP (b/s)

1104 128.80 128.90 EP (b/s)

1105 128.90 129.00 EP (b/s)

1106 129.00 129.10 EP (b/s)

1107 129.10 129.20 EP (b/s)

1108 129.20 129.30 EP (b/s)

1109 129.30 129.40 EP (b/s)

1110 129.40 129.50 EP (b/s)

1111 129.50 129.60 EP (b/s) / EP crossing / transformer

1112 129.60 129.70 EP (b/s) / EP crossing

1113 129.70 129.80 EP (b/s)

1114 129.80 129.90 EP (b/s)

1115 129.90 130.00 EP (b/s)

Page 29: Ponds along Project Stretchenvironmentclearance.nic.in/writereaddata/Online/... · Ponds along Project Stretch Sl No. From To 1 Chainage (Km) Chainage ... Social Facilities along

1116 130.00 130.10 EP (RHS)

1117 130.10 130.20 EP (RHS)

1118 130.20 130.30 EP (RHS)

1119 130.30 130.40 EP (RHS) / EP crossing

1120 130.40 130.50 EP (RHS)

1121 130.50 130.60 EP (RHS)

1122 130.60 130.70 EP (RHS)

1123 130.70 130.80 EP (RHS)

1124 130.80 130.90 EP crossing

1125 131.00 131.10 EP (RHS)

1126 131.10 131.20 EP (RHS) / EP crossing

1127 131.20 131.30 EP (RHS) /transformer / EP crossing

1128 131.30 131.40 EP (b/s)

1129 131.40 131.50 EP (b/s)

1130 131.50 131.60 EP (b/s)

1131 131.60 131.70 HT&EP crossing

1132 131.70 131.80 EP crossing

1133 131.80 131.90 HT crossing (3nos)

1134 132.20 132.30 HT&EP crossing

1135 132.80 132.90 HT crossing

1136 133.20 133.30 EP (b/s)

1137 133.30 133.40 EP crossing

1138 133.50 133.60 EP (LHS)

1139 133.60 133.70 EP (LHS)

1140 133.70 133.80 EP (LHS)

1141 134.60 134.70 EP (LHS) / EP crossing

1142 134.70 134.80 EP (LHS)

1143 134.80 134.90 EP (LHS)

1144 134.90 135.00 EP (LHS)

1145 135.00 135.10 EP crossing / transformer(RHS)

1146 135.30 135.40 EP crossing

1147 135.70 135.80 EP (LHS)

1148 135.80 135.90 EP (LHS)

1149 136.40 136.50 EP (RHS) / EP crossing / transformer(RHS)

Page 30: Ponds along Project Stretchenvironmentclearance.nic.in/writereaddata/Online/... · Ponds along Project Stretch Sl No. From To 1 Chainage (Km) Chainage ... Social Facilities along

Item Assumptions

1. Provision of Sewage and

sanitation facilities for the

construction camps, including

maintenance for 3 years in two

location

75,000/- in each location camp site

per year

2. Provision of Water Supply

Facilities for the construction

camp

80,000/- in each location per year

3. Compensatory avenue

plantation of thrice the number

of trees to be cut and their

fencing and maintenance for

three years

2,00,000/-

4. Shrub plantation in the 4.5 m

median for the entire corridor (q)

1000 saplings (double row) and

their fencing and maintenance

for 3 years

75,000/-

5. Environmental Monitoring

5.1.Air Quality Monitoring at

sensitive locations at an average

distance of 15 Km.

10 locations @ 5000/- per year in

each season

5.2. Water Quality Monitoring

at major water bodies at an

average distance of 25 Km.

1.Siragia Nala at 10+946 km

2.Kattonal River at 21+760 km 

3.Gobbur River at 27+405  km

4.Awaraja River at 39+880 km

5.  Garganji Nala at 44+000  km

6.  Bori River at 101+250  km

7.  Chappala wadi River at

114+260  km

A. Total Cost During Construction Phase

At 7 Rivers one place for 3 years at

pre and post monsoon

Page 31: Ponds along Project Stretchenvironmentclearance.nic.in/writereaddata/Online/... · Ponds along Project Stretch Sl No. From To 1 Chainage (Km) Chainage ... Social Facilities along

5.3. Noise Monitoring at

sensitive locations at an average

distance of 15 Km.

10 locations @ 5000/- for 3 years

per season

5.4.Soil Quality Monitoring at

sensitive locations at an average

distance of 25 Km.

5 locations for 3 years

5 Mobilization Charges 25,000/- per year

6. Dust Suppression at Site for

3 years50,000/- per year per district

7. Severances & Others

(including training, workshops,

awareness campaigning etc.)

50,000/- per year per time

Total cost during construction

phaseB. Annual Cost During

Operational Phase during

First Three Years

1. Environmental Monitoring

1.1. Air Pollution Monitoring at

sensitive

locations at an average distance

of 15 Km

1.2. Noise Monitoring at

sensitive locations at an average

distance of 15 Km

1.3. Mobilization Charges

Total annual cost during

operational phase during first

three years

C. Annual Cost During

Operational Phase from 4th

Year Onwards

1. Maintenance of Avenue

Plantation

Total annual cost during

operational phase from 4th

year onwards

Page 32: Ponds along Project Stretchenvironmentclearance.nic.in/writereaddata/Online/... · Ponds along Project Stretch Sl No. From To 1 Chainage (Km) Chainage ... Social Facilities along

Cost in Rs.

450000

480000

2,00,000/-

75,000/-

450000

A. Total Cost During Construction Phase

420000

Page 33: Ponds along Project Stretchenvironmentclearance.nic.in/writereaddata/Online/... · Ponds along Project Stretch Sl No. From To 1 Chainage (Km) Chainage ... Social Facilities along

450000

180000

75000

300000

1500000

4,305,000

50,000/-

10,000/-

1,10,000

50,000/-

50,000/-

50,000/-