Ponds along Project StretchSl No. From To
1 Chainage
(Km)
Chainage
(Km)
No of Ponds Location Present Use To be Reclaimed / Affected
2 22.2 22.3 open well LHS To be Reclaimed
3 25.3 25.4 open well LHS To be Reclaimed
4 42.6 42.7 open well LHS To be Reclaimed
5 61.6 61.7 open well LHS To be Reclaimed
6 59.30 59.40 open well RHS To be Reclaimed
7 60.00 60.10 open well RHS To be Reclaimed
8 71.00 71.10 open well LHS To be Reclaimed
9 71.10 71.20 open well RHS To be Reclaimed
10 71.70 71.80 open well RHS To be Reclaimed
11 76.30 79.40 open well LHS To be Reclaimed
12 78.70 78.80 Pond dry RHS To be Reclaimed
13 79.10 79.20 Pond dry LHS To be Reclaimed
14 81.50 81.60 open well LHS To be Reclaimed
15 84.30 84.40 open well LHS To be Reclaimed
16 86.70 86.80 open well LHS&RHS Also
17 90.50 90.60 open well LHS To be Reclaimed
18 95.10 95.20 pond filled RHS To be Reclaimed
19 95.30 95.40 open well LHS To be Reclaimed
20 96.70 96.80 lake dry LHS To be Reclaimed
21 99.00 99.10 Pond filled LHS To be Reclaimed
22 99.90 100.00 open well filled LHS To be Reclaimed
23 103.10 103.20 open well RHS To be Reclaimed
24 109.90 110.00 lake filled RHS To be Reclaimed
25 109.80 109.90 pond RHS To be Reclaimed
26 134.60 134.70 open well RHS To be Reclaimed
27 137.00 137.10 pond LHS To be Reclaimed
Source: Tehsil Office & Primary Reconnaissance Survey
Economic Value of Species
Ponds
Social Facilities along Project RoadFrom To
Chainage (Km) Chainage (Km) Name To be Reclaimed/ Affected
1 62.30 62.40 bus shelter(RHS) & petrol bunk(LHS)
2 62.60 62.70 Electricity sub station
3 62.80 62.90 Temple(LHS)
4 62.90 63.00 petrol bunk(LHS)
5 63.20 63.30 bus depo(RHS) afzalpur
6 67.20 67.30 bus shelter(RHS)
7 68.80 68.90 Govt school (LHS)
8 69.90 70.00 Pragati daba (RHS)
9 73.80 73.90 Bus shelter (RHS)
10 74.20 74.30 OHT (LHS)
11 74.30 74.40 Govt school ballurgi (LHS)
12 75.70 75.80 Temple (RHS) @ border
13 81.20 81.30 Bus shelter (LHS) dudani
14 82.40 82.50 Petrol bunk (LHS)
15 82.60 82.70 OHT (RHS)
16 82.80 82.90 Electricity sub station dudani
17 83.00 83.10 railway crossing
18 85.10 85.20 toll gate near sugar factroy
19 85.60 85.70 sugar factroy enterence
20 86.20 86.30 matoshri primary school
21 89.00 89.10 OHT (LHS)
22 92.10 92.20 Durga (RHS)
23 96.00 96.10 Electricity sub station maindargi
24 97.00 97.10 Temple & OHT (LHS)
25 97.90 98.00 Petrol bunk (LHS)
26 99.60 99.70 Petrol bunk (RHS)
27 102.50 102.60 Bus shelter (LHS)
28 105.40 105.50 Hotel (LHS)
29 105.50 105.60 Hotel (RHS)
30 106.30 106.40 Petrol bunk (RHS)
31 107.00 107.10 Ashrama(LHS)
32 107.10 107.20 Bar & Restaurant (LHS)
33 109.80 109.90 Muslim prayer hall (LHS) Affected so bypass proposd
34 109.90 110.00 Lake (RHS) Affected so bypass proposd
35 111.40 111.50 Electricity sub station (LHS) Akkalkot
36 112.20 112.30 Petrol bunk (RHS)
37 112.50 112.60 Garbage dumping yard (RHS) Akkalkot
38 112.60 112.70 Garbage dumping yard (RHS) Akkalkot
39 113.00 113.10 Petrol bunk (LHS)
40 116.60 116.70 Electricity sub station (LHS) Akkalkot
41 117.40 117.50 Petrol bunk (RHS)
42 117.70 117.80 Garbage dumping yard (RHS) Akkalkot
43 117.80 117.90 Garbage dumping yard (RHS) Akkalkot
44 118.20 118.30 Petrol bunk (LHS)
45 118.50 118.60 KLE's socity belgaum
46 119.60 119.70 School building
47 120.10 120.20 Bus shelter (LHS)
48 122.50 122.60 OHT (LHS)
49 122.60 122.70 High school (RHS) karjol
50 123.00 123.10 OHT & Bus shelter (LHS)
51 124.90 125.00 Cotton factory (LHS)
52 126.20 126.30 Natya mandir (LHS)
53 127.10 127.20 Bus shelter (LHS)
54 127.30 127.40 Network tower (LHS) & BSNL office (RHS)
55 127.80 127.90 Muslim structure
56 129.50 129.60 Fun Food Restoraunt (RHS)
57 131.30 131.40 OHT (RHS)
58 131.60 131.70 Temple (RHS)
Sl No. Institutions/ Social facilities/ amenities
59 132.00 132.10Power grid corporation sollapur (RHS)
765/400/200 KW, OHT & Idga ground (LHS)
60 132.40 132.50 Hotel new shivapark (LHS)
61 135.10 135.20 Shrishail resart
62 138.60 138.70 Cotton Industry
63 140.10 140.20 Ashwine degree collage (LHS)
64 140.20 140.30 Temple (LHS)
65 140.80 140.90 Petrol bunk (RHS)
66 140.90 141.00 2 nos OHT (LHS)
67 141.40 141.50 Toll gate sollapur
68 144.00 144.10 Chavan tata motars (RHS)
69 144.50 144.60 Network tower (RHS)
70 146.50 146.60 Hero showroom
71 146.60 146.70 Temple (LHS)
72 147.50 147.60 Bus shelter (LHS)
73 148.30 148.40 ESSAR Petrol bunk (RHS)
74 148.60 148.70 Over head water tank
Chainage (Km.) Type Side Leading to (LHS) Leading to (RHS) Location Feature
01 00+000 X-Junction BHS Gulbarga City HumnabaadHumnabaad Ring
roadBuilt up Area
02 00+585 X-Junction BHS Shivaji Nagar Ram Nagar Gulbarga City Built up Area
03 01+100 X-Junction BHS Bhavani Nagar Samipur Gulbarga City Built up Area
04 02+060 X-Junction BHS Gulbarga City Sultanpur Gulbarga City Built up Area
05 02+490 X-Junction BHS Gulbarga City Syed Chincholi Gulbarga City Built up Area
06 02+660 T-Junction LHSMahatma Gandhi Truck
Terminal- Gulbarga City Built up Area
07 03+882 X-Junction BHS Gulbarga City Aland City Aland Crossing Built up Area
08 05+300 X-Junction BHS Chadri Chowk (Gulbarga) DabarabadhDabarabadh
CrossingBuilt up Area
09 06+350 X-Junction BHS Gulbarga City MSK Mill MSK Square Built up Area
10 07+355 X-Junction BHS Gulbarga Bus Stand Hirapur Hirapur Circle Built up Area
11 08+800 Y-Junction LHS Sedam (Jewargi) - Afzalpur Square
12 12+760 T-Junction LHS Kalavi Village -
13 17+350 X-Junction BHS Kanni VillageHadagi Haruti Tanda
Village
14 19+660 T-Junction RHS - Kollur Village Kollur Crossing
15 21+574 T-Junction LHS Havanoor Village - Havanoor Crossing Bus Stand
16 22+415 X-Junction BHS Gobbur Village Mali Village Gobbur Village
17 26+407 T-Junction RHS - Machanal Tanda Village
18 28+775 Y-Junction RHS - Bhair Madagi village Built Up Area
19 31+865 T-Junction RHS - Wadali Village Wadali Crossing Bus Stand
20 32+893 X-Junction BHS Field Wadali Village Wadali Crossing Bus Stand
21 37+235 Y-Junction LHS Chinmali Village -
22 37+520 Y-Junction LHS Gangapur -Chowdapur
CrossingBuilt up Area
23 37+877 T-Junction RHS - Chowdapur VillageChowdapur
VillageBuilt up Area
24 38+400 Y-Junction RHS - Gangapur Railway Station
25 40+345 T-Junction RHS - Goudgaon Village Bus Stand
26 42+150 T-Junction LHS Lkedki Village - Bus Stand
27 44+535 T-Junction RHS - Boknali Village Bus Stand
28 46+730 T-Junction LHS Atanur Village - Atanur village Built up Area
29 52+295 T-Junction RHS - Raiyur Village Built up Area
30 52+920 T-Junction RHS - Matholi Village Bus Stand
31 59+955 X-Junction BHS Kalur Village Bijapur Village Built up Area
32 64+730 Y-Junction RHS - Eladda Village Bus Stand
33 70+540 Y-Junction LHS Belurgi Masjid - Belurgi Village Built up Area
34 70+925 Y-Junction RHS - Badadal Village Belurgi Village Built up Area
35 77+530 Y-Junction RHS - Revur Village Dudhani Village
GULBARGA - SOLAPUR PROJECT
Details of Major and Minor Junction list
Sl. No.Road Junction Road Side Features
Chainage (Km.) Type Side Leading to (LHS) Leading to (RHS) Location Feature
GULBARGA - SOLAPUR PROJECT
Details of Major and Minor Junction list
Sl. No.Road Junction Road Side Features
36 77+785 T-Junction RHS - Dudhani City Dudhani City Built up Area
37 79+410 Y-Junction LHS Baroti Village -
38 80+220 T-Junction RHS - Aland City
39 83+100 T-Junction RHS - Mugali Village
40 83+555 T-Junction LHS Rudhdewadi -
41 85+225 T-Junction LHS Thallewada -
42 85+640 X-Junction BHS Sangoli Baswal Mougadi Village Built up Area
43 85+975 T-Junction RHS - Kadaka Devi
44 87+795 T-Junction LHS Binjigarh -
45 90+990 T-Junction RHS - Naghur Village
46 91+630 Y-Junction LHS Maindargi Village
47 92+515 X-Junction BHS Maindargi Village Aland City
48 93+800 T-Junction RHS - Sangodi Village Maindargi Village Built up Area
49 93+965 T-Junction LHS Maindargi Village - Maindargi Village Built up Area
50 98+510 T-Junction LHS Mirajigi Village - Mirajigi Village Built up Area
51 98+595 Y-Junction RHS - Hadi Hadumos Village Mirajigi Village Built up Area
52 100+870 T-Junction RHS - Goudagaon VillageBorimpargi
VillageBuilt up Area
53 101+708 T-Junction RHS - Rapur Village
54 104+895 T-Junction LHSSVS MD's Polytechnic
College
55 105+560 Y-Junction RHS - Akalkot City Akalkot City Built up Area
56 106+612 X-Junction BHS Nagansur / Hajgi Akalkot CityAkalkot Bypass
SquareBuilt up Area
57 107+525 T-Junction RHS - Akalkot City Akalkot City Built up Area
58 112+375 Staggered Junction BHS Banagahati Village Temple
59 114+525 T-Junction RHS - Dahitanewadi
60 114+590 T-Junction LHS Konhali Village
61 117+405 Staggered Junction BHS Singjodi Village Halhali village Karjal Village Built up Area
62 124+795 X-Junction BHS Revansi Temple Dindur Village
63 128+385 X-Junction BHS Hungaon Village Rampur VillageThougapadi
Village
64 132+740 T-Junction RHS - Khaduthakhadi Village
65 133+070 T-Junction LHS Hanmgaon Togarali Village
66 134+180 Staggered Junction BHS Sidheshwar Sakhara Mill Dhodi Village Kumbhari Village Built up Area
67 137+775 X-Junction BHS Krishna Temple Ali Mahara Ashram
68 139+450 T-Junction RHS - Rebba Nagar Wamik Square
69 140+190 T-Junction LHSMaharashtra Industrial
Development Corporation
Chainage (Km.) Type Side Leading to (LHS) Leading to (RHS) Location Feature
GULBARGA - SOLAPUR PROJECT
Details of Major and Minor Junction list
Sl. No.Road Junction Road Side Features
70 141+685 X-Junction BHS Solapur Bus Stand Sakhare Wada Solapur City Built up Area
71 142+197 X-Junction BHS Solapur City Rajendra Square Solapur City Built up Area
Chainage (Km.) Type Side Leading to (LHS) Leading to (RHS) Location Feature
01 35+900 Y-Junction RHS -- Chowdapur Bypass Start
02 38+700 X-Junction BHS -- Chowdapur Bypass End
03 58+250 Y-Junction RHS -- Afzalpur Bypass Start
04 61+775 Y-Junction RHS -- Afzalpur Bypass End
05 69+400 Y-Junction RHS -- Belurgi Bypass Start
06 72+700 Y-Junction RHS -- Belurgi Bypass End
07 76+700 Y-Junction LHS Dudhani Bypass Start --
08 80+525 Y-Junction LHS Dudhani Bypass End --
09 91+200 Y-Junction LHS Maindargi Bypass Start --
10 95+250 Y-Junction LHS Maindargi Bypass End --
11 104+600 Y-Junction RHS -- Akalkot Bypass Start
12 108+700 Y-Junction RHS -- Akalkot Bypass End
ADDITIONAL MAJOR JUNCTIONS LIST (BY-PASS)
Sl. No.
Road Junction Road Side Features
Chowdapur
VillageBuilt up Area
Maindargi Village Built up Area
Akalkot Village Built up Area
Afzalpur Village Built up Area
Belurgi Village Built up Area
Dudhani Village Built up Area
Chainage Sides State Taluka Village
Location
Chainage Residential Commercial Insutional Community Utility Total
0 to100 LHS Karnataka Gulbarga 03.000 to
4.000 RHS 3.28 Shop 16.000 to
7.000 RHS 6.35 Shop 17.000 to
8.000 RHS 7.65
Partialliy
(3/4th part) 1
7.95
Raiway
gurard room
(not affected
as ROB is
under
Construction 1
13.000
to14.000 RHS 14.05
Residential
outer wall 1
19.000
to20.000 LHS 19.65
Shops (Half
parts) 2
19.000
to20.000 RHS 19.62
Shop ( 1/3
part initial) 1
24.000to25.0
00 LHS 24.85 Tube well 1
28.000to29.0
00 LHS 29.05 Shop 28.480 Tub 1
28.000to29.0
00 RHS 28.7 Shop 28.480 Tub 1
37.000 to
38.000 LHS 37.9 well 1
41.000 to
42.000 RHS 41.8 sump 0
46.000 to
47.000 LHS 46.7 shops 2
46.000 to
47.000 RHS 46.38 shops 1
47.000 to
48.000 LHS 47.1 sheds 1
51.000 to
52.000 LHS 51.1 pit 1
51.000 to
52.000 RHS 51.9 house shop tank 3
52.000 to
53.000 LHS 52.3 shop 3
52.000 to
53.000 RHS
52.35 &
52.900 shop 2
53.000 to
54.000 LHS 53.8 Pump house 2
53.000 to
54.000 RHS 53.1 house wall 1
59.000 to
60.000 LHS 50.25 well 1
59.05 Pit 1
59.85 shops Bus stand 8
60.000 to
61.000 LHS 60.05 shops 3
60.000 to
61.000 RHS 60.05 shops 4
62.000 to
63.000 RHS 62.2 houses 20
68.000 to
69.000 RHS 68.5 Well & shed 2
70.000 to
71.000 LHS 70.5 to 71 houses 26
70.000 to
71.000 RHS 70.5 to 72 houses 38
71.000 to
72.000 LHS 71.1 -71.3 houses 0
72.000 to
73.000 RHS Maharasthra Akalkot 0
73.000 to
74.000 LHS 73.7 house 8
73.000 to
74.000 RHS 73.9 house 5
77.000 to
78.000 LHS 77.1 1 1
77.78 2 2
78 1 1
77.000 to
78.000 RHS 77.85 2 2
78.000 to
79.000 LHS 78.09 1 1
Affected Structures
59.000 to
60.000 RHS
78.000 to
79.000 RHS 78.09 1 1
79.000 to
80.000 LHS 79.9
1 Fence &
Railway
Track 1
85.000 to
86.000 LHS 85.658 1 1
93.000 to
94.000 LHS 93.5 5 5
105.000 to
106.000 LHS 105.6 4 2 1 Mosque 7
105.000 to
106.000 RHS 4 4
125.000 to
126.000 RHS 125.5 1 1
From To
1 0.00 0.10 EP(b/s) / Street poles
2 0.10 0.20 EP(b/s) / Street poles
3 0.20 0.30 EP(b/s) / Street poles
4 0.30 0.40 EP(b/s) / Street poles
5 0.40 0.50 EP(b/s) / Street poles
6 0.50 0.60 EP(b/s) / transformer (RHS) / Street poles
7 0.60 0.70 EP(RHS) / HT crossing / Street poles
8 0.70 0.80 EP(b/s) / Street poles
9 0.80 0.90 EP(b/s) / Street poles
10 0.90 1.00 EP(b/s) / Street poles
11 1.00 1.10 EP(b/s) / Street poles
12 1.10 1.20 EP(LHS) / Street poles
13 1.20 1.30 EP(LHS) / Street poles
14 1.30 1.40 EP(LHS) / Street poles
15 1.40 1.50 EP(LHS) / Street poles / transformer (RHS)
16 1.50 1.60 EP(LHS) / Street poles
17 1.60 1.70 EP(LHS) / Street poles / transformer (RHS)
18 1.70 1.80 EP(b/s) / Street poles / EP(crossing)
19 1.80 1.90 EP(b/s) / Street poles / EP(crossing)
20 1.90 2.00 EP(b/s) / Street poles / EP(crossing)
21 2.20 2.30 EP(LHS) / Street poles
22 2.30 2.40 EP(LHS) / Street poles
23 2.40 2.50 EP(LHS) / Street poles / transformer (RHS)
24 2.50 2.60 EP(LHS) / Street poles
25 2.60 2.70 EP(RHS) / Street poles
26 2.70 2.80 EP(RHS) / Street poles
27 2.80 2.90 EP(RHS) / Street poles
28 2.90 3.00 EP(RHS) / Street poles
29 3.00 3.10 EP(RHS) / Street poles
30 3.10 3.20 EP(RHS) / Street poles / EP(crossing)
31 3.20 3.30 EP(b/s) / Street poles
32 3.30 3.40 EP(RHS) / EP(crossing) / Street poles
33 3.40 3.50 EP(RHS) / EP(crossing) / Street poles
34 3.50 3.60 EP(RHS) / Street poles
35 3.60 3.70 EP(RHS) / Street poles
36 3.70 3.80 EP(b/s) / Street poles
37 3.80 3.90 EP(b/s) / Street poles / transformer (RHS)
38 3.90 4.00 EP(b/s) / Street poles / transformer (RHS)
39 4.00 4.10 EP(b/s) / Street poles
40 4.10 4.20 EP(RHS) / Street poles
41 4.20 4.30 EP(RHS) / Street poles
42 4.30 4.40 EP(b/s) / Street poles / transformer (LHS)
43 4.40 4.50 transformer (RHS)
44 4.50 4.60 transformer (RHS)
45 4.60 4.70 EP(b/s) / Street poles
46 4.70 4.80 EP(b/s) / Street poles
47 4.80 4.90 EP(b/s) / Street poles
48 4.90 5.00 EP(b/s) / Street poles / EP(crossing)
49 5.00 5.10 EP(b/s) / Street poles
50 5.10 5.20 EP(b/s) / Street poles
51 5.20 5.30 EP(b/s) / Street poles / EP(crossing)
Sl No.
Annexure III. C Land Utilsation Checklist
Chainage
(Km)
Chainage
(Km)
Utilities
Water Pipe line/ Sewer Line/ Electrcity poles/ Others Location Present Use To be Reclaimed/ Affected
52 5.30 5.40 EP(b/s) / Street poles / EP(crossing)
53 5.40 5.50 EP(b/s) / Street poles / EP(crossing)
54 5.50 5.60 EP(b/s) / Street poles
55 5.60 5.70 EP(b/s) / Street poles
56 5.70 5.80 EP(b/s) / Street poles
57 5.80 5.90 EP(b/s) / Street poles
58 5.90 6.00 EP(b/s) / Street poles
59 6.00 6.10 EP(b/s) / Street poles
60 6.10 6.20 EP(b/s) / Street poles
61 6.20 6.30 EP(b/s) / Street poles
62 6.30 6.40 EP(b/s) / Street poles
63 6.40 6.50 EP(b/s) / Street poles
64 6.50 6.60 EP(b/s) / Street poles
65 6.60 6.70 EP(RHS) / Street poles
66 6.70 6.80 EP(b/s) / Street poles
67 6.80 6.90 EP(b/s) / Street poles
68 6.90 7.00 EP(b/s) / Street poles
69 7.00 7.10 EP(RHS) / Street poles
70 7.10 7.20 EP(RHS) / Street poles
71 7.20 7.30 EP(RHS) / Street poles
72 7.30 7.40 EP(RHS) / Street poles
73 7.40 7.50 EP(b/s) / Street poles
74 7.50 7.60 EP(b/s) / Street poles
75 7.60 7.70 EP(b/s) / Street poles
76 7.70 7.80 EP(b/s) / Street poles
77 7.80 7.90 EP(b/s) / Street poles
78 7.90 8.00 EP(b/s) / Street poles
79 8.00 8.10 EP(b/s) / Street poles
80 8.10 8.20 EP(b/s) / Street poles
81 8.20 8.30 EP(b/s) / Street poles
82 8.30 8.40 EP(b/s) / Street poles
83 8.40 8.50 EP(b/s) / Street poles
84 8.50 8.60 EP(b/s) / Street poles
85 8.60 8.70 EP(b/s) / Street poles
86 8.70 8.80 EP(b/s) / Street poles
87 8.80 8.90 EP(b/s) / Street poles
88 8.90 9.00 EP(b/s)
89 9.00 9.10 EP(b/s)
90 9.10 9.20 EP(b/s)
91 9.20 9.30 EP(b/s)
92 9.30 9.40 EP(b/s)
93 9.40 9.50 EP(b/s)
94 9.50 9.60 EP(b/s) / EP(crossing)
95 9.60 9.70 EP(b/s)
96 9.70 9.80 EP(b/s)
97 9.80 9.90 EP(b/s)
98 9.90 10.00 EP(b/s)
99 10.00 10.10 EP(b/s)
100 10.10 10.20 EP(b/s) / EP(crossing)
101 10.20 10.30 EP(b/s) / EP(crossing)
102 10.30 10.40 EP(b/s) / EP(crossing) / network tower
103 10.40 10.50 EP(b/s)
104 10.50 10.60 EP(b/s)
105 10.60 10.70 EP(b/s) / EP(crossing)
106 10.70 10.80 EP(b/s) / EP(crossing)
107 10.80 10.90 EP(b/s)
108 10.90 11.00 EP(b/s)
109 11.00 11.10 EP(b/s)
110 11.10 11.20 EP(b/s) / EP(crossing)
111 11.20 11.30 EP(b/s) / EP(crossing)
112 11.30 11.40 EP(b/s) / EP(crossing)
113 11.40 11.50 EP(b/s)
114 11.50 11.60 EP(b/s)
115 11.60 11.70 EP(b/s) / EP(crossing)
116 11.70 11.80 EP(b/s)
117 11.80 11.90 EP(b/s) / EP(crossing)
118 11.90 12.00 EP(b/s) / EP(crossing)
119 12.00 12.10 EP(b/s) / EP(crossing)
120 12.10 12.20 EP(b/s)
121 12.20 12.30 EP(b/s)
122 12.30 12.40 EP(b/s)
123 12.40 12.50 EP(b/s)
124 12.50 12.60 EP(b/s)
125 12.60 12.70 EP(b/s)
126 12.70 12.80 EP(b/s)
127 12.80 12.90 EP(b/s)
128 12.90 13.00 EP(b/s) / EP(crossing) 6 nos
129 13.30 13.40 EP(crossing)
130 13.50 13.60 EP(RHS) / EP(crossing)
131 13.60 13.70 EP(RHS)
132 13.70 13.80 EP(RHS)
133 13.80 13.90 EP(RHS) / EP(crossing)
134 13.90 14.00 EP(b/s)
135 14.00 14.10 EP(b/s)
136 14.10 14.20 EP(b/s) / HT crossing
137 14.20 14.30 EP(b/s)
138 14.30 14.40 EP(b/s)
139 14.40 14.50 EP(b/s) / EP(crossing)
140 14.50 14.60 EP(b/s)
141 14.60 14.70 EP(b/s) / EP(crossing)
142 14.70 14.80 EP(b/s)
143 14.80 14.90 EP(b/s) / EP(crossing) 2 nos
144 14.90 15.00 EP(b/s)
145 15.00 15.10 EP(b/s)
146 15.10 15.20 EP(b/s)
147 15.20 15.30 EP(b/s) / EP(crossing)
148 15.30 15.40 EP(RHS) / EP(crossing)
149 15.40 15.50 EP(RHS)
150 15.50 15.60 EP(RHS)
151 15.60 15.70 EP(RHS) / EP(crossing)
152 15.70 15.80 EP(RHS)
153 15.80 15.90 EP(RHS)
154 15.90 16.00 EP(RHS) / EP(crossing)
155 16.00 16.10 EP (LHS)
156 16.10 16.20 EP (LHS)
157 16.20 16.30 EP (LHS)
158 16.30 16.40 EP (LHS) / EP(crossing)
159 16.40 16.50 EP (LHS) / EP(crossing)
160 16.50 16.60 EP (LHS)
161 16.60 16.70 EP (LHS)
162 16.70 16.80 EP (LHS)
163 16.80 16.90 EP (LHS) / EP(crossing)
164 16.90 17.00 EP (LHS) / EP(crossing)
165 17.00 17.10 EP(b/s)
166 17.10 17.20 EP(b/s)
167 17.20 17.30 EP(b/s)
168 17.30 17.40 EP(b/s)
169 17.40 17.50 EP(b/s)
170 17.50 17.60 EP(b/s) / EP(crossing)
171 17.60 17.70 EP(b/s) / EP(crossing)
172 17.70 17.80 EP(b/s)
173 17.80 17.90 EP(b/s) / EP(crossing)
174 17.90 18.00 EP (RHS)
175 18.00 18.10 EP (RHS)
176 18.10 18.20 EP (RHS)
177 18.20 18.30 EP (RHS)
178 18.30 18.40 EP (RHS)
179 18.40 18.50 EP (RHS)
180 18.50 18.60 EP (RHS)
181 18.60 18.70 EP (RHS)
182 18.70 18.80 EP (RHS)
183 18.80 18.90 EP (RHS)
184 18.90 19.00 EP (RHS) / EP(crossing)
185 19.00 19.10 EP (RHS)
186 19.10 19.20 EP (RHS)
187 19.20 19.30 EP (RHS) / EP(crossing)
188 19.30 19.40 EP (RHS)
189 19.40 19.50 EP (RHS) / EP(crossing)
190 19.50 19.60 EP (RHS) / EP(crossing)
191 19.60 19.70 EP (RHS)
192 19.70 19.80 EP(b/s)
193 19.80 19.90 EP(b/s)
194 19.90 20.00 EP(b/s) / EP(crossing
195 20.00 20.10 EP(b/s)
196 20.10 20.20 EP(b/s) / EP(crossing
197 20.20 20.30 EP(b/s) / EP(crossing
198 20.30 20.40 EP(b/s)
199 20.40 20.50 EP(b/s) / EP(crossing)
200 20.50 20.60 EP(b/s) / EP(crossing)
201 20.60 20.70 EP(RHS)
202 20.70 20.80 EP(RHS)
203 20.80 20.90 EP(RHS)
204 20.90 21.00 EP(RHS)
205 21.20 21.30 EP (LHS) / EP(crossing)
206 21.80 21.90 EP (RHS)
207 21.90 22.00 EP (RHS)
208 22.00 22.10 EP (RHS)
209 22.10 22.20 EP (RHS)
210 22.50 22.60 EP (LHS)
211 22.60 22.70 EP (LHS)
212 22.70 22.80 EP (RHS)
213 22.80 22.90 EP (RHS)
214 22.90 23.00 EP (RHS) / EP(crossing)
215 23.00 23.10 EP (RHS) / EP(crossing)
216 23.10 23.20 EP (RHS) / EP(crossing)
217 23.20 23.30 EP (RHS)
218 23.30 23.40 EP (RHS) / EP(crossing)
219 23.40 23.50 EP (RHS)
220 23.50 23.60 EP (RHS)
221 23.60 23.70 EP (RHS)
222 23.70 23.80 EP (RHS) / EP(crossing)
223 25.40 25.50 EP(crossing)
224 25.50 25.60 EP(crossing)
225 25.60 25.70 EP(b/s) / EP(crossing)
226 27.20 27.30 EP (RHS)
227 27.30 27.40 EP (RHS)
228 27.40 27.50 EP (RHS)
229 27.50 27.60 EP (RHS) / EP(crossing)
230 27.60 27.70 EP (RHS) / EP(crossing)
231 28.10 28.20 EP (RHS) / EP(crossing)
232 28.20 28.30 EP (RHS)
233 28.30 28.40 EP (RHS)
234 28.40 28.50 EP (RHS)
235 28.50 28.60 EP (b/s)
236 28.60 28.70 EP (b/s) / EP(crossing)
237 28.70 28.80 EP (b/s) / EP(crossing)
238 28.80 28.90 EP (b/s) / EP(crossing)
239 28.90 29.00 EP (b/s) / network tower (LHS)
240 29.00 29.10 EP (b/s)
241 29.10 29.20 EP (b/s)
242 29.20 29.30 EP (b/s) / EP(crossing)
243 29.30 29.40 EP (b/s)
244 29.40 29.50 EP (b/s)
245 29.50 29.60 EP (b/s)
246 29.60 29.70 EP (b/s)
247 29.70 29.80 EP (b/s) / EP(crossing)
248 29.80 29.90 EP (b/s)
249 29.90 30.00 EP (b/s) / EP(crossing)
250 30.00 30.10 EP (b/s) / EP(crossing)
251 30.10 30.20 EP (b/s) / EP(crossing)
252 30.20 30.30 EP (b/s)
253 30.30 30.40 EP (b/s)
254 30.40 30.50 EP (b/s)
255 30.50 30.60 EP (b/s)
256 30.60 30.70 EP(b/s)
257 30.70 30.80 EP(b/s)
258 30.80 30.90 EP(b/s)
259 30.90 31.00 EP(b/s)
260 31.00 31.10 EP(b/s)
261 31.10 31.20 EP(b/s) / EP (crossing)
262 31.20 31.30 EP(b/s)
263 31.30 31.40 EP(b/s)
264 31.40 31.50 EP(b/s) / EP (crossing)
265 31.50 31.60 EP (LHS)
266 31.60 31.70 EP (LHS)
267 31.70 31.80 EP (LHS)
268 31.80 31.90 EP (LHS)
269 31.90 32.00 EP (LHS)
270 32.00 32.10 EP (LHS)
271 32.60 32.70 EP (crossing)
272 32.80 32.90 EP (RHS)
273 32.90 33.00 EP (RHS)
274 33.00 33.10 EP (RHS)
275 33.10 33.20 EP (RHS)
276 33.20 33.30 EP (RHS)
277 33.30 33.40 EP (RHS)
278 33.40 33.50 EP (RHS)
279 33.50 33.60 EP (RHS)
280 33.60 33.70 EP (RHS)
281 33.70 33.80 EP (RHS)
282 33.80 33.90 EP (RHS)
283 33.90 34.00 EP (RHS) / EP(crossing)
284 34.00 34.10 EP (RHS)
285 34.10 34.20 EP (RHS) / EP(crossing)
286 34.50 34.60 EP(crossing)
287 35.10 35.20 EP (LHS) / EP(crossing)
288 35.20 35.30 EP (LHS) / EP(crossing)
289 35.30 35.40 EP (LHS)
290 35.40 35.50 EP (LHS)
291 35.50 35.60 EP (LHS)
292 35.60 35.70 EP (LHS)
293 35.80 35.90 EP (LHS)
294 35.90 36.00 EP (LHS)
295 36.00 36.10 EP (LHS)
296 36.10 36.20 EP (LHS)
297 36.20 36.30 EP (LHS)
298 36.30 36.40 EP (LHS)
299 36.40 36.50 EP (LHS) / EP (crossing)
300 36.50 36.60 EP (LHS)
301 36.60 36.70 EP (LHS)
302 36.70 36.80 EP (LHS)
303 36.80 36.90 EP (LHS)
304 36.90 37.00 EP (LHS)
305 37.00 37.10 EP (LHS)
306 37.10 37.20 EP (LHS) / EP (crossing)
307 37.20 37.30 EP (crossing)
308 37.90 38.00 EP (b/s)
309 38.00 38.10 EP (b/s) / EP (crossing)
310 38.10 38.20 EP (LHS)
311 38.20 38.30 EP (LHS)
312 38.30 38.40 EP (LHS)
313 38.40 38.50 EP (LHS)
314 38.50 38.60 EP (LHS)
315 38.60 38.70 EP (LHS)
316 38.70 38.80 Chowdapur city
317 38.80 38.90 Chowdapur city
318 38.90 39.00 Chowdapur city
319 39.00 39.10 Chowdapur city
320 39.10 39.20 Chowdapur city
321 39.20 39.30 Chowdapur city
322 39.30 39.40 Chowdapur city
323 39.40 39.50 Chowdapur city
324 39.50 39.60 Chowdapur city
325 39.60 39.70 Chowdapur city
326 39.70 39.80 EP (b/s)
327 39.80 39.90 EP (b/s)
328 39.90 40.00 EP (b/s)
329 40.00 40.10 EP (b/s)
330 40.10 40.20 EP (b/s)
331 40.20 40.30 EP (b/s)
332 40.30 40.40 EP (b/s)
333 40.40 40.50 EP (b/s)
334 40.50 40.60 EP (b/s)
335 40.60 40.70 EP (b/s) / EP (crossing)
336 40.70 40.80 EP (b/s)
337 40.80 40.90 EP (b/s)
338 40.90 41.00 EP (crossing)
339 41.00 41.10 EP (crossing)
340 41.10 41.20 EP (RHS)
341 41.20 41.30 EP (RHS)
342 41.30 41.40 EP (RHS)
343 41.40 41.50 EP (RHS)
344 41.50 41.60 EP (RHS)
345 41.60 41.70 EP (RHS)
346 41.70 41.80 EP (RHS) / EP (crossing)
347 41.80 41.90 EP (RHS)
348 41.90 42.00 EP (RHS) / EP (crossing)
349 42.00 42.10 EP (RHS)
350 42.10 42.20 EP (RHS)
351 42.20 42.30 EP (RHS)
352 42.30 42.40 EP (RHS)
353 42.40 42.50 EP (b/s) / EP (crossing)
354 43.70 43.80 EP (crossing)
355 43.80 43.90 HT crossing
356 44.40 44.50 EP (crossing)
357 44.60 44.70 EP (RHS)
358 44.70 44.80 EP (RHS) / EP (crossing)
359 44.80 44.90 EP (RHS)
360 46.20 46.30 EP (RHS) / EP (crossing)
361 46.30 46.40 EP (RHS)
362 46.40 46.50 EP (RHS)
363 46.50 46.60 EP (RHS)
364 46.60 46.70 EP (RHS)
365 46.70 46.80 EP (RHS)
366 46.80 46.90 EP (RHS)
367 46.90 47.00 EP (RHS)
368 47.00 47.10 EP (RHS)
369 47.10 47.20 EP (RHS)
370 47.20 47.30 EP (RHS)
371 47.30 47.40 EP (RHS)
372 47.40 47.50 EP (RHS)
373 47.50 47.60 EP (RHS)
374 47.60 47.70 EP (RHS) / EP (crossing) 2 nos
375 47.70 47.80 EP (RHS)
376 47.80 47.90 EP (RHS) / EP (crossing)
377 47.90 48.00 EP (RHS) / EP (crossing)
378 48.00 48.10 EP (RHS) / EP (crossing)
379 48.10 48.20 EP (b/s)
380 48.20 48.30 EP (b/s)
381 48.30 48.40 EP (b/s)
382 48.70 48.80 EP (b/s) / EP (crossing)
383 48.80 48.90 EP (b/s)
384 48.90 49.00 EP (b/s)
385 49.00 49.10 EP (b/s)
386 49.10 49.20 EP (b/s) / EP (crossing)
387 49.20 49.30 EP (b/s)
388 49.30 49.40 EP (b/s)
389 49.40 49.50 EP (b/s)
390 49.50 49.60 EP (b/s)
391 49.60 49.70 EP (b/s)
392 49.70 49.80 EP (b/s)
393 49.80 49.90 EP (b/s)
394 49.90 50.00 EP (b/s)
395 50.00 50.10 EP (b/s)
396 50.10 50.20 EP (b/s)
397 50.20 50.30 EP (b/s)
398 50.30 50.40 EP (b/s)
399 50.40 50.50 EP (b/s) / EP (crossing)
400 50.50 50.60 EP (b/s)
401 50.60 50.70 EP (b/s)
402 50.70 50.80 EP (b/s)
403 50.80 50.90 EP (b/s) / EP (crossing)
404 50.90 51.00 EP (b/s)
405 51.00 51.10 EP (b/s)
406 51.10 51.20 EP (b/s)
407 51.20 51.30 EP (b/s)
408 51.30 51.40 EP (b/s)
409 51.40 51.50 EP (b/s)
410 51.50 51.60 EP (b/s)
411 51.60 51.70 EP (b/s)
412 51.70 51.80 EP (b/s)
413 51.80 51.90 EP (b/s)
414 51.90 52.00 EP (b/s)
415 52.00 52.10 EP (b/s)
416 52.10 52.20 EP (b/s)
417 52.20 52.30 EP (b/s)
418 52.30 52.40 EP (b/s)
419 52.40 52.50 EP (b/s)
420 52.50 52.60 EP (b/s)
421 52.60 52.70 EP (b/s)
422 52.70 52.80 EP (b/s)
423 52.80 52.90 EP (b/s) / EP (crossing)
424 52.90 53.00 EP (b/s)
425 53.00 53.10 EP (b/s)
426 53.10 53.20 EP (b/s)
427 53.20 53.30 EP (b/s)
428 53.30 53.40 EP (b/s)
429 53.40 53.50 EP (b/s) / EP (crossing)
430 53.50 53.60 EP (b/s)
431 53.60 53.70 EP (b/s)
432 53.70 53.80 EP (b/s)
433 53.80 53.90 EP (RHS) / EP (crossing)
434 53.90 54.00 EP (RHS) / EP (crossing)
435 54.00 54.10 EP (RHS) / EP (crossing)
436 54.10 54.20 EP (RHS)
437 54.20 54.30 EP (RHS)
438 54.30 54.40 EP (RHS) / EP (crossing)
439 54.40 54.50 EP (RHS)
440 54.50 54.60 EP (RHS)
441 54.60 54.70 EP (RHS) / EP (crossing)
442 54.70 54.80 EP (RHS)
443 54.80 54.90 EP (RHS) / EP (crossing)
444 54.90 55.00 EP (RHS)
445 55.00 55.10 EP (RHS) / EP (crossing)
446 55.10 55.20 EP (RHS)
447 55.20 55.30 EP (RHS)
448 55.30 55.40 EP (RHS)
449 55.40 55.50 EP (RHS)
450 55.50 55.60 EP (RHS)
451 55.60 55.70 EP (RHS)
452 55.70 55.80 EP (RHS) / EP (crossing)
453 55.80 55.90 EP (b/s)
454 55.90 56.00 EP (RHS)
455 56.00 56.10 EP (RHS)
456 56.10 56.20 EP (RHS)
457 56.20 56.30 EP (RHS)
458 56.30 56.40 EP (RHS)
459 56.40 56.50 EP (RHS)
460 56.50 56.60 EP (RHS)
461 56.60 56.70 EP (RHS)
462 56.70 56.80 EP (RHS)
463 56.80 56.90 EP (RHS)
464 56.90 57.00 EP (RHS)
465 57.00 57.10 EP (RHS)
466 57.10 57.20 EP (RHS)
467 57.20 57.30 EP (RHS)
468 57.30 57.40 EP (RHS) / EP (crossing)
469 57.40 57.50 EP (RHS)
470 57.50 57.60 EP (RHS)
471 57.60 57.70 EP (RHS)
472 57.70 57.80 EP (RHS)
473 57.80 57.90 EP (RHS) /HT (crossing)
474 57.90 58.00 EP (RHS)
475 58.00 58.10 EP (RHS) / EP (crossing)
476 58.10 58.20 EP (RHS) /HT (crossing)
477 58.20 58.30 EP (RHS)
478 58.30 58.40 EP (RHS)
479 58.40 58.50 EP (RHS) / EP (crossing)
480 58.50 58.60 EP (RHS)
481 58.60 58.70 EP (RHS) / EP (crossing)
482 58.70 58.80 EP (RHS)
483 58.80 58.90 EP (RHS)
484 58.90 59.00 EP (RHS)
485 59.00 59.10 EP (RHS)
486 59.30 59.40 EP(crossing) affected
487 59.40 59.50 EP(crossing) affected
488 60.00 60.10 EP(crossing) affected
489 60.50 60.60 EP(RHS)
490 60.60 60.70 EP(RHS)
491 60.70 60.80 EP(RHS)
492 60.90 61.00 EP(crossing)
493 61.00 61.10 EP(crossing)/ EP(b/s) affected
494 61.10 61.20 EP(crossing)/ EP(b/s) affected
495 61.40 61.50 EP(crossing) / HT(crossing) /EP
496 61.50 61.60 EP(RHS)
497 61.60 61.70 EP(crossing) / transformer (RHS)
498 61.70 61.80 EP(crossing)
499 61.80 61.90 EP(crossing)
500 61.90 62.00 EP
501 62.00 62.10 EP(crossing) / transformer (RHS)
502 62.10 62.20 EP(crossing)/ EP(b/s) affected
503 62.20 62.30 EP(crossing)/ EP(b/s) / transformer (RHS) affected
504 62.30 62.40 EP(crossing)/ EP(b/s) affected
505 62.40 62.50 transformer (RHS)
506 62.70 62.80 EP(crossing)/ EP(b/s)
507 63.10 63.20 EP(crossing)
508 63.20 63.30 transformer (RHS)
509 63.50 63.60 EP(crossing)
510 63.60 63.70 EP(RHS)
511 63.70 63.80 EP(RHS)
512 63.80 63.90 EP(RHS)
513 63.90 64.00 EP(RHS)
514 64.00 64.10 EP(RHS)
515 64.10 64.20 EP(RHS)
516 64.20 64.30 EP(RHS)
517 64.30 64.40 EP(RHS)
518 64.40 64.50 EP(RHS) / EP(crossing)
519 64.50 64.60 EP (RHS) / transformer (RHS)
520 64.60 64.70 EP (RHS) / transformer (RHS)
521 64.70 64.80 EP (RHS)
522 64.80 64.90 EP (RHS)
523 64.90 65.00 EP (RHS)
524 65.00 65.10 EP (RHS)
525 65.10 65.20 EP (RHS)
526 65.20 65.30 EP (RHS)
527 65.30 65.40 EP (RHS)
528 65.40 65.50 EP(RHS) / EP(crossing)
529 65.50 65.60 EP (RHS)
530 65.60 65.70 EP (RHS)
531 65.70 65.80 EP (RHS)
532 65.80 65.90 EP (RHS)
533 65.90 66.00 EP (b/s) / transformer (LHS)
534 66.00 66.10 EP (b/s) / transformer (RHS)
535 66.10 66.20 EP (RHS)
536 66.20 66.30 EP (RHS) / transformer (LHS)
537 66.30 66.40 EP (RHS)
538 66.40 66.50 EP (RHS)
539 66.50 66.60 EP (b/s)
540 66.60 66.70 EP (b/s)
541 66.70 66.80 EP (b/s) / transformer (LHS)
542 66.80 66.90 EP (b/s)
543 66.90 67.00 EP (b/s)
544 67.00 67.10 EP (b/s)
545 67.10 67.20 EP (b/s)
546 67.20 67.30 EP (b/s)
547 67.30 67.40 EP (b/s)
548 67.40 67.50 EP (b/s)
549 67.50 67.60 EP (b/s) / HT (crossing)
550 67.60 67.70 EP (b/s)
551 67.70 67.80 EP (b/s) / HT (crossing)
552 67.80 67.90 EP (b/s)
553 67.90 68.00 EP (b/s)
554 68.00 68.10 EP (b/s)
555 68.10 68.20 EP (b/s)
556 68.20 68.30 EP (RHS)
557 68.30 68.40 EP (b/s) RHS affected
558 68.40 68.50 EP (b/s) RHS affected
559 68.50 68.60 EP (b/s) RHS affected
560 68.60 68.70 EP (b/s) RHS affected
561 68.70 68.80 EP (b/s) RHS affected
562 68.80 68.90 EP (b/s) RHS affected
563 68.90 69.00 EP (b/s) RHS affected
564 69.00 69.10 EP (b/s) RHS affected
565 69.10 69.20 EP (b/s) RHS affected
566 69.20 69.30 EP (b/s) RHS affected
567 69.30 69.40 EP (RHS)
568 69.40 69.50 EP (RHS)
569 69.50 69.60 EP (RHS)
570 69.60 69.70 EP (RHS)
571 69.70 69.80 EP (RHS)
572 69.80 69.90 EP (RHS)
573 69.90 70.00 EP (RHS) / transformer (RHS)
574 70.00 70.10 EP (RHS)
575 70.10 70.20 EP (RHS)
576 70.20 70.30 EP (RHS)
577 70.30 70.40 EP (RHS)
578 70.40 70.50 EP (RHS)
579 70.50 70.60 EP (RHS)
580 70.60 70.70 EP (RHS)
581 70.70 70.80 EP (RHS)
582 70.80 70.90 EP (RHS)
583 70.90 71.00 EP (RHS)
584 71.00 71.10 EP (RHS)
585 71.10 71.20 EP (RHS) / transformer (RHS&LHS)
586 71.20 71.30 EP (RHS)
587 71.30 71.40 EP (RHS)
588 71.40 71.50 EP (RHS)
589 71.50 71.60 EP (RHS)
590 71.60 71.70 EP (RHS)
591 71.70 71.80 EP (RHS)
592 71.80 71.90 EP (RHS)
593 71.90 72.00 EP (RHS)
594 72.00 72.10 EP (RHS)
595 72.10 72.20 EP (b/s)
596 72.20 72.30 EP (b/s)
597 72.30 72.40 EP (b/s)
598 72.40 72.50 EP (b/s)
599 72.50 72.60 EP (b/s)
600 72.60 72.70 EP (b/s)
601 72.70 72.80 EP (RHS)
602 72.80 72.90 EP (RHS)
603 72.90 73.00 EP (RHS)
604 73.00 73.10 EP (RHS)
605 73.10 73.20 EP (RHS)
606 73.20 73.30 EP (RHS)
607 73.30 73.40 EP (RHS)
608 73.40 73.50 EP (RHS) / transformer (RHS)
609 73.50 73.60 EP (b/s)
610 73.60 73.70 EP (b/s) / transformer (RHS)
611 73.70 73.80 EP (b/s) / transformer (LHS)
612 73.80 73.90 EP (b/s)
613 75.70 75.80 EP (LHS)
614 75.80 75.90 EP (LHS)
615 75.90 76.00 EP (LHS)
616 76.00 76.10 EP (LHS)
617 76.10 76.20 EP (LHS)
618 76.20 76.30 EP (LHS)
619 76.30 76.40 EP (LHS) / transformer (LHS)
620 76.40 76.50 EP (b/s) / transformer (RHS)
621 76.50 76.60 EP (b/s)
622 76.60 76.70 EP (b/s)
623 76.70 76.80 EP (b/s)
624 76.80 76.90 EP (b/s) / transformer (LHS) / network tower
625 77.20 77.30 EP (LHS)
626 77.30 77.40 EP (LHS)
627 77.40 77.50 EP (LHS)
628 77.50 77.60 EP (LHS)
629 77.60 77.70 EP (LHS)
630 77.70 77.80 EP (LHS)
631 77.80 77.90 EP (LHS)
632 77.90 78.00 EP (LHS)
633 78.00 78.10 EP (LHS)
634 78.10 78.20 EP (LHS)
635 78.20 78.30 EP (LHS)
636 78.30 78.40 EP (LHS)
637 78.40 78.50 EP (LHS)
638 78.50 78.60 EP (LHS)
639 78.60 78.70 EP (LHS)
640 78.70 78.80 EP (LHS)
641 78.80 78.90 EP (LHS)
642 78.90 79.00 EP (LHS)
643 79.00 79.10 EP (LHS)
644 79.10 79.20 EP (LHS)
645 79.20 79.30 EP (LHS)
646 79.30 79.40 EP (LHS)
647 79.40 79.50 EP (LHS)
648 79.50 79.60 EP (LHS)
649 79.60 79.70 EP (LHS)
650 79.70 79.80 EP (LHS)
651 79.80 79.90 EP (LHS)
652 79.90 80.00 EP (LHS) / steet poles
653 80.00 80.10 street poles
654 80.10 80.20 street poles
655 80.20 80.30 EP (b/s) / steet poles
656 80.30 80.40 EP (b/s) / steet poles
657 80.40 80.50 EP (b/s) / steet poles
658 80.50 80.60 EP (b/s) / steet poles / transformer (RHS)
659 80.60 80.70 EP (b/s) / steet poles
660 80.70 80.80 EP (b/s) / steet poles
661 80.80 80.90 EP (LHS) / steet poles
662 80.90 81.00 EP (LHS) / steet poles
663 81.00 81.10 steet poles / transformer (LHS)
664 81.10 81.20 steet poles
665 81.20 81.30 EP (b/s) / steet poles / transformer (RHS)
666 81.30 81.40 EP (b/s) / steet poles
667 81.40 81.50 EP (b/s) / steet poles
668 81.50 81.60 EP (b/s) / steet poles
669 81.60 81.70 EP (b/s) / steet poles / transformer (LHS)
670 81.70 81.80 EP (b/s) / steet poles
671 81.80 81.90 EP (b/s) / steet poles
672 81.90 82.00 EP (RHS) / steet poles / transformer (LHS)
673 82.00 82.10 EP (RHS) / steet poles
674 82.10 82.20 EP (RHS) / steet poles
675 82.20 82.30 EP (RHS) / steet poles
676 82.30 82.40 EP (RHS) / steet poles
677 82.40 82.50 EP (RHS) / steet poles
678 82.50 82.60 EP (b/s)
679 82.60 82.70 EP (b/s)
680 82.70 82.80 EP (b/s)
681 83.10 83.20 EP (RHS)
682 83.20 83.30 EP (RHS)
683 83.30 83.40 EP (RHS)
684 83.40 83.50 EP (RHS)
685 83.50 83.60 EP (RHS)
686 83.60 83.70 EP (RHS)
687 83.70 83.80 EP (RHS)
688 83.80 83.90 EP (RHS)
689 83.90 84.00 EP (RHS)
690 84.00 84.10 EP (RHS)
691 84.10 84.20 EP (RHS)
692 84.20 84.30 EP (RHS)
693 84.30 84.40 EP (RHS) / transformer (RHS)
694 84.40 84.50 EP (RHS)
695 84.50 84.60 EP (RHS)
696 84.60 84.70 EP (RHS)
697 84.70 84.80 EP (RHS)
698 84.80 84.90 EP (RHS)
699 84.90 85.00 EP (RHS)
700 85.00 85.10 EP (RHS)
701 85.10 85.20 EP (RHS)
702 85.20 85.30 EP (RHS)
703 85.30 85.40 EP (RHS)
704 85.40 85.50 EP (RHS)
705 85.50 85.60 EP (RHS)
706 85.60 85.70 EP (RHS)
707 85.70 85.80 EP (RHS)
708 85.80 85.90 EP (RHS)
709 85.90 86.00 EP (RHS)
710 86.00 86.10 EP (RHS)
711 86.10 86.20 EP (RHS)
712 86.20 86.30 EP (RHS)
713 86.30 86.40 EP (RHS)
714 86.40 86.50 EP (RHS)
715 86.50 86.60 EP (RHS)
716 86.60 86.70 EP (RHS)
717 86.70 86.80 EP (RHS)
718 86.80 86.90 EP (RHS)
719 86.90 87.00 EP (RHS)
720 87.00 87.10 EP (RHS)
721 87.10 87.20 EP (RHS)
722 87.20 87.30 EP (b/s)
723 87.30 87.40 EP (b/s)
724 87.40 87.50 EP (b/s)
725 87.50 87.60 EP (b/s)
726 87.60 87.70 EP (b/s)
727 87.70 87.80 EP (b/s)
728 87.80 87.90 EP (b/s)
729 87.90 88.00 EP (b/s)
730 88.00 88.10 EP (b/s)
731 88.10 88.20 EP (b/s)
732 88.20 88.30 EP (b/s)
733 88.30 88.40 EP (b/s)
734 88.40 88.50 EP (b/s)
735 88.50 88.60 EP (b/s)
736 88.60 88.70 EP (b/s)
737 88.70 88.80 EP (LHS)
738 88.80 88.90 EP (LHS)
739 88.90 89.00 EP (LHS)
740 89.00 89.10 EP (b/s)
741 89.10 89.20 EP (b/s)
742 89.20 89.30 EP (b/s) / transformer (RHS)
743 89.30 89.40 EP (LHS)
744 89.40 89.50 EP (LHS)
745 89.50 89.60 EP (LHS)
746 89.60 89.70 EP (LHS)
747 89.70 89.80 EP (LHS)
748 89.80 89.90 EP (b/s) / transformer (RHS)
749 89.90 90.00 EP (b/s)
750 90.00 90.10 EP (b/s)
751 90.10 90.20 EP (b/s)
752 90.20 90.30 EP (b/s)
753 90.30 90.40 EP (b/s)
754 90.70 90.80 EP (RHS) affected
755 90.80 90.90 EP (RHS) affected
756 90.90 91.00 EP (RHS) affected
757 91.00 91.10 EP (RHS) affected
758 91.10 91.20 EP (RHS) affected
759 91.20 91.30 EP (RHS) affected
760 91.30 91.40 EP (RHS) affected
761 91.40 91.50 EP (RHS) affected
762 91.50 91.60 EP (RHS) affected
763 91.60 91.70 EP (RHS) affected
764 91.70 91.80 EP (RHS) affected
765 91.80 91.90 EP (b/s) affected
766 91.90 92.00 EP (b/s) affected
767 92.00 92.10 EP (b/s) affected
768 92.10 92.20 EP (b/s) affected
769 92.20 92.30 EP (b/s) affected
770 92.30 92.40 EP (b/s) affected
771 92.40 92.50 EP (b/s) affected
772 92.50 92.60 EP (b/s) affected
773 92.60 92.70 EP (b/s) affected
774 92.70 92.80 EP (b/s) affected
775 92.80 92.90 EP (b/s) affected
776 92.90 93.00 EP (b/s) affected
777 93.00 93.10 EP (b/s) affected
778 93.10 93.20 EP (b/s) affected
779 93.20 93.30 EP (b/s) / transformer (LHS) affected
780 93.30 93.40 EP (b/s) affected
781 93.40 93.50 EP (b/s) affected
782 93.50 93.60 EP (b/s) affected
783 93.60 93.70 EP (b/s) affected
784 93.70 93.80 EP (b/s) affected
785 93.80 93.90 EP (b/s) affected
786 93.90 94.00 EP (b/s) affected
787 94.00 94.10 EP (b/s) affected
788 94.10 94.20 EP (b/s) affected
789 94.20 94.30 EP (b/s) affected
790 94.30 94.40 EP (b/s) affected
791 94.40 94.50 EP (RHS) affected
792 94.50 94.60 EP (RHS) affected
793 94.60 94.70 EP (RHS) affected
794 94.70 94.80 EP (RHS) affected
795 94.80 94.90 EP (RHS) affected
796 94.90 95.00 EP (RHS) affected
797 95.00 95.10 EP (RHS) affected
798 95.10 95.20 EP (RHS) affected
799 95.20 95.30 EP (RHS) affected
800 95.30 95.40 EP (RHS) affected
801 95.40 95.50 EP (RHS) affected
802 95.50 95.60 EP (RHS) affected
803 95.60 95.70 EP (b/s)
804 95.70 95.80 EP (b/s) / transformer (LHS)
805 95.90 96.00 EP (b/s)
806 96.00 96.10 EP (b/s)
807 96.10 96.20 EP (b/s)
808 96.20 96.30 EP (b/s)
809 96.30 96.40 EP (b/s)
810 96.40 96.50 EP (b/s)
811 96.50 96.60 EP (b/s)
812 96.60 96.70 EP (b/s)
813 96.70 96.80 EP (b/s)
814 96.80 96.90 EP (b/s)
815 96.90 97.00 EP (b/s)
816 97.00 97.10 EP (b/s)
817 97.10 97.20 EP (b/s)
818 97.20 97.30 EP (b/s)
819 97.30 97.40 EP (b/s)
820 97.40 97.50 EP (b/s)
821 97.50 97.60 EP (LHS) / transformer (LHS)
822 97.60 97.70 EP (LHS)
823 97.70 97.80 EP (LHS)
824 97.80 97.90 EP (RHS)
825 97.90 98.00 EP (RHS)
826 98.00 98.10 EP (RHS)
827 98.10 98.20 EP (RHS)
828 98.20 98.30 EP (RHS)
829 98.30 98.40 EP (RHS)
830 98.40 98.50 EP (RHS)
831 98.50 98.60 EP (RHS)
832 98.60 98.70 EP (b/s)
833 98.70 98.80 EP (b/s)
834 98.80 98.90 EP (b/s)
835 98.90 99.00 EP (b/s)
836 99.00 99.10 EP (b/s)
837 99.10 99.20 EP (b/s)
838 99.20 99.30 EP (b/s)
839 99.30 99.40 EP (b/s)
840 99.40 99.50 EP (b/s)
841 99.50 99.60 EP (b/s)
842 99.60 99.70 EP (b/s) / transformer (RHS)
843 99.70 99.80 EP (b/s)
844 99.80 99.90 EP (b/s)
845 99.90 100.00 EP (b/s) / transformer (LHS)
846 100.00 100.10 EP (b/s)
847 100.10 100.20 EP (b/s)
848 100.20 100.30 EP (b/s)
849 100.30 100.40 EP (b/s)
850 100.40 100.50 EP (b/s)
851 100.50 100.60 EP (b/s)
852 100.60 100.70 EP (b/s)
853 100.70 100.80 EP (b/s)
854 100.80 100.90 EP (b/s)
855 100.90 101.00 EP (b/s)
856 101.00 101.10 EP (b/s)
857 101.10 101.20 EP (b/s)
858 101.20 101.30 EP (b/s)
859 101.30 101.40 EP (b/s)
860 101.40 101.50 EP (b/s)
861 101.50 101.60 EP (b/s)
862 101.60 101.70 EP (b/s)
863 101.70 101.80 EP (b/s)
864 101.80 101.90 EP (b/s)
865 101.90 102.00 EP (b/s)
866 102.00 102.10 EP (b/s)
867 102.10 102.20 EP (b/s)
868 102.20 102.30 EP (b/s)
869 102.30 102.40 EP (b/s)
870 102.40 102.50 EP (b/s)
871 102.50 102.60 EP (b/s)
872 102.60 102.70 EP (b/s)
873 102.70 102.80 EP (b/s)
874 102.80 102.90 EP (b/s)
875 102.90 103.00 EP (b/s)
876 103.00 103.10 EP (b/s)
877 103.10 103.20 EP (b/s)
878 103.20 103.30 EP (b/s)
879 103.30 103.40 EP (b/s)
880 103.40 103.50 EP (b/s)
881 103.50 103.60 EP (b/s)
882 103.60 103.70 EP (b/s)
883 103.70 103.80 EP (b/s)
884 103.80 103.90 EP (b/s)
885 103.90 104.00 EP (b/s)
886 104.00 104.10 EP (b/s)
887 104.10 104.20 EP (b/s)
888 104.20 104.30 EP (b/s)
889 104.30 104.40 EP (b/s)
890 104.40 104.50 EP (b/s)
891 104.50 104.60 EP (RHS)
892 104.60 104.70 EP (RHS)
893 104.70 104.80 EP (RHS)
894 104.80 104.90 EP (RHS)
895 104.90 105.00 EP (RHS)
896 105.00 105.10 EP (RHS)
897 105.10 105.20 EP (RHS)
898 105.20 105.30 EP (RHS)
899 105.30 105.40 EP (RHS)
900 105.40 105.50 EP (b/s)
901 105.50 105.60 EP (b/s)
902 105.60 105.70 EP (RHS)
903 105.70 105.80 EP (RHS)
904 105.80 105.90 EP (RHS) / transformer (RHS)
905 105.90 106.00 EP (b/s)
906 106.00 106.10 EP (b/s)
907 106.10 106.20 EP (b/s)
908 106.20 106.30 EP (b/s)
909 106.30 106.40 EP (RHS)
910 106.40 106.50 EP (RHS)
911 106.50 106.60 EP (RHS)
912 106.60 106.70 EP (RHS)
913 106.70 106.80 EP (RHS)
914 106.80 106.90 EP (RHS)
915 106.90 107.00 EP (RHS)
916 107.00 107.10 EP (RHS)
917 107.10 107.20 EP (RHS)
918 107.20 107.30 EP (RHS)
919 107.30 107.40 EP (RHS)
920 107.80 107.90 EP (LHS)
921 107.90 108.00 EP (LHS)
922 108.00 108.10 EP (b/s)
923 108.10 108.20 EP (b/s)
924 108.20 108.30 EP (RHS)
925 108.30 108.40 EP (RHS)
926 108.40 108.50 EP (RHS)
927 108.50 108.60 EP (RHS)
928 108.60 108.70 EP (RHS)
929 108.70 108.80 EP (RHS)
930 108.80 108.90 EP (RHS)
931 108.90 109.00 EP (RHS)
932 109.00 109.10 EP (RHS)
933 109.10 109.20 EP (RHS) / transformer (LHS)
934 109.20 109.30 EP (RHS)
935 109.30 109.40 EP (RHS)
936 109.40 109.50 EP (RHS)
937 109.50 109.60 EP (RHS)
938 109.60 109.70 EP (RHS)
939 109.70 109.80 EP (RHS)
940 109.80 109.90 EP (LHS) / transformer (LHS)
941 109.90 110.00 EP (LHS)
942 110.00 110.10 EP (LHS)
943 110.10 110.20 EP (LHS)
944 110.20 110.30 EP (LHS)
945 110.30 110.40 EP (LHS)
946 110.40 110.50 EP (LHS)
947 110.50 110.60 EP (LHS)
948 110.60 110.70 EP (LHS)
949 110.70 110.80 EP (LHS)
950 110.80 110.90 EP (b/s) / transformer (LHS)
951 110.90 111.00 EP (b/s)
952 111.00 111.10 EP (b/s)
953 111.10 111.20 EP (b/s)
954 111.20 111.30 EP (b/s)
955 111.30 111.40 EP (b/s)
956 111.40 111.50 EP (b/s)
957 111.50 111.60 EP (b/s)
958 111.60 111.70 EP (b/s)
959 111.70 111.80 EP (b/s)
960 111.80 111.90 EP (LHS)
961 111.90 112.00 EP (LHS)
962 112.00 112.10 EP (LHS)
963 112.10 112.20 EP (LHS)
964 112.20 112.30 EP (LHS)
965 112.30 112.40 EP (LHS)
966 112.40 112.50 EP (LHS)
967 112.50 112.60 EP (LHS)
968 112.60 112.70 EP (LHS)
969 112.70 112.80 EP (RHS)
970 112.80 112.90 EP (RHS)
971 112.90 113.00 EP (RHS)
972 113.00 113.10 EP (RHS)
973 113.10 113.20 EP (RHS) / HT crossing
974 113.20 113.30 EP (RHS)
975 113.30 113.40 EP (RHS)
976 113.40 113.50 EP (RHS)
977 113.50 113.60 EP (RHS)
978 113.60 113.70 EP (RHS)
979 113.70 113.80 EP (RHS)
980 113.80 113.90 EP (RHS)
981 113.90 114.00 EP (RHS)
982 114.00 114.10 EP (RHS)
983 114.10 114.20 EP (RHS)
984 114.20 114.30 EP (RHS)
985 114.30 114.40 EP (RHS)
986 114.40 114.50 EP (RHS)
987 114.50 114.60 EP (RHS)
988 114.60 114.70 EP (RHS)
989 114.70 114.80 EP (RHS)
990 114.80 114.90 EP (b/s)
991 114.90 115.00 EP (LHS)
992 115.00 115.10 EP (LHS)
993 115.10 115.20 EP (LHS)
994 115.20 115.30 EP (LHS)
995 115.30 115.40 EP (LHS)
996 115.40 115.50 EP (LHS) / 3 nos transformer (RHS)
997 115.50 115.60 EP (LHS)
998 115.60 115.70 EP (LHS)
999 115.70 115.80 EP (LHS) / transformer (RHS)
1000 115.80 115.90 EP (LHS)
1001 115.90 116.00 EP (b/s)
1002 116.00 116.10 EP (b/s)
1003 116.10 116.20 EP (b/s)
1004 116.20 116.30 EP (b/s)
1005 116.30 116.40 EP (b/s)
1006 116.40 116.50 EP (b/s)
1007 116.50 116.60 EP (b/s)
1008 116.60 116.70 EP (b/s)
1009 116.70 116.80 EP (b/s)
1010 116.80 116.90 EP (b/s)
1011 116.90 117.00 EP (b/s)
1012 117.00 117.10 EP (b/s)
1013 117.10 117.20 EP (b/s)
1014 117.20 117.30 EP (b/s)
1015 117.30 117.40 EP (b/s)
1016 117.40 117.50 EP (b/s)
1017 117.50 117.60 EP (b/s)
1018 117.60 117.70 EP (RHS)
1019 117.70 117.80 EP (RHS)
1020 117.80 117.90 EP (RHS)
1021 117.90 118.00 EP (RHS)
1022 118.00 118.10 EP (RHS)
1023 118.10 118.20 EP (RHS)
1024 118.20 118.30 EP (RHS)
1025 118.30 118.40 EP (RHS)
1026 118.40 118.50 EP (b/s)
1027 118.50 118.60 EP (b/s)
1028 118.60 118.70 transformer (LHS)
1029 119.20 119.30 EP (b/s)
1030 119.30 119.40 EP (b/s)
1031 119.40 119.50 EP (b/s)
1032 119.50 119.60 EP (b/s)
1033 119.80 119.90 EP (RHS)
1034 119.90 120.00 EP (RHS)
1035 120.00 120.10 EP (RHS)
1036 120.10 120.20 EP (RHS)
1037 120.20 120.30 EP (RHS)
1038 120.30 120.40 EP (RHS)
1039 120.40 120.50 EP (RHS)
1040 120.50 120.60 EP (RHS)
1041 120.60 120.70 EP (RHS)
1042 120.70 120.80 EP (RHS)
1043 120.80 120.90 EP (RHS)
1044 120.90 121.00 EP (RHS)
1045 121.00 121.10 EP (RHS)
1046 121.10 121.20 EP (RHS)
1047 121.20 121.30 EP (RHS) / EP crossing
1048 121.30 121.40 EP (RHS)
1049 121.40 121.50 EP (RHS)
1050 121.50 121.60 EP (LHS)
1051 121.60 121.70 EP (LHS)
1052 121.70 121.80 EP (LHS)
1053 121.80 121.90 EP (LHS)
1054 121.90 122.00 EP (LHS)
1055 122.00 122.10 EP (LHS)
1056 122.10 122.20 EP (LHS)
1057 122.20 122.30 EP (LHS)
1058 122.30 122.40 EP (LHS)
1059 122.40 122.50 EP (b/s)
1060 122.50 122.60 EP (b/s)
1061 122.60 122.70 EP (LHS)
1062 122.70 122.80 EP (LHS)
1063 122.80 122.90 EP (b/s)
1064 122.90 123.00 EP (b/s)
1065 123.00 123.10 EP (RHS) / transformer(RHS)
1066 123.10 123.20 EP (RHS)
1067 123.20 123.30 EP (RHS)
1068 123.50 123.60 transformer(RHS)
1069 124.20 124.30 HT&EP crossing
1070 124.50 124.60 HT crossing
1071 124.80 124.90 EP (RHS) / EP crossing
1072 124.90 125.00 EP (RHS)
1073 125.00 125.10 EP (RHS) /EP crossing
1074 125.20 125.30 EP (b/s)
1075 125.30 125.40 EP (b/s)
1076 125.50 125.60 EP crossing
1077 125.70 125.80 EP (LHS) / EP crossing
1078 125.80 125.90 EP (LHS)
1079 125.90 126.00 EP (LHS)
1080 126.00 126.10 EP (LHS)
1081 126.10 126.20 EP (LHS)
1082 126.20 126.30 EP (LHS)
1083 126.30 126.40 EP (LHS) / EP crossing
1084 126.40 126.50 EP (LHS)
1085 126.50 126.60 EP (LHS)
1086 126.60 126.70 EP (LHS)
1087 126.70 126.80 EP (LHS)
1088 126.80 126.90 EP crossing / transformer
1089 126.90 127.00 EP (RHS)
1090 127.00 127.10 EP (RHS)
1091 127.10 127.20 EP (RHS)
1092 127.20 127.30 EP (RHS)
1093 127.30 127.40 EP crossing / network tower
1094 127.40 127.50 EP crossing
1095 127.50 127.60 EP (LHS) / EP crossing
1096 127.60 127.70 EP (LHS) / EP crossing
1097 127.70 127.80 EP (LHS)
1098 128.20 128.30 EP (b/s)
1099 128.30 128.40 EP (b/s)
1100 128.40 128.50 EP (b/s)
1101 128.50 128.60 EP (b/s)
1102 128.60 128.70 EP (b/s)
1103 128.70 128.80 EP (b/s)
1104 128.80 128.90 EP (b/s)
1105 128.90 129.00 EP (b/s)
1106 129.00 129.10 EP (b/s)
1107 129.10 129.20 EP (b/s)
1108 129.20 129.30 EP (b/s)
1109 129.30 129.40 EP (b/s)
1110 129.40 129.50 EP (b/s)
1111 129.50 129.60 EP (b/s) / EP crossing / transformer
1112 129.60 129.70 EP (b/s) / EP crossing
1113 129.70 129.80 EP (b/s)
1114 129.80 129.90 EP (b/s)
1115 129.90 130.00 EP (b/s)
1116 130.00 130.10 EP (RHS)
1117 130.10 130.20 EP (RHS)
1118 130.20 130.30 EP (RHS)
1119 130.30 130.40 EP (RHS) / EP crossing
1120 130.40 130.50 EP (RHS)
1121 130.50 130.60 EP (RHS)
1122 130.60 130.70 EP (RHS)
1123 130.70 130.80 EP (RHS)
1124 130.80 130.90 EP crossing
1125 131.00 131.10 EP (RHS)
1126 131.10 131.20 EP (RHS) / EP crossing
1127 131.20 131.30 EP (RHS) /transformer / EP crossing
1128 131.30 131.40 EP (b/s)
1129 131.40 131.50 EP (b/s)
1130 131.50 131.60 EP (b/s)
1131 131.60 131.70 HT&EP crossing
1132 131.70 131.80 EP crossing
1133 131.80 131.90 HT crossing (3nos)
1134 132.20 132.30 HT&EP crossing
1135 132.80 132.90 HT crossing
1136 133.20 133.30 EP (b/s)
1137 133.30 133.40 EP crossing
1138 133.50 133.60 EP (LHS)
1139 133.60 133.70 EP (LHS)
1140 133.70 133.80 EP (LHS)
1141 134.60 134.70 EP (LHS) / EP crossing
1142 134.70 134.80 EP (LHS)
1143 134.80 134.90 EP (LHS)
1144 134.90 135.00 EP (LHS)
1145 135.00 135.10 EP crossing / transformer(RHS)
1146 135.30 135.40 EP crossing
1147 135.70 135.80 EP (LHS)
1148 135.80 135.90 EP (LHS)
1149 136.40 136.50 EP (RHS) / EP crossing / transformer(RHS)
Item Assumptions
1. Provision of Sewage and
sanitation facilities for the
construction camps, including
maintenance for 3 years in two
location
75,000/- in each location camp site
per year
2. Provision of Water Supply
Facilities for the construction
camp
80,000/- in each location per year
3. Compensatory avenue
plantation of thrice the number
of trees to be cut and their
fencing and maintenance for
three years
2,00,000/-
4. Shrub plantation in the 4.5 m
median for the entire corridor (q)
1000 saplings (double row) and
their fencing and maintenance
for 3 years
75,000/-
5. Environmental Monitoring
5.1.Air Quality Monitoring at
sensitive locations at an average
distance of 15 Km.
10 locations @ 5000/- per year in
each season
5.2. Water Quality Monitoring
at major water bodies at an
average distance of 25 Km.
1.Siragia Nala at 10+946 km
2.Kattonal River at 21+760 km
3.Gobbur River at 27+405 km
4.Awaraja River at 39+880 km
5. Garganji Nala at 44+000 km
6. Bori River at 101+250 km
7. Chappala wadi River at
114+260 km
A. Total Cost During Construction Phase
At 7 Rivers one place for 3 years at
pre and post monsoon
5.3. Noise Monitoring at
sensitive locations at an average
distance of 15 Km.
10 locations @ 5000/- for 3 years
per season
5.4.Soil Quality Monitoring at
sensitive locations at an average
distance of 25 Km.
5 locations for 3 years
5 Mobilization Charges 25,000/- per year
6. Dust Suppression at Site for
3 years50,000/- per year per district
7. Severances & Others
(including training, workshops,
awareness campaigning etc.)
50,000/- per year per time
Total cost during construction
phaseB. Annual Cost During
Operational Phase during
First Three Years
1. Environmental Monitoring
1.1. Air Pollution Monitoring at
sensitive
locations at an average distance
of 15 Km
1.2. Noise Monitoring at
sensitive locations at an average
distance of 15 Km
1.3. Mobilization Charges
Total annual cost during
operational phase during first
three years
C. Annual Cost During
Operational Phase from 4th
Year Onwards
1. Maintenance of Avenue
Plantation
Total annual cost during
operational phase from 4th
year onwards
Cost in Rs.
450000
480000
2,00,000/-
75,000/-
450000
A. Total Cost During Construction Phase
420000
450000
180000
75000
300000
1500000
4,305,000
50,000/-
10,000/-
1,10,000
50,000/-
50,000/-
50,000/-